MAURY USCG vessel records Sign in
← All vessels

NEW LONDON

NEW LONDON is a 1979 passenger vessel (inspected). The Coast Guard has recorded 121 inspections since 1984, most recently in April 2026, along with 187 deficiencies and 8 casualty investigations between 2007 and 2025.

Records from 1984 to 2026. Most recent: inspection, 21 April 2026.

Built
1979
Last inspected
21 April 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WYW9986
Flag
UNITED STATES
366925620
Maury page id
psix-50253

Inspections, by type

…with no type recorded31
Years with a record 41 calendar years (1984–2026)
The 121 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)247.4 ft × 42.0 ft × 15.1 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)247.4 ft × 42.0 ft × 15.1 ft
ITC tonnagegross 1,170 / net 351
BuilderCROSS ISLAND FERRY SVCS · NEW LONDON, CT, UNITED STATES · built 1979
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 3 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
1170 - Convention (Subpart B), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
351 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WYW9986MMSI 366925620 · active · compulsorily equipped · granted 25 January 2024, expires 13 April 2034
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

M. V. JOHN H. Passenger (Inspected) · MISLE 329171 · 20 April 2007 · activity 2914399

Inspection history · 121

21 April 2026 Examination of Repairs
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8372628
30 December 2025 Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8289280
16 November 2025 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8277450
16 September 2025 Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8236310
1 July 2025 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8177932
6 November 2024 Deficiency Check · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8029759
11 December 2023 Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7837556
4 October 2023 Deficiency Check · COI Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7801936
18 January 2023 Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7622544
22 July 2022 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7513881
21 July 2022 Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7513720
21 July 2022 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7517632
23 February 2022 Deficiency Check · Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7398435
23 December 2021 Special Consideration
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7371991
20 October 2021 Deficiency Check · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7335822
9 March 2021 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7158411
9 March 2021 Damage Survey · Administrative Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7161023
23 December 2020 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7115473
23 September 2020 MTSA Verification · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7059983
19 August 2020 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7037250
15 May 2020 Hull Examination · Internal Structural Exam · Re-Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6955977
6 April 2020 Special Consideration
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6935968
6 November 2019 Annual Inspection · MTSA Verification
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6849356
15 January 2019 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6611787
15 January 2019 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6614532
13 June 2018 Examination of Repairs · COI Inspection · Internal Structural Exam · Hull Examination · Inclining Experiment · Plan Review (Other than "T")
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6458321
22 September 2017 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6272444
16 November 2016 MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6042129
21 October 2016 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6028345
6 May 2016 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5870328
31 March 2016 Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5844657
1 December 2015 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5769347
29 October 2014 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5015755
28 October 2014 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5014175
22 October 2014 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5011546
1 October 2014 Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4996929
28 February 2012 Special
Type not classified · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4252864
12 January 2012 Drydock Extension
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4223665
24 February 2010 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3685666
5 February 2010 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3675915
17 December 2009 Internal Structural Exam · Annual Inspection · Hull Examination · MTSA Verification · Examination of Repairs
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3651400
14 July 2009 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3534533
10 October 2008 COI Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3342192
29 April 2008 Plan Review (Other than "T")
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3195023
29 January 2008 Hull Examination · Deficiency Check · Annual Inspection · Examination of Repairs · Internal Structural Exam · MTSA Verification
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3142679
4 July 2007 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2984027
3 July 2007 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2983871
21 May 2007 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2936447
20 April 2007 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2914334
20 April 2007 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2914399
25 January 2007 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2861649
9 January 2007 Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2853693
20 June 2006 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2686220
25 May 2006 Excursion Permit
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2658432
24 May 2006 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2657576
12 April 2006 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2623674
10 January 2006 Annual Inspection · MTSA Verification
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2564428
3 November 2005 Hull Examination · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2527974
8 July 2005 MTSA Verification
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2419849
7 July 2005 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2418557
19 May 2005 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2362262
5 April 2005 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2332249
4 April 2005 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2332786
1 April 2005 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2324468
10 January 2005 Administrative Inspection
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2272023
2 November 2004 Deficiency Check · MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2233271
6 October 2004 MTSA Verification
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2215241
30 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1972346
29 December 2003 Hull Examination · Internal Structural Exam
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1980422
24 February 2003 Deficiency Check · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1749265
23 December 2002 Inclining Experiment · Construction Oversight
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 1724318
8 November 2002 Permit to Proceed
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1702906
5 March 2002 COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1491637
1 November 2001 Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1445890
24 April 2001 Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1366359
23 January 2001 Administrative
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1059556
10 April 2000 Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1379070
14 December 1999 Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1397324
3 March 1999 MARPOL Annex V Examination · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1473476
23 July 1998 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 802120
1 June 1998 Hull Examination · Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 794498
18 April 1998 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 175542
14 November 1997 Administrative
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 795963
22 September 1997 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 795607
19 September 1997 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 90
3 September 1997 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 63506
28 July 1997 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 783735
14 July 1997 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1130810
19 June 1997 Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 778623
1 August 1996 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1089881
19 June 1996 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 885048
12 March 1996 COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 780078
