MAURY USCG vessel records
← All vessels

STAR OF THE NORTHEAST

STAR OF THE NORTHEAST is a 1978 passenger vessel (inspected). The Coast Guard has recorded 21 inspections since 2016, most recently in March 2026, along with 43 deficiencies and 2 casualty investigations between 2004 and 2025.

Records from 2004 to 2026. Most recent: inspection, 12 March 2026.

Built
1978
Last inspected
12 March 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 12 March 2026
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDP3423
Flag
UNITED STATES
Maury page id
psix-49676

Documentation record

Registered dimensions (L × B × D)100.1 ft × 22.6 ft × 8.6 ft
Registered tonnagegross 96 / net 65
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNICHOLS BROTHERS BOAT · FREELAND, WA, UNITED STATES · built 1978
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it96 - Regulatory (Subpart C or D), Gross Ton
65 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

NAUTICAL EMPRESS Passenger (Inspected) · MISLE 328228 · 21 March 2025 · activity 8099832

Inspection history · 21

12 March 2026 Annual Inspection · MSP Additional Oversight - Risk Assessment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8318622
21 January 2026 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8299298
21 March 2025 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8097693
21 March 2025 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 8099832
13 January 2025 Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8062962
9 December 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8045206
13 June 2024 Plan Review (Other than "T") · Deficiency Check · Construction Oversight · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7943740
3 May 2024 Deficiency Check · Inclining Experiment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7907973
26 January 2024 Construction Oversight · Administrative Inspection · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7856173
4 December 2023 COI Inspection · Administrative Inspection · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7834412
22 June 2023 Hull Examination · COI Inspection · Administrative Inspection · Examination of Repairs · Internal Structural Exam · Deficiency Check · Drydock Exam · MTSA Verification
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7720802
22 April 2022 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7437871
26 October 2020 Drydock Exam · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7085359
22 June 2020 Administrative Inspection
Administrative · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6986105
15 May 2019 Annual Inspection · Administrative Inspection · MTSA Verification · DAPI Audit · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6685186
15 October 2018 Drydock Exam · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6561982
4 May 2018 Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6441724
10 April 2017 Administrative Inspection · Deficiency Check · COI Inspection · Spot Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6129892
28 March 2017 Deficiency Check · Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6110647
6 May 2016 Deficiency Check · Annual Inspection · Spot Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5990790
29 March 2016 Spot Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5848159

