Inspection history · 105
12 March 2026
Annual Inspection · MSP Additional Oversight - Risk Assessment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8318622
21 January 2026
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8299298
21 March 2025
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8097693
21 March 2025
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 8099832
13 January 2025
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8062962
9 December 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8045206
13 June 2024
Plan Review (Other than "T") · Deficiency Check · Construction Oversight · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7943740
3 May 2024
Deficiency Check · Inclining Experiment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7907973
26 January 2024
Construction Oversight · Administrative Inspection · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7856173
4 December 2023
COI Inspection · Administrative Inspection · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7834412
22 June 2023
Hull Examination · COI Inspection · Administrative Inspection · Examination of Repairs · Internal Structural Exam · Deficiency Check · Drydock Exam · MTSA Verification
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7720802
22 April 2022
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7437871
26 October 2020
Drydock Exam · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7085359
22 June 2020
Administrative Inspection
Administrative · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6986105
15 May 2019
Annual Inspection · Administrative Inspection · MTSA Verification · DAPI Audit · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6685186
15 October 2018
Drydock Exam · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6561982
4 May 2018
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6441724
10 April 2017
Administrative Inspection · Deficiency Check · COI Inspection · Spot Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6129892
28 March 2017
Deficiency Check · Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6110647
6 May 2016
Deficiency Check · Annual Inspection · Spot Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5990790
29 March 2016
Spot Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5848159
1 May 2014
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4844429
8 June 2012
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4343277
2 May 2012
Deficiency Check · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4295821
6 December 2011
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4203231
28 April 2009
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3459989
24 March 2009
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3439878
11 March 2009
Drydock Exam · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3432307
24 April 2008
MTSA Verification · Annual Inspection · MARPOL Annex V Examination · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3191601
11 April 2008
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3182292
2 May 2007
COI Inspection · MTSA Verification · Deficiency Check · MARPOL Annex V Examination · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2969329
27 April 2007
Internal Structural Exam · Hull Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2917047
25 April 2006
Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2705022
25 July 2005
Annual Inspection · MTSA Verification
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2439478
27 January 2005
Administrative Inspection
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2281887
12 November 2004
Hull Examination · Internal Structural Exam
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2241410
12 August 2004
MTSA Verification
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2165258
2 August 2004
Damage Survey
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2153889
25 July 2004
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2147408
13 May 2004
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2109507
11 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1963347
25 September 2003
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1923492
21 April 2003
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1804866
26 September 2002
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1681249
24 April 2002
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1687292
3 May 2001
Plan Review "T" Boat · Re-Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1386978
21 April 2000
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 820059
21 April 2000
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1365855
6 June 1999
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 17245
26 April 1999
COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1365148
16 April 1998
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1394946
14 April 1997
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1398655
4 April 1997
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1396699
18 April 1996
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1353912
24 April 1995
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1180113
13 April 1995
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1152867
28 April 1994
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1442135
15 April 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 215867
29 March 1994
Deficiency Check · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 855976
24 February 1994
Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1396054
14 June 1993
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 839244
13 November 1992
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1134907
19 October 1992
Plan Review "T" Boat
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1136456
8 October 1992
Plan Review "T" Boat
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1265536
15 September 1992
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 949568
3 July 1992
COI Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1393857
27 January 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 956182
27 December 1991
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 943062
16 December 1991
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 955189
27 November 1991
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 938300
7 November 1991
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 947820
14 August 1991
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1249477
4 January 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 930203
5 December 1990
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1228136
2 August 1990
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1239945
8 May 1990
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 900102
13 February 1990
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 908593
13 February 1990
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1268725
14 December 1989
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1217011
24 October 1989
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1200701
26 September 1989
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1209695
9 September 1989
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1202926
20 May 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1196918
16 March 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1197892
31 January 1989
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1032134
31 December 1988
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1352243
29 December 1988
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1344713
16 December 1988
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1031093
30 November 1988
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1208074
31 October 1988
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 889733
30 September 1988
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1044650
28 July 1988
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1033834
17 June 1988
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1205555
25 January 1988
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1016940
22 December 1987
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1313219
18 November 1987
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1026011
5 November 1987
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1026676
23 March 1987
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1017223
23 March 1987
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1327306
3 December 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1331974
5 November 1986
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1015389
11 March 1986
Credit Drydock
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 994723
10 December 1985
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 994263
19 March 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1287933
29 January 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 974894
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 March 2026
Resolved
All safety and relief valves for use on pressure vessels or piping systems must be designed to meet the protection and service requirements for which they are intended and must be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel or piping system. Relief valve installed on the pressure
vessel was rated higher than maximum allowable working pressure. Replace relief valve.
46 CFR 54.15-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2026
Resolved 13 March 2026
Resolution: Rectified. New pressure relief valves installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 March 2026
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Impeller housing on the bilge power take-off system is missing bolt. Repair. 46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2026
Resolved 13 March 2026
Resolution: Rectified. New bolt was installed.
14 - Pollution Prevention › 143 - MARPOL Annex III › Other (MARPOL Annex III)
Issued 12 March 2026
Resolved
All personnel must complete the training specified in
paragraphs (d)(1)(ii) through (v) of this section by January 12, 2026, and annually thereafter. Crew did not complete cyber security training. Complete cyber security training.
