Records from 1984 to 2008. Most recent: inspection, 4 February 2008.
Electrical
Issued 29 August 2001
Resolved
Denergize non-explosion proof lighting fixture located in paint locker (aftbridge deck), otherwise replace with approved class 1 div 1 lighting fixture.
Condition: Unknown
Due 29 August 2001
Resolved 29 August 2001
Construction/Loadline
Issued 29 August 2001
Resolved
Repair holes in aft line locker on deck hatch coming and deck plate near frame 245.
Condition: Unknown
Due 7 September 2001
Resolved 7 September 2001
Construction/Loadline
Issued 29 August 2001
Resolved
Affect repairs to WTD 20B (BHD-216) open/close indicator (remote indicator on Aloha deck).
Condition: Unknown
Due 7 September 2001
Resolved 7 September 2001
Electrical
Issued 29 August 2001
Resolved
Properly insert stuffing in electrical cable tube on deck by NFSD-12, Alohadeck.
Condition: Unknown
Due 7 September 2001
Resolved 7 September 2001
Construction/Loadline
Issued 14 June 2001
Resolved
Affect permanent repairs to #7 hold watertight door (adjust/seal/ensure door is watertight)
Condition: Unknown
Due 14 June 2001
Resolved 14 June 2001
Construction/Loadline
Issued 14 June 2001
Resolved
Make permanent repairs to cracked port-light glass (starboard side above loadline mark). Secure with temporary cover until satisfactory repairs aremade.
Condition: Unknown
Due 14 June 2001
Resolved 14 June 2001
Lifesaving
Issued 14 June 2001
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001
Electrical
Issued 14 June 2001
Resolved
Determine source and effect repairs to the partial ground on the 115vac emergency circuit (engine space).
Condition: Unknown
Due 14 June 2001
Resolved 14 June 2001
Construction/Loadline
Issued 14 June 2001
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001
Construction/Loadline
Issued 14 June 2001
Resolved
Install standpipe/properly seal 1" hole in deck (Aloha Deck, cargo space CO2 manifold room).
Condition: Unknown
Due 14 June 2001
Resolved 14 June 2001
Fire Fighting
Issued 22 February 2001
Resolved
Effect repairs to fire damper #10 (Aloha deck).
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Electrical
Issued 22 February 2001
Resolved
Label electrical panel behind FSD #19 (Aloha deck)
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Electrical
Issued 22 February 2001
Resolved
Make watertight the general alarm bell enclosures at cabins 307 & 317.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Fire Fighting
Issued 22 February 2001
Resolved
Effect repairs to FSD 17 (Maui deck) hose port.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Accommodation/Occupational Safety
Issued 22 February 2001
Resolved
Label the switch for the fire damper release at fire zone #5 at FSD #17 Maui deck.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Fire Fighting
Issued 22 February 2001
Resolved
Install a door toggle on FSD #9 (Ohana deck) so that the outboard door doesnot restrict the inboard door from closing under any circumstances.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Electrical
Issued 22 February 2001
Resolved
Remove portable electric cable on power panel PO1-163-1 Ohana deck at FSD 14 and make connection permanent.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Electrical
Issued 22 February 2001
Resolved
Make an enclosure for the fire panel batteries behind the purser's office.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Electrical
Issued 22 February 2001
Resolved
Properly dead end exposed dead end wires in Gyro room.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Construction/Loadline
Issued 22 February 2001
Resolved
Forward bulkhead #2 hold; evaluate condition of plate in way of leaks and make proposal for repairs.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Construction/Loadline
Issued 22 February 2001
Resolved
Free all dogs and prove operation of fore and aft deck hatches & ventilation closures.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Accommodation/Occupational Safety
Issued 22 February 2001
Resolved
