Records from 2016 to 2017. Most recent: inspection, 30 November 2017.
Fire Fighting › Portable Foam Applicators › General
Issued 16 May 2016
Resolved
Eductor was inoperable onboard. required vessel rep to provide operable eductor prior to carrying portable tanks and within 7 days.
Due 23 May 2016
Resolved 23 May 2016
Resolution: vessel rep provided reciept for new eductor.
Communications › Radio Communications › EPIRB
Issued 16 May 2016
Resolved
EPIRB Battery was expired. restricted vessel to 3NM until EPIRB battery was replaced.
Due 23 May 2016
Resolved 23 May 2016
Resolution: recieved reciept for new EPIRB Battery.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 16 May 2016
Resolved
junction box for the fuel pump comtroller was wasted and not electrically isolated. required vessel rep to provide electricaly safe pump controller housing.
Due 23 May 2016
Resolved 23 May 2016
Resolution: on first attempt vessel rep incorrectly installed cables entering junction box, provided feed back requiring the cable to be inserted in to the box. vessel rep provided sufficent photoraphic evidence of satisfactory installation.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 16 May 2016
Resolved
Vessel had about 8 inches of oil water mixture in the bilge, about 4 inches of it was oil mixture and about 4 inches of it was water. required vessel rep to pump down the bilge in order to prevent a stability and fire hazard. within 7 days.
Due 23 May 2016
Resolved 23 May 2016
Resolution: vessel rep provided pictures of dry bilge where there had previously been sludge.
Fire Fighting › Fire Pumps › Gland Sealing
Issued 16 May 2016
Resolved
fire monitor(not required fire pump) leaked heavily out of the impeller packing gland during operation. required vessel rep to repair it prior to operating as a standby vessel and within 30 days.
Due 16 June 2016
Resolved 23 May 2016
Resolution: vessel rep requested to amend their coi to remove the standby endorsement. documented requirments to return to standby service in the narrative. cleared defeciency pending delivery of new COI to vessel.
Stability › Watertight Integrity › General
Issued 16 May 2016
Resolved
watertight wire runs into engine room were not watertight and were missing required sealing material.
Due 23 May 2016
Resolved 23 May 2016
Resolution: vessel rep provided picture of sufficent watertight penetration sealant onboard.
Engineering › Compressed Air System (start air) › Valve
Issued 16 May 2016
Resolved
pressure relief valve was painted with paint coating springs and relief mechanism. required vessel rep to provide replacment relief valve.
Due 23 May 2016
Resolved 23 May 2016
Resolution: vessel rep provided reciept for new pressure relief valve.
Communications › Radio Communications › VHF Radiotelephone
Issued 16 May 2016
Resolved
Vessel did not meet all requirments for an over 200 NM voyage found in 47CFR80.905. requried vessel rep to meet all requirments of 47CFR80.905.
Due 23 May 2016
Resolved 23 May 2016
Resolution: vessel rep requested to amend route to under 200 NM in order not to meet 47CFR80.905 requirments for over 200NM.