33 CFR 101.650(d)(4)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2026
Resolved 7 April 2026
Resolution: Rectified, Captain and crew received cyber security training.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 21 January 2026
Resolved
MI observed sealant covering hole on port side of lazarette, provide repair plan for approval by local OCMI prior credit Drydock.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: vessel conducted complete crop and renewal and NDT was conducted (vaccuum box)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 21 January 2026
Resolved
MI observed wastage on railings located amidship on stbd side. Repair prior credit Drydock.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Railing repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 January 2026
Resolved
MI observed vessel propellers detached from propeller shaft. Prior credit drydock refit propellers.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Propellers attached.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 21 January 2026
Resolved
MI observed frozen drainage scuppers, prior credit drydock provide proof of drainage scuppers unfrozen and tested.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Scuppers cleared. All sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 January 2026
Resolved
MI observed wastage on frame of aft STBD loading door. Provide repair proposal prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Frame repaired.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 May 2025
Resolved
"Each window... and its means of attachment... must be capable of withstanding the maximum load from wave and wind conditions expected due to its location on the vessel..." Vessel will have temporary window repair. Ensure vessel installs permanent windows adaquately w/in 14 weeks.
46 CFR 116.1020
Action required: 705 - Other - as specified
Resolved 27 May 2025
Resolution: Verified installation of permanent windows.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 March 2025
Resolved
(a) The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel sustained damage to the top deck, second deck, and main deck on the portside. Submit a repair plan for approval. Have an MI witness satisfactory repairs.
46 CFR 116.100(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2025
Resolution: Verified repairs.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 January 2025
Resolved
Alcohol test swabs not on board.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2025
Resolved 3 February 2025
Resolution: Verified presence of alcohol swabs.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 January 2025
Resolved
Number 3 high level bilge alarm not illuminating on panel.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2025
Resolved 3 February 2025
Resolution: Witnessed proper operation of #3 high bilge level alarm
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 December 2024
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel operator self-reported a casualty affecting an oil cooler serving the port transmission, rendering the transmission inoperative. Restore the transmission to full operation. Tech report, repair proposal, and MI witnessed sea trial prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 December 2024
Resolution: Witnessed SAT sea trials and DVTPs
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 27 June 2024
Resolved
Plans required to be submitted. Per email sent to you on April 24, 2024 requesting the following drawings be made available to us in response to MSC letter E1-2400926, Ref.(a), E2-2400925, Ref. (a), and revised drawings from MSC letters(s) E1-2400926, Ref.(d), & E2-2400925. In addition to the aforementioned, owner/operator to submit updated electrical plan that more accurately reflects the o/o intention to run the H-VAC system.
46 CFR 177.05-3 (a)
"OLD T"
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2024
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 27 June 2024
Resolved
Plans requiring revision. Owner/Operator to revise drawing in clarifying the following MSC approval letter H2-2400253 to more accurately reflect the space categorization for all bulkheads & decks where the construction on the 2nd and 3rd decks are constructed of aluminum core.
46 CFR 177.05-3 (a) "OLD T"
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2024
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 27 June 2024
Resolved
Vessels shall be provided with at least two avenues of escape. During the engine room exam, means of escape was observed seized open and watertight gasket was compromised. Renew and make ready available all means
escape from below decks are readily available in an
emergency.
46 CFR 177.15-1 (a) "OLD T"
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 June 2024
Resolved
Bilge suctions shall have suitable strainers and opening at least 3 times the width of the pipe. During visual examination of the bilge system pick-ups some of the screens were missing and the pick-ups were undersized. Ensure adequate pick-ups and strainers are provided at the next dry-dock.
46 CFR 182-25-5(b) "OLD T"
UPDATE: 7/1/24, as below;
Bilge suctions shall have suitable strainers and opening at least 3 times the width of the pipe. During visual examination of the bilge system pick-ups some of the screens were missing and the pick-ups were undersized. Ensure adequate pick-ups and strainers are provided at the next winter 2024 / 2025 maintenance period.
Action required: 705 - Other - as specified
Resolved 3 February 2025
Resolution: Bilge strainer baskets installed at all pick-ups.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 June 2024
Resolved
Fire Detection system to be readily available at all times during the ships operation. During the walk-through of the system tested all pull stations and detectors. Ensure the following: Submit alternate arrangement proposal from the manufacturer to ensure back-up batteries are not drawn from while the ship is at the slip without shore power. Ensure forward pull station on the second deck accommodation was inoperable. Renew as appropriate.
46 CFR 181-405 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2024
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 June 2024
Resolved
Deck and Bulkhead penetrations. All electrical runs that penetrate fire boundaries should be sealed at least to the extent to maintain the fire rating of that boundary. Penetrations into the pilot house and in the engine room bullhead need to be sealed. Ensure this is completed prior to credit dry dock.
46 CFR 72.05-10
Action required: 705 - Other - as specified
Resolved 2 July 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 June 2024
Resolved
Provide OCMI with verifiable written vessel procedures identifying & requiring; roles & responsibilities, documentation in vessel logbook, and risk mitigation plans to address;
1) (de)energizing installed Fire Detection system prior to embarking, and after disembarking passengers due to lack of available shore-power & reserve battery drain
2) crew responsibilities and passenger management in event of a fire, due to lack of fire doors separating the main & 2nd deck accommodation spaces & aluminum blkhd on port main deck b/w Type (9) and Type (3) space.