Crop and renew wasted section of ventilation duct on the starboard bow.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Construction/Loadline
Issued 22 February 2001
Resolved
Repair and prove proper operation of local hand crank forward side of WTD #5C.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Electrical
Issued 22 February 2001
Resolved
Mount transformers and provide protective panel cover for the public announcement console aft of the purser's office. Dress up power strip and mount behind same.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Fire Fighting
Issued 22 February 2001
Resolved
Provide proof of valid annual servicing of galley Gaylord hood systems.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Engineering
Issued 22 February 2001
Resolved
Replace the raw water suction hose on the #1 and #13 lifeboat with acceptable lined flexible hose.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Accommodation/Occupational Safety
Issued 22 February 2001
Resolved
Remove damper stencil on fan room 5F fwd door and relocate to represent theactual location of the dampers.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Fire Fighting
Issued 22 February 2001
Resolved
Effect repairs and prove proper operation to siezed fire damper BT 18 in fan room 5F aft.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Fire Fighting
Issued 22 February 2001
Resolved
Remount heat detector in the Kamaaina deck support kitchen.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Fire Fighting
Issued 22 February 2001
Resolved
Provide non-combustible insulation on refrigeration lines in the Kamaaina deck support kitchen.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Lifesaving
Issued 10 January 2001
Resolved
PRIOR TO SAILING, PROVE LIFERAFT DAVIT SAFETY STOPS PREVENT RELEASE OF THE BREAK WHILE HAND CRANK IS IN PLACE.
Condition: Unknown
Due 10 January 2001
Resolved 12 January 2001
Construction/Loadline
Issued 14 September 2000
Resolved
Effect permanent repairs to hole in stand pipe on the #11 port double bottom in shaft alley. IAW: NVIC 7-68.
Condition: Unknown
Due 14 September 2000
Resolved 14 September 2000
Construction/Loadline
Issued 14 September 2000
Resolved
Guage suspect wasted plate in way of the fuel tank bulkhead in aft engine room aft bulkhead, at top of ladder and outboard to switchboard on stbd side in way of sewage tank and purifier on the port side lower level. Effect repairs to all leaks at fuel tank connection to hull. IAW NVIC 7-68.
Condition: Unknown
Due 14 September 2000
Resolved 14 September 2000
Fire Fighting
Issued 14 September 2000
Resolved
Replace cracked discharge hose on 50lb CO2 bank system (fixed). IAW: 46 CFR71.25-30 (3).
Condition: Unknown
Due 14 September 2000
Resolved 14 September 2000
Lifesaving
Issued 27 June 2000
Resolved
Effect permanent repairs to the #1 lifeboat transmission and prove satisfactory operation of the #1 lifeboat to the satisfaction of the attending USCG Marine Inspector in accordance with 46CFR199.45._x001C_
Condition: Unknown
Due 27 June 2000
Resolved 27 June 2000
Documentation
Issued 27 June 2000
Resolved
Provide an approved Shipboard Oil Pollution Emergency Plan (SOPEP) to the satisfaction of the attending marine inspector. 33CFR151.27.
Condition: Unknown
Due 27 June 2000
Resolved 27 June 2000
Construction/Loadline
Issued 8 March 2000
Resolved
Effect permanent repairs to the remote visual indicators located at the watertight door operating stations above the bulkhead deck, for watertight doors B-1,B-2, B-10, B-17, B-18, B-20, C-1, C-5, C-8, D-1, G-1, H-2, H-3 inaccordance with 46 CFR 170.270.
Condition: Unknown
Due 23 March 2000
Resolved 23 March 2000
Electrical
Issued 8 March 2000
Resolved
Install guards on overhead lighting fixtures in all emergency gear lockers in accordance with 46 CFR 111.75-20(b).
Condition: Unknown
Due 23 March 2000
Resolved 23 March 2000
Fire Fighting
Issued 8 March 2000
Resolved
Install ventilation and smoke detection in the shaft alley paint locker in accordance with 46 CFR 76.05-1 table (A) - Service spaces, and 46 CFR 72.15-15(a) (Ventilation).
