MAURY USCG vessel records
← All vessels

LA PRINCESA

Built
1979
Last inspected
4 March 2019
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 4 March 2019
…with no type recorded9
Operational controls None recorded without a removal date
Years with a record 33 calendar years (1985–2019)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8642476
Flag
UNITED STATES
Maury page id
psix-50293

Documentation record

Tonnage as PSIX records it7771 - Regulatory (Subpart C or D), Gross Ton
27271 - Convention (Subpart B), Gross Ton
7771 - Regulatory (Subpart C or D), Net Ton
10848 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 69 inspections, each with its date, unit and type; 127 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 3 other vessels inspected with it; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

SAM B Towing Vessel · MISLE 88427 · 29 April 2005 · activity 2345946ORLEANS Towing Vessel · MISLE 130830 · 29 April 2005 · activity 2345946MONITOR Towing Vessel · MISLE 137328 · 29 April 2005 · activity 2345946

Inspection history · 69

4 March 2019 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6635815
27 March 2018 Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6378727
14 June 2017 Periodic Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6173581
31 May 2017 Administrative Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6160999
10 June 2016 Administrative Inspection · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6016845
5 June 2015 Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5144752
1 December 2014 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5031989
26 March 2014 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4823531
6 March 2014 COI Inspection · Hull Examination · MARPOL Annex I Examination · MTSA Verification · Drydock Exam · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4804619
28 June 2013 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4637678
28 June 2013 MTSA/ISPS Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4671131
5 November 2012 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4490284
13 September 2012 Deficiency Check · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4440062
16 May 2012 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4313163
29 March 2012 Annual Inspection · MARPOL Annex VI Survey · MTSA/ISPS Verification · MARPOL Annex I Examination · Administrative Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4273655
15 June 2009 MARPOL Annex I Examination · COI Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3500512
14 August 2008 Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3308756
18 July 2008 Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3271832
30 October 2007 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3090937
13 July 2007 Administrative Inspection · MARPOL Annex I Examination · MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2919938
12 May 2006 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2647287
21 November 2005 Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2538351
23 September 2005 Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2499611
6 July 2005 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2417304
21 June 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2397459
3 May 2005 Annual Inspection · Examination of Repairs · MTSA Verification
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2348388
29 April 2005 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2345946
29 April 2005 Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2346015
1 June 2004 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2116506
6 February 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2003595
30 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978207
25 August 2003 Hull Examination · Internal Structural Exam
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1911192
8 August 2003 Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1870135
26 March 2002 Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1597648
8 June 2001 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1471916
25 May 2001 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1432514
26 December 2000 Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1393584
5 September 2000 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 822866
16 June 2000 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1435062
27 July 1999 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1106721
12 July 1999 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1095787
2 June 1999 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1461975
21 August 1998 Hull Examination · Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1421549
27 July 1998 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1378418
24 June 1997 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1114755
23 July 1996 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1252057
17 January 1996 Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 940625
1 July 1995 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1360302
30 August 1994 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1178860
26 August 1993 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 831382
4 August 1993 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1156145
16 July 1993 Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 846387
8 June 1993 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1140834
25 June 1992 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 958007
4 June 1992 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1261353
18 May 1992 Examination of Repairs · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1256585
31 July 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 944122
17 July 1991 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1251534
19 June 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 909484
6 February 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 899664
31 January 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1218259
19 July 1990 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 920650
7 July 1989 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1033045
12 August 1988 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1035485
20 July 1988 Hull Examination · COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1031406
28 December 1987 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1006483
21 January 1987 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1316361
10 January 1986 Credit Drydock · COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1296115
16 January 1985 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 977205

Deficiency record · 127

Construction/Loadline › Structures › Deck Plating
Issued 1 June 2017 Resolved
Make temporary repairs to holes found in main deck above voids #9 & #2 & ballast tank #8.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2017
Resolved 2 June 2017
Resolution: Temp repairs inspected/tested by attending MI.