46 CFR 122.510
46 CFR 11.524
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2024
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 June 2024
Resolved
Type approved installed Sea-Fire drawing no. 300-2640d and MSC Approved (per Ltr. E2-2400203, dtd Jan. 23, 2024) "Fire Detection, Alarm Arrangement, & System" Dwg. No. BMS-735-715-001, Sheet 2, dtd Dec.23, 2023 - do not correlate on fuse size / type and disconnect switch installed to 24v back-up battery arrangement. Provide clear evidence (via component part numbers) of compliance with approved dwg. OR unaltered type apprvd. Sea-Fire system, within 14 days. Installed Fire Detection system, as currently installed, was observed to operate as intended during power loss.
46 CFR 181-405 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 August 2024
Resolution: recieved approval letter from MSC
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 June 2024
Resolved
Pending OCMI approval of requested passenger increase, and prior to carriage of additional passengers, vessel must demonstrate proper outfitting & compliance with stowage requirements for Life Jackets to the satisfaction of attending MI's.
46 CFR 117.71
46 CFR 117.78
Action required: 705 - Other - as specified
Resolved 7 August 2024
Resolution: Couted sat number of life jackets and witnessed stowage
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 June 2024
Resolved
Plans requiring approval. Referencing MSC Letter Serial: H2-2402512, dtd June 27, 2024, which Returned for Revision, Ref.(b), Dwg. BMS-735-910-001, Rev.A. Upon MSC Approval of the re-submitted "Space Designation & Insulation Boundaries" drawing from Blancke Marine Services, BMS-735-910-001, (now Rev. D) - comply with space and boundary installation & insulation requirements of approved drawings, within 30 days of approval.
46 CFR 177.05-3 (a)
"Old-T"
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 August 2024
Resolution: Verified installation
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 27 June 2024
Resolved
Receive OCMI and/or MSC approval, as applicable, via submitted plans, prior to commencing any additional alterations or installations affecting vessel safety.
46 CFR 115.700
Action required: 705 - Other - as specified
Resolved 7 August 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 December 2023
Resolved
33 CFR 104.105(a)(6)
This part applies to the owner or operator of any: Passenger vessel certificated to carry more than 150 passengers. Vessel has applied for a PVA ASP and is awaiting response. Vessel is certificated to carry not more than 150 passengers until the following requirements are met:
1. Provide PVA acceptance letter from PVA.
2. Provide security assessments for all intended moorings.
This carriage requirement is only valid for 30 days. After 30 days the vessel will not be authorized to carry passengers unless the above items have been satisfied by an attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 December 2023
Resolution: PVA acceptance letter provided.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 December 2023
Resolved
Testing or renewal of flexible connections and discharge hoses on semiportable extinguishers and fixed gas extinguishing systems in accordance with § 147.65 in subchapter N of this chapter. Flexible connections on CO2 bottles required replacement. Certified servicing technicians were on-scene to replace.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 December 2023
Resolution: Witnessed the renewal of new flexible connections on the same day as the 3rd party had them in stock and were able to renew on site.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 December 2023
Resolved
At each initial and subsequent inspection for certification, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment, including ...Inspection and testing of smoke and fire detecting systems (including sensors and alarms). Prior to carriage of passengers, demonstrate proper operation of currently installed fire indicating arrangement at operating station.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 December 2023
Resolution: O/O provided acceptable video evidence and verified onboard 26Dec23 of proper fire detector and helm audio / visual alarm operation of system as installed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 December 2023
Resolved
Propulsion machinery spaces must be equipped with a fire detection and alarm system of an approved type that is installed in accordance with part 76 in subchapter H of this chapter, except when a fixed gas fire extinguishing system that is capable of automatic discharge upon heat detection is installed or when the space is manned. Vessel shall install an approved fire detection system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 30 August 2024
Resolution: Resolved - Rcvd MSC Approval of fire detection system as built / installed
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2023
Resolved
Employers must maintain records of chemical tests as provided in 49 CFR 40.333 and must make these records available, to satisfy the requirements of §§ 16.210(b) and 16.220(c) of this part AND to identify the total number of individuals chemically tested annually... including the annual number of individuals failing chemical tests... Owner / Operator to schedule a Drug and Alcohol Program audit. Audit form provided.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Audit form provided.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 4 December 2023
Resolved
A hatch cover must: (1) Have securing devices; and (2) Be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Vessel shall install retaining device to hatch all hatch covers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Retaining device on hatch all hatch covers.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 December 2023
Resolved
Vessel must be provided with a visual and audible alarm at the operating station to indicate a high water level in unmanned spaces with through-hull fittings below
deepest load waterline, machinery spaces with sea water piping, or spaces with non-watertight closures. Bilge alarms were only observed in #3 Hold, Engine Room, and Lazarette. Vessel shall demonstrate proper operation of high water alarms in all required spaces.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Vessel demonstrated proper operation of bilge high level water alarms
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2023
Resolved
In systems where flexible hoses are permitted to be clamped: (1) Double hose clamping is required on each end of the hose, unless pipe ends are expanded or beaded to provide a positive stop against hose slippage. Double hose clamps were missing from two (02) locations along starboard ships service diesel generator (SSDG) exhaust discharge piping at the side shell.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Double hose clamping installed on starboard SSDG exhaust
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 December 2023
Resolved
All observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Lube oil leak was observed on outboard side of exhaust manifold gasket of starboard SSDG.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 24 January 2024
Resolution: O/O provided video evidence of correction with engine running.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2023
Resolved
The official number of the vessel...must be marked on some clearly visible interior structural part of the hull... Owner / Operator shall permanently affix Official Number to vessel interior, as prescribed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 24 January 2024
Resolution: O/O provided photo evidence of correction.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2023
Resolved
The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Remove or cover previous hailing port and provide clear marking of current hailing port on stern.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 24 January 2024
Resolution: O/O provided photo evidence.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 December 2023
Resolved
Portable fire extinguishers must be located so that they are clearly visible and readily accessible from the space being protected, and installed in proper brackets.