Condition: Unknown
Due 30 March 2000
Resolved 30 March 2000
Construction/Loadline
Issued 15 February 2000
Resolved
Remove bolts located in rivet holes for the #2 starboard outboard fuel tankand make proper repairs to the satisfaction of the attending marine inspector in accordance with NVIC 7-68._x001C_ _x001C_
Condition: Unknown
Due 15 February 2000
Resolved 15 February 2000
Construction/Loadline
Issued 15 February 2000
Resolved
Make proper repairs to the leaking rivets for the #2 port outboard fuel tank to the satisfaction of the attending marine inspector in accordance with NVIC 7-68._x001C_ _x001C_
Condition: Unknown
Due 15 February 2000
Resolved 15 February 2000
Construction/Loadline
Issued 20 January 2000
Resolved
On the port side at frame 204 in shaft alley, renew wasted metal in way of the frame connection to the bottom shell in accordance with NVIC 7-68.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
Provide approved plans for the modifications to the forward hold in accordance with 46CFR71.65-10. All work completed prior to receiving approved plans is subject to changes in accordance with approved plans and comments.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
At frame 209 on the port side, shaft alley, crop and renew approximately 2 foot of the transverse frame as marked under the shaft in accordance with NVIC 7-68.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
Renew dead cover dogs on the port and starboard side shell doors located inthe athwart ship passageway in the garbage handling area in accordance with46CFR171.117(d).
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
Effect permanent repairs to the leaking fuel tank rivets at the boundary tothe #2 starboard outboard F/O tank. Rivets are suspected of leaking fuel into the cofferdam. Repairs shall be to the satisfaction of the attending marine inspector & in accordance with NVIC 7-68.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
Crop and renew deteriorated framing located under the emergency escape stair forward of frame 128 in accordance with NVIC 7-68.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
Install a means of operating hull penetration valves from above the freeboard deck where the valve is in line with a nonmetallic piping system in accordance with 46CFR56.60-25(a)(5). This requirement applies to unmanned spaces only, i.e. shaft alley MSD piping.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
At frame 208 on the port side, shaft alley, crop and renew approximately 4 foot of the transverse frame as marked under the shaft in accordance with NVIC 7-68.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Electrical
Issued 20 January 2000
Resolved
Provide a repair proposal for low insulation resistance to ground for all SSTGs. Provide megger readings for the rotors & stators of all generators,taken immediately after machinery is secured. Insulation Resistance to ground shall be maintained above the calculation in ABS rules Part 4/5.37.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
On the port watertight door located on the focsle, crop and renew the wasted knife-edge and service the door dogs so that they move freely in accordance with 46CFR171.122(f)(2).
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
Renew dogs on the vent closure located on port side deck house on the focsle in accordance with 46CFR72.15-15(a).
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Construction/Loadline
Issued 20 January 2000
Resolved
Renew/repair the wasted ventilation cover to the starboard fire damper closure forward of the focsle deckhouse in accordance with 46CFR72.15- 15(a).
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000
Engineering
Issued 7 December 1999
Resolved
Repair or replace return spring for the valve on the sounding tube for deeptank #3 S.O. (Hawaii deck) to the satisfaction of the attending marine inspector. (46CFR56.50-90).