12 March 1996 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1079490
3 March 1996 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 97515
7 October 1995 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 141419
29 September 1995 Deficiency Check · Excursion Permit
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1191862
15 March 1995 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1140708
13 September 1994 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 861307
28 March 1994 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1169323
1 April 1993 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1151500
29 March 1993 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 842214
10 February 1993 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1151499
17 September 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 942522
12 November 1991 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1251786
17 September 1991 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1252672
21 May 1991 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1003371
27 September 1990 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1224545
3 April 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 905290
31 October 1989 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1210677
29 September 1989 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1311155
12 May 1989 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 894203
1 October 1988 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1043589
10 March 1988 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1332335
2 February 1988 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1015974
1 October 1987 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1319708
6 January 1987 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1311957
1 October 1986 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1017433
28 January 1986 Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 996529
10 October 1985 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1298428
28 January 1985 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 976297
14 November 1984 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 976213

Deficiency record · 187

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 November 2024 Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment. The overboard bilge piping in E/R has a hole with a temporary patch.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 December 2024
Resolved 12 March 2025
Resolution: Bilge pipe renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 November 2024 Resolved
A vessel must meet the applicable requirements for main and aux steering in sub F and J. A hydraulic line valve for the steering system was leaking.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 December 2024
Resolved 12 March 2025
Resolution: Valve overhauled in place.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 6 November 2024 Resolved
The number and identification of lifejackets must be marked on the stowage container. The containers for the children's lifejackets were not marked.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 December 2024
Resolved 12 March 2025
Resolution: Life jacked storage lockers have been maked.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 November 2024 Resolved
Electrical equipment must be installed to protect crew from electrical hazards. Blanks were missing from the emergency electrical panel on the bridge.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 December 2024
Resolved 12 March 2025
Resolution: Blank put in place.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2023 Resolved
01- Remove surge protectors for all heat trace installations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2023
Resolved 10 October 2023
Resolution: Completed.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 4 October 2023 Resolved
Renew expired items from first aid kit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2023
Resolved 10 October 2023
Resolution: New first aid kit provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2023 Resolved
Remove dead end wire from CO2 space
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2023
Resolved 10 October 2023
Resolution: Completed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2023 Resolved
Provide electrical grade matting in front of switchboard
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2023
Resolved 10 October 2023
Resolution: Completed.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 21 July 2022 Resolved
Prior to the carriage of passengers, make structural repairs to both bow loading door assemblies and prove proper operation to the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 July 2022
Resolved 22 July 2022
Resolution: completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 July 2022 Resolved
Prior to the carriage of passengers, identify and repair the causative factors that lead to the loss of astern propulsion and prove proper operation to the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 July 2022
Resolved 22 July 2022
Resolution: completed
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 October 2021 Resolved
Repair leak in fire main in E/R.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2021
Resolved 21 October 2021
Resolution: verified repair and witnessed propper operation of the fire main. No leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 October 2021 Resolved
Prove proper operatin of bilge suction in the fore peak tank.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2021
Resolved 21 October 2021
Resolution: witnessed de-watering of the void space utilizing the fixed bilge system
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 20 October 2021 Resolved
De-water void #3 and make ready for inspection.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2021
Resolved 21 October 2021
Resolution: Space de-watered, but no leak identified. Crew will monitor space.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 October 2021 Resolved
Replace ground detection lights on GP#1 panel in galley.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 October 2021
Resolved 21 October 2021
Resolution: New bulbs installed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 20 October 2021 Resolved
Replace broken window on 02 deckaft cabin door.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 October 2021
Resolved 23 February 2022
Resolution: Broken window has been replaced with new.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 March 2021 Resolved
Prove proper operation and provide causal analysis of pilot house engine control system. Causal analysis to be completed by manufactures rep.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2021
Resolution: Recieved report from Twin Disc identifing the repairs made and likely cause of the propulsion failure.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 6 November 2019 Resolved
Provide proper operation of general alarm bell on 02 aft deck
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2020
Resolution: Verified operational
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 January 2019 Resolved
Vessel pilot house propulsion control system failed in the pilot house and bridge wings while under way with passengers. Vessel propulsion system was operable from the engine room and the vessel returned to port using engine room control. Vessel to have propulsion control system manufactures representative provide a report detailing causal analysis and attest to satisfactory operation of propulsion control system. Vessel to also complete satisfactory Coast Guard sea trial prior to returning to operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 January 2019
Resolved 24 January 2019
Resolution: Recieved reports and conducted satisfactory underway Sea Trial.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 November 2018 Resolved
While conducting final workmanship inspection of new electrical installations in the engine room several differences were noted from the approved plans to what was installed. Items were listed on different distribution panels and some items were not listed on the plans at all. In order to operate the vessel must lock out or disconnect the following items from the #1 and #2 distribution panels in the engine room. #1 Block heaters on the #1 panel. #2 Pressure washer on #2 panel. Resubmit electrical one line diagram for approval to USCG MSC to reflect actual installation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2018
Resolved 28 December 2021
Resolution: The electrical loads above are in the coarrect location as per the approved electrical diagram from reviewed by MSC.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 13 June 2018 Resolved
Port side void 4 c/r frame in way of man hole as marked.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 September 2018
Resolution: Frame replaced
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 June 2018 Resolved
Pressure test STBD Eng Exhaust in engine room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 September 2018
Resolution: tested
Electrical › Lighting (service) › Lighting Fixture
Issued 7 December 2016 Resolved
Install rack lighting in crew accommadation space.