Construction/Loadline › Penetrations › Weld
Issued 1 June 2017 Resolved
Make temporary repairs to holes at stern strake/deck seam.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2017
Resolved 1 June 2017
Resolution: Temp repairs tested/inspected by attending MI.
Construction/Loadline › Penetrations › Weld
Issued 1 June 2017 Resolved
Grind/Reweld the following cracked welds: long 1 stbd entry void 8, gusset Fr37, gusset Fr40 and long 3 @ Fr31.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2017
Resolved 1 June 2017
Resolution: Welds inspected by attending MI.
Construction/Loadline › Hull › Weld
Issued 1 June 2017 Resolved
Complete permanent repairs for worklist dated 01JUN17 for items found during ISE. See documents for worklist.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 27 June 2017
Resolution: Worklist items completed and witnessed by attending MI.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 31 May 2017 Resolved
Internal structural exam not completed by required date (21MAR2017).
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 1 June 2017
Resolution: ISE completed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 5 June 2015 Resolved
The stern light battery had no charge and needs to be replaced.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2015
Resolution: Replaced battery
Construction/Loadline › Structures › Deck Plating
Issued 5 June 2015 Resolved
2nd level between frames 34 - 36, stbd side lane, the deck has corroded through in several areas. 3rd level between frames 26 - 27 in the third lane from the stbd side there is a fracture in the deck approx. 3ft long.
Due 28 July 2015
Resolved 27 July 2015
Resolution: Vessel cut out bad areas to good metal and put in inserts.
Construction/Loadline › Structures › Manhole
Issued 5 June 2015 Resolved
01 deck centerline manhole covers, towards the aft are missing hardware between frames 46 - 48.
Due 28 July 2015
Resolved 21 July 2015
Resolution: Hardware has been installed.
Construction/Loadline › Structures › Deck Plating
Issued 5 June 2015 Resolved
02 deck and main deck, replace sections of the bent/fractured coulumn #1 stanchions.
Due 28 July 2015
Resolved 21 July 2015
Resolution: Satisfactory repairs have been made.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 5 June 2015 Resolved
Between frames 52 - 53, replace safety chain on main deck.
Due 28 July 2015
Resolved 21 July 2015
Resolution: Safety chain was replaced.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 June 2015 Resolved
3rd deck, stbd side, handrails center bars were corroded through and needed replacement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2015
Resolution: Vessel replaced bad sections of hand rails.
Engineering › Fuel Oil Service System › Tank
Issued 5 June 2015 Resolved
The fuel tank shut off valve would not operate.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2015
Resolution: Crew cleaned and lubricated valve, op test SAT.
Construction/Loadline › Hull › Weld
Issued 6 March 2014 Resolved
Two welds in void #9 were found on frame #58 were found to be cracked with previous repairs failed. Vsl rep was contracted for repairs to be complete in Jacksonville, Fl.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 December 2014
Construction/Loadline › Structures › Rake
Issued 13 September 2012 Resolved
Repair crack in port side diagonal IWO frame in the bow rake.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repaired crack.
Construction/Loadline › Hull › Girder
Issued 13 September 2012 Resolved
Repair diagonal that is separated from deck beam (overhead) on frame 37 port center tank #6.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repaired diagonal.
Construction/Loadline › Hull › Girder
Issued 13 September 2012 Resolved
Repair diagonal that is separated from deck beam (overhead) on frame 39 starboard center tank #6.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repair of diagonal.
Construction/Loadline › Structures › Manhole
Issued 13 September 2012 Resolved
C/R latter to space. #7 port ballast tank.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repair of #7 port ballast tank.
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2012 Resolved
Repair lightering holes, as per ABS guidance, throughout #7 starboard ballast tanks. Must Provide ABS Guidance.
Due 12 October 2012
Resolved 26 October 2012
Resolution: Vessel provided a letter from ABS correcting the issue and is scanned into documents as ABS Lightering Hole Guidance 24OCT12.
