Records from 1982 to 2012. Most recent: inspection, 19 July 2012.
Inspection history · 89
19 July 2012
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4385664
16 September 2011
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4146981
21 February 2010
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3683321
21 February 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3692508
3 February 2010
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3674770
25 January 2010
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3673775
24 January 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3673666
22 January 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3668185
9 January 2009
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3393983
26 September 2008
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3333176
17 June 2008
MTSA Verification · Periodic Inspection · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3205504
5 June 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3227881
29 May 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2944967
15 May 2007
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2931342
24 April 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2915200
9 May 2006
Internal Structural Exam · Annual Inspection · MTSA Verification · Hull Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2643646
31 March 2006
Drydock Extension
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2612870
6 July 2005
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2417567
10 January 2005
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2271783
8 January 2005
Damage Survey · Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2272583
25 October 2004
MTSA Verification · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2224683
10 September 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2192435
23 March 2004
Deficiency Check · Administrative Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2029770
30 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1999721
21 October 2003
Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1933081
28 May 2003
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1798955
1 May 2003
Permit to Proceed
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1784511
20 February 2003
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1747203
14 February 2003
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1746974
31 January 2003
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1736418
9 August 2002
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1713120
31 March 2002
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1619627
4 October 2001
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1387212
21 July 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1070773
19 April 2001
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1469677
25 July 2000
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1464961
9 October 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 164746
31 August 1999
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1119481
30 July 1999
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1386567
25 June 1999
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1457672
31 March 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 229669
10 June 1998
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1126494
2 January 1998
Examination of Repairs · Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 788089
23 December 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 106157
23 December 1997
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 781984
19 December 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1456549
17 December 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 117568
12 June 1997
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 774892
18 November 1996
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1463994
26 September 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 229689
14 June 1996
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1388058
12 March 1996
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1355695
23 February 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 88354
30 October 1995
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1187024
18 July 1995
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1186448
12 February 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 136016
18 November 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 868664
25 August 1994
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1177336
28 June 1994
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1434135
1 March 1994
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 682486
25 February 1994
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 32787
27 October 1993
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1142889
22 April 1993
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 682487
16 April 1993
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 8080
24 February 1993
Examination of Repairs · Damage Survey
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1376932
21 February 1993
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1362703
20 February 1993
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 135613
28 December 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 144621
25 September 1992
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 943421
20 May 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 15441
24 April 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 682485
22 April 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 108389
9 April 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 682484
16 March 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 22608
29 February 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 80341
26 February 1992
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1265050
16 February 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 18221
13 February 1992
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1262305
10 December 1991
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 943144
11 October 1991
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 935303
28 September 1990
Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 927490
31 October 1989
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1223701
25 May 1989
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1198065
4 November 1988
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1339784
23 September 1987
Re-Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1012629
12 November 1986
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1023349
7 November 1985
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 996038
23 November 1984
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1284725
9 May 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968653
Engineering › Shafting/Propeller Arrangements › Coupling
Issued 21 February 2010
Resolved
Vessels port engine shaft seperated from reduction gear at coupling. Vessel is to provide rpair and transit plan to local OCMI prior to moving vessel.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 24 March 2010
Resolution: shaft was bent 60 thousandths. repaired shafted
Engineering › Bilge Water Management System › Piping
Issued 21 February 2010
Resolved
found about 3 foot of piping with pin holes.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 March 2010
Resolution: croped and renewed 3 foot section of piping
Engineering › Diesel Engine (auxiliary) › Block
Issued 21 February 2010
Resolved
temp gauge mount was leaking coolant
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 March 2010
Resolution: replaced fitting
Stability › Watertight Integrity › General
Issued 21 February 2010
Resolved
watertight door aft engine room hing was broken and a couple of dogs needing adjustment
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2010
Resolution: installed new bushing in hinge and adjusted all dogs
Engineering › Diesel Engine (propulsion-reduction gear) › Air-flex Clutch
Issued 25 January 2010
Resolved
Complete repairs to and prove proper operation of the port propulsion system gear clutch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2010
Resolution: Witnessed a satisfactory test of the vessel''s propulsion system.
Documentation › Manuals/Policy Documentation › Vessel Action Plan (SIP)
Issued 11 July 2005
Resolved
Recommend adding the Bowthruster to the Vessel Action Plan as an ICR item under Auxiliary Machinery.
