MAURY USCG vessel records
← All vessels

LEDGER T

Built
1979
Last inspected
16 April 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 2016.

Inspection record

Last inspected 16 April 2026
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8982541
WDC9572
Flag
UNITED STATES
Maury page id
psix-50321

Documentation record

Registered dimensions (L × B × D)104.1 ft × 21.5 ft × 6.8 ft
Registered tonnagegross 93 / net 63
ITC dimensions (L × B × D)100.6 ft × 21.8 ft × 8.7 ft
ITC tonnagegross 164 / net 49
BuilderCAMCRAFT, INC. · JEAN LAFITTE, LA, UNITED STATES · built 1979
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLOS ANGELES, LA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 18 September 2025 · expires 30 September 2026
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Regulatory (Subpart C or D), Gross Ton
164 - Convention (Subpart B), Gross Ton
63 - Regulatory (Subpart C or D), Net Ton
49 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 33 inspections, each with its date, unit and type; 32 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 1 other vessel inspected with it; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

RYAN T Offshore Supply Vessel · MISLE 53497 · 23 January 2020 · activity 6895082

Inspection history · 33

16 April 2026 Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8328286
10 February 2026 Deficiency Check · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8301975
18 February 2025 Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8081025
31 May 2024 Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7923874
22 April 2024 Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7898278
22 February 2024 Internal Structural Exam · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7851197
24 January 2023 COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7608713
27 December 2022 Plan Review "T" Boat
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7613870
12 October 2022 Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7575924
15 September 2022 In-Service Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7554221
8 September 2022 Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7554575
5 May 2022 Examination of Repairs · Annual Inspection · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7441430
6 December 2021 Plan Review "T" Boat · Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7363572
17 March 2021 Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7157863
4 June 2020 Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6962266
26 March 2020 Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6932084
6 February 2020 Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6887353
23 January 2020 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6895082
4 November 2019 Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6849179
3 July 2019 Uninspected Other
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6728881
9 April 2019 In-Service Inspection · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6658935
19 February 2019 Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6612406
4 May 2018 Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6409487
30 March 2018 Drydock Extension
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6386277
23 March 2018 Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6377641
16 March 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6373330
9 February 2018 COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6335858
29 November 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6314716
30 March 2017 Annual Inspection · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6104591
7 April 2016 Annual Inspection · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5809610
29 February 2016 Hull Examination · Administrative Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5824376
13 February 2016 Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5814857
13 February 2016 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5836342