Construction/Loadline › Structures › Manhole
Issued 13 September 2012 Resolved
C/R #1, #2,#3 rungs on access ladder to space #9 port void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
C/R 4ft (approx) of both the #1 and #2(counting from maindeck) horizontal side shell stiffners between main vertical frames 54 and 55 #9 port void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Girder
Issued 13 September 2012 Resolved
Repair cracked weld at the bottom of vertical frame #55 located in the #9 port wing at the bulkhead between the #9 port and port center void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Girder
Issued 13 September 2012 Resolved
Repair cracked weld at bottom of vertical frame #56 located in the #9 port wing tank at the bulkhead between the #9 port and port center void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Bracket
Issued 13 September 2012 Resolved
C/R tripped vertical bracket(18in long) between frames #58 and #59 in way of aft rake port corner #9 port void
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
Repair cracked weld at the top of the flat plate stiffener. #9 Port Void aft outboard corner.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Structures › Manhole
Issued 13 September 2012 Resolved
C/R # 1, 2, 3 and 4 ladder rungs #9 starboard void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
C/R # 3, 4, 5, 6, and 7 buckled transom vertical stiffeners. #9 starboard void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
C/R buckled side longitudinal stiffener between Frames 58 and 59 #9 starboard void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
C/R #1 and #2 side longitudinal stiffeners between Frames 55-56 #9 starboard void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2012 Resolved
Repair crack on #5 transverse stern vertical frame #9 starboard center void.
Due 12 October 2012
Resolved 5 November 2012
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
#1 Port Side Void. C/R 33x14 side shell stiffener IWO FR #9. 16X45.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repair of side shell stiffener.
Construction/Loadline › Hull › Weld
Issued 13 September 2012 Resolved
#1 Port of Ctr line Void. #8, centerline bulkhead, Repair Cracked Welding @ CVK.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repair of cracked welding at CVK.
Construction/Loadline › Hull › Weld
Issued 13 September 2012 Resolved
#1 Port Ctr line Void. FR #7, , #1 centerline vertical longitudinal #3, repair crack welding.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed satisfactory repair of weld.
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
Stbd #1 Void, FR #6, Vertical Stiffener, Weld @ H-beam vertical frame.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed satisfactory repair of weld @ H-beam vertical frame.
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
Stbd #1 Void, C/R inner bulkhead stiffener @ FR#6, STBD #FR and bottom plate stiffener.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed satisfactory repair of inner bulkhead stiffiner.
Construction/Loadline › Hull › Weld
Issued 13 September 2012 Resolved
Stbd #1 Void, weld and gouge cracked weldment @ FR 7.5 IWO long #3 and 4 side shell.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repaired weld @ FR 7.5 IWO long #3 and 4 side shell.
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
#2 Stbd Void, drill stop, weld, and back gouge cracked weld @ FR 15 stbd and reweld bottom shell stiffener.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repair of weld @ FR 15 stbd.
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 September 2012 Resolved
#2 Stbd Ctr Void, C/R 16X26 at FR 15, IWO Vertical FR, CVK connection.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed repair of FR 15 IWO of CVK connection.
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 September 2012 Resolved
#2 Port Ctr Void, C/R Bulkhead 18X28 and renew soul plate @ CVK, inner bulkhead connection @ FR 13.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed satisfactory repair.
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 September 2012 Resolved
#2 Port Ctr Void, weld side shell vertical long #3, FR 12.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed satisfactory repair.
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
#2 Port Ctr Void, weld backside of FR 12 @ bulkhead stiffener, long # 4.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed satisfactory repair.
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012 Resolved
#2 Port Ctr Void, Weld stiffener on bulkhead vertical frame @ FR 11.5.
Due 12 October 2012
Resolved 5 November 2012
Resolution: Attending MI witnessed satisfactory repair.