Ensure proper brackets and installation for all portable fire extinguishers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Proper brackets installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2023
Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. All electrical equipment and circuits must be clearly marked and identified. Ensure switchboard door covers close securely and ensure proper labeling of electrical breakers / circuits.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 24 January 2024
Resolution: O/O provided photo evidence of correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2023
Resolved
All pressure vessels must be provided with protective devices. Pressure-relieving devices shall be constructed, located, and installed so that they are readily accessible for inspection and repair. Pressure relieving device requires renewal. Pressure set-point could not be determined during inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 23 January 2024
Resolution: Rcvd photos from O/O correcting Press. Relief Device def.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 December 2023
Resolved
All automatically or remotely controlled or monitored vital systems addressed by part 62 of this subchapter must be subjected to tests and inspections to evaluate the operation and reliability of controls, alarms, safety features, and interlocks. Test procedures must be submitted to the Coast Guard for approval. Owner / Operator shall provide Design Verification Testing Procedures (DVTPs) for review, and ensure Periodic Safety Test Procedures (PSTPs) are made available for periodic testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 4 January 2024
Resolution: O/O provided DVTP & PSTPs and MSC approval ltr from 2015,2018, respectively.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 15 May 2019
Resolved
Fire dampers (04) were not operational remotely. Ensure fire dampers are operational.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2019
Resolved 11 June 2019
Resolution: Tested satisfactory
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 26 April 2017
Resolved
Repair port vent closure to engine room
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 26 April 2017
Resolution: Vent closure repairs and works satisfactorily.
Engineering › Sea-water System (primary cooling) › Piping
Issued 26 April 2017
Resolved
double clamp hose on center MDE
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 26 April 2017
Resolution: second clamp added
Engineering › Fuel Oil Service System › Hose
Issued 10 May 2016
Resolved
Replace hoses on fuel lines of generators with approved SAE J-1942 for fuel.
Action required: 705 - Other - as specified
Due 10 June 2016
Resolved 25 May 2016
Resolution: Hoses were replaced satisfactorily
Stability › Watertight Integrity › General
Issued 1 May 2014
Resolved
Seal hole in forward bulkhead of potable water tank.
Action required: 705 - Other - as specified
Due 1 June 2014
Resolved 7 May 2014
Resolution: Witnessed penetration in potable water room was properly sealed.
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 1 May 2014
Resolved
Provide steel mounts for starboard generator, & remove wood.
Action required: 705 - Other - as specified
Due 31 January 2015
Resolved 2 July 2015
Resolution: steel mounts sat, wood removed
Electrical › Electric Supply System (service) › Battery Installation
Issued 1 May 2014
Resolved
Provide operable bank of secondary start batteries for main engines
Action required: 705 - Other - as specified
Due 1 June 2014
Resolved 7 May 2014
Resolution: Witnessed proper function of secondary start batteries for main engine.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 2 May 2012
Resolved
Renew SFP between E/R & accoms space (1" hole).
Action required: 705 - Other - as specified
Due 2 June 2012
Resolved 8 June 2012
Resolution: Attended vessel and verified proper repairs to 1" hole located in SFP between E/R and accoms space.
Engineering › Sea-water System (primary cooling) › Piping
Issued 2 May 2012
Resolved
Renew port generator raw water suction hose.
Action required: 705 - Other - as specified
Due 2 June 2012
Resolved 8 June 2012
Resolution: Attended vessel and verified proper installation of new raw water suction hose on port generator.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 2 May 2012
Resolved
Provide copy of fixed fire extinguishing system report.
Action required: 705 - Other - as specified
Due 9 May 2012
Resolved 2 May 2012
Resolution: Examined report prior to departing vsl.
Documentation › Markings/Placards › Capacity Marking
Issued 2 May 2012
Resolved
Install new signs indicating max passengers allowed to upper two decks IAW new stability letter addendum dated 03Nov2011.
Action required: 705 - Other - as specified
Due 2 June 2012
Resolved 8 June 2012
Resolution: Attended vessel and verified new signs indicating max passengers allowed on upper deck were installed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 May 2012
Resolved
Provide "first aid kit" with appropriate contents & instructions in watertight container.
Action required: 705 - Other - as specified
Due 2 June 2012
Resolved 8 June 2012
Resolution: Attended vessel and verified new first aid kit on board with proper contents and in a watertight container.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 2 May 2012
Resolved
Mark vessel name to port bow.
Action required: 705 - Other - as specified
Due 2 June 2012
Resolved 8 June 2012
Resolution: Attended vessel and verified vessel name was marked on the port bow.
Navigation › Piloting/Steering › US Coast Pilot
Issued 28 April 2009
Resolved
Provide updated Nav pubs as required by 46 CFR 184.420
Due 28 May 2009
Resolved 7 May 2009
Resolution: New pubs were provided.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 28 April 2009
Resolved
Prove proper operation of fwd hatch in main hold.
Due 28 May 2009
Resolved 7 May 2009
Resolution: The hatch opens and closes properly.
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 11 March 2009
Resolved
Renew forward water heater in engine room STBD side. Water Heater must meet the requirements of 46CFR 119.320.
