Records from 2003 to 2026. Most recent: inspection, 6 March 2026.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 4 March 2025
Resolved
"A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural examination at least once every two years." Vessel exceeded 5 year dry dock requirement. Prior to carriage of passengers, vessel must be given credited drydock prior to carriage of passengers.
46 CFR 115.600(c)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2025
Resolution: Rcvd credit DDX/ISE on 04APR2025
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 February 2025
Resolved
Provision shall be made by means of plugs, covers, etc., to prevent the admission of air into the space protected. Engine Room ventilation closure located on STBD side unable to completely close.
46 CFR 181.25-1 (OLD T)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2025
Resolution: Tested ventilation closure
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 February 2025
Resolved
The bilge suctions shall be fitted with suitable strainers having an open area not less than three times the area of the bilge pipe. 02 bilge suction strainers located in Pump Room void are wasted and ineffective for designed purpose.
46 CFR 182.25-5(b) (OLD T)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2025
Resolution: Examined newly installed bilge strainer
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 February 2025
Resolved
At each initial and subsequent inspection for certification the marine inspector shall examine and test the following items to the extent necessary to determine that they are in proper operating condition, safe electrical condition, and fit for the service for which they are intended: (5) Batteries shall be checked for condition and security of stowage. 03 batteries in Engine Room contain excessive liquid in each battery storage container.
46 CFR 176.25-15(a)(5) (OLD T)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2025
Resolved 11 April 2025
Resolution: Containers inspected without fluid
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 18 February 2025
Resolved
Remote fuel shutoff stations shall be marked in at least 1-inch letters indicating purpose of the valve and direction of operation. Remote fuel shutoff markings are missing.
46 CFR 185.30-20 (OLD T)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 18 February 2025
Resolution: Markings added
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 February 2025
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall inspect all lifesaving equipment to determine its serviceability. Grab line on a lifebuoy was severed.
46 CFR 176.25-22(a) (OLD T)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2025
Resolved 4 April 2025
Resolution: Grab line examined
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 May 2023
Resolved
A grease extraction hood must be equipped with a dry or wet chemical fire extinguishing system meeting the
applicable sections of NFPA 17 ‘‘Dry Chemical Extinguishing Systems,’’ 17A ‘‘Wet Chemical Extinguishing Systems,’’ or other standard specified by
the Commandant, and must be listed by an independent laboratory recognized by the Commandant.
Two fusible links were not replaced at last annual inspection as required by NFPA.
46 CFR 118.425(b), 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 June 2023
Resolved 11 July 2023
Resolution: Verified replacement of fusible links.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 May 2023
Resolved
Complete but simple instructions for the operation of a fixed gas fire extinguishing system must be located in
a conspicuous place at or near each pull box and stop valve control and in the space where the extinguishing
agent cylinders are stored. If the storage cylinders are separate from the protected space, the instructions must
also include a schematic diagram of the system and instructions detailing alternate methods of releasing the extinguishing agent should the local manual release or stop valve controls fail to operate. Each control valve to a distribution line must be marked to indicate the space served.
Vessel lacked CO2 instructions, schematic, and labels.
46 CFR 122.612(a), 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 June 2023
Resolved 11 July 2023
Resolution: Verified instructions posted.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 May 2023
Resolved
At all inspections special attention shall be paid to insure that no fire hazards exist.
Grease accumulation in galley space posed significant fire risk. Cleaned in person to the satisfaction of attending MIs.
46 CFR 176.25-10(b), 10c
Action required: 10 - Deficiency Rectified
Resolved 26 May 2023
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 May 2023
Resolved
At each initial and subsequent inspection for certification, reinspection and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected.
Vessel's fire panel was showing system trouble alarms and did not alarm when fire detection was activated. Conduct repairs in accordance with manufacturer instructions/standards and perform satisfactory tests in the presence of a qualified MI prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2023
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 April 2021
Resolved
A door in a bulkhead required to be A-0 must be capable of meeting the requirements of an A-0 class bulkhead.
Door going into C02 space is deformed and does not properly seal space.
46CFR116.435(c)(2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 April 2021
Resolved
Multiple self closing doors throughout vessel do not fully seat when closed.
46CFR116.435(c)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 April 2021
Resolved
Electrical equipment on a vessel must be maintained to protect passengers and crew from shock.
Electrical front panel falling off, main deck, forward area, stbd outside walkway, in overhead area.
46CFR120.200(B)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 April 2021
Resolved
Open light switch main deck, stbd side, near bar.
46CFR120.200(B)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 April 2021
Resolved
All electrical equipment must be marked and identified
Switchboard in galley requires CB markings for identification.