Due 7 January 2017
Resolved 22 September 2017
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 16 November 2016 Resolved
Repair hydraulic line on port and starboard forward capstans located at bow door.
Due 7 February 2017
Resolved 22 September 2017
Construction/Loadline › Penetrations › Pipe Flange
Issued 16 November 2016 Resolved
Repair fresh water leak located in void #7, flushing water fill pipe.
Due 7 January 2017
Resolved 22 September 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 November 2016 Resolved
Remove plastic zip ties securing shore power line and replace with metal straps.
Due 17 January 2017
Resolved 22 September 2017
Navigation › Piloting/Steering › Compass Deviation Table
Issued 1 December 2015 Resolved
Update comapss deviation card.
Due 1 January 2016
Resolved 18 April 2016
Lifesaving › Lifefloat › Serviceable
Issued 1 December 2015 Resolved
Paint lifefloats using manufacturer's repair kit.
Due 1 January 2016
Resolved 6 May 2016
Engineering › Steam System (auxiliary) › Valve, Control
Issued 1 December 2015 Resolved
Repair low water senor on heating boiler.
Due 1 January 2016
Resolved 18 April 2016
Engineering › Steam System (auxiliary) › Valve, Control
Issued 1 December 2015 Resolved
Provide flame out alarm on boiler.
Due 1 January 2016
Resolved 18 April 2016
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 1 December 2015 Resolved
Provide bracket for raw water pipe on #1 SSG.
Due 1 January 2016
Resolved 18 April 2016
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 December 2015 Resolved
Move railing IWO starboard MDE flywheel.
Due 1 January 2016
Resolved 18 April 2016
Electrical › Electrical Distribution System (service) › Cable
Issued 1 October 2014 Resolved
Properly secure electrical cables in main cabin storage closet.
Action required: 705 - Other - as specified
Due 1 November 2014
Resolved 22 October 2014
Resolution: Electrical cables secured.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 1 October 2014 Resolved
Renew reflective tape on ring buoy outside wheel house.
Action required: 705 - Other - as specified
Due 1 November 2014
Resolved 22 October 2014
Resolution: Reflective tape renewed.
Lifesaving › Lifefloat › Serviceable
Issued 1 October 2014 Resolved
Repair damaged life float outer jacket.
Action required: 705 - Other - as specified
Due 1 November 2014
Resolved 29 October 2014
Resolution: Life float jacket repaired IAW manufacturers repair procedure and repair kit.
Electrical › Electrical Distribution System (service) › Cable
Issued 1 October 2014 Resolved
Provide approved electrical plans for new A/C units.
Action required: 705 - Other - as specified
Due 1 January 2015
Resolved 6 May 2016
Lifesaving › Immersion Suits › General
Issued 1 October 2014 Resolved
Provide appropriate dry-suit for MOB recovery crewmember.
Action required: 705 - Other - as specified
Due 1 November 2014
Resolved 29 October 2014
Resolution: New mustang suit ordered and placed on vsl.
Operations/Management › Drills/Instruction › Making Voice Radio Distress Call
Issued 1 October 2014 Resolved
Provide emergency radio broadcast placard
Action required: 705 - Other - as specified
Due 1 November 2014
Resolved 22 October 2014
Resolution: Instructions posted.
Engineering › Lubricating Oil Service System › Piping
Issued 1 October 2014 Resolved
Repair hydraulic leaks at bow door controls
Action required: 705 - Other - as specified
Due 1 November 2014
Resolved 29 October 2014
Resolution: Numerous o-rings replaced, no leaks present.
Electrical › Lighting (service) › Lighting Fixture
Issued 27 January 2010 Resolved
Provide metal guards for glass globes light fixtures in engine room (2).
Due 29 April 2010
Resolved 29 April 2010
Resolution: Guards installed.
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 27 January 2010 Resolved
Repair high limit safety on furnace.
Due 29 April 2010
Resolved 29 April 2010
Resolution: Safety repaired.
Construction/Loadline › Structures › Air Pipe
Issued 27 January 2010 Resolved
Repair wasted vent; starboard side, void #4.
Due 29 April 2010
Resolved 29 April 2010
Resolution: Vent repaired.