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Engineering
Issued 7 December 1999
Resolved
Clean and evaluate F/O leak in bulkhead of #3 starboard outboard deep fuel tank; provide repair proposal for repair at dry-dock. (MSM Vol ll Ch 6)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Fire Fighting
Issued 7 December 1999
Resolved
Remove plywood from stair tower leading to the carpenter shop to the satisfaction of the attending marine inspector. (46CFR72.05-55(c))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Lifesaving
Issued 7 December 1999
Resolved
Provid proof of servicing/inpsection of portable fire extinguishers for alllifeboats to the satisfaction of the marine inspector. (46CFR199.175(b)(9))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Install receptical cover on receptical on aft bulkhead of state room Hawaii#35 and install light cover on oeverhead fixture to the satisfaction of theattending marine inspector. (46CFR111.81-1(c))/(46CFR111.75-20)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Engineering
Issued 7 December 1999
Resolved
Make permanent repairs or replace the butterfly valve on the stern thrusterport side to the satisfaction of the attending marine inspector. _x001C_ (46CFR56.20-15)
Condition: Unknown
Due 7 December 1999
Resolved 7 December 1999
Electrical
Issued 7 December 1999
Resolved
Remount electrical junction box in #2 cargo hold to the satisfaction of theattending marine inspector. (46CFR111.81-1(e))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Fire Fighting
Issued 7 December 1999
Resolved
Repair hose port in fire screen door #9A to the satisfaction of the attending marine inspector. (46CFR72.05-25(a)(6))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Fire Fighting
Issued 7 December 1999
Resolved
Update the fire control plan and submit for approval to the satisfaction ofthe attending marine inspector. (46CFR71.65-5(d))
Condition: Unknown
Due 7 December 1999
Resolved 7 December 1999
Lifesaving
Issued 7 December 1999
Resolved
Replace lifeboat davit hand crank pins on the #1 and #3 (starboard) davits to the satisfaction of the attending marine inspector. (46CFR160.132-2)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Lifesaving
Issued 7 December 1999
Resolved
Repair or replace portable fire extinguisher in lifeboat #4 to the satisfaction of the attending marine inspector. (46CFR199.175(b)(9))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Lifesaving
Issued 7 December 1999
Resolved
Repair or replace the rudder for lifeboat #13 to the satisfaction of the attending marine inspector. (46CFR160.035-3(k))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Lifesaving
Issued 7 December 1999
Resolved
Seal the open asbestos lagging in the piping located centerline, aft bulkhead, #4 cargo hold to the satisfaction of the attending marine inspector. (NVIC 6-87)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Construction/Loadline
Issued 7 December 1999
Resolved
Make permanent repairs to the drain line located next to the hull, starboard side, Kauai deck, above the bow thruster room to the satisfactionof the attending marine inspector. (46CFR56.50-95)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Fire Fighting
Issued 7 December 1999
Resolved
Free up dog on the door for fire station #9, boat deck, starboard side to the satisfaction of the attending marine inspector. (46CFR76.10-10(d))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Lifesaving
Issued 7 December 1999
Resolved
Renew retro-reflective tape on lifeboats and life ring buoys to the satisfaction of the attending marine inspector. (46CFR199.176(a)(4))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Engineering
Issued 7 December 1999
Resolved
Repair lagging in air forward and aft air ejectors in the forward engine room to the satisfaction of the attending marine inspector. _x001C_ (46CFR56.50-1(k))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Fire Fighting
Issued 7 December 1999
Resolved
Repair or replace structural fire protection insulation in overhead in #6 cargo hold to the satisfaction of the attending marine inspector._x001C_ (46CFR72.05-10(c)(1))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Remove dead ended electrical cables located behind the aft engine room mainswitchboard to the satisfaction of the attending marine inspector._x001C_ (MSM Vol ll Ch 6)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Prove proper operation of #2 SSTG low lube oil trip of the throttle valve to the satisfaction of the attending marine inspector. (ABS 4/5.29)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Remove portable wire runs penetrating the bulkhead aft of the washer/dryer in the engine lounge to the satisfaction of the attending marine inspector.(46CFR111.60-13(b)(1))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Accommodation/Occupational Safety
Issued 7 December 1999
Resolved
Make permanent repairs to overhead piping in plumber shop (#6 hold) locatedover the centerline workbench to the satisfaction of the attending marine inspector. (MSM Vol II Ch 6)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Remove splice to bilge high level alarm in #3 cargo hold to the satisfaction of the attending marine inspector. (46CFR111.60-17(c))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Remove plastic wire ties to bilge high level alarm in #5 cargo hold to the satisfaction of the attending marine inspector. (IEEE-45 Reg 20.5)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Install electrical matting in front of the 440 VAC group controller in the forward engine room to the satisfaction of the attending marine inspector._x001C_(46CFR111.30-11)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Engineering
Issued 7 December 1999
Resolved
Effect repairs to spring loaded gate valves to F.O. sounding tubes near female state room passageway to the satisfaction of the attending marine inspector. (46CFR56.50-90)
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Remove or properly mount the thermostat hanging behind the starboard bulkhead in the engine lounge to the satisfaction of the attending marine inspector. (46CFR111.81-1(e))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Electrical
Issued 7 December 1999
Resolved
Properly mount the P.A. speaker adjacent to the mens bathroom #1 starboard side. (46CFR111.81-1(e))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Fire Fighting
Issued 7 December 1999
Resolved
Permanently close fire screen door to the womans head that opens into the stair tower between water tight door #6 and fire screen door #8n to the satisfaction of the attending marine inspector. (46CFR72.05-20(f))
Condition: Unknown
Due 21 December 1999
Resolved 21 December 1999
Engineering
Issued 4 December 1999
Resolved
Tighten bolts on the flange located in the steam drum, which connects the de-superheater to the safety relief valve in accordance with 46CFR52.01-40.