46CFR120.220(d)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 29 April 2021
Resolved
Child and adult life jacket must be marked and separated from one another.
3rd deck and 4th deck adult/child life jackets were not
Stowed seperately.
46CFR117.78(a)(5)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 April 2021
Resolved
Each life ring must be approved in accordance 160.050 sub-chapter Q.
Grab line on all three of the port life ring bouys require replacement.
46CFR117.70(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 29 April 2021
Resolved
Portable fire extinguishers need to be maintained in accordance with Chapter 4 NFPA.
Monthly inspections require documentation for portable extinguishers.
46CFR115.810(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 April 2021
Resolved
Bilge test required in all spaces.
46CFR115.804(h)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2021
Resolved 16 June 2021
Resolution: AJMI attended vessel and verified rectification.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 30 January 2020
Resolved
Upper deck lifejacket stowage box needs to be mounted to prevent it from flipping over when opening.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2020
Resolved 13 February 2020
Resolution: Complete
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 January 2020
Resolved
Fix all bulbs on the ambiance lighting on main deck and do not use while underway as it interfers with navigational lighting.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2020
Resolved 13 February 2020
Resolution: Complete
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 January 2020
Resolved
Clean all lifejackets and ensure proper labeling with vessel's name.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2020
Resolved 13 February 2020
Resolution: Complete
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 30 January 2020
Resolved
Label pull station for galley range FF system.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 January 2020
Resolution: Complete
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 January 2020
Resolved
Identify and correct the 1 amp ground in the 480 system.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 January 2020
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 30 January 2020
Resolved
Electrical controls for MDE have two error codes ER 27 & ER 65, must figure out what this means and clear codes by manufacture recommendations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2020
Resolved 13 February 2020
Resolution: Tech serviced controls and cleaned control heads. Errors were caused by corroded terminals at control head.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 30 October 2019
Resolved
For semiportable and fixed gas fire extinguishing systems, the owner or managing operator shall provide satisfactory evidence of the required servicing to the marine inspector. Servicing tags for galley fixed gas indicated 6 month servicing was required. Update servicing document to reflect service tag discrepancy.
46CFR115.810(b)(2)
Action required: 705 - Other - as specified
Resolved 31 October 2019
Resolution: Received satisfactory tech report attesting to servicing of fixed fire extinguishing in galley.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 October 2019
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards. Cable in steering gear room was covered in electrical tape.
46CFR120.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 November 2019
Resolution: Received satisfactory picture attesting to repair.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 October 2019
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards. Electrical panel on main deck starboard quarter next to bar was misaligned leaving a gap between the breakers and the protective covering.
46CFR120.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 November 2019
Resolution: Received satisfactory picture attesting to repair.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 30 October 2019
Resolved
Hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Stair on lowest level weather deck on stern of vessel was corroded and missing a weld.
46CFR115.830(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 November 2019
Resolution: Received satisfactory picture attesting to repair.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 30 October 2019
Resolved
Repairs or alterations to equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] drain line in the steering gear room was repaired with a soft patch.
46CFR115.700(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 November 2019
Resolution: Received satisfactory picture attesting to repair.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 30 October 2019
Resolved
All pages of the stability letter must be visible from the operating station. Stability letter was not posted at the operating station.
46CFR115.306
Action required: 10 - Deficiency Rectified
Resolved 30 October 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 October 2019
Resolved
Each individual bilge suction shall be fitted with a suitable bilge strainer. Bilge suction in bow thruster space did not have a strainer.
46CFR56.50-50(g)
Action required: 10 - Deficiency Rectified
Resolved 30 October 2019
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 30 October 2019
Resolved
The owner or managing operator shall have the vessel ready for inspection of its smoke and fire detecting systems. Fire detector in steering gear room was missing.
46CFR115.810(a)(7)
Action required: 10 - Deficiency Rectified
Resolved 30 October 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 October 2019
Resolved
A-Class decks must be insulated with approved structural insulation. Overhead in steering gear room was missing parts of fire insulation.
46CFR116.415(a)(i)
Action required: 10 - Deficiency Rectified
Resolved 30 October 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 30 October 2019
Resolved
The following records must be kept: annual audit of the Vessel Security Plan. The security assessment was not kept in the security binder.
