MAURY USCG vessel records
← All vessels

RESOLVE PIONEER

Built
1978
Last inspected
17 March 2026
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.

Inspection record

Last inspected 17 March 2026
…with no type recorded6
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7528843
WDD8846
Flag
UNITED STATES
Maury page id
psix-49860

Documentation record

Tonnage as PSIX records it299 - Regulatory (Subpart C or D), Gross Ton
1058 - Convention (Subpart B), Gross Ton
203 - Regulatory (Subpart C or D), Net Ton
317 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 43 inspections, each with its date, unit and type; 49 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; 1 other recorded name; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 43

17 March 2026 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8327749
28 May 2024 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7924213
28 March 2024 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7886122
24 February 2024 Examination of Repairs
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7869592
25 September 2023 Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7798228
9 September 2023 Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7788683
20 June 2023 Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7719487
4 May 2023 Examination of Repairs · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7711446
3 April 2023 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7662184
20 February 2023 Administrative Inspection
Administrative · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7711414
10 January 2023 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7620896
9 January 2023 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7633272
9 August 2022 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7529371
22 February 2022 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7400303
25 January 2022 Administrative Inspection
Administrative · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7385696
3 November 2021 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7344702
20 June 2021 Type not recorded
No type recorded · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7261648
4 May 2021 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7206621
8 March 2021 Administrative Inspection
Administrative · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7152528
22 February 2021 Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7124809
31 July 2020 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7039403
22 June 2020 Internal Structural Exam · Deficiency Check · Administrative Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6974370
11 May 2020 DAPI Audit · Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6951441
10 March 2020 Administrative Inspection · Drydock Extension
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6926375
27 February 2020 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6917284
15 November 2019 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6856073
17 June 2019 Administrative Inspection
Administrative · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6716970
13 May 2019 MTSA Verification · DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6681371
25 July 2018 Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6491322
23 May 2018 Damage Survey
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6421886
23 May 2018 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6563420
14 May 2018 MTSA/ISPS Verification · DAPI Audit · Periodic Inspection · Ballast Water Examination
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6414538
17 April 2018 Examination of Repairs
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6400629
13 April 2018 Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6395188
22 December 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6327797
15 December 2017 Damage Survey
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6327261
10 December 2017 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6321877
6 December 2017 Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6334465
25 July 2017 Drydock Exam · Simplified Stability Test · Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6219899
3 July 2017 Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6220561
18 May 2017 MTSA Verification · DAPI Audit · Annual Inspection · Ballast Water Examination
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6149740
18 July 2016 Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 5948735
12 February 2016 COI Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 5816403