Construction/Loadline › Structures › Deck Plating
Issued 10 April 2012 Resolved
3rd deck, lane A at frame 57-58, insert deck approximately 4'x6'.//Extended until 10JUN12
Due 10 June 2012
Resolved 15 May 2012
Construction/Loadline › Structures › Deck Plating
Issued 10 April 2012 Resolved
3rd deck, lane 8 at frame 35, insert deck approximately 3'x6'.//Extended until 10JUN12
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 May 2012
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 10 April 2012 Resolved
3rd deck at portside railing; frame 56-57. Insert 3 areas approximately 18"x18".//Extended until 10JUN12
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 May 2012
Construction/Loadline › Structures › Deck Plating
Issued 10 April 2012 Resolved
3rd deck, lane E and F, at frame 40; Insert Deck approximately 4'x20'.//Doubler plates installed-Extended until 10JUN12
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 May 2012
Construction/Loadline › Structures › Deck Plating
Issued 10 April 2012 Resolved
3rd deck, lane F and G, at frame 57; insert deck approximately 2'x3' and insert 4'x6' at frame 35.//Extended until 10JUN12
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 May 2012
Construction/Loadline › Structures › Deck Plating
Issued 10 April 2012 Resolved
3rd deck, lane L at frame 47; insert deck approximately 4'x8' and insert dec 2'x20' at frame 40.//Temp Doubler plates intalled- Extended until 10JUN12
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 May 2012
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2012 Resolved
Crop and Renew 3x4 angle at frame 35 and 36, 34 and 35 on deck 2.
Due 29 April 2012
Resolved 10 April 2012
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Crop and renew gusset at frame 54,55 (D and E), 41(D and E), frame 9, main deck from frame 16-17, #6 at #16 side long, frame 29 bottom side long.//18APR12 Received request for extension from 4/29 until 5/10//Extended until 6/10
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 May 2012
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Crop and renew diagonal support, 2nd deck between F&G at frame 58. (Insert lower section)
Due 29 April 2012
Resolved 10 April 2012
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Inser 4x8 outboard A at frame 28 on maind deck. (buckled deck)
Due 31 January 2013
Resolved 5 November 2012
Resolution: Witnessed satisfactory repair.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Repair crack on main deck diagonal at frame 34. (Insert section that was previously welded)//18APR12 Received request for extension from 4/29 until 5/10//
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 3 May 2012
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Repair crack on main deck (D and E) at frame 32. (Top of diagonal frame)
Due 29 April 2012
Resolved 10 April 2012
Construction/Loadline › Structures › Deck Plating
Issued 29 March 2012 Resolved
Crop and renew buckled deck on main deck at frame 37 outboard of J.
Action required: 705 - Other - as specified
Due 31 January 2013
Resolved 5 November 2012
Resolution: Witnessed satisfactory repair.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 29 March 2012 Resolved
Remount junction box at main deck at frame 41 outboard of J.//18APR12 Received request for extension from 4/29 until 5/10//
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 3 May 2012
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Crop and renew diagonal support on H59 on main deck. (lower section)//18APR12 Received request for extension from 4/29 until 5/10//
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 3 May 2012
Construction/Loadline › Structures › Deck Plating
Issued 29 March 2012 Resolved
Crop and renew approximately 8x8 deck insert, 3rd deck, J between 32-33.
Action required: 705 - Other - as specified
Due 29 April 2012
Resolved 10 April 2012
Construction/Loadline › Structures › Deck Plating
Issued 29 March 2012 Resolved
Crop and renew approximately 6x10 deck insert, 3rd deck, 37 Hand I.
Action required: 705 - Other - as specified
Due 29 April 2012
Resolved 10 April 2012
Construction/Loadline › Structures › Deck Plating
Issued 29 March 2012 Resolved
Crop and renew approximately 6x8 deck insert, 3rd deck, G45.