Action required: 705 - Other - as specified
Due 11 April 2009
Resolved 24 March 2009
Accommodation/Occupational Safety › Heating › Metal Protection
Issued 2 May 2007
Resolved
Secure Wittco oven in galley to prevent injury
Action required: 705 - Other - as specified
Due 2 June 2007
Resolved 14 June 2007
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 2 May 2007
Resolved
Secure MSD overboard discharge thru-hull value with lock & chain or tie-wraps
Action required: 705 - Other - as specified
Due 2 June 2007
Resolved 14 June 2007
Electrical › Electrical Distribution System (service) › Junction Box
Issued 2 May 2007
Resolved
Replace cover on sewage pump motor junction box
Action required: 705 - Other - as specified
Due 2 June 2007
Resolved 14 June 2007
Fire Fighting › Structural - Horizontal Zones › General
Issued 2 May 2007
Resolved
Repair / Replace SFP in eng room overhead
Action required: 705 - Other - as specified
Due 2 June 2007
Resolved 14 June 2007
Operations/Management › Drills/Instruction › Not Conducted
Issued 25 April 2006
Resolved
Conduct satisfactory drills in presence of Coast Guard marine inspector
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 May 2006
Resolved 4 May 2006
Engineering › Fuel Oil Service System › Filter
Issued 25 April 2006
Resolved
Replace fuel filter with those of an approved type
Action required: 705 - Other - as specified
Due 25 May 2006
Resolved 4 May 2006
Lifesaving › Lifebuoys › Approval
Issued 25 July 2005
Resolved
Provide Tretro tape on lifering.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 July 2005
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 July 2005
Resolved
Replace broken glass aft pilot house
Due 25 July 2005
Resolved 25 July 2005
Construction/Loadline › Hull › Bottom Plating
Issued 2 August 2004
Resolved
Repair torn hull plating, rudders, shafts and props as per repair proposal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 10 August 2004
Resolution: Repairs conducted sat, vessel due for re haul for hull exam within 60 days.
Fire Fighting
Issued 3 May 2001
Resolved
REPLACE FIRE STATION #1 HOSE PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 3 May 2001
Resolved 24 August 2001
Engineering
Issued 3 May 2001
Resolved
RESTENCIL FO SHUT-OFFS PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 3 May 2001
Resolved 24 August 2001
Construction/Loadline
Issued 3 May 2001
Resolved
ADJUST WATERTIGHT HATCH COVERS.
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Engineering
Issued 3 May 2001
Resolved
ADJUST PORT SHAFT LOG.
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Navigation
Issued 3 May 2001
Resolved
ADJUST P/S RUDDER PACKING.
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Engineering
Issued 3 May 2001
Resolved
RELAG CME TURBOCHARGERS
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Fire Fighting
Issued 3 May 2001
Resolved
REPLACE MISSING A-0 GALLEY DOOR
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Electrical
Issued 3 May 2001
Resolved
REPAIR GENERATOR OIL LEAK IN EXHAUST
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Construction/Loadline
Issued 3 May 2001
Resolved
PUMP OUT ER BILGE
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Lifesaving
Issued 3 May 2001
Resolved
LABEL PFD LOCKERS AS NEEDED PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 3 May 2001
Resolved 24 August 2001
Electrical
Issued 3 May 2001
Resolved
REPAIR LIGHTS/GUARD IN LAZARETTE
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Accommodation/Occupational Safety
Issued 3 May 2001
Resolved
REPAIR PA SYSTEM PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 3 May 2001
Resolved 24 August 2001
Accommodation/Occupational Safety
Issued 3 May 2001
Resolved
CAP OLD DRAIN LINE ON PORT SIDE OF MSD TANK
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Accommodation/Occupational Safety
Issued 3 May 2001
Resolved
COMPLETE TOILET INSTALLATION
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Lifesaving
Issued 3 May 2001
Resolved
REMOVE FLAMMABLE/HAZARDOUS MATERIAL FROM VESSEL
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Lifesaving
Issued 3 May 2001
Resolved
RELOCATE 6 CHILD PFDS TO UPPER DECK AND LABEL LOCATION
Condition: Unknown
Due 17 May 2001
Resolved 24 August 2001
Fire Fighting
Issued 21 April 2000
Resolved
Post corrected copy of CO2 instructions outside main entrance to E-room.
Condition: Unknown
Due 21 May 2000
Resolved 11 July 2000
Fire Fighting
Issued 21 April 2000
Resolved
Re-label vent closures to E-room to indicate correct direction for closure.
Condition: Unknown
Due 21 May 2000
Resolved 11 July 2000
Accommodation/Occupational Safety
Issued 21 April 2000
Resolved
Relabel emergency escapes and add arrows towards escapes in E-room.
Condition: Unknown
Due 21 May 2000
Resolved 11 July 2000
Construction/Loadline
Issued 21 April 2000
Resolved
Replace screen on bilge suction from E-room.
Condition: Unknown
Due 21 May 2000
Resolved 11 July 2000
Construction/Loadline
Issued 21 April 2000
Resolved
Replace 2 deteriorated flex hose runs off Jabsco pump.
Condition: Unknown
Due 21 May 2000
Resolved 11 July 2000
Engineering
Issued 24 April 1995
Resolved
Prove satisfactory operation of port generator.
Condition: Unknown
Due 11 May 1995
Resolved 5 May 1995
Fire Fighting
Issued 29 March 1994
Resolved
PROVE PROPER OPERATION OF FIRE PUMP AT 60 PSI.