Electrical › Electric Supply System (service) › Cable
Issued 27 January 2010 Resolved
Secure cable to 30A receptical, starboard side of engine room adjacent to the battery charger.
Due 29 April 2010
Resolved 29 April 2010
Resolution: Cable secured.
Electrical › Lighting (service) › Lighting Fixture
Issued 27 January 2010 Resolved
Repair light fixture on starboard bow door.
Due 29 April 2010
Resolved 29 April 2010
Resolution: Light fixture replaced.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Pressure
Issued 27 January 2010 Resolved
Conduct operational test of car deck sprinkler system.
Due 29 April 2010
Resolved 29 April 2010
Resolution: Satisfactory test completed.
Fire Fighting › Fire Pumps › Pressure
Issued 10 October 2008 Resolved
Replace gauge on Port Fire Pump to show the correct discharge pressure.
Due 29 October 2008
Resolved 14 July 2009
Resolution: Gauge replaced, discharge pressure verified.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 28 February 2008 Resolved
Provide current light list, coast pilot and charts.
Due 28 March 2008
Resolved 3 March 2008
Resolution: Nav publications renewed.
Navigation › Piloting/Steering › Compass Deviation Table
Issued 28 February 2008 Resolved
Provide updated compass deviation card.
Due 28 March 2008
Resolved 6 March 2008
Resolution: Received copy of compass deviation card.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 28 February 2008 Resolved
Provide current approved fire control plan.
Due 28 March 2008
Resolved 6 May 2008
Resolution: Approved fire control plan provided.
Fire Fighting › Fire Main › Pressure
Issued 28 February 2008 Resolved
Conduct operational tests of the fire main and car deck sprinkler system.
Due 28 March 2008
Resolved 4 March 2008
Resolution: Tests conducted.
Engineering › Bilge Water Management System › Not Operational
Issued 28 February 2008 Resolved
Conduct proper operational tests of bilge system.
Due 29 February 2008
Resolved 29 February 2008
Resolution: Bilge system tested satisfactorily.
Operations/Management › Drills/Instruction › Fire
Issued 28 February 2008 Resolved
Conduct fire and man overboard drills.
Due 28 March 2008
Resolved 4 March 2008
Resolution: Satisfactory drills conducted.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 28 February 2008 Resolved
Provide approved plans for modifications to passenger heads.
Due 28 March 2008
Resolved 6 May 2008
Resolution: Approved plans provided.
Documentation › Manifests/Lists › Muster List/Emergency Instructions
Issued 28 February 2008 Resolved
Remove overspray from anchoring instructions.
Due 27 March 2008
Resolved 28 March 2008
Resolution: Overspray removed.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 28 February 2008 Resolved
Replace retro reflective tape on PFDs as needed.
Due 28 March 2008
Resolved 4 March 2008
Resolution: Tape replaced or PFD renewed.
Deck/Cargo › Mooring/Anchoring › Anchor Rope
Issued 27 February 2008 Resolved
Repair lid to anchor chain locker.
Due 28 March 2008
Resolved 29 February 2008
Resolution: Lid repaired.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 29 January 2008 Resolved
Reinstall structural fire protection around pinball machine and bunk room.
Due 28 February 2008
Resolved 28 February 2008
Resolution: Structral fire protection reinstalled.
Documentation › Markings/Placards › Warning Signs
Issued 10 January 2007 Resolved
Stencil Fire Damper STBD Side AFT.
Due 23 January 2007
Resolved 24 January 2007
Resolution: Vent has been stenciled
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 10 January 2007 Resolved
Relace all batteries for all waterlights
Due 23 January 2007
Resolved 24 January 2007
Resolution: Batteries have been replaced
Electrical › Electric Generation Source (service) › Generator Cable
Issued 10 January 2007 Resolved
Install chafing gear on port generator cable
Due 24 January 2007
Resolved 24 January 2007
Resolution: Chafing gear is installed
Construction/Loadline › Structures › Door
Issued 10 January 2006 Resolved
Prove proper operation of men's room doors (2) and starboard side door between upper/lower passenger cabins.
Condition: Improper/Lack of Maintenance
Due 24 January 2006
Resolved 12 April 2006
Resolution: Sighted repairs
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 10 January 2006 Resolved
Prove proper operation of MDE & SSDG alarms.
Condition: Unknown
Due 24 January 2006
Resolved 12 April 2006
Resolution: Tested sat
Construction/Loadline › Hull › Hull Plating
Issued 3 November 2005 Resolved
FP: C/R to good metal hole in deck at peak.
Due 2 December 2005
Resolved 21 December 2005
Construction/Loadline › Hull › Keel
Issued 3 November 2005 Resolved
FP: Pump out water and drill limber hole in keelsom.