Condition: Unknown
Due 9 December 1999
Resolved 9 December 1999
Engineering
Issued 4 December 1999
Resolved
In the #1 Boiler, renew lagging/refractory on the upper most inspection cover in the outboard superheater & aft section of the fire box in way of the lower port burner in accordance with 46CFR52.01-40.
Condition: Unknown
Due 9 December 1999
Resolved 9 December 1999
Engineering
Issued 4 December 1999
Resolved
Determine the source of the exhaust leak in the forward upper air box in the #1 Boiler & effect repairs to the satisfaction of the attending USCG marine inspector in accordance with 46CFR52.01-40.
Condition: Unknown
Due 4 December 1999
Resolved 4 December 1999
Engineering
Issued 4 December 1999
Resolved
Effect permanent repairs to the 12" crack in the upper-forward mud drum casing in the #1 Boiler. Repairs must be made in accordance with the manufacturer's specifications and a Coast Guard accepted repair proposal inaccordance with 46CFR78.33-1
Condition: Unknown
Due 4 December 1999
Resolved 4 December 1999
Engineering
Issued 4 December 1999
Resolved
Water wash/clean soot & corrosion build up on the superheater tubes in accordance with 46CFR52.01-40.
Condition: Unknown
Due 4 December 1999
Resolved 4 December 1999
Lifesaving
Issued 2 September 1999
Resolved
Attach retro-reflective tape to the hulls of all life boats in way of the keels in accordance with 46CFR199.176(a)(4).
Condition: Unknown
Due 24 September 1999
Resolved 24 September 1999
Electrical
Issued 2 September 1999
Resolved
Effect repairs to the high jacket water alarm for the emergency generator set in accordance with 46CFR112.50-1(h).
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Engineering
Issued 8 June 1999
Resolved
Renew fire brick in the starboard aft air box of #2 boiler.
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Electrical
Issued 8 June 1999
Resolved
Make permanent all 110 VAC power supplies from receptacle to elevator panels #1 and #2._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Electrical
Issued 8 June 1999
Resolved
Clean the older elevator control panel, ensure that the capacitors, resistors, ect are properly mounted and wire nuts are removed (compression fittings only).
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Accommodation/Occupational Safety
Issued 8 June 1999
Resolved
Fit a relief valve to the Maui Deck pressure vessel at or below the MAWP ofthe pressure vessel.
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Engineering
Issued 8 June 1999
Resolved
Repair water leaks from the water manifold inspection ports at the starboard aft #2 boiler (deck level).
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Accommodation/Occupational Safety
Issued 8 June 1999
Resolved
Repair broken glass on the lanai of the Ohana deck.