Deficiency record · 49

03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 28 March 2024 Resolved
Each Class 1 door on a vessel in ocean service must be designed to withstand a head of water equivalent to the depth from the sill of the door to the margin line but in no case less than 10 feet. Three of the four QAWTDs onboard vessel were out of adjustment and did not securely close. Adjust doors to ensure all doors completely and securely close.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2024
Resolved 3 April 2024
Resolution: Verified subject QAWTDs were adjusted and closing properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 March 2024 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Two junction boxes in the bow thruster room did not close securely and personnel were exposed to energized parts. Secure junction boxes securely.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2024
Resolved 3 April 2024
Resolution: Ensured junction boxes were closing properly and no longer presenting electrical hazards.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 March 2024 Resolved
Electric installations on vessels must ensure:Protection of passengers, crew, other persons, and the vessel from electrical hazards. Several wiring cables were pulled from junction box through stuffing tubes in bow thruster room. Ensure all electrical cables are properly inserted in stuffing tubes and tightened to keep in place.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 April 2024
Resolution: Verified wiring cables were properly inserted in stuffing tubes and tightened to keep in place and no longer presenting electrical hazards.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 28 March 2024 Resolved
Entries shall be made in the Oil Record Book on each occasion, on a tank to tank basis if appropriate, whenever any of the following machinery space operations take place on any ship to which this section applies—) Disposal of oil residue. Improper entry in Oil Record Book regarding discharge of oil. Correct entry and provide supplementry training to all individuals who make ORB entries on proper ORB entries.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 April 2024
Resolution: Verified crew/company took appropriate corrective actions including: documenting non-conformance thru company and conducted training with crew.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 February 2024 Resolved
The respective piping systems installed on ships shall be constructed for the safe and efficient operation of the vessel. A hole in the keel cooler vent piping prevented adequate cooling water to the number two generator, causing the generator to be secured. The section of piping shall be removed, and replaced with satisfactory piping materials, and verified by the attending Coast Guard Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2024
Resolved 24 February 2024
Resolution: Verified completion of repairs
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 21 November 2023 Resolved
"Systems of the type indicated in § 95.15–5(d), other than systems for tanks, which are of more than 300 pounds of carbon dioxide, shall be fitted with an approved delayed discharge so arranged that the alarm will be sounded for at least 20 seconds before the carbon dioxide is released into the space." During the vessels annual exam in May 2023, the time delay for the fixed fire suppression system failed the above requirements. A certified fire technician shall successful complete the time delay testing, in the presence of a CG Marine Inspector. If during impending testing, the time delays fail, this CG-835 will be changed to a Code 17, and the vessel will not be allowed to operate until the testing is completed successfully.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 21 December 2023
Resolved 31 January 2024
Resolution: Certified fire suppression company was able to successfully conduct the time delay within the -0/+20% allowance of the rated time delay period.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 April 2023 Resolved
At least two lifebuoys, each with self-activating smoke signals, must be stowed where they can be quickly released from the navigating bridge and should, when released, fall directly into the water without striking any part of the vessel; lifebuoys on vessel's bridge wings were not bridge buoys (insufficient weight) and would not fall directly into the water, as no release mechanism is provided (lifebuoy and smoke signal require movement from side of pilothouse). Vessel must provide bridge buoys and sufficient stowage to meet regulation.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2023
Resolved 31 May 2023
Resolution: One quick-release device was fabricated, installed, and tested to the satisfaction of the CG. The vessel is presently fabricating another of the same design to fully rectify the deficiency.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 3 April 2023 Resolved
Each fire pump must be capable of delivering water simultaneously from the two highest outlest at 50 psi; vessel's pump provided 46-48 psi; must provide the minimum pressure of 50 psi as required.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2023
Resolved 2 May 2023
Resolution: Witnessed operational test with 64psi provided.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 3 April 2023 Resolved
Each power ventilation system must have the circuit breakers for ventilation grouped on the main switchboard and marked, "IN CASE OF FIRE TRIP TO STOP VENTILATION." Vessel's switchboard was not marked as such.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2023
Resolved 2 May 2023
Resolution: Labeling provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 April 2023 Resolved
Main propulsion machinery must be provided with automatic shut-off controls in accordance with 46 CFR Part 62; vessel's starboard main engine low lube oil shut-off did not automatically shut down the engine; must provide shut-offs as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2023