Due 11 August 2005
Resolved 9 June 2006
Documentation › Manuals/Policy Documentation › Vessel Action Plan (SIP)
Issued 11 July 2005
Resolved
Ensure SIP deficiency reports are submitted to SIP representative as listed in VAP.
Due 11 August 2005
Resolved 9 June 2006
Documentation › Manuals/Policy Documentation › Vessel Action Plan (SIP)
Issued 11 July 2005
Resolved
Several deficiency reports (110 volt outlets, dogs on engine room door), are well past 30 day corrective criteria. Any exceeding 30 days must be handled in accordance with VAP, section VII (B)
Due 11 August 2005
Resolved 9 June 2006
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 11 July 2005
Resolved
Provide proof of Coast guard approved Aotomation Procedures.
Due 11 August 2005
Resolved 9 June 2006
Construction/Loadline › Hull › Hull Plating
Issued 8 January 2005
Resolved
Repair holes discovered IWO the stern compartment. Complete dye-pen check of the weld.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 January 2005
Resolved 9 January 2005
Resolution: Completed examination of the repair check. 2 X 4'' X 4'' X 1/2" plate IWO the hull directly over the screws, all sat.
Construction/Loadline › Hull › Bottom Plating
Issued 7 January 2005
Resolved
An approximately 6 inch long fracture found in the vessel's bottom plating immediately aft of the #6 Starboard Ballast Tank aft bulkhead in the Steering Gear Compartment.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 8 January 2005
Resolution: ABS, vessel''s class society, conducted a class survey report and recommended that vessel proceed directly to Houston for repairs. Vesssel went to Brady''s Island to conduct repairs. Vessel must be inspected to the satisfaction of the local OCMI.
Documentation › Safety/Response Plans/Programs
Issued 23 March 2004
Resolved
Provide updated fire control plan to Galveston OCMI for approval no later than 23 Apr 2004. LEGACY COMPONENT DESC: Fire Control Plans
Due 23 April 2004
Resolved 28 April 2004
Construction/Loadline
Issued 23 December 1997
Resolved
MAKE PERMENT REPAIRS TO DAMAGE IN HULL PLATEING IN THE AREA OF THE # 6 PORTBALLAST TANK TO THE APPROVAL OF A CG MARINE INSPECTOR.
Condition: Unknown
Due 23 December 1997
Resolved 23 December 1997
Electrical
Issued 27 October 1993
Resolved
INSTALL COVERSTO FLORESCENT LIGHTS IN COOKS ROOM, 6 MAN BERTHING, AND UPPERDECK HEAD.
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Lifesaving
Issued 27 October 1993
Resolved
RELOCATE #1 AND #2 LIFERAFTS TO FACILITATE FLOAT FREE WITHOUT OVERHANG OBSTRUCTION.
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Deck/Cargo
Issued 27 October 1993
Resolved
MAKE PERMANENT REPAIRS TO PORT ANCHOR (FREE-UP)
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Fire Fighting
Issued 27 October 1993
Resolved
MAKE PERMANENT REPAIRS TO BOW THRUSTER/ FIRE MONITOR PUMP FOUNDATION.
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Construction/Loadline
Issued 21 February 1993
Resolved
Sound and properly log all ballast tanks and void spaces every two hours.
Condition: Unknown
Due 21 February 1993
Resolved 21 February 1993
Engineering
Issued 21 February 1993
Resolved
Prior to vessel movement remove all fuel from # 1 stbd wing fuel tank._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Unknown
Issued 21 February 1993
Resolved
Provide escort vessel (suitable size) to escort M/V Lafayette to Seward, AKin event of power or steering failure._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 February 1993
Resolved 22 February 1993
Construction/Loadline
Issued 21 February 1993
Resolved
Make permanent repairs to bottom damage and internal damage in way of #2 and #3 STBD Ballast tank and conduct complete bottom survey of vessel.