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Lifesaving
Issued 8 June 1999
Resolved
Provide spare batteries for the life boat radios.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Electrical
Issued 8 June 1999
Resolved
Repair L/O leak on the pedestal bearing of #2 SSTG (turbine side)._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Electrical
Issued 8 June 1999
Resolved
Install missing bolts (2) in the #4 SSTG L/O supply line._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Electrical
Issued 8 June 1999
Resolved
Install cable supports for the bilge sensor wiring in the #2 hold._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 June 1999
Resolved 28 June 1999
Construction/Loadline
Issued 3 June 1999
Resolved
Make temp repairs to hole in #3S F/O tank to the satisfaction of the attending marine inspector. Tank is not to be filled until requiremtent iscleared. Peramnent repairs to be completed in drydock.
Condition: Unknown
Due 3 June 1999
Resolved 3 June 1999
Construction/Loadline
Issued 1 May 1999
Resolved
Make permanent repairs to the hull at the next drydock in way of the forward sewage tank on the port & stbd sides. Vessel is authorized to use doublers as temporary repairs. Vessel is to periodically inspect doublers quarterly until permanent repairs are completed.
Condition: Unknown
Due 1 May 1999
Resolved 1 May 1999
Accommodation/Occupational Safety
Issued 13 March 1999
Resolved
RENEW THE CRACKED SEWAGE PIPE FLANGE IN THE LOWER LEVEL OVERHEAD ON THE PORT SIDE OF THE #1 BOILER.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Accommodation/Occupational Safety
Issued 13 March 1999
Resolved
REMOVE THE PORTABLE GAUGES & INSTALL PERMANENT GAUGES ON THE WINE COOLER ROOM A/C COMPRESSOR.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Electrical
Issued 13 March 1999
Resolved
PROVIDE ADEQUATE SUPPORT TO WIRING USING ACCEPTABLE METAL BANDING IN ACCORDANCE WITH IEEE 45 ON THE BRIDGE, BOAT, AND SUN DECKS.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Electrical
Issued 13 March 1999
Resolved
MAKE ELECTRICAL OUTLETS IN THE LOWER LEVEL FORWARD BOILER ROOM WATERTIGHT. MAKE THE PORTABLE CONNECTION TO THE PORT SIDE ELECTRICAL OUTLET PERMANENT OR REMOVE IF NOT REQUIRED.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Electrical
Issued 13 March 1999
Resolved
INSTALL LIGHTING IN THE FORWARD CREW AREAS TO ENSURE THE PHOTOLUMINESCENT TAPE FOR THE LOW LOCATION LIGHTING SYSTEM IS RECEIVING ADEQUATE LIGHTING TOCHARGE THE TAPE IN ACCORDANCE WITH IMO RESOLUTION A.752(18).
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Fire Fighting
Issued 22 December 1998
Resolved
Replace missing structural fire protection insulation as per C/M's list.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Accommodation/Occupational Safety
Issued 22 December 1998
Resolved
Remove stores from the following locations until fire detection is installed: Photo stores, Kauai deck/electrical spares,hold 6/acetylene btl stores/elev mach space,#7 elev/two closets in way of theater.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Construction/Loadline
Issued 22 December 1998
Resolved
Make permanent repairs to deck in way of emergency escape in way of laundrycorridor.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Deck/Cargo
Issued 22 December 1998
Resolved
Repair leak in starboard vane on stern thruster.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Electrical
Issued 22 December 1998
Resolved
Replace covers to elevator power boxes, or secure elevator machinery lockers.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Lifesaving
Issued 22 December 1998
Resolved
Remove forescent lights from photo labs or install permanent wiring and mounts.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Electrical
Issued 22 December 1998
Resolved
Hang lights, cables, and smoke detector in AC&R workshop.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Fire Fighting
Issued 22 December 1998
Resolved
Repair hole and prove proper operation of FSD to crew's gym.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Engineering
Issued 22 December 1998
Resolved
repack #4 auxiliary circulation pump.
Condition: Unknown
Due 22 December 1998
Resolved 22 December 1998
Navigation
Issued 24 September 1998
Resolved
Effect permanent repairs to the navigation light panel visual and audible alarms.
Condition: Unknown
Due 14 October 1998
Resolved 14 October 1998
Fire Fighting
Issued 24 September 1998
Resolved
Relocate or provide a means of identifying the FSD release switch for FSD 36. This item is applicable to other FSD switches in similar positions throughout the vessel.