Condition: Unknown
Due 30 April 1994
Resolved 26 April 1994
Lifesaving
Issued 29 March 1994
Resolved
VESSEL IS LIMITED TO THE CARRAIGE OF 388 PERSONS UNTIL 16 ADULT LIFE PRESERVERS ARE REPLACED.
Condition: Unknown
Due 29 April 1994
Resolved 26 April 1994
Construction/Loadline
Issued 29 March 1994
Resolved
PROPERLY REPAIR MAIN DECK IN WAY OF FIBER GLASS PATCH IN STBD SIDE WASH ROOM.
Condition: Unknown
Due 30 April 1994
Resolved 26 April 1994
Engineering
Issued 29 March 1994
Resolved
PROPERLY LABEL STARBOARD SIDE AFT EMERGENCY SHUT OFF.
Condition: Unknown
Due 30 April 1994
Resolved 26 April 1994
Electrical
Issued 3 July 1992
Resolved
PROPERLY BAND ALL ELECTRICAL CABLES.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Construction/Loadline
Issued 3 July 1992
Resolved
PROVE PORPER OPERATION OF BILGE PUMPING SYSTEM.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Lifesaving
Issued 3 July 1992
Resolved
RENEW GRABLINES ON BUOYANT APPARATUS.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Accommodation/Occupational Safety
Issued 3 July 1992
Resolved
CLEAN AND GAS FREE MSD HOLDING TANK AND MAKE AVAILABLE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Engineering
Issued 3 July 1992
Resolved
HARD PIPE MAIN DIESEL ENGINE COOLING SYSTEM.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Fire Fighting
Issued 3 July 1992
Resolved
COMPLY WITH ALL APPLICABLE STRUCTURAL FIRE PROTECTION REGULATIONS.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Fire Fighting
Issued 3 July 1992
Resolved
SHOW PROPER OPERATION AND PERFORM REQUIRED TESTS OF FIXED CO2 SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Fire Fighting
Issued 3 July 1992
Resolved
PROVE PROPER OPERATION OF ALL FIRE DAMPERS.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Electrical
Issued 3 July 1992
Resolved
SHOW THAT ALL WIRING MEETS MINIMUMS OUTLINED IN IEEE 45 AND 46 CFR SUBCHAPTER J.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Navigation
Issued 3 July 1992
Resolved
PLACE PROPER BULB IN MASTHEAD LIGHT.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Construction/Loadline
Issued 3 July 1992
Resolved
CROP AND RENEW DECK IN MENS' HEAD TO GOOD METAL.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Fire Fighting
Issued 3 July 1992
Resolved
PROVIDE PROPER BRACKETS FOR 2 PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 10 July 1992
Resolved 10 July 1992
Construction/Loadline
Issued 27 January 1992
Resolved
REMOVE THE AWNING ON THE UPPERMOST DECK OR SUBMIT ADDITIONAL STABILITY CALCULATIONS TO COMMANDANT (G-MSC-1) WHICH REEVALUATE THE ADDITIONAL WEIGHTAND WIND HEEL MOMENT._x001C_ _x001C_
Condition: Unknown
Due 27 January 1992
Resolved 27 January 1992
Lifesaving
Issued 16 December 1991
Resolved
REMOVE ALL PROPANE APPLIANCES FROM THE VESSEL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Electrical
Issued 16 December 1991
Resolved
REPAIR AND PROPERLY MARK THE EMERGENCY LIGHT IN THE LOWER LOUNGE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Documentation
Issued 16 December 1991
Resolved
DESIGANTE THE SENIOR DECKHAND IN WRITING._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Lifesaving
Issued 16 December 1991
Resolved
PROVIDE 250 ADDITIONAL ADULT AND 27 ADDITIONAL CHILD TYPE ONE LIFE PRESERVERS. THE VESSEL SHALL NOT CARRY MORE THAN 140 PERSONS TOTAL UNTIL CORRECTED._x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Lifesaving
Issued 16 December 1991
Resolved
REMOVE ALL OILY WASTE AND PROPERLY CLEAN THE ENGINE ROOM BILGE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Electrical
Issued 16 December 1991
Resolved
REMOVE ALL WIRING WHICH DOES NOT COMPLY WITH THE REGULATIONS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Construction/Loadline
Issued 16 December 1991
Resolved
CORRECT THE BULKHEAD PENETRATION BETWEEN THE ENGINE ROOM AND MSD COMPARTMENT. NON-METALLIC PIPING PASSING THROUGH A WATERTIGHT BULKHEAD MUST BE FITTED WITH A STEEL SPOOL PIECE WELDED TO THE BULKHEAD AND FITTED WITH A METALLIC VALVE ON BOTH SIDES ON THE BULKHEAD._x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Lifesaving
Issued 16 December 1991
Resolved
CONDUCT A SATISFACTORY MAN OVERBOARD DRILL WITH ALL DECKHANDS PRESENT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Documentation
Issued 16 December 1991
Resolved
OBTAIN AND PLACE ON BOARD A COPY OF THE INLAND NAVIGATION RULES.