Action required: 705 - Other - as specified
Due 29 April 2012
Resolved 10 April 2012
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Properly repair crack on uppoer long, main deck, frame 37, lane H.//Extended until 6/10
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 May 2012
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2012 Resolved
Crop and renew flat bar stiffiner, main deck, fram 54, starboardside.
Action required: 705 - Other - as specified
Due 29 April 2012
Resolved 10 April 2012
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 March 2012 Resolved
Crop and renew transverse beam uppoer, main deck, frame 30, lane A.//18APR12 Received request for extension from 4/29 until 5/10//
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 3 May 2012
Electrical › Electric Generation Source (service) › Generator
Issued 29 March 2012 Resolved
Prove proper operation of overspeed on the #2 SSDG. 10APR12 Received request to extend//
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 3 May 2012
Construction/Loadline › Structures › Deck Plating
Issued 29 March 2012 Resolved
3rd deck to be inspected by CG inspector in unloaded condition.
Action required: 705 - Other - as specified
Due 15 April 2012
Resolved 10 April 2012
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 15 June 2009 Resolved
Provide receptical covers in the following areas on the 2nd deck: lane 1, frame 24 lane 1, frame 36 lane 10, frames 12, 23 and 47
Due 15 July 2009
Resolved 24 June 2009
Resolution: Covers provided.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 15 June 2009 Resolved
Inspect and repair ground detection system. Current system provides inconclusive detection. Repair grounds if detected.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Ground detection system was repaired and tested satisfactory.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 15 June 2009 Resolved
Repair junction boxes on the 2nd deck, lane 1, frames 36 and 37.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Boxes repaired.
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 15 June 2009 Resolved
Repair/renew latches on the breaker panels for the shore power and 450v panels. Current latches do not close. Refasten 240v panel.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Latches repaired.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 June 2009 Resolved
Crop and renew wasted outboard vertical angle stiffener around the 2nd deck STARBOARD water-tight door. 4" x 3" x 3/8" angle.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Area cropped and renewed.
Construction/Loadline › Structures › Deck Plating
Issued 15 June 2009 Resolved
Crop and renew to good metal on the top deck in the following locations: lane K/L, frame 44 lane C, frame 36 (2 areas) lane F/G, frame 26 Stern frames 56-53 (3 areas) FWD bow, 1' aft of the PORT ladderwell access.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Areas cropped and renewed.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 15 June 2009 Resolved
Repair/renew fire extinguisher bracket, main deck, frame 49, PORT side.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Bracket repaired.
Electrical › Lighting (service) › Lighting Fixture
Issued 15 June 2009 Resolved
Provide dome cover light in way of the portside ladderwell from the main deck to the 2nd deck.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Dome cover provided.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 15 June 2009 Resolved
repair/renew broken railing on the top deck, amidships, STARBOARD side.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Railing renewed.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 15 June 2009 Resolved
Repair/renew hand rails on the car deck, frame 55.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Rails renewed.
Construction/Loadline › Hull › Stiffener
Issued 15 June 2009 Resolved
Repair/renew 2 cross-stanchions, 1 stanchion, and 2 gussets in Lane E/F, frame 34.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Stanchions renewed.
Construction/Loadline › Hull › Stiffener
Issued 15 June 2009 Resolved
Repair/renew stanchion, lane E/F, frame 10, as well as the cross-stanchion, frame 30, STARBOARD outboard side.
Due 15 July 2009
Resolved 24 June 2009
Resolution: Stanchions renewed.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 18 July 2008 Resolved
Ground indicator on 240V L1 panel shows a ground. Troubleshoot and repair ground.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2008
Resolution: Ground found in overhead lighting. Ground repaired.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 18 July 2008 Resolved
Electrical plug box broken and hanging, on second deck port side between frames 12 and 13.
Condition: Damaged By Earlier Event
Due 18 August 2008
Resolved 23 July 2008
Resolution: The box was removed.