Deficiency record · 43

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 March 2026 Resolved
All safety and relief valves for use on pressure vessels or piping systems must be designed to meet the protection and service requirements for which they are intended and must be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel or piping system. Relief valve installed on the pressure vessel was rated higher than maximum allowable working pressure. Replace relief valve. 46 CFR 54.15-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2026
Resolved 13 March 2026
Resolution: Rectified. New pressure relief valves installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 March 2026 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Impeller housing on the bilge power take-off system is missing bolt. Repair. 46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2026
Resolved 13 March 2026
Resolution: Rectified. New bolt was installed.
14 - Pollution Prevention › 143 - MARPOL Annex III › Other (MARPOL Annex III)
Issued 12 March 2026 Resolved
All personnel must complete the training specified in paragraphs (d)(1)(ii) through (v) of this section by January 12, 2026, and annually thereafter. Crew did not complete cyber security training. Complete cyber security training. 33 CFR 101.650(d)(4)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2026
Resolved 7 April 2026
Resolution: Rectified, Captain and crew received cyber security training.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 21 January 2026 Resolved
MI observed sealant covering hole on port side of lazarette, provide repair plan for approval by local OCMI prior credit Drydock.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: vessel conducted complete crop and renewal and NDT was conducted (vaccuum box)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 21 January 2026 Resolved
MI observed wastage on railings located amidship on stbd side. Repair prior credit Drydock.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Railing repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 January 2026 Resolved
MI observed vessel propellers detached from propeller shaft. Prior credit drydock refit propellers.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Propellers attached.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 21 January 2026 Resolved
MI observed frozen drainage scuppers, prior credit drydock provide proof of drainage scuppers unfrozen and tested.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Scuppers cleared. All sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 January 2026 Resolved
MI observed wastage on frame of aft STBD loading door. Provide repair proposal prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Frame repaired.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 May 2025 Resolved
"Each window... and its means of attachment... must be capable of withstanding the maximum load from wave and wind conditions expected due to its location on the vessel..." Vessel will have temporary window repair. Ensure vessel installs permanent windows adaquately w/in 14 weeks. 46 CFR 116.1020
Action required: 705 - Other - as specified
Resolved 27 May 2025
Resolution: Verified installation of permanent windows.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 March 2025 Resolved
(a) The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel sustained damage to the top deck, second deck, and main deck on the portside. Submit a repair plan for approval. Have an MI witness satisfactory repairs. 46 CFR 116.100(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2025
Resolution: Verified repairs.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 January 2025 Resolved
Alcohol test swabs not on board.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2025
Resolved 3 February 2025
Resolution: Verified presence of alcohol swabs.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 January 2025 Resolved
Number 3 high level bilge alarm not illuminating on panel.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2025
Resolved 3 February 2025
Resolution: Witnessed proper operation of #3 high bilge level alarm
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 December 2024 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel operator self-reported a casualty affecting an oil cooler serving the port transmission, rendering the transmission inoperative. Restore the transmission to full operation. Tech report, repair proposal, and MI witnessed sea trial prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 December 2024
Resolution: Witnessed SAT sea trials and DVTPs
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 27 June 2024 Resolved
Plans required to be submitted. Per email sent to you on April 24, 2024 requesting the following drawings be made available to us in response to MSC letter E1-2400926, Ref.(a), E2-2400925, Ref. (a), and revised drawings from MSC letters(s) E1-2400926, Ref.(d), & E2-2400925. In addition to the aforementioned, owner/operator to submit updated electrical plan that more accurately reflects the o/o intention to run the H-VAC system. 46 CFR 177.05-3 (a) "OLD T"
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2024
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 27 June 2024 Resolved
Plans requiring revision. Owner/Operator to revise drawing in clarifying the following MSC approval letter H2-2400253 to more accurately reflect the space categorization for all bulkheads & decks where the construction on the 2nd and 3rd decks are constructed of aluminum core. 46 CFR 177.05-3 (a) "OLD T"
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2024
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 27 June 2024 Resolved
Vessels shall be provided with at least two avenues of escape. During the engine room exam, means of escape was observed seized open and watertight gasket was compromised. Renew and make ready available all means escape from below decks are readily available in an emergency. 46 CFR 177.15-1 (a) "OLD T"
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 June 2024 Resolved
Bilge suctions shall have suitable strainers and opening at least 3 times the width of the pipe. During visual examination of the bilge system pick-ups some of the screens were missing and the pick-ups were undersized. Ensure adequate pick-ups and strainers are provided at the next dry-dock. 46 CFR 182-25-5(b) "OLD T" UPDATE: 7/1/24, as below; Bilge suctions shall have suitable strainers and opening at least 3 times the width of the pipe. During visual examination of the bilge system pick-ups some of the screens were missing and the pick-ups were undersized. Ensure adequate pick-ups and strainers are provided at the next winter 2024 / 2025 maintenance period.