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Navigation
Issued 16 December 1991
Resolved
PROPERLY REPAIR THE STARBOARD RADAR AND MAKE AVAILABLE FOR INSPECTION._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Electrical
Issued 16 December 1991
Resolved
PROVIDE A PERMANENTLY MOUNTED SEARCHLIGHT FOR THE PILOT HOUSE USE._x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Engineering
Issued 16 December 1991
Resolved
MAKE THE VESSEL AVAILABLE FOR TESTING OF THE CENTER MAIN ENGINE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Navigation
Issued 16 December 1991
Resolved
REPAIR THE ANCHOR LIGHT AND PROVIDE AN ANCHOR BALL FOR THE VESSEL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Engineering
Issued 16 December 1991
Resolved
MAKE VESSEL AVAILABLE FOR INTERNAL EXAM OF THE AIR RECEIVER AND TEST OF THESAFETY RELIEF VALVE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Lifesaving
Issued 16 December 1991
Resolved
RENEW ALL LONES AND PENDANTS ON ALL OF THE LIFEFLOATS AND REPAIR ALL_x001C_ PUNCTURES IN THE COVERS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Lifesaving
Issued 16 December 1991
Resolved
RENEW ALL GRAB LINES ON ALL LIFE RING BOUYS OR REPLACE THE LIFE RINGS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Electrical
Issued 4 January 1991
Resolved
INSTALL NEW SHORETIE SYSTEM IN ACCORDANCE WITH APPROVED PLANS.
Condition: Unknown
Due 4 January 1991
Resolved 4 January 1991
Accommodation/Occupational Safety
Issued 5 December 1990
Resolved
REMOVE MSD (HOLDING TANK) OVERBOARD DISCHARGE VALVE AND CONNECTION.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Electrical
Issued 5 December 1990
Resolved
REPAIR BROKEN GLOBE IN AFT STEERING AND REPLACE MISSING GLOBE ABOVE EMER. FUEL SHUTOFF.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Fire Fighting
Issued 5 December 1990
Resolved
MOUNT FIRE AXE, AND STENCIL WITH VESSEL'S NAME.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Lifesaving
Issued 5 December 1990
Resolved
INSTALL RETROREFLECTIVE TAPE ON ALL LIFERINGS AND LIFEFLOATS.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Lifesaving
Issued 5 December 1990
Resolved
REPLACE OR REPAIR BROKEN NET SPREADERS ON ALL LIFEFLOATS.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Electrical
Issued 5 December 1990
Resolved
SUBMIT PLANS TO [name withheld] TO SHORETIE SYSTEM.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Fire Fighting
Issued 5 December 1990
Resolved
HAVE INSTALLED CO2 SYSTEM TESTED AND PROVIDE REPORT.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Engineering
Issued 5 December 1990
Resolved
REPAIR BOTH NATURAL VENTILATION SHUTOFFS TO ENGINE ROOM.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Electrical
Issued 5 December 1990
Resolved
STENCIL ALL EMERGENCY LIGHTING WITH A RED "E."
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Navigation
Issued 5 December 1990
Resolved
OBTAIN MAGNETIC COMPASS DEVIATION CARD.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Navigation
Issued 5 December 1990
Resolved
REPAIR OR REMOVE FATHOMETER.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Engineering
Issued 5 December 1990
Resolved
REPAIR LAGGING ON STBD MDE EXHAUST RUNNING THROUGH AFT STEERING.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Navigation
Issued 5 December 1990
Resolved
REPAIR HYDRAULIC LEAK ON STEERING GEAR AND REMOVE SPILLED FLUID FROM BILGE.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Navigation
Issued 5 December 1990
Resolved
SUFFICIENTLY LOCKWIRE RUDDER ANGLE INDICATOR LINKAGE IN AFT STEERING.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Engineering
Issued 5 December 1990
Resolved
REPAIR AND PROVE OPERATION OF BILGE LEVEL ALARM SYSTEM.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Engineering
Issued 13 February 1990
Resolved
REMOVE FUEL OILSIGHT GLASS FROM ENGINE ROOM.
Condition: Unknown
Due 13 February 1990
Resolved 13 February 1990
Documentation
Issued 13 February 1990
Resolved
OBTAIN ORIGINAL STABILITY LETTER AND POST ON BRIDGE.
Condition: Unknown
Due 13 February 1990
Resolved 13 February 1990
Engineering
Issued 13 February 1990
Resolved
MARK FUEL SHUT OFFS AT THE PULL LOCATIONS.
Condition: Unknown
Due 13 February 1990
Resolved 13 February 1990
Construction/Loadline
Issued 13 February 1990
Resolved
MARK LOCATION OF FORE PEAK SHUT OFF VALVE.
Condition: Unknown
Due 13 February 1990
Resolved 13 February 1990
Lifesaving
Issued 14 December 1989
Resolved
REPLACE THE BATTERY ON THE LIFEFLOAT PORT SIDE FORWARD TOP OF THE PILE.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Electrical
Issued 14 December 1989
Resolved
REPLACE BROKEN LIGHT GLOBES IN VARIOUS LOCATIONS ON THE VESSEL.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Fire Fighting
Issued 14 December 1989
Resolved
REPLACE SPANNER WRENCHES AT ALL FIRE STATIONS. (HOSES ALL WORK AND WERE EASILY REMOVED DURING INSPECTION BY HAND AS WELL AS THE NOZZLES.)