Electrical › Electric Supply System (service) › Cable
Issued 13 July 2007 Resolved
Replace the wire going to the light on the 1st deck , stbd side at frame #40.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 August 2007
Resolved 7 September 2007
Resolution: Wire is replaced.
Electrical › Electrical Distribution System (service) › Cable
Issued 13 July 2007 Resolved
Replace bad wire from frames #37 to #39, on the 1st deck, stbd side.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 August 2007
Resolved 10 September 2007
Resolution: Wire is replaced.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 13 July 2007 Resolved
Secure the J-box at frame #37 on the 1st deck, stbd side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: J-box is secured.
Construction/Loadline › Hull › Stiffener
Issued 13 July 2007 Resolved
Cracked welds on stiffeners. Repair or replace the vertical supports in lane D&E at frames #10, #16 and #18
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2007
Resolution: Old weld was gouged out and stiffeners were re-welded.
Construction/Loadline › Structures › Superstructure
Issued 13 July 2007 Resolved
Cracked welds on the over hangs of the side curtains on the port and stbd sides at frame #59 on the3rd deck. Repair or crop and renew to good metal at Next Dry Dock (30 Sep 2008)
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 23 September 2008
Resolution: Cropped and renewed to the satisfaction of the attending Coast Guard Marine Inspector. //[name withheld]//
Construction/Loadline › Structures › Superstructure
Issued 13 July 2007 Resolved
Crop and renew side shell curtain by the stbd frame #58 at the deck. To be done at next Dry-Dock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 7 September 2007
Resolution: 8ft x 6ft side curtain is replaced.
Fire Fighting › Means of Escape › Handrails/Handholds
Issued 13 July 2007 Resolved
Crop and renew the wasted hand rails on the port side ladder from the 2nd deck to the 3rd deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: The rails were replaced.
Construction/Loadline › Structures › Superstructure
Issued 13 July 2007 Resolved
Crop and renew wasted side shell curtain plating between frames 38 and 39 on the port side. To be done at the next Dry-Dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 23 September 2008
Resolution: Cropped and renewed to the satisfaction of the attending Coast Guard Marine Inspector. //[name withheld]//
Engineering › Diesel Engine (auxiliary) › Valve
Issued 13 July 2007 Resolved
Install a handle on the fuel shut valve for the outboard generator.
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 August 2007
Resolved 7 September 2007
Resolution: A handle was installed.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 13 July 2007 Resolved
Secure the lagging on the inboard generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 July 2007
Resolved 7 September 2007
Resolution: Lagging is secured.
Construction/Loadline › Penetrations › Pipe Flange
Issued 13 July 2007 Resolved
Crop and renew the stuffing tube for the light on the stbd side bow, 2nd deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: The stuffing tube was replaced.
Construction/Loadline › Hull › Stiffener
Issued 13 July 2007 Resolved
Repair or replace the vertical stanchion in lane B&C at frame 59
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2007
Resolution: The welds were gouged out and the stanchion was welded.
Construction/Loadline › Hull › Side Shell
Issued 13 July 2007 Resolved
De-scale the port side curtain longitudinal on the 1st deck, between frames 27 and 29 to determine the thickness and repair as necessary. To be done next Dry-Dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 23 September 2008
Resolution: Cropped and renewed to the satisfaction of the attending Coast Guard Marine Inspector. //[name withheld]//
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 July 2007 Resolved
Replace the port side long. between frames 17 and 18. The 2nd frame from the deck. No the 1st deck
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2007
Resolved 7 September 2007
Resolution: The frames are replaced.
Electrical › Lighting (service) › Lighting Fixture
Issued 13 July 2007 Resolved
Repair the flood light between frames 15 and 16 on the 1st deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: Light is working fine
Construction/Loadline › Hull › Side Shell
Issued 13 July 2007 Resolved
Crop and renew wasted side shell curtain plating between frames 10 and 11 on the port side 1st deck. To be done next Dry-Dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 23 September 2008
Resolution: Cropped and renewed to the satisfaction of the attending Coast Guard Marine Inspector. //[name withheld]//
Electrical › Electric Supply System (service) › Battery Installation
Issued 13 July 2007 Resolved
Replace #1 generators starting battery. The battery post is wasted.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2007
Resolution: The battery was replaced.