Due 2 December 2005
Resolved 21 December 2005
Construction/Loadline › Structures › Air Pipe
Issued 3 November 2005 Resolved
Void 2: repair wasted heating pipe iwo aft bulkhead
Due 21 January 2006
Resolved 12 April 2006
Resolution: Sighted repairs
Construction/Loadline › Hull › Transverse Frame
Issued 3 November 2005 Resolved
Void 3: C/R 1st transverse bulkhead to good metal aft of fwd bulkhead stbd side
Due 21 December 2005
Resolved 21 December 2005
Construction/Loadline › Hull › Hull Plating
Issued 3 November 2005 Resolved
Void 3: Pressure test heating pipes at deck iwo aft scuttle and spot gauge hull plate below same
Due 2 December 2005
Resolved 21 December 2005
Construction/Loadline › Structures › Manhole
Issued 3 November 2005 Resolved
Void 9: Reinstall port scuttle captive device.
Due 2 December 2005
Resolved 21 December 2005
Construction/Loadline › Structures › Machinery Space Opening
Issued 3 November 2005 Resolved
Repair guard on furnace stack stbd deck level.
Due 2 December 2005
Resolved 21 December 2005
Construction/Loadline › Hull › Bracket
Issued 3 November 2005 Resolved
E/R: Repair /replace brackets for steering hydraulic piping
Due 2 December 2005
Resolved 21 December 2005
Deck/Cargo › Cargo Stowage › General
Issued 3 November 2005 Resolved
E/R: Properly stow wiring (remove polypro) in overhead
Due 2 December 2005
Resolved 21 December 2005
Fire Fighting › Fire Main › Condition
Issued 3 November 2005 Resolved
E/R: Replace hose and nipple (pipe threaded at both ends) at firestation #9
Due 2 December 2005
Resolved 21 December 2005
Engineering › Pressure Vessel › Piping
Issued 3 November 2005 Resolved
E/R: replace expansion hoses on furnace piping with approved material.
Due 2 December 2005
Resolved 21 December 2005
Electrical › Lighting (service) › Outlet Box
Issued 3 November 2005 Resolved
Main Deck: Install cover to electrical outlet stbd side iwo void #3
Due 2 December 2005
Resolved 21 December 2005
Construction/Loadline › Structures › Door
Issued 3 November 2005 Resolved
Crew Quarters: Replace/repair door of crew berthing to wx deck.
Due 21 January 2006
Resolved 20 June 2006
Resolution: Completed.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 2 November 2004 Resolved
prove proper operation of car deck sprnkler system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 November 2004
Resolution: Witnessed sat operation of sprinkler.
Stability › Unintentional Flooding › General
Issued 2 November 2004 Resolved
Prove proper operation of bilge system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 November 2004
Resolution: Witnessed sat test of bilge system.
Lifesaving › Lifejacket/PFD (General)
Issued 24 February 2003 Resolved
Replace Retro Tape on 17 Adult PFDs and replace one Childs PFD. LEGACY COMPONENT DESC: Retroreflective Material
Due 27 February 2003
Resolved 6 March 2003
Lifesaving › Buoyant Apparatus
Issued 24 February 2003 Resolved
Unsnarl BA and Float Light Lines. LEGACY COMPONENT DESC: Lines
Condition: Placed in Improper Service
Due 27 February 2003
Resolved 6 March 2003
Fire Fighting › Means of Escape
Issued 24 February 2003 Resolved
Prove proper operation of E/R Escape Scuttle.
Condition: Placed in Improper Service
Due 27 February 2003
Resolved 6 March 2003
Documentation › Certificates/Documents
Issued 24 February 2003 Resolved
Provide Stabilty Letter. LEGACY COMPONENT DESC: Stability Letter
Due 27 February 2003
Resolved 6 March 2003
Documentation › Certificates/Documents
Issued 24 February 2003 Resolved
Provide Cert of Documentation. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Due 27 February 2003
Resolved 6 March 2003
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 24 February 2003 Resolved
Provide Waiver for new Nav Light arraingement. LEGACY COMPONENT DESC: Navigation Lights
Condition: Design Flaw
Due 27 March 2003
Resolved 10 January 2005
Resolution: Resolved.
