Records from 2006 to 2022. Most recent: inspection, 14 September 2022.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 14 February 2019
Resolved
Replace gasket on the aft steering room watertight door and adjust all watertight doors and hatches to ensure watertight integrity. 46 CFR 131.893; 17c.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2019
Resolution: MI attended vessel and cleared the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 February 2019
Resolved
Replace the following non-metallic flexible hose as marked, replace with hose meeting SAE J-1942: Bow thruster engine – (3) oil hoses & (1) fuel oil hose; STBD SSDG – (1) oil gauge hoses; STBD MDE – (2) fuel oil hoses; PORT MDE – (1) oil hose; STBD R/G – (2) oil hoses; and PORT R/G – (2) oil hoses. 46 CFR 56.60-25(b); 17c.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2019
Resolution: MI attended vessel and cleared deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 February 2019
Resolved
Provide personnel light for engine room lifejacket. 46 CFR 133.70(b)(4); 17c.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2019
Resolution: MI attended the vessel and cleared the deficiency.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 14 February 2019
Resolved
Provide fuel transfer procedures at fuel oil transfer pump; 33 CFR 156.120; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 20 February 2019
Resolution: MI attended vessel and cleared the deficiency.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 February 2019
Resolved
Provide emergency steering instructions at engine room steering station. 46 CFR 131.845; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 20 February 2019
Resolution: MI attended the vessel and cleared the deficiency.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 14 February 2019
Resolved
Calibrate bridge and rudder angle repeaters to match mechanical rudder angle indicator. 46 CFR 130.140; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 20 February 2019
Resolution: MI attended the vessel and cleared the deficiency.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 14 February 2019
Resolved
All five (05) dry-bulk tanks are corroded and leaking at the tank neck. Make necessary repairs to prevent leaking. 46 CFR 127.210; 50a/c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 March 2019
Resolved 20 February 2019
Resolution: MI and Class accepted the proposed repair plans for the vessel cargo tanks to be conducted at drydock w/in 5 months..
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 February 2019
Resolved
Replace relief valves on air receivers. 46 CFR 54.15-10; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 20 February 2019
Resolution: MI attended vessel and cleared the deficiency.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 February 2019
Resolved
Make repairs to pinhole leak on #3 air receiver cut-out valve. 46 CFR 127.210; 50a/c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 March 2019
Resolved 20 February 2019
Resolution: MI and Class attended vessel and approved repair procedure.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 14 February 2019
Resolved
Make sewage tank overboard valve operable. 33 CFR 159.17; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 20 February 2019
Resolution: MI attended vessel and cleared deficiency.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 February 2019
Resolved
Paint locker has insufficient fire protection, install required fire protection. In addition, paint locker is not identified on the Fire Safety Plan, amend for CG approval. 46 CFR 132.310; 46 CFR 95.15-5(d).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 March 2019
Resolved 20 February 2019
Resolution: MI and Class attended the vessel and approved the changes to the fireplan, installation of required fire extinguishing system.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 February 2019
Resolved
Make operational fire pump pressure gauge on bridge. 46 CFR 130.430; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 February 2019
Resolved 20 February 2019
Resolution: MI attended the vessel and cleared the deficiency.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 14 February 2019
Resolved
Make operational STBD fuel remote shut off valve. 46 CFR 56.50-60; 17c.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2019
Resolution: MI attended the vessel and cleared the deficiency.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 14 February 2019
Resolved
Test all smoke and heat detectors in the engine room for proper operation. 46 CFR 130.470; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 20 February 2019
Resolution: MI attended vessel and verified operation of all fire detection sensors in engine room.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 February 2019
Resolved
Amend the Periodic Safety Test Procedures (PSTPs) to include testing of all smoke and heat detectors; submit to MSU Houma for approval. 46 CFR 130.480; 50c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 March 2019
Resolved 20 February 2019
Resolution: MI attended the vessel and received updated PSTPs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 February 2019
Resolved
Make necessary repairs to prevent oil leaks on the STBD SSDG. 46 CFR 126.430; 17c.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2019
Resolution: MI attended vessel and verified repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 February 2019
Resolved
Replace Type I retro-reflective material on all stowed lifejackets. 46 CFR 133.70(b)(3).
Action required: 10 - Deficiency Rectified
Resolved 14 February 2019
Resolution: Vessel corrected in presence of MI.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 14 February 2019
Resolved
Replace Type II retro-reflective material on rescue boat. 46 CFR 131.855; 10c.
Action required: 10 - Deficiency Rectified
Resolved 14 February 2019
Resolution: Vessel corrected in presence of attending MI.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 February 2019
Resolved
Provide documentation that rescue boat is approved under 160.156, the rescue boat david is approved under 160.132, and the winch is approved under 160.115. 46 CFR 133.135; 46 CFR 133.160; 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 20 February 2019
Resolution: Vessel provided series approval documentation for rescue boat, davit, and winch to attending [name withheld] in permanent vessel documents.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 February 2018
Resolved
Several deck rails contained excessive wastage and need to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 15 March 2018
Resolution: All wasted rails were replaced; pictures provided via email.
Electrical › Electric Generation Source (service) › Conductor
Issued 20 February 2018
Resolved
Windings need to be free of oil, gunk and debris.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 15 March 2018
Resolution: Corrected 12MAR18; pictures were provided via email.
Fire Fighting › Fire Hydrants › Condition
Issued 20 February 2018
Resolved
Fire stations below the main deck were clogged with mud, etc., which did not allow firefighting water to flow through and must be corrected prior to operating.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 20 February 2018
Resolution: Cleared mud from piping. All sat.
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 20 February 2018
Resolved
STBD shaft tachometer is reading astern propulsion inverted.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 15 March 2018
Resolution: Repaired by a technician; report was provided via email.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 1 February 2017
Resolved
Vessel failed to provide updated COFR.
Action required: 705 - Other - as specified
Due 15 February 2017
Resolved 7 February 2017
Resolution: Vessel provided documentation for COFR.
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 1 February 2017
Resolved
Vessel must conduct general house keeping in engine room, address oil soaked exhaust lagging and dirty generator windings.
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 15 February 2017
Resolution: Vessel cleaned generator windings and general cleaning of engine room as noted by CG inspector and ABS surveyor. ABS surveyor witnessed cleaning.
Operations/Management › Drills/Instruction › Fire
Issued 19 February 2016
Resolved
Conduct fire drill prior to returning to service.
Action required: 705 - Other - as specified
Due 19 February 2017
Resolved 24 August 2016
Resolution: Witnessed satisfactory fire drill
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 19 February 2016
Resolved
Prior to returning to service conduct rescue boat drill and abandon ship drill.
Action required: 705 - Other - as specified
Due 19 February 2017
Resolved 24 August 2016
Resolution: Witnessed satisfactory abandon ship drill.