Deficiency record · 32

02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 18 February 2025 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. When repairs are made during an emergency, the owner, managing operator, or master shall notify the OCMI as soon as practicable after such repairs or alternations are made. Aluminum hull plating was found with a 6-inch longitudinal crack next to the stbd generator exhaust. Submit a repair proposal to the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2025
Resolved 11 March 2025
Resolution: Vessel completed Repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 22 April 2024 Resolved
A vessel which, under § 178.310 of this part, complies with requirements in sub chapter S of this chapter, must have stability details on the vessel's Certificate of Inspection, a stability letter issued by the cognizant Officer in Charge, Marine Inspection (OCMI) or the Commanding Officer, Marine Safety Center, or an approved stability booklet. BILGES: The vessel’s bilges and voids shall be kept pumped to minimum content at all times consistent with pollution prevention requirements. Vessel's engine room bilge had approximately 4-6 inches of oily water in centerline bilge. Clean out bilges to the satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 May 2024
Resolved 31 May 2024
Resolution: Vessel provided proof of bilge free from excess standing water.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 22 April 2024 Resolved
When the exhaust cooling water system is separate from the engine cooling water system, a suitable warning device, visual or audible, must be installed at the operating station to indicate any reduction in normal water flow in the exhaust cooling system. Port exhaust audible and visual warning device at the operating station was inoperable. Repair alarm panel or flow switch and provide satisfactory test of port exhaust audible and visual alarm to the attending marine inspector.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 May 2024
Resolved 11 June 2024
Resolution: Vessel replaced flow switch with test sat.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 22 April 2024 Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radio beacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessel master did not have a valid radio operator permit. Present valid radio operator permit for master on board during inspection or show a vessel log that can prove there is a crew member on board during vessel operation with a valid radio operator permit to the attending marine inspector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 May 2024
Resolved 31 May 2024
Resolution: Master provided proof of MROP.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 January 2023 Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers, and on a vessel of more than 19.8 meters (65 feet) in length, each hose must be lined commercial fire hose that conforms to UL 19 or hose that is listed and labeled by an independent laboratory recognized by the Commandant as being equivalent in performance. The port side hose was found leaking through a point approximately two feet from the fire plug end of the hose. Replace with approved and properly labeled hose and destroy the damaged hose.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 February 2023
Resolved 3 February 2023
Resolution: Vessel replaced hose and tested it in the presence of a marine inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 January 2023 Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment, other than small buoyancy compartments, under all practicable conditions. The vessel was unable to get suction from the after bilge pickup in the engine room. The forward bilge suction was functioning. Demonstrate proper operation of engine space bilge suction as designed and approved.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2023
Resolved 5 February 2023
Resolution: Vessel replaced wasted elbow and demonstrated proper function.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 January 2023 Resolved
A vessel of at least 7.9 meters (26 feet) in length must be provided with individual bilge lines and bilge suctions for each watertight compartment, except that the space forward of the collision bulkhead need not be fitted with a bilge suction line when the arrangement of the vessel is such that ordinary leakage may be removed from this compartment by the use of a hand portable bilge pump or other equipment, and such equipment is provided. The fore peak bilge suction line was found wasted and unable to provide adequate suction for dewatering. Vessel made temporary repairs using electrical tape and demonstrated suction, and provided additional electric submersible pump to provide space dewatering. Make proper permanent repairs or provide repair plan with appropriate intermediate repairs.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2023
Resolved 3 February 2023
Resolution: Vessel demonstrated proper operation and adequacy of temporary repairs. Permanent repair to be conducted by next dry docking (March 2024).
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 24 January 2023 Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Penetrations in the transverse watertight bulkheads located at frames 10 and 20 were found with unsealed cable penetrations. Make penetrations watertight.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 February 2023
Resolved 5 February 2023
Resolution: Vessel plugged cable penetrations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2022 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Macerator pump was found installed with only zip ties. Properly mount macerator pump.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 1 July 2022
Resolution: Vessel properly mounted pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 June 2022 Resolved
At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. Galley bilge was found with excessive trash and debris. Remove items and debris.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 1 July 2022
Resolution: Vessel cleaned bilge.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 13 June 2022 Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. First aid kit provided did not meet 46 CFR 160.041. Provide complete and current first aid kit.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 1 July 2022
Resolution: Vessel provided new first aid kit.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 June 2022 Resolved
Spanner wrenches must be provided where a 40 millimeter (1.5 inch) diameter firehose is required by § 181.320. Both fire hydrants were missing wrenches. Provide spanner wrenches.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 1 July 2022
Resolution: Vessel provided spanner wrenches.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2022 Resolved
Materials used in piping systems must meet the requirements of this subpart and be otherwise acceptable to the cognizant [name withheld] piping located in the starboard aft corner of the engine room was found leaking at a coupling. Repair leak.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 1 July 2022
