Records from 2016 to 2025. Most recent: inspection, 25 June 2025.
Inspection history · 11
25 June 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8157858
30 April 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7879583
6 June 2023
Drydock Exam · Examination of Repairs · Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7690593
19 May 2022
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7434139
14 April 2021
Examination of Repairs · Drydock Exam · Internal Structural Exam · COI Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7175313
3 April 2020
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6931009
23 April 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6661420
19 March 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6649464
11 June 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6441089
23 May 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6152531
15 February 2016
COI Inspection · Construction Oversight · Drydock Exam · Simplified Stability Test
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5818263
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. A crack, approximately 3", in the bottom plate of the engine room was discovered IVO STBD main engine. Slow water intrusion was noted. Crop and renew affected area.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. Fractures, approximately 8", in the side shell of the engine room was discovered IVO STBD main engine where previously clad welded. Crop and renew affected area.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. P/S rudder post structural supports have cracked and separated. Crop and renew affected area.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. Strut structural supports have cracked and separated. Crop and renew affected area.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 June 2023
Resolved
Piping used in a vital system must be composed of as permitted by ferrous of nonferrous metallic piping materials. Flexible hose was found in numerous locations of the bilge system. Renew piping arrangements to authorized material.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 January 2024
Resolution: Vessel corrected piping materials. All Sat.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 8 June 2023
Resolved
Electrical equipment used in machinery spaces must be drip proof. Fuel pump bus bar was mounted with no protection from water in the engine room. Remount in a drip proof arrangement.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 September 2023
Resolution: Completed satisfactory electrical repairs.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. In void #2, STBD side shell received damage resulting in numerous separated stitches and cracked welds. Grind and reweld.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all watertight closures in the hull, decks, bulkheads such as through hull fittings and sea valves. In void #2, an abandoned transducer was found; noted signs of water intrusion. Crop and renew.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all watertight closures in the hull, decks, bulkheads such as through hull fittings and sea valves. In void #2 and ER, capped through hull fittings for abandoned systems were identified with rubber wrappings. Make available for inspection to determine condition.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 January 2024
Resolution: Vessel made fittings available for inspection. All Sat.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. Fwd/Aft ER bulkhead has existing repairs which have failed, and numerous cracks/fractures throughout bulkhead. Crop and renew affected area.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 8 June 2023
Resolved
Fuel tanks must be adequately supported and braced to prevent movement. Fuel tank mounting arrangements were missing bolts and had numerous cracked weld on the supports. Conduct needed repairs/install necessary bolts.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, weather deck. In lazarette, aft mooring bits improperly installed utilizing a doublerplate with incomplete welds; resulting in deck wastage and cracking of the deck plate. Crop and renew; properly install mooring bits.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. In lazarette, where deck plate meets transom, numerous previous repairs have failed; resulting in deck cracking, broken welds, and water intrusion. Crop and renew affected area.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 September 2023
Resolution: Completed satisfactory repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 8 June 2023
Resolved
Starting motors, generators, and any spark producing device must be mounted as high above the bilges as practicable. Main engines were missing proper mounting arrangements and the mounting supports were cracked in numerous locations. Repair mount supports and properly mount engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2023
Resolution: Completed satisfactory repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 June 2023
Resolved
Each life jacket must be marked with Type I retroreflective material. Retroreflective tape of numerous life jackets failed. Renew retro.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2023
Resolution: Renewed PFDs. All Sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 June 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Dead-ended wiring was found in Void #2. Remove/Properly secure.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. Fwd Port side of engine, main deck cracking was observed. Crop and renew affected area(s).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2023
Resolution: Completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 8 June 2023
Resolved
Owner/operators shall have the vessel ready for inspection, including all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. Engine room hatch covers were cracking in the corners. Repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2023
Resolution: Completed satisfactory repairs.