Resolved 2 May 2023
Resolution: Witnessed satisfactory s/o of starboard main.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 April 2023 Resolved
Periodic testing of vital systems' procedures must no simulate monitored system conditions by mis-adjustment, artificial signals, improper wiring, tampering, or revision of the system unless the test would damage equipment or endanger personnel; PSTP for jacketwater not practicable; vessel must re-evaluate the procedure and re-submit revision for approval in accordance with 46 CFR 61.40-1.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2023
Resolved 31 May 2023
Resolution: C/E provided a receipt as proof of purchase of the dry block temperature tester. He is to call the office upon delivery of the item.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 April 2023 Resolved
Chemical testing of personnel must be conducted as required by this subpart and in accordance with the procedures detailed in 49 CFR part 40; vessel could not provide evidence of company-run testing nor consortium enrollment. Must provide evidence of such.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2023
Resolved 2 May 2023
Resolution: Obtained documentation to satisfaction of MI.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 22 February 2022 Resolved
Each vessel msut have an amplifier-type announcing system that will supplement the general alarm system; vessel does not have a functional public address system (PA system) onboard. Must provide a satisfactory PA system to meet inspection subchapter requirements.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 March 2022
Resolved 6 April 2022
Resolution: PA system intalled onboard and satisfactorily tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 February 2022 Resolved
Each lifebuoy must be approved under 46 CFR 160.150; three lifebuoys were outfitted with silicone instead of approved plugs. Must provide means for buoys to be IAW 46 CFR 160.150.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 March 2022
Resolved 6 April 2022
Resolution: New liferings provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 February 2022 Resolved
Each generator prime mover mst be outfitted with an overspeed device IAW regulation; #2 generator overspeed inoperatble then starter inoperable. Must show satisfactory test to attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 February 2022
Resolved 23 February 2022
Resolution: Generator #2 tested satisfactorily in presence of attending MI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 4 May 2021 Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm set-points, the procedure to be followed, and the expected test result. Both Ship Service Generator's low lube oil pressure automatic shutdowns were not shutting down in accordance with the vessel's current Periodic Test Procedures (PSTP). Submit an amendment of the vessel's current PSTP for the RESOLVE Pioneer's Alarm Testing Procedures (Procedure Number: EG-1) (Testing Generator Low Lube Oil Pressure Alarm and Shut-down), on company letterhead to USCG MSD Dutch Harbor. In the letter, specify what you are modifying and what steps you are looking to add/remove for the CG to approve the amendment to the PSTP and a reason for the modification. Consult with the manufacturer's instructions to obtain the automatic shutdown parameters of the engine and include them in the letter. In addition, after approval of PSTP, vessel must demonstrate proper testing of automated vital system in accordance with 46 CFR 62.30-10 to the satisfaction of the attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 21 June 2021
Resolution: Procedure was amended by the company and accepted by Sector Anchorage
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 23 February 2021 Resolved
All ships of 150 gross tonnage and upwards and passenger ships irrespective of size shall, in addition to the requirements of paragraph 2.1, be fitted with: a bridge navigation watch alarm system (BNWAS), as follows: cargo ships of 150 gross tonnage and upwards but less than 500 gross tonnage constructed before 1 July 2011, not later than the first survey after 1 January 2018. Vessel does not have an installed BNWAS. Install a BNWAS prior to sailing international to the satisfaction of the attending USCG Marine Inspector.
Action required: 702 - Prior to embarking on international voyage
Resolved 4 May 2021
Resolution: Vessel installed BNWAS, test sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 23 February 2021 Resolved
Automated vital systems must be tested in accordance with subpart 61.40 of this chapter. Vessel was not able to demonstrate the proper low LO level alarm and shutdown on the #2 SSDG IAW the approved PSTP for automation. Vessel must demonstrate proper testing of #2 SSDG to the satisfaction of the attending USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 31 May 2021
Resolved 28 May 2021
Resolution: Vessel will be ammending the test procedure document for the SSDG's low lube oil shut-down, to reflect its current shutdown parameters. Issued new CG-835 on 28MAY21 for them to ammend procedures.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 June 2020 Resolved
Propulsion shaft oil anlysis has not been conducted on a semi-annual basis as required by 46 CFR 61.20-17(e)(3). Provide sampling history and records to prove recommended oil change has been conducted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 August 2020
Resolved 21 August 2020
Resolution: Vessel had oil sample drawn and tested, sample was drawn 11AUG2020.Test reported no abnormalities.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 22 June 2020 Resolved
Crop and renew wasted quick acting hatch sealing ring for chain locker, located in galley.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 August 2020
Resolved 21 August 2020
Resolution: WTH was renewed and to the satisfaction of the attending CG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 May 2020 Resolved