Condition: Unknown
Due 21 February 1993
Resolved 21 February 1993
Electrical
Issued 31 October 1989
Resolved
INSTALL TACOMETERS FOR BOTH S/S GENERAATORS.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Engineering
Issued 31 October 1989
Resolved
TENEWW OIL SOAKED EXHAUST LAGGING ON BOTH S/S GENS. REMOVE ASBESTOS BLANKETS TYPE WHICH REPLACED OIL SOAKED LAGGING.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
SUPPORT S/S GENS PNEUMATIC LINES TO STARTERS AND PROVIDE CG ACCEPTABLE PNEUMATIC FLEX LINES, FWD UNIT
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Construction/Loadline
Issued 31 October 1989
Resolved
VEE AND WELD 2 LEAKS IN TUNNEL FORPEAK BULD HEAD ABOVE BOW THRUSTER PNEUMATIC CONTROLS - IF EXCESSIVE WASTAGE OVER 25% - RENEW TO A CG ACCEPTABLE STANDARDS - ADVISE FFOR INSPECTION PRIOR TO COMPLETION. NO WASTEWAGE - SURFACE RUST ONLY.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Navigation
Issued 31 October 1989
Resolved
SUBMIT STEERING GEAR HYDRAULIC FLUID FOR ANALYSIS AND SUPPLY COPY TO USCG SINGAPORE, IF NECESSARY FLUSH AND RENEW FLUID. ]
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Navigation
Issued 31 October 1989
Resolved
ELEC. WIRING FOR OPERATION OF AND CONTROL OF STEERING SYSTEM IN LAZERETTE (RUDDER QUADRANT, RAMS COMPT) WILL BE REMOVED FROM THE BILGES AND RUN IN THE OVERHEAD.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Navigation
Issued 31 October 1989
Resolved
STEERING CONTROL BOXES IN LAZERETTE WILL BE WATER TIGHT.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Accommodation/Occupational Safety
Issued 31 October 1989
Resolved
REPAIR/RENEW COVER FOR A/C COND.COOOL.PUMP CONTROL SWITCH.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
LITE FIXTURE - IN TUNNEL, STBD SIDE, BESIDE FIRE MONITOR PUMP - REMOUNT AS ORIGINAL OR RENEW FIXTURE AND NECESSARY WIRING AS ORIGINAL.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
SUPPORT ELEC. WIRE LEADING TO AND PROPERLY AFFIX TO CONTROL BOX - A/C CONDENSER COOLING PUMP SWITCH.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
INSTALL KNOCKOUT PLUGS IN UNLABELED ELECTRICAL BOXES BESIDE AND FOREWARD OFANCHOR WINDLASS CONTROL PANEL STATION AND LABEL SAID BOXES.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Accommodation/Occupational Safety
Issued 31 October 1989
Resolved
FRESH WATER PURIFIER - REWIRE/REPLUMB AS ORIGINAL OR TERMINATE FITTINGS AS DIRECTED BY 46CFR.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
ELEC WIRE TO FRESH WATER PUMP CONTROL BOX - AFFIX IN ACCORDANCE WITH 46CFR J.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
INSTALL MARINE ACCEPTABLE FUEL OIL FILTERS FOR BOTH S/S GENS.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
ENGINE ROOM - ELEC BOX, FWD STBD MDE, INSTALL KNOCKOUT PLUGS AND PROPERLY MOUNT SUPPORT/ELEC WIRING.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Engineering
Issued 31 October 1989
Resolved
ENGINE ROOM - PORT MAIN DIESEL ENGINE INSTRUMENT PANEL - PROPERLY TERMINATEWIRES.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Engineering
Issued 31 October 1989
Resolved
ENGINE ROOM - STBD MAIN DIESEL ENGINE INSTRUMENT PANEL -- PROPERLY TERMINATE WIRES.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Engineering
Issued 31 October 1989
Resolved
IINSTALL INDICATOR LIGHT, LENS AND MAKE OPERATIONAL FUEL OIL TANK LEVEL INDICATOR.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
PROVIDE VERIFICATION THAT BATTERY CHARGER IS MARINE ACCEPTABLE OR RENEW.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Fire Fighting
Issued 31 October 1989
Resolved
PROVIDE ENGINE ROOM FIRE MAIN SYSTEM SCHEMATIC, LABEL FIRE MAIN VALVES AND POST SCHEMATIC AND OPERATING INSTRUCTIONS BESIDE FIRE PUMP
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Construction/Loadline
Issued 31 October 1989
Resolved