Deck/Cargo › Mooring/Anchoring
Issued 24 February 2003 Resolved
Provide proof of Proper anchor size from architect. LEGACY COMPONENT DESC: Anchor
Condition: Placed in Improper Service
Due 27 February 2003
Resolved 6 March 2003
Deck/Cargo › Mooring/Anchoring
Issued 24 February 2003 Resolved
Provide and demonstrate a safe method of launching anchor. LEGACY COMPONENT DESC: Anchor
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 27 March 2003
Resolved 27 March 2003
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Remove all docking plugs to spaces not opened for installation of midbody or steel replacement. LEGACY COMPONENT DESC: Bottom Plating
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Hull plate was removed, no need to remove docking plugs.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 38. LEGACY COMPONENT DESC: Transverse Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate replaced.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 25. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 26. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 32. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 33. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 34. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 36 thru 40. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Renewed flange plate.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 59. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 60. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 61. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flage plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 63. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 64. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 4' off centerline FR 65. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flane plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 8' off centerline FR 54. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal port 8' off centerline FR 57. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 32 thru 36. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 38 thru 40. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 54 thru 57. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 20 thru 26. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 34 thru 41. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 47 thru 48. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 50 thru 51. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR54 thru 57. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 4' off centerline FR 59 thru 65. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 8' off centerline FR 34 thru 44. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: FLANGE PLATE RENEWED.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 8' off centerline FR 54 thru 57. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 8' off centerline FR 59. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 8' off centerline FR 60. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Replace flange plate longitudinal stbd 8' off centerline FR 61 thru 65. LEGACY COMPONENT DESC: Longitudinal Frame
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side across to side shell from centerline to 12" up from the bottom shell at FR 34. LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Flange plate renewed.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side across to side shell from centerline to 12" up from the bottom shell at FR 36. LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead replaced port.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side to 4' off centerline and up 12" at FR 38.
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead renewed.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side to 8' off centerline and up 12" at FR 38. LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead replaced.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side FR 40 to 8' off centerline and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead replaced.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side FR 59 to 8' off centerline and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Replaced Bulkhead.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side FR 32 from 4' to 8' off centerline and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead replaced.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side FR 40 from 4' to 8' off centerline and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead replaced.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead port side FR 61 from 4' to 8' off centerline and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Replaced Bulkhead.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead stbd side FR 34 from centerline to sideshell and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Replaced Bulkhead.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead stbd side FR 38 from centerline to sideshell and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead Replaced.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead stbd side FR 36 from centerline to 4' off and up 12". LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 23 February 2003
Resolution: Bulkhead replaced.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead stbd side FR 45 from centerline to 4' off and up 12" LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead Replaced.
Construction/Loadline › Structures
Issued 23 December 2002 Resolved
Replace bulkhead stbd side FR 46 from centerline to 4' off and up 12" LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Bulkhead replaced.
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Crop and renew hull plating in way of exhaust pipe penetrations located port side engine room. LEGACY COMPONENT DESC: Hull Plating
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Crop and renew transom hull plating in way of starboard exhaust shell penetration. LEGACY COMPONENT DESC: Hull Plating
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Mechanically clean and descale starboard ballast tank between frames 26 and 32 to facilitate Coast Guard internal inspection. LEGACY COMPONENT DESC: Hull Plating
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Mechanically clean stbd fwd peak tank to facilitate inspection.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Remove all deck plates in engine room to allow for inspection of bottom shell and structure. Also, mechanically clean and descale structure/plating in way of shaft and rudder tubes to facilitate inspection. LEGACY COMPONENT DESC: Bottom Plating
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 13 January 2004
Engineering › Freshwater System (jacketwater cooling)
Issued 23 December 2002 Resolved
Install acceptable sight glasses and provide protection for all sight glasses for engine cooling system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Accommodation/Occupational Safety › Potable Water System
Issued 23 December 2002 Resolved
Install 100 PSI or lower relief valve for water heater. LEGACY COMPONENT DESC: Hot Water Heater
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Accommodation/Occupational Safety › Potable Water System
Issued 23 December 2002 Resolved
Install cover for heater element on hot water heater. LEGACY COMPONENT DESC: Heater Element Cover
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Stability › Watertight Integrity
Issued 23 December 2002 Resolved
Remove all sea valves and side shell overboard valves for Coast Guard inspection. LEGACY COMPONENT DESC: Sea valves
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 13 January 2004
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 23 December 2002 Resolved
Repair exhaust leaks to all internal combustion engines. LEGACY COMPONENT DESC: Piping (exhaust)
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 23 December 2002 Resolved
Prove operation of auxiliary boiler safety devices to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 23 December 2002 Resolved
Install Coast Guard approved fire suppression for galley hood as required by 46 CFR 118.425.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Accommodation/Occupational Safety › Potable Water System
Issued 23 December 2002 Resolved
Install relief valve to hot water heater storage tank in galley.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Engineering › Lubricating Oil Service System
Issued 23 December 2002 Resolved
Repair hydraulic leaks in hydraulic system for port car deck bow closure.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Construction/Loadline › Hull
Issued 23 December 2002 Resolved
Provide original USCG approved structural drawings for scantling and repair evaluation.
Action required: 705 - Other - as specified
Due 23 January 2003
Resolved 12 February 2003
Resolution: Owner provided original USCG approved structural drawings for scantling and repair evaluation.
Documentation › Certificates/Documents
Issued 23 December 2002 Resolved
Provide application for inspection of midbody/Hulll/ISE/COI inspection. LEGACY COMPONENT DESC: Certificate of Inspection
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 January 2003
Documentation › Certificates/Documents
Issued 23 December 2002 Resolved
. Provide USCG approved drawings for midbody Plug fabrication.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 12 February 2003
Resolution: Owner provided USCG approved drawings for midbody Plug fabrication.