Action required: 705 - Other - as specified
Resolved 3 February 2025
Resolution: Bilge strainer baskets installed at all pick-ups.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 June 2024 Resolved
Fire Detection system to be readily available at all times during the ships operation. During the walk-through of the system tested all pull stations and detectors. Ensure the following: Submit alternate arrangement proposal from the manufacturer to ensure back-up batteries are not drawn from while the ship is at the slip without shore power. Ensure forward pull station on the second deck accommodation was inoperable. Renew as appropriate. 46 CFR 181-405 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2024
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 June 2024 Resolved
Deck and Bulkhead penetrations. All electrical runs that penetrate fire boundaries should be sealed at least to the extent to maintain the fire rating of that boundary. Penetrations into the pilot house and in the engine room bullhead need to be sealed. Ensure this is completed prior to credit dry dock. 46 CFR 72.05-10
Action required: 705 - Other - as specified
Resolved 2 July 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 June 2024 Resolved
Provide OCMI with verifiable written vessel procedures identifying & requiring; roles & responsibilities, documentation in vessel logbook, and risk mitigation plans to address; 1) (de)energizing installed Fire Detection system prior to embarking, and after disembarking passengers due to lack of available shore-power & reserve battery drain 2) crew responsibilities and passenger management in event of a fire, due to lack of fire doors separating the main & 2nd deck accommodation spaces & aluminum blkhd on port main deck b/w Type (9) and Type (3) space. 46 CFR 122.510 46 CFR 11.524
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2024
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 June 2024 Resolved
Type approved installed Sea-Fire drawing no. 300-2640d and MSC Approved (per Ltr. E2-2400203, dtd Jan. 23, 2024) "Fire Detection, Alarm Arrangement, & System" Dwg. No. BMS-735-715-001, Sheet 2, dtd Dec.23, 2023 - do not correlate on fuse size / type and disconnect switch installed to 24v back-up battery arrangement. Provide clear evidence (via component part numbers) of compliance with approved dwg. OR unaltered type apprvd. Sea-Fire system, within 14 days. Installed Fire Detection system, as currently installed, was observed to operate as intended during power loss. 46 CFR 181-405 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 August 2024
Resolution: recieved approval letter from MSC
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 June 2024 Resolved
Pending OCMI approval of requested passenger increase, and prior to carriage of additional passengers, vessel must demonstrate proper outfitting & compliance with stowage requirements for Life Jackets to the satisfaction of attending MI's. 46 CFR 117.71 46 CFR 117.78
Action required: 705 - Other - as specified
Resolved 7 August 2024
Resolution: Couted sat number of life jackets and witnessed stowage
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 June 2024 Resolved
Plans requiring approval. Referencing MSC Letter Serial: H2-2402512, dtd June 27, 2024, which Returned for Revision, Ref.(b), Dwg. BMS-735-910-001, Rev.A. Upon MSC Approval of the re-submitted "Space Designation & Insulation Boundaries" drawing from Blancke Marine Services, BMS-735-910-001, (now Rev. D) - comply with space and boundary installation & insulation requirements of approved drawings, within 30 days of approval. 46 CFR 177.05-3 (a) "Old-T"
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 August 2024
Resolution: Verified installation
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 27 June 2024 Resolved
Receive OCMI and/or MSC approval, as applicable, via submitted plans, prior to commencing any additional alterations or installations affecting vessel safety. 46 CFR 115.700
Action required: 705 - Other - as specified
Resolved 7 August 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 December 2023 Resolved
33 CFR 104.105(a)(6) This part applies to the owner or operator of any: Passenger vessel certificated to carry more than 150 passengers. Vessel has applied for a PVA ASP and is awaiting response. Vessel is certificated to carry not more than 150 passengers until the following requirements are met: 1. Provide PVA acceptance letter from PVA. 2. Provide security assessments for all intended moorings. This carriage requirement is only valid for 30 days. After 30 days the vessel will not be authorized to carry passengers unless the above items have been satisfied by an attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 December 2023
Resolution: PVA acceptance letter provided.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 December 2023 Resolved
Testing or renewal of flexible connections and discharge hoses on semiportable extinguishers and fixed gas extinguishing systems in accordance with § 147.65 in subchapter N of this chapter. Flexible connections on CO2 bottles required replacement. Certified servicing technicians were on-scene to replace.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 December 2023
Resolution: Witnessed the renewal of new flexible connections on the same day as the 3rd party had them in stock and were able to renew on site.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 December 2023 Resolved
At each initial and subsequent inspection for certification, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment, including ...Inspection and testing of smoke and fire detecting systems (including sensors and alarms). Prior to carriage of passengers, demonstrate proper operation of currently installed fire indicating arrangement at operating station.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 December 2023
Resolution: O/O provided acceptable video evidence and verified onboard 26Dec23 of proper fire detector and helm audio / visual alarm operation of system as installed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 December 2023 Resolved
Propulsion machinery spaces must be equipped with a fire detection and alarm system of an approved type that is installed in accordance with part 76 in subchapter H of this chapter, except when a fixed gas fire extinguishing system that is capable of automatic discharge upon heat detection is installed or when the space is manned. Vessel shall install an approved fire detection system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 30 August 2024