Engineering › Diesel Engine (auxiliary) › Cylinder Head
Issued 13 July 2007 Resolved
Determine the cause of the oil leak on the #1 generator and make repairs. Demonstrate proper operation to the attending inspector.
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: Leak is repaired and generator is working.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 13 July 2007 Resolved
Repair the ground detection system lights for power panels L1and L5, 1st deck fwd. Demonstrate proper operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: Lights were replaced and system is working.
Construction/Loadline › Hull › Stiffener
Issued 13 July 2007 Resolved
Crop and renew wasted 2nd deck conning port side in way of the ladder.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2007
Resolved 30 October 2007
Resolution: The coaming is renewed.
Construction/Loadline › Structures › Superstructure
Issued 13 July 2007 Resolved
Crop and renew the wasted railing around the exhaust piping port side fwd, 2nd deck
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2007
Resolved 7 September 2007
Resolution: The rail is replaced.
Electrical › Electric Supply System (service) › Cable
Issued 13 July 2007 Resolved
Properly install electrical cabling at the break water bulkhead fwd, on the 2nd deck. The kick pipe is wasted beyond repair.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: The pipe is replaced.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 13 July 2007 Resolved
Properly secure the J-box cover, portside 2nd deck at frame 32.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2007
Resolved 7 September 2007
Resolution: Cover is secured.
Construction/Loadline › Structures › Deck Plating
Issued 13 July 2007 Resolved
Crop and renew wasted deck plating at frame 36 port side 3rd deck and repair possible fracture on the transverse frame 36 overhead port side 2nd deck.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2007
Resolution: The plating was replaced. No fracture was found in the frame.
Construction/Loadline › Hull › Stiffener
Issued 13 July 2007 Resolved
Crop and renew or repair the vertical stanchion and gusset at frame 58 in lane A, 2nd deck.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2007
Resolution: The weld was gouged out the stanchion and gusset were welded.
Construction/Loadline › Structures › Superstructure
Issued 13 July 2007 Resolved
Crop and renew the wasted bulwarks, railing and structure members. 3rd deck fwd.To be done next Dry-Dock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 30 October 2007
Resolution: Railing and structure members are renewed.
Fire Fighting › Means of Escape › Handrails/Handholds
Issued 13 July 2007 Resolved
Crop and renew the wasted railing leading to and around the P/H area as needed on the 3rd deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 September 2007
Resolved 7 September 2007
Resolution: Railing is replaced.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 13 July 2007 Resolved
Renew electrical J-box kick pipe and secure the cover to the box on the port side 3rd deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2007
Resolved 7 September 2007
Resolution: Pipe is replaced and cover is secured.
Construction/Loadline › Structures › Deck Plating
Issued 12 May 2006 Resolved
Properly repair the small hole in the deck stbd side fwd on the 3rd deck.
Action required: 705 - Other - as specified
Due 9 June 2006
Resolved 5 June 2006
Resolution: Doubler plate was welded over the holes.
Construction/Loadline › Structures › Superstructure
Issued 12 May 2006 Resolved
Properly repair the electrical backet port side aft most bracket.
Due 9 June 2006
Resolved 5 June 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 12 May 2006 Resolved
Properly replace the glass cover on the light at frame 39 starboard side.
Due 9 June 2006
Resolved 5 June 2006
Construction/Loadline › Hull › Hull Plating
Issued 29 April 2005 Resolved
Vessel sustained damage after alliding with M/V CEMCON. Vessel to maker perm repairs to damaged Stbd-side transom hull plating IWO of gunnel and damaged bulwarks.
Action required: 705 - Other - as specified
Due 30 September 2005
Resolved 29 September 2005
Resolution: Satrisfactory repairs conducted and tested.