Documentation › Certificates/Documents
Issued 23 December 2002 Resolved
Provide USCG Marine Safety Center determination letter of major conversion for midbody stretch and conversion.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 14 February 2003
Resolution: Major Conversion determination was made by MSC-1 letter dated 8/19/02. The proposed modifications to the vessel constitutes a major conversion as defined by Title 46, United States Code 2101(14a).
Stability › Incline Test
Issued 23 December 2002 Resolved
Provide approved inclining procedure for stability and complete necessary test.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 27 January 2003
Documentation › Certificates/Documents
Issued 23 December 2002 Resolved
Provide tonnage certificate issued by an authorized class society after vessel is admeasured. LEGACY COMPONENT DESC: International Tonnage Certificate
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Fire Fighting › Automatic Sprinkler System
Issued 23 December 2002 Resolved
Repair or renew broken sprinkler heads throughout car deck area. LEGACY COMPONENT DESC: Sprinklers
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Electrical › Electric Supply System (service)
Issued 23 December 2002 Resolved
Remove wire nuts installed on electrical conections throughout the vessel.
Action required: 705 - Other - as specified
Due 12 March 2003
Resolved 6 March 2003
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 5 March 2002 Resolved
Replace 6 damaged lifejackets
Due 5 March 2002
Resolved 5 March 2002
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 5 March 2002 Resolved
Properly install gripe on liferaft/IBA canister
Due 5 March 2002
Resolved 5 March 2002
Lifesaving › Immersion Suits
Issued 5 March 2002 Resolved
Remove deteriorated survival suit from bridge
Due 5 March 2002
Resolved 5 March 2002
Lifesaving › Emergency Outfit
Issued 5 March 2002 Resolved
Provide a harness for use by personnel recovering man overboard LEGACY COMPONENT DESC: Lifeline and Belt/Harness
Due 2 April 2002
Resolved 8 May 2002
Engineering › Bilge Water Management System
Issued 5 March 2002 Resolved
Repair pinhole leaks in Bilge/Ballast system overboard discharge LEGACY COMPONENT DESC: Piping
Due 2 April 2002
Resolved 8 May 2002
Engineering › Bilge Water Management System
Issued 5 March 2002 Resolved
Post bilge manifold operating instructions LEGACY COMPONENT DESC: Manifold
Due 2 April 2002
Resolved 8 May 2002
Engineering › Bilge Water Management System
Issued 5 March 2002 Resolved
Repair valve and reach rod on forepeak bilge pipe LEGACY COMPONENT DESC: Valve
Due 2 April 2002
Resolved 8 May 2002
Navigation › Piloting/Steering
Issued 5 March 2002 Resolved
Provide current edition of nav rules, CP, LL, Tide & Current tables LEGACY COMPONENT DESC: Inland Navigation Rules
Due 2 April 2002
Resolved 8 May 2002
Lifesaving
Issued 24 April 2001 Resolved
Provide painters for 3 Life Floats.
Condition: Unknown
Due 11 July 2001
Resolved 12 July 2001
Accommodation/Occupational Safety
Issued 24 April 2001 Resolved
Repair 4 broken windows, 02 dk strb aft door, 3 portholes on the car deck.
Condition: Unknown
Due 24 April 2001
Resolved 24 April 2001
Fire Fighting
Issued 24 April 2001 Resolved
Remove plastic garbage cans from vsl.
Condition: Unknown
Due 11 July 2001
Resolved 12 July 2001
Electrical
Issued 24 April 2001 Resolved
Repair elec. conection on 01 deck starb aft modine heater .
Condition: Unknown
Due 11 July 2001
Resolved 12 July 2001
Electrical
Issued 3 March 1999 Resolved
REMOVE EXTENSION CORDS FROM MICROWAVE OVEN IN SNACKBAR.
Condition: Unknown
Due 14 January 2000
Resolved 14 January 2000
Fire Fighting
Issued 3 March 1999 Resolved
MAKE PROPER REPAIRS TO BROKEN SPRINKLER BRACKET, STARBOARD SIDE FWD ZONE #1
Condition: Unknown
Due 14 January 2000
Resolved 14 January 2000
Lifesaving
Issued 1 June 1998 Resolved
Lone lifefloeat not equipped with a weak link, provide such that apparatus is rated for 20 people
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Engineering
Issued 1 June 1998 Resolved
Replace wasted unions and couplings on heat piping in tank void #1, tank void #2, and fresh water tank void
Condition: Unknown
Due 1 June 1998
Resolved 1 June 1998
Lifesaving
Issued 1 June 1998 Resolved
Provide 2 water lights for 2 lifefloats
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 1 June 1998 Resolved
Replace top 3 steps of lower ladder near starboard entrance to after ballast tank
Condition: Unknown
Due 15 June 1998
Resolved 15 July 1998
Fire Fighting
Issued 19 June 1997 Resolved
TEST THE SPRINKLER SYSTEM (USING AIR OR WATER).