Resolution: Resolved - Rcvd MSC Approval of fire detection system as built / installed
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2023 Resolved
Employers must maintain records of chemical tests as provided in 49 CFR 40.333 and must make these records available, to satisfy the requirements of §§ 16.210(b) and 16.220(c) of this part AND to identify the total number of individuals chemically tested annually... including the annual number of individuals failing chemical tests... Owner / Operator to schedule a Drug and Alcohol Program audit. Audit form provided.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Audit form provided.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 4 December 2023 Resolved
A hatch cover must: (1) Have securing devices; and (2) Be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Vessel shall install retaining device to hatch all hatch covers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Retaining device on hatch all hatch covers.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 December 2023 Resolved
Vessel must be provided with a visual and audible alarm at the operating station to indicate a high water level in unmanned spaces with through-hull fittings below deepest load waterline, machinery spaces with sea water piping, or spaces with non-watertight closures. Bilge alarms were only observed in #3 Hold, Engine Room, and Lazarette. Vessel shall demonstrate proper operation of high water alarms in all required spaces.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Vessel demonstrated proper operation of bilge high level water alarms
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2023 Resolved
In systems where flexible hoses are permitted to be clamped: (1) Double hose clamping is required on each end of the hose, unless pipe ends are expanded or beaded to provide a positive stop against hose slippage. Double hose clamps were missing from two (02) locations along starboard ships service diesel generator (SSDG) exhaust discharge piping at the side shell.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Double hose clamping installed on starboard SSDG exhaust
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 December 2023 Resolved
All observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Lube oil leak was observed on outboard side of exhaust manifold gasket of starboard SSDG.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 24 January 2024
Resolution: O/O provided video evidence of correction with engine running.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2023 Resolved
The official number of the vessel...must be marked on some clearly visible interior structural part of the hull... Owner / Operator shall permanently affix Official Number to vessel interior, as prescribed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 24 January 2024
Resolution: O/O provided photo evidence of correction.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2023 Resolved
The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Remove or cover previous hailing port and provide clear marking of current hailing port on stern.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 24 January 2024
Resolution: O/O provided photo evidence.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 December 2023 Resolved
Portable fire extinguishers must be located so that they are clearly visible and readily accessible from the space being protected, and installed in proper brackets. Ensure proper brackets and installation for all portable fire extinguishers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 January 2024
Resolved 26 December 2023
Resolution: Proper brackets installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2023 Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. All electrical equipment and circuits must be clearly marked and identified. Ensure switchboard door covers close securely and ensure proper labeling of electrical breakers / circuits.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 24 January 2024
Resolution: O/O provided photo evidence of correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2023 Resolved
All pressure vessels must be provided with protective devices. Pressure-relieving devices shall be constructed, located, and installed so that they are readily accessible for inspection and repair. Pressure relieving device requires renewal. Pressure set-point could not be determined during inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 23 January 2024
Resolution: Rcvd photos from O/O correcting Press. Relief Device def.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 December 2023 Resolved
All automatically or remotely controlled or monitored vital systems addressed by part 62 of this subchapter must be subjected to tests and inspections to evaluate the operation and reliability of controls, alarms, safety features, and interlocks. Test procedures must be submitted to the Coast Guard for approval. Owner / Operator shall provide Design Verification Testing Procedures (DVTPs) for review, and ensure Periodic Safety Test Procedures (PSTPs) are made available for periodic testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 4 January 2024
Resolution: O/O provided DVTP & PSTPs and MSC approval ltr from 2015,2018, respectively.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 15 May 2019 Resolved
Fire dampers (04) were not operational remotely. Ensure fire dampers are operational.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2019
Resolved 11 June 2019
Resolution: Tested satisfactory
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 26 April 2017 Resolved
Repair port vent closure to engine room
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 26 April 2017
Resolution: Vent closure repairs and works satisfactorily.
Engineering › Sea-water System (primary cooling) › Piping
Issued 26 April 2017 Resolved
double clamp hose on center MDE
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 26 April 2017
Resolution: second clamp added
Engineering › Fuel Oil Service System › Hose
Issued 10 May 2016 Resolved
Replace hoses on fuel lines of generators with approved SAE J-1942 for fuel.
Action required: 705 - Other - as specified
Due 10 June 2016
Resolved 25 May 2016
Resolution: Hoses were replaced satisfactorily

Casualty record · 2

25 July 2004Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 2147408
21 March 2025Significant Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 8099832
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

STAR OF THE NORTHWEST (2004). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.