There shall be at least two means of escape from all general areas accessible to where the crew may be quartered or normally employed. 02 emergency escape hatches for the engine room have thicker gasket material that requires the hatches to be ratcheted down with additional force - utilizing a wrench. This additional force makes it impossible for crew members to escape the engine room, utilizing the hatch, without the assistance of a wrench.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 May 2020
Resolved 18 May 2020
Resolution: Gaskets renewed with correct size and securing dogs correctly adjusted.
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 11 May 2020 Resolved
For each watertight door in a required subdivision bulkhead, an indicator light must be installed in the pilothouse. The watertight door indicating panel, located in the pilothouse, does not illuminate for the engine room door due to a faulty sensor.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2020
Resolution: Door switch renewed.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Certification, verification and control
Issued 11 May 2020 Resolved
Every Company should develop, implement and maintain a safety management system which includes: instructions and procedures to ensure safe operation of ships and protection of the environment in compliance with relevant international and flag legislation. The instructions and procedures are not followed onboard. SMS procedures audit is required to be conducted by RO.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2020
Resolved 31 July 2020
Resolution: Vessel had ABS conducted the external SMS audit.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 11 May 2020 Resolved
Inspector not limited from making such tests or inspections deemed necessary. Vessel crew is unable to demonstrate operation of installed OWS (OWS not required per CFR.)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 June 2020
Resolution: Crew demonstrated proper operation.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 May 2020 Resolved
No change shall be made in the vessel's structure, equipment, arrangement, material, or scantlings without the specific approval of the assigning and issuing authority. Vessel has a temporary repair, located at the outboard port side "tugger deck", that uses a doubler plate and silicon for repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2020
Resolved 13 July 2020
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 11 May 2020 Resolved
Items found to be in unsatisfactory condition shall be repaired or renewed in order to place the vessel in satisfactory condition. Vessel has a separated weld located centerline about 20' aft of the H bit. Significant corrosion also identified at the H bit deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2020
Resolved 13 July 2020
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 11 May 2020 Resolved
It shall be to the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment is provided, maintained and replaced as indicated. Visual inspection of fires hoses, located interior and exterior, show signs of degradation. Recommend 100 PSI test of hoses for verification.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2020
Resolved 19 May 2020
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 11 May 2020 Resolved
Each self-propelled vessel over 150 gross tons when engaged on an international voyage must have on board an efficient daylight signaling lamp that may not be solely dependent upon the vessel's main source of electrical power. Vessel's signaling lamp does not have independent power supply.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2020
Resolved 22 May 2020
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 11 May 2020 Resolved
Entries shall be made in the oil record book (ORB) on each occasion to include disposal of oil residues, discharge overboard or disposal otherwise of bilge water that has accumulated in machinery space. The ship's master should obtain from the operator of the reception facility receipts that detail the discharge. The ORB did not have receipts of discharge kept with the ORB.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 May 2020
Resolution: Receipts acquired from receiving facility for past three transfers. (Resolve Marine)
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 11 May 2020 Resolved
If your vessel's Certificate of inspection is renewed less often than annually the marine inspector must check the settings of the safety or relief valves twice every 5 years but no more than 3 years may lapse. Relief valves are due for testing, however calibrated test gauges have not been calibrated in many years.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2020
Resolved 13 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 May 2019 Resolved
Unable to operate generators in parallel as designed. Prove proper operation of generators in parallel and reverse power relay per PSTP's.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 14 May 2019
Resolution: Tech was hired who adjusted frequency for both gens. Successfully ran both gens in parellel and tested reverse power relay on both. Def Cleared.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 13 May 2019 Resolved
Vessel has two port and stbd tonnage openings on the main deck that were found with caulking and gaskets. Required to remove gaskets and caulking to meet regs.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 23 May 2019
Resolution: Tonnage openings were removed and straightened. Caulk and gasket was removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 May 2019 Resolved
Two watertight doors on maindeck aft house bulkhead failed the chalk test and were found with loose dogs. Make all watertight doors watertight.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 23 May 2019
Resolution: Water tight doors were adjusted and passed chalk test.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 13 May 2019 Resolved