ROOM BALLAST PUMP (SECENDARY FIRE PUMP) SCHEMATIC, LABEL VALVES AND POST SCHEMATIC AND OPERATING INSTRUCTIONS BESIDE BALLAST PUMP.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Fire Fighting
Issued 31 October 1989
Resolved
MAKE FIRE MAIN AND BALLAST SYSTEM VALVES OPERATE AAS MANUFACTURED OR RENEW VALVE HANDLE MECHANISMS.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Construction/Loadline
Issued 31 October 1989
Resolved
LOCATE AND REPAIR WATER LEAK (COMPT. VENT PIPE) TO STEERING COMPARTMENT STBD SIDE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Fire Fighting
Issued 31 October 1989
Resolved
PROVIDE PTO FIRE MONITOR FIRE MAIN SYSTEM WITH SCHEMATIC OPERATING INSTRUCTIONS, VALVES LABELED AND POST BESIDE PTO FIRE MONITOR PUMP.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Fire Fighting
Issued 31 October 1989
Resolved
MAKE OPERABLE AS ORIGINAL FIRE MONITOR PUMP HOUSING VENT VALVE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Fire Fighting
Issued 31 October 1989
Resolved
RENEW FIRE MONITOR PUMP PRESSURE (DISCHARGE) GAUGE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Fire Fighting
Issued 31 October 1989
Resolved
MAKE OPERABLE AS MANUFACTURED - SEA STRAINER FOR FIRE MONITOR PUMP SUPPLY AND MAKE SEA STRAINERS AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Construction/Loadline
Issued 31 October 1989
Resolved
INSTALL VALVE HANDLE - AS ORIGINAL, PROVE, OPERATION OF VALVE AND LABEL (BALLAST) VALVE LOCATED INN BILGE DIRECTLY BELOW PTO/BOW THRUSTER ENGINE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
LITE FIXTURE - FOREPEAK BULDHEAD, IN TUNNEL PORT SIDE - INSTALL GLOBE AND AND THE GUARD.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
LITE FIXTURE - FOREPEAK BULKHEAD, IN TUNNEL, STBD SIDE - INSTALL GLOBE AND GUARD.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
INSTALL - AS WAS ORIGINAL - PREVENTOR LOCK SO THAT S/S GEN AND OR SHORE POWER CANNOT BE PLACED IN PARALLEL OPERATION.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
INSTALL PERMANENT SHIELD OVER ELEC, MOTOR DIRECTLY UNDER FUEL OIL METER.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Unknown
Issued 31 October 1989
Resolved
RENEW STBD FWD AIR FILTER ON DRY BULD TANK AIR COMPRESSOR.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
INSTALL KNOCKOUT PLUGS IN WATER PUMP CONTROL BOX AND POTABLE WATER SWITCH BOX.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Construction/Loadline
Issued 31 October 1989
Resolved
LABEL BALLAST PIPING VALVES IN TUNNEL.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
REPAIR TO ORIGINAL OPERATING CONDITION OR RENEW ENGINE ROOM VENT - NO. 1 VENT OWER SUPPLY SWITCH.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Unknown
Issued 31 October 1989
Resolved
INSTALL CHAEFING MATERIAL ON AIR CONTROL LINES IN TUNNEL WHERE MISSING.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
ENGINE ROOM ELECTRICAL POWER SUPPLY CABBLE FOR BALLAST PUMP INSTALL EAW 46 CFR J.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
ENGINE ROOM - RENEW F/O SUPPLY FLEX HOSE TO S/S GEN N #1 F/O FILTER WITH 4"CG APPROVED LINE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
ENGINE ROOM - PROVIDE APPROVED ELECT. MAT IN FRONT OF ELECT SWITCH BOARD.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
MAKE OPERABLE AND PROVE OPERATION OF #2 S/S GEN OVERSPEED SHUTDOWN.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Unknown
Issued 31 October 1989
Resolved
REPAIR THE REMOTE SHUTDOWN REACH ROD FOR #2 STBD FUEL OIL TANK.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Lifesaving
Issued 31 October 1989
Resolved
PROVIDE CG APPROVED RESCUE BOAT.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
ENGINE ROOM - ELEC CONTROL BOX (NO LABEL) FWD #1 S/S GEN - LOWER ELEC WIRE - REINSTALL.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Engineering
Issued 31 October 1989
Resolved
REPAIR MAIN DIESEL ENGINE EXHAUST LEAKS (REMOVE JURY RIG DEFLECTOR SHIELDS ON ENGINES).