Resolution: Vessel repaired leak.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 June 2022 Resolved
Cable and wire for power and lighting circuits must: (1) Meet Section 310-13 of NFPA 70 (incorporated by reference; see 46 CFR 175.600) except that asbestos insulated cable and dry location cables may not be used; (2) Be listed by Underwriters Laboratories (UL), as UL Boat or UL Marine cable; or (3) Meet § 111.60-1 in subchapter J of this chapter for cable, and § 111.60-11 in subchapter J of this chapter for wire. Engine start batteries were found with battery jumper cables using spring clips connecting the two banks. Vessel representative replaced jumper cables with 0000 cable and proper terminal connectors, but cable did not meet 46CFR183.340 amd was not what was listed in plan bill of materials. Replace with UL-marine or other approved cable.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 1 July 2022
Resolution: Vessel replaced cable with proper UL-marine 0000 cable.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 9 April 2019 Resolved
When the cognizant OCMI or the Commanding Officer, Marine Safety Center determines, in accordance with §178.210, that a vessel must have stability details indicated on its Certificate of Inspection or a stability letter, the owner or operator must submit the information listed in paragraph (b) of this section: Provide an approved stability letter noting stability details for a minimum of 50 passengers, 4 crew and cargo.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 May 2019
Resolved 4 November 2019
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 9 April 2019 Resolved
Pursuant to 46 CFR 170.010, substitutions for calculations, information, or tests required in sub-chapter T may be approved by the Officer in Charge, Marine Inspection, if the substitution provides an equivalent level of safety. While the vessel is carrying more than 50 total persons the maximum cargo load must be reduced to no more than 15,000 lbs.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2019
Resolved 4 November 2019
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 19 February 2019 Resolved
Replace lagging on port and starboard engine exhuast. Found 5X& holes in both outboard side exhaust lagging.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2019
Resolved 22 March 2019
Resolution: Def rectified to the satisfaction of the attending marine inspector.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 February 2019 Resolved
Found electrical panel to be missing drip shield in generator room. Provide drip shield for panel B in generator room.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2019
Resolved 22 March 2019
Resolution: Def rectified to the satisfaction of the attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 February 2019 Resolved
Provide spanner wrenches for fire hydrants.
Action required: 10 - Deficiency Rectified
Due 19 February 2019
Resolved 19 February 2019
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 February 2019 Resolved
Electrical breaker panel on the bridge had a breaker that did not fit inside the face of the plate and was exposing the inside of the panel.
Action required: 10 - Deficiency Rectified
Due 19 February 2019
Resolved 19 February 2019
Resolution: the electrical breaker panel on the bridge had a breaker that did not fit inside the face of the plate and was exposing the inside of the panel.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 February 2019 Resolved
electrical panel in the number two forward void under the galley was missing two screws and the front cover was swinging open, exposing the wires inside.
Action required: 10 - Deficiency Rectified
Due 19 February 2019
Resolved 19 February 2019
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 February 2019 Resolved
An electrical cord with semi exposed wires made with a temporary type splice, held together with only electrical tape, was utilized on the bridge to extend the length of an extension cord for an installed fan.
Action required: 10 - Deficiency Rectified
Due 19 February 2019
Resolved 19 February 2019
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 February 2019 Resolved
One lifejacket found to be missing required light
Action required: 10 - Deficiency Rectified
Due 19 February 2019
Resolved 19 February 2019
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 February 2019 Resolved
three lifejackets were found to be missing retroreflective material
Action required: 10 - Deficiency Rectified
Due 19 February 2019
Resolved 19 February 2019
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 9 February 2018 Resolved
Stuffing tubes on watertight bulkhead in engine room not sealed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2018
Resolved 23 March 2018
Engineering › Bilge Water Management System › Not Operational
Issued 30 March 2017 Resolved
Prove proper operation of all bilge suctions and both pumps
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 March 2017
Resolution: Maintenence personnel found a wasted gate valve and section of piping. RNR and tested, all sat.
Stability › Watertight Integrity › General
Issued 7 April 2016 Resolved
Transverse watertight bulkhead cable penetrations not watertight.
Action required: 705 - Other - as specified
Due 7 April 2016
Resolved 7 April 2016
Resolution: Operator made transverse watertight bulkead penetrations watertight.
Fire Fighting › Combustible Materials › Insulation
Issued 7 April 2016 Resolved
Discovered insulation lagging on turbochargers to be loose.
Action required: 705 - Other - as specified
Due 7 April 2016
Resolved 7 April 2016
Resolution: Operator tightened insulation lagging on turbochargers.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 7 April 2016 Resolved
Discovered missing backing plates on engine's battery start connections on switchboard.
Action required: 705 - Other - as specified
Due 7 April 2016
Resolved 7 April 2016
Resolution: Operator installed backing plates on battery start connections on switchboard.
Construction/Loadline › Hull › Hull Plating
Issued 29 February 2016 Resolved
Vessel overdue for drydock; complete hull exam prior to carrying passengers or cargo.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 February 2016
Resolved 9 March 2016
Resolution: Completed credit drydock.
Electrical › Electric Supply System (service) › Battery Charger
Issued 13 February 2016 Resolved
Battery Charger failed to maintain a charge on vital navigational equip battery bank.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 March 2016
Resolved 18 February 2016
Resolution: Battery Charger working properly
Electrical › Electric Supply System (service) › Cable
Issued 13 February 2016 Resolved
Loose live wires were discovered behind navigation console on the bridge.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 March 2016
Resolved 18 February 2016
Resolution: Wires properly ended in junction box

Recorded names · 1

PATRICK (2008–2020). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.