33CFR104.235(a)(8)
Action required: 10 - Deficiency Rectified
Resolved 30 October 2019
05 - Radio Communications › N/A - No Subsystem › SART/AIS-SART
Issued 13 July 2019
Resolved
AIS not transmitting/power failure
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 July 2019
Resolution: Fixed corrosion issue
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 February 2019
Resolved
07106 - VESSELS SHALL HAVE FIXED FIRE DETECTION SHYSTEMS FOR THE SPACES LISTED IN (c)(1)-(c)(3) OF THIS PART. THE VESSELS FIXED FIRE DETECTION SYSTEM IS MALFUNCTIONING, SHOWING FAULTS FOR ALL ZONES. REPAIR SYSTEM TO ORIGINAL FUNCTIONALITY. 46CFR118.400(c) 701C
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2019
Resolution: MI witnessed operation of fire/smoke detection system during a follow-up visit.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 February 2019
Resolved
07109 - VESSELS WITH FIXED GAS EXTINGUISHING SYSTEMS SHALL HAVE A DEVICE THAT AUTOMATICALLY SHUTS DOWN POWER VENTILATION AND ENGINES THAT DRAW INTAKE FROM THE PROTECTED SPACE. THE AUTOMATIC SHUTDOWN DID NOT SHUT DOWN THE EMERGENCY GENERATOR OF BOW THRUSTER ENGINE. DETERMINE A COURSE OF ACTION FOR REPAIRS AND SUBMIT IT TO MI. 46CFR118.410(b)(10) 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 May 2019
Resolution: Attended vessel, witnessed satisfactory shut down.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 June 2018
Resolved
Vessel must install strainers on bilge piping system in tank space and steering space. 46 CFR 119.510 / 46 CFR 56.50-50.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2018
Resolved 24 July 2018
Resolution: Strainers have been installed on bilge piping.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 29 June 2018
Resolved
Vessel must repair two holes in the ventiliation duck located in the steering space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2018
Resolved 29 June 2018
Resolution: Vessel repaired holes in ventiliation duct. Pictures provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 June 2018
Resolved
Upon testing bilge system, the bilge pump was unable to properly dewater any of the compartments. Vessel is to prove proper operation of bilge system to CG Marine Inspector.
46 CFR 119.500(a).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2018
Resolution: Vessel proved proper operation of bilge system.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 June 2018
Resolved
Electrical equipment on a vessel must be installed an maintained to protect passengers and crew from electrical hazards. All battery cables were loosly attached to battery terminals. 46 CFR 120.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: Battery cables tightened
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 28 June 2018
Resolved
The design of all exhaust systems must ensure minimum risk of injury to all personnel. No insulation was present on any turbochargers for the main engines. 46 CFR 119.430(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: Lagging added to turbochargers
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 June 2018
Resolved
Electrical equipment in machinery spaces must be dripproof. Wiring for the block heaters on the main engines must be in a junction box. 46 CFR 120.210(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: Wiring replaced with waterproof connections.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 June 2018
Resolved
Machinery equipment and arrangemnts may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Morse mechanical cable for the starboard main engine ZF drive was being held in place by a zip tie. Zip tie must be removed and repaired to manufacture specs. 46 CFR 115.800(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: Zip ties removed, function proved while arranged to manufacturer specs and a metal cable strap was added as additional safey measure.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 June 2018
Resolved
Materials and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. All dead end cables must be removed from the control station. 46 CFR 115.800(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: All dead end cables removed from the control station.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 June 2018
Resolved
Cable and wire for power and lighting circuits must be listed by Underwriters Laboratories as UL Boat or UL Marine cable. ROMEX cable under the operating station muste be removed and replaced. 46 CFR 120.340.(d)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: All ROMEX was replaced with marine grade cable.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 28 June 2018
Resolved
Materials used in piping systems must meet the requirments of this subpart and be otherwise acceptable to the cognizant OCMI. The packing material for the overboard firemain and firemain supply valves must be replaced. 46 CFR 119.700
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: Packing material replaced. Function tested and showed no leaks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 June 2018
Resolved
Machinery equipment and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. The hydarulic system on the bow thruster leaks heavily and must be repaired. 46 CFR 115.800(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: Hydraulic oil cleaned up and no leaks occured when system pressed up.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 June 2018
Resolved
Each battery must be free of exposure to water splash or spray. The batteries on the bridge must be equipped with a cover. 46 CFR 120.350(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 24 July 2018
Resolution: A cover was provided for the batteres at the operating station.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 June 2018
Resolved
Arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. When tasked with pumping out the bilge spaces, the crew was not aware of how to accomplish the task until the master stepped in. The company must provide training for the crew members on operation of essential systems, specifically the bilge pumpimg system. 46 CFR 115.800(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 29 April 2021
Resolution: Crew demonstrated ability to utilize bilge system.
Fire Fighting › Fixed Fire Detection System › Detector/Call Point Grouping
Issued 24 January 2018
Resolved
DK01: Demonstrate proper operation of the fire detection system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: demonstrated.