Condition: Unknown
Due 19 June 1997
Resolved 19 June 1997
Lifesaving
Issued 19 June 1997 Resolved
PROVIDE A NEW LIFELINE FOR ONE 20-PERSON LIFEFLOAT.
Condition: Unknown
Due 19 June 1997
Resolved 19 June 1997
Accommodation/Occupational Safety
Issued 1 August 1996 Resolved
Gas free and make available for inspection MSD holding tank.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
Lifesaving
Issued 12 March 1996 Resolved
prove proper operation of engineroom alarm bell.
Condition: Unknown
Due 13 August 1996
Resolved 13 August 1996
Navigation
Issued 12 March 1996 Resolved
Prove proper operation of navigation lights.
Condition: Unknown
Due 13 August 1996
Resolved 13 August 1996
Lifesaving
Issued 12 March 1996 Resolved
Provide adequate number of buoyant apparatus or life floats totaling 91 persons.
Condition: Unknown
Due 13 August 1996
Resolved 13 August 1996
Lifesaving
Issued 15 March 1995 Resolved
PROVIDE GUARDS AROUND PULLEYS OF AFT END OF #1 AND #2 MAIN ENGINES.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 21 May 1991 Resolved
RENEW LADDERS IN #2 AND #3 VOIDS.
Condition: Unknown
Due 21 May 1991
Resolved 21 May 1991
Accommodation/Occupational Safety
Issued 21 May 1991 Resolved
#5 VOID IS TO BE CERTIFIED "SAFE FOR MEN" BY A CERTIFIED MARINE CHEMIST PRIOR TO ENTRY FOR INSPECTION. THIS REQUIREMENT TO BE COMPLETED PRIOR TO PLACING THE VESSEL BACK IN SERVICE.
Condition: Unknown
Due 21 May 1991
Resolved 21 May 1991
Fire Fighting
Issued 21 May 1991 Resolved
REPAIR BROKEN FIRE MAIN PIPING IN #8 AFTER BALLAST TANK. THIS REQUIREMENT TO BE COMPLETED PRIOR TO PLACING THE VESSEL BACK IN SERVICE.
Condition: Unknown
Due 21 May 1991
Resolved 21 May 1991
Navigation
Issued 29 September 1989 Resolved
PROVIDE PRESSURE RELIEF VALVE FOR SHIP'S WHISTLE AIR RECEIVER TANK LOCATED IN CREW GALLEY.
Condition: Unknown
Due 29 September 1989
Resolved 29 September 1989
Construction/Loadline
Issued 29 September 1989 Resolved
REPAIR MULTIPLE WELD FRACTURES TO SUPPORT HINGE ASSEMBLY TO BOW CLAM SHELL DOORS AND TO STRUCTURAL COMPONENTS OF FORWARD VEHICLE RAMP AND BOW.
Condition: Unknown
Due 29 September 1989
Resolved 29 September 1989
Engineering
Issued 1 October 1987 Resolved
INSTALL LAGGING ON BOTH MAIN ENGINES EXHAUST PIPING.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Electrical
Issued 14 November 1984 Resolved
CLEAR GROUND ON #2 GENERATOR
Condition: Unknown
Due 14 November 1984
Resolved 14 November 1984
Electrical
Issued 14 November 1984 Resolved
REMOVE JURY RIGGED WIRING AND DEAD-END WIRING THROUGHOUT VESSEL
Condition: Unknown
Due 14 November 1984
Resolved 14 November 1984
Electrical
Issued 14 November 1984 Resolved
PROVIDE GUARD FOR ALTERNATOR ON #2 GENERATOR
Condition: Unknown
Due 14 November 1984
Resolved 14 November 1984
Engineering
Issued 14 November 1984 Resolved
PROVIDE PERMANENT GAUGE ON DISCHARGE SIDE OF BOW THRUSTER HYDRAULIC PUMP
Condition: Unknown
Due 14 November 1984
Resolved 14 November 1984
Navigation
Issued 14 November 1984 Resolved
REPAIR HYDRAULIC LEAK IN FOLLOW-UP UNIT FOR STEERING GEAR
Condition: Unknown
Due 14 November 1984
Resolved 14 November 1984
Construction/Loadline
Issued 14 November 1984 Resolved
RENEW PILOT HOUSE DOOR ON STARBOARD SIDE
Condition: Unknown
Due 14 November 1984
Resolved 14 November 1984

Casualty record · 8

20 April 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2914334
20 April 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2914399
21 October 2016Routine · role: Involved in a Marine Casualty · activity 6028345
15 January 2019Routine · role: Involved in a Marine Casualty · activity 6611787
9 March 2021Routine · role: Involved in a Marine Casualty · activity 7158411
21 July 2022Routine · role: Involved in a Marine Casualty · activity 7517632
1 July 2025Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 8177932
16 November 2025Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 8277450
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.