Reach rod for the #9 fuel shutoff valve located on port side of engine room was found inoperatable. Prove proper operatin of remote valve.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 14 May 2019
Resolution: Crew replaced broken cotter pin and showed proper operation of reach rod.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 May 2019 Resolved
Numerous electrical installations around the ship were found deadended. Power strips were found daisy chained. Extension cords were found as permanent installations. Replace extension cords were approved wire, remove daisy chained power cords, and remove deadended cables or place in junction box.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 23 May 2019
Resolution: All identified electrical issues were repaired or removed.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 13 May 2019 Resolved
Lagging around exhaust manifold on bowthruster engine was sagging and exposing hot surface near fuel source. Replace or re-secure lagging around manifold.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 23 May 2019
Resolution: Lagging was re-wrapped around exhaust.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 May 2019 Resolved
Crew installed a home use battery charger in the welding room via zip ties. Replace with an approved battery charger and properly install charger.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2019
Resolved 14 May 2019
Resolution: Charger was removed from service. Def Cleared.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 13 May 2019 Resolved
Employers must maintain records of chemical test as provided in 49CFr40.33 and must make these records available to the coast Guard upon Request. Vessel could not provide DAPI documentation for the crew to include pre-imployment test and enrollment with a consortium. Provide requested documents.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 23 May 2019
Resolution: DAPI records were provided for all crewmembers on board.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 13 May 2019 Resolved
Entries shall be made in the oil record book on each occasion to include disposal of oil residues, discharge overboard or disposal otherwise of bilge water that has accumulated in machinery space. The ORB did not match any receipts for disposal of oily waist over the last two years.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 13 May 2019
Resolved 13 May 2019
Resolution: Conducted training with Master and Chief Engineer on the requirements of the Oil Record book.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 13 May 2019 Resolved
Hand railing on the starboard side was found wasted and cracked. Repair or replace hand rails.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2019
Resolved 23 May 2019
Resolution: hand railings were repaired.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 May 2019 Resolved
Could not provide documentation that EAP training was being conducted.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2019
Resolved 17 June 2019
Resolution: Received documentation of completed DAPI training.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 23 May 2018 Resolved
Remove exhaust lagging on STBD exhaust piping and adjust piping to ensure it does not chaff on electrical wiring from house generator.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 6 June 2018
Resolved 25 July 2018
Resolution: Piping was adjusted, lagging replaced and wiring re-ran and support to ensure wire didn't chaff. Def cleared.
Documentation › Logs/Records › Drug Test Records
Issued 14 May 2018 Resolved
Must have the ability to conduct chemical testing while underway outside 32hrs from testing facility.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 May 2018
Resolved 14 May 2018
Resolution: Captain was certified and received chemical testing equipment from local testing facility.
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 17 April 2018 Resolved
Refer to OCMI letter dated 26 Apr 2018.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 June 2018
Resolved 25 July 2018
Resolution: Primary mechanical pump for port controllable pitch propeller was replaced and tested satisfactory. Def Cleared.
Lifesaving › Rescue Boat › Inflated Condition
Issued 18 August 2017 Resolved
Rescue boat must be in satisfactory condition prior to departure from dry dock.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2017
Resolution: Corrected.
Lifesaving › Rescue Boat › Construction
Issued 18 August 2017 Resolved
Rescue boat must be USCG approved under 46CFR160.056 and equipped as per 46CFR199.175.
Action required: 705 - Other - as specified
Due 30 January 2018
Resolved 24 January 2018
Resolution: Corrected.
Engineering › Pressure Vessel › Weld
Issued 18 August 2017 Resolved
Each pressure vessel listed on the COI must be either internally examined or hydrostatically tested tested to 1.25 MAWP to the satisfaction of attending marine inspector.
Action required: 705 - Other - as specified
Resolved 8 September 2017
Resolution: Corrected.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 23 May 2017 Resolved
The low lube oil pressure shutdown for the port mde did not operate as required by the approved automation test procedures.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 July 2017
Resolved 3 July 2017
Resolution: Verified the repair of the Port MDE was made and verified operation.
Operations/Management › Vessel Activity › Other
Issued 18 May 2017 Resolved
The vessel's 2017 annual inspection was started on 18MAY17 (to begin prior to the end of its annual inspection window), but could not be completed without a qualified USCG Machinery Inspector. The vessel must complete its annual inspection with a qualified USCG Machinery Inspector to conduct the machinery portion of the inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 23 June 2017
Resolution: Machinery inspection was completed with 01 deficiency issued. //[name withheld]//

Recorded names · 1

PIONEER SERVICE (2002–2004). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.