Construction/Loadline
Issued 25 May 2001 Resolved
MAKE PERMANENT REPAIRS TO THE PORT AFT QUARTER STERN VOID.
Condition: Unknown
Due 25 May 2001
Resolved 25 May 2001
Construction/Loadline
Issued 27 July 1998 Resolved
REPAIR MAIN DECK PORT AFT CORNER FRACTURE COVERED WITH RED HAND TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Construction/Loadline
Issued 27 July 1998 Resolved
REPAIR WASTED VOID MANHOLE COVER GASKET CHANNELS AS REQUIRED.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Construction/Loadline
Issued 27 July 1998 Resolved
RENEW WASTED/FRACTURED BALLAST TANK VENTS ON MAIN DECK..
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Electrical
Issued 27 July 1998 Resolved
INSTALL BLANK COVERS IN OPEN SLOTS OF ELECTRICAL PANEL P-3.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Electrical
Issued 27 July 1998 Resolved
CLEAN/NEUTRALIZE BATTERY ACID FROM THE INTERIOR OF THE PORT GENERATOR BATTERY BOX.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Electrical
Issued 27 July 1998 Resolved
REMOVE DEAD-END WIRING/JUNCTION BOXES ON UPPER DECK IN WAY OF NAVIGATION LIGHTS.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Engineering
Issued 27 July 1998 Resolved
RESTENCIL FUEL CUT-OFF VALVE AT REMOTE DECK LOCATION.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Construction/Loadline
Issued 27 July 1998 Resolved
DETERMINE EXTENT OF DAMAGE TO UPSET DECK AND INTERNAL STRUCTURAL MEMBERS AND REPAIR TO SATISFACTION OF ATTENDING USCG MARINE INSPECTOR IN WAY OF NO.7 STBD BALLAST TANK BETWEEN FRAMES 43 & 44 AT SIDESHELL.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Electrical
Issued 27 July 1998 Resolved
REPAIR LIGHT FIXTURE GLOBE LOCATED AT FORWARD PORT LADDER SECOND DECK.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Construction/Loadline
Issued 27 July 1998 Resolved
REPAIR SEVERAL FRACTURES ON THE UPPER WEATHER DECK PORT SIDE ADJACENT TO THE PORT NAVIGATION LIGHT TO THE SATISFACTION OF AN ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Accommodation/Occupational Safety
Issued 27 July 1998 Resolved
REPAIR BROKEN UPPER RAIL PORT SIDE UPPER DECK; 6TH SECTION AFT OF NAVIGATION LIGHT.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Construction/Loadline
Issued 27 July 1998 Resolved
REPLACE DISTORTED VERTICAL STANTION ON SECOND DECK CENTERLINE AT FRAME 49.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Electrical
Issued 27 July 1998 Resolved
RE-AFFIX LIGHT FIXTURES TO OVERHEAD BRACKETS.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Engineering
Issued 17 July 1991 Resolved
PROVE PROPER OPERATION OF THE REMOTE FUEL TANK SHUT OFF VALVE AND PROPERLY LABEL SAME.
Condition: Unknown
Due 17 July 1991
Resolved 17 July 1991
Construction/Loadline
Issued 19 June 1991 Resolved
CROP AND RENEW DAMAGE IN STERN LOG IN ACCORDANCE WITH REPAIR PROPOSAL DATED18JUN91 ON FILE AT COAST GUARD MSO JACKSONVILLE.
Condition: Unknown
Due 19 June 1991
Resolved 19 June 1991
Construction/Loadline
Issued 19 June 1991 Resolved
CROP AND RENEW DAMAGE AND RENEW DAMAGE TO STEM IN ACCORDANCE TO REPAIR PROPOSAL DATED 24NOV90 ON FILE AT COAST GUARD MSO JACKSONVILLE.
Condition: Unknown
Due 19 June 1991
Resolved 19 June 1991

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.