Documentation › Certificates/Documents › Permit, Other
Issued 24 January 2018
Resolved
DK03: Provide senior deckhand designation letter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Provided
Communications › Public Address System › Loudspeaker
Issued 24 January 2018
Resolved
DK04: Demonstrate proper operation of PA system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Demonstrated
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 24 January 2018
Resolved
DK05: Identify and clear 440v system ground.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 February 2018
Resolution: Complete
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 24 January 2018
Resolved
DK06: Demonstrate operation of 220v system ground detection.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 13 February 2018
Resolution: Complete
Electrical › Lighting (service) › Lighting Fixture
Issued 24 January 2018
Resolved
DK07: Install light guard fixture IWO 220v panel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Complete
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 January 2018
Resolved
DK08: Permanently wire-lighting in liquor locker, air horn compressor, plug above stbd battery bank
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Resolution: Complete
Electrical › Electric Generation Source (service) › Power Requirement
Issued 24 January 2018
Resolved
DK09: Remove charge pro convertor above stbd side battery bank.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Resolution: Complete
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 January 2018
Resolved
DK10: Remove dead end wires in junction box port side aft bulkhead in CO2 void.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Resolution: Complete
Communications › Radio Communications › Satellite Communications Capability
Issued 24 January 2018
Resolved
DK11: Install DSC for radio.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Resolution: Complete
Navigation › Piloting/Steering › Marine Charts
Issued 24 January 2018
Resolved
DK12: Need to provide updated chart.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Resolution: Complete
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 24 January 2018
Resolved
DK14: Contents of first-aid kit not complete.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Complete
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 January 2018
Resolved
DK15: Distribution panel doors in Galley will not close properly.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Resolution: Complete
Fire Fighting › Grease Extraction Hood › General
Issued 24 January 2018
Resolved
DK16: Clean galley hood
Action required: 705 - Other - as specified
Due 24 January 2018
Resolved 24 January 2018
Resolution: Cleaned galley hood.
Lifesaving › Lifebuoys › Stowage
Issued 24 January 2018
Resolved
DK17: Ensure all life rings have retro tape and grab lines.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Complete
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 24 January 2018
Resolved
DK18: Secure portable fire extinguishers throughout vessel with marine grade mounts.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Complete
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 24 January 2018
Resolved
DK19: Aft engine room bulkhead port side must maintain A-0 boundary.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Complete
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 15 November 2016
Resolved
Prove proper operation of the engine shut down CO2 pressure switch
Action required: 705 - Other - as specified
Due 30 November 2016
Resolved 30 November 2016
Resolution: Attended vessel, system is repaired.
Fire Fighting › Grease Extraction Hood › General
Issued 15 November 2016
Resolved
Prove proper operation of the galley hood electric shut off pressure switch for the fixed system.
Due 30 November 2016
Resolved 30 November 2016
Resolution: Attended vessel, witnessed proper operation.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 15 November 2016
Resolved
Stencil the engine room emergency exit on both sides.
Action required: 705 - Other - as specified
Due 30 November 2016
Resolved 30 November 2016
Resolution: complete.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 15 November 2016
Resolved
Develop Periodic safety test procedures.
Action required: 705 - Other - as specified
Resolved 1 December 2017
Resolution: Current policy does not require PSTPs of K vessels
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 15 November 2016
Resolved
label circuit breakers throughout the vessel.
Action required: 705 - Other - as specified
Due 30 November 2016
Resolved 30 November 2016
Resolution: Resolved
Electrical › Lighting (service) › Lighting Fixture
Issued 15 November 2016
Resolved
repair lighting fixture in galley
Action required: 705 - Other - as specified
Due 30 November 2016
Resolved 30 November 2016
Resolution: Resolved
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Piping
Issued 1 September 2016
Resolved
The 2nd deck zone piping has hole, repair and test. The portable fire extinguisher quantity on the 2nd deck will be increased to 3 and an additional deck hand will be added to the vessel to act as a fire watch on the 2nd deck for early intervention.
Condition: Improper/Lack of Maintenance
Due 14 September 2016
Resolved 14 September 2016
Resolution: Attended vessel verified sprinkler system is operational.
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 August 2016
Resolved
STBD Eng shows intermittent fault interrupting operation, vessel has prove proper operation of port eng and bow thruster at this time. Vessel may operate for one 4 HR trip on 27 AUG 16, with tug assist. Vessel must prove proper operation prior to carrying passengers after this trip.
Action required: 705 - Other - as specified
Resolved 1 September 2016
Resolution: Attended vessel to witness proper operation of the STBD engine.