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Engineering
Issued 31 October 1989
Resolved
REPAIR/RENEW TO ORIGINAL ALL MDE PYRO CONDUITS/SSUPPORTS AND PROVE OPERATION
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
REPAIR BURNED OUT GROUND PHASE DETECTOR LIGHTS ON S/S GEN CONTROL SWITCH BOARD.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
LOCATE DISCREPANCIES INDICATED BY GROUND FAULT LIGHTS AND REPAIR.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Deck/Cargo
Issued 31 October 1989
Resolved
RENEW/REPAIR ALL FRESH WATER LEAKS ON BOW THRUSTER EENGINE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Engineering
Issued 31 October 1989
Resolved
RENEW LUBE OIL LINE ATTACHED TO STBD MDE LUBE OIL PUMP.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
ALL PANELBOARDS, MOTTOR CONTROLLERS AND PPANEL BOARDS WILL BE PROPERLY LABELED WITH DIRECTORIES AND/OR WIRING DIAGRAMS AS REQUIRED BY 46CFR J.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Deck/Cargo
Issued 31 October 1989
Resolved
PROVE BRAKE AND CAPSTAIN/GYPSY OPERATION AFTER BRAKE PAD RENEWAL/ ADJUSTMENT AND PORT ANCHOR CHAIN RENEWED WITH APPROPRIATE SIZE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
PROVIDE VERIFICATION THAT ELEC MOTOR LOCATED UNDER CARGO FUEL OIL METER IS DRIP PROOF.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Electrical
Issued 31 October 1989
Resolved
PROPERLY ROUTE ELEC SUPPLY WIRE TO CLOTHES DRYER. DRYER TO BE MOVED
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Unknown
Issued 31 October 1989
Resolved
REMOVE OIL/OIL SLUDGE FROM ENGINE ROOM BILGE FRAMINGG AND BOTTOM - AND - IN WAY OF BOW THRUSTER ENGINE.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Unknown
Issued 12 November 1986
Resolved
SERVICE THE PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 12 November 1986
Resolved 12 November 1986
Unknown
Issued 12 November 1986
Resolved
MAKE THE VESSEL'S EIGHT PRESSURE VESSELS AND RELIEF VALVES AVAILABLE FOR TESTING AND INTERNAL EXAMINATION.
Condition: Unknown
Due 12 November 1986
Resolved 12 November 1986
Unknown
Issued 12 November 1986
Resolved
SERVICE THE INFLATABLE LIFERAFTS AND ASSOCIATED HYDROSTATIC RELEASES.
Condition: Unknown
Due 12 November 1986
Resolved 12 November 1986
Engineering
Issued 23 November 1984
Resolved
REPLACE OR REPAIR INPROPERLY FUNCTIONING STARBOARD MAIN ENGINE LOW LUBE OILPRESSURE ALARM AND INDICATOR.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984
Engineering
Issued 23 November 1984
Resolved
PROVE PROPER OPERATION OF BOTH CLUTCH AIR RELIEF VALVES.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984
Engineering
Issued 23 November 1984
Resolved
REPAIR OR REPLACE NON-FUNCTIONING MAINE ENGINE EXHAUST TEMPERATURE GUAGE AND ALARM.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984
Fire Fighting
Issued 23 November 1984
Resolved
PROVIDED A FIRE CONTROL PLAN COMPLYING WITH PROVISION OF L/G CFR 97.36-1
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984
Electrical
Issued 23 November 1984
Resolved
PROVIDED SUFFICIENT ADDITIONAL EMERGENCY LIGHTING FOR THE PILOT HOUSE TO ENGINE ROOM BELOW DECK PASSAGEWAY.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984
Electrical
Issued 23 November 1984
Resolved
PROVE PROPER OPERATION BOTH GENERATORS' HIGH COOLING WATER TEMPERATURE ALARM AND SHUTDOWNS.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984
Deck/Cargo
Issued 23 November 1984
Resolved
PROVIDE DOCUMENTATION THAT THE MAWP OF THE CEMENT, CARGO TANK S.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984
Engineering
Issued 23 November 1984
Resolved
REPLACE OR REPAIR NON-FUNCTIONING PORT MAIN ENGINE TACHOMETER.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984