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Construction/Loadline
Issued 14 December 1989
Resolved
CLEAN THE OIL FROM THE BILGES ON THE STARBOARD SIDE UNDER THE STABILIZER.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Navigation
Issued 14 December 1989
Resolved
REPAIR/REPLACE RUDDER ANGLE INDICATOR BAR ON THE PORT RUDDER POST IN AFTER STEERING COMPARTMENT.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Fire Fighting
Issued 14 December 1989
Resolved
HAVE FIXED CO2 SYSTEM SERVICED AND PROVIDE COPY OF THE REPORT TO THIS OFFICE.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Fire Fighting
Issued 14 December 1989
Resolved
MOUNT FIRE EXTINGUISHER IN THE ENGINEROOM WITH A PROPER BRACKET.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Lifesaving
Issued 14 December 1989
Resolved
PROVIDE THREE NEW ORANGE SMOKE DISTRESS SIGNALS FOR THE VESSEL.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Navigation
Issued 14 December 1989
Resolved
REPAIR/REPLACE FATHOMETER.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Engineering
Issued 14 December 1989
Resolved
REPAIR/REPLACE THE LAGGING ON EXHAUSTS IN SEWAGE TANK ROOM AND IN AFTER STEERING COMPARTMENTS.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Lifesaving
Issued 14 December 1989
Resolved
REMOVE THREE LIFEFLOATS FROM THE VESSEL UNTIL STAINLESS STEEL NET RINGS AREREPAIRED.(VESSEL IS WELL OVER THE 30% MARK FOR LIFEFLOATS SHOULD IT CHOOSE NOT TO REPLACE THEM ON THE VESSEL.)
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Electrical
Issued 16 December 1988
Resolved
LINE BATTERY BOXES WITH FIBERGLASS OR LEAD.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Navigation
Issued 16 December 1988
Resolved
REPAIR HYDRAULIC LEAK ON HOSE IN STEERING GEAR.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Documentation
Issued 16 December 1988
Resolved
OBTAIN PERMANANT STABILITY LETTER.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Construction/Loadline
Issued 16 December 1988
Resolved
LABEL EMERGENCY ESCAPE HATCH FROM LOWER LOUNGE.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Fire Fighting
Issued 16 December 1988
Resolved
SERVICE ALL PORTABLE FIRE EXTINGUISHERS BEFORE THE CARRAGE OF PASSENGERS.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Fire Fighting
Issued 16 December 1988
Resolved
SERVICE FIXED CO2 SYSTEM BEFORE THE CARRAGE OF PASSENGERS.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 16 December 1988
Resolved
REMOVE EXCESSIVE OIL AND WATER FROM BILGES IN ENGINEROOM.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Accommodation/Occupational Safety
Issued 16 December 1988
Resolved
CHAIN, LOCK AND LABEL MSD.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Navigation
Issued 16 December 1988
Resolved
DOUBLE NUT AND LOCK WASHER OR PIN AFT STEERING EQUIPMENT.
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 18 November 1987
Resolved
PROVIDE METALLIC, PERMANENT SUPPORTS AS APPROPRIATE FOR MAIN ENGINE SALTWATER COOLING SYSTEMS (3) PIPED WITH NON-METALLIC FLEXIBLE HOSE, SUCH THAT HOSES ARE FREE-STANDING, SUPPORTED, AND NOT ABLE TO BE CHAFED BY EXISTING VESSEL STRUCTURE.
Condition: Unknown
Due 18 November 1987
Resolved 18 November 1987
Accommodation/Occupational Safety
Issued 5 November 1987
Resolved
PROVIDE A SUITABLE RELIEF VALVE FOR THE HOT WATER HEATER WHICH RELIEVES LESS THAN OR EQUAL TO 100 PSI.
Condition: Unknown
Due 5 November 1987
Resolved 5 November 1987
Lifesaving
Issued 5 November 1987
Resolved
PROVIDE A SUITABLE RESCUE BOAT WITH A (4) PERSON CAPACITY AS PER 46 CFR 180.10-35 AND 46 CFR 160.056 AS ORIGINALLY INSTALLED ABOARD THE VESSEL, OR PROPOSE AN EQUIVALENT METHOD OF CONDUCTING RESCUE OPERATIONS FOR APPROVAL BY THE OCMI.
Condition: Unknown
Due 5 November 1987
Resolved 5 November 1987
Engineering
Issued 23 March 1987
Resolved
REPLACE ALL NONMETALLIIC PIPING MATERIALS IN VITAL SYSTEMS (M/E AND GEN. RAW WATER, BILGE SYSTEM, AND FIRE MAIN) WITH ACCEPTABLE METALLIC MATERIALS.
Condition: Unknown
Due 23 March 1987
Resolved 23 March 1987
Engineering
Issued 23 March 1987
Resolved
TAKE CLEARANCE READINGS OF THE PORT TAILSHAFT STERN TUBE AND STRUT BEARINGSAND REPLACE AS NECESSARY.
Condition: Unknown
Due 23 March 1987
Resolved 23 March 1987
Accommodation/Occupational Safety
Issued 5 November 1986
Resolved
INSTALL SCREW DOWN TYPE STOP VALVE JUST AFT OF THE COLLISION BULKHEAD.
Condition: Unknown
Due 5 November 1986
Resolved 5 November 1986
Lifesaving
Issued 5 November 1986
Resolved
REPLACE BOTH FLOAT FREE LINKS ON LIFEFLOATS.
Condition: Unknown
Due 5 November 1986
Resolved 5 November 1986
Construction/Loadline
Issued 5 November 1986
Resolved
REPLACE ALL BROKEN WINDOWS.
Condition: Unknown
Due 5 November 1986
Resolved 5 November 1986
Fire Fighting
Issued 5 November 1986
Resolved
FIXED CO2 BOTTLES NEED WEIGHING AND HYDRO TESTING.
Condition: Unknown
Due 5 November 1986
Resolved 5 November 1986