Condition: Unknown
Due 14 October 1998
Resolved 14 October 1998
Navigation
Issued 24 September 1998
Resolved
Effect repairs to the steering gear room repeater lamp.
Condition: Unknown
Due 13 October 1998
Resolved 13 October 1998
Fire Fighting
Issued 24 September 1998
Resolved
Effect permanent repairs to fire screen door 40 hose port.
Condition: Unknown
Due 14 October 1998
Resolved 14 October 1998
Electrical
Issued 24 September 1998
Resolved
Properly dead end or remove wires at the stuffing tubes in the [name withheld] office.
Condition: Unknown
Due 14 October 1998
Resolved 14 October 1998
Lifesaving
Issued 24 September 1998
Resolved
Found oxygen and acetalene bottles loosely stowed in the loading area at the aft gangway. Properly secure the oxygen & acetalene bottles.
Condition: Unknown
Due 13 October 1998
Resolved 13 October 1998
Fire Fighting
Issued 24 September 1998
Resolved
Make stuffing tube in stairwell near fire screen door 14 fire tight.
Condition: Unknown
Due 14 October 1998
Resolved 14 October 1998
Accommodation/Occupational Safety
Issued 24 September 1998
Resolved
Found part of the hand rail missing in the stairwell leading down to the machinery space from FSD 15A. Effect permanent repairs to the hand rail.
Condition: Unknown
Due 13 October 1998
Resolved 13 October 1998
Engineering
Issued 24 September 1998
Resolved
Found L/O purifier pipe support brackets loose and missing in the overhead of the lower forward engine room. Reinstall pipe support brackets.
Condition: Unknown
Due 13 October 1998
Resolved 13 October 1998
Electrical
Issued 24 September 1998
Resolved
Install electrical matting in front of the bowthruster switchbaord.
Condition: Unknown
Due 13 October 1998
Resolved 13 October 1998
Fire Fighting
Issued 24 September 1998
Resolved
Properly mount number 93 portable fire extinguisher.
Condition: Unknown
Due 13 October 1998
Resolved 13 October 1998
Fire Fighting
Issued 23 May 1998
Resolved
Found Fire Screen Door to emergency stair tower to have no indicator light and incapable of closure. Make permanent repairs and prove proper operation.
Condition: Unknown
Due 23 May 1998
Resolved 23 May 1998
Fire Fighting
Issued 23 May 1998
Resolved
Found Fire Screen Doors for stair towers, galleys, and main vertical zone bulkheads not to have indicator lights. Install indicator lights.
Condition: Unknown
Due 23 May 1998
Resolved 23 May 1998
Fire Fighting
Issued 23 May 1998
Resolved
Found Fire Screen doors #6 and #10 on Kamaaina deck to be faulty. Prove proper operation.
Condition: Unknown
Due 23 May 1998
Resolved 23 May 1998
Electrical
Issued 23 May 1998
Resolved
Found plastic tie wraps on electrical installations on Kamaaina, Ohana, andAloha decks. Replace plastic tie wraps with metal bands.
Condition: Unknown
Due 23 May 1998
Resolved 23 May 1998
Electrical
Issued 23 May 1998
Resolved
Found electrical distribution panel covers on Ohana deck in electrical stations 72 & 73 to be loose and or missing hardware. Properly fasten.
Condition: Unknown
Due 23 May 1998
Resolved 23 May 1998
Electrical
Issued 23 May 1998
Resolved
Found deadend wiring in Aloha deck fanroom 2B, also new wiring installationwith out proper support. Provide junction boxes for deadend wiring and properly support all wiring runs.
Condition: Unknown
Due 23 May 1998
Resolved 23 May 1998
Fire Fighting
Issued 19 March 1998
Resolved
Complete maintenance to ensure proper closure of the following fire screen doors: MAUI Deck #15, SUN Deck #1 and #6.
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Lifesaving
Issued 19 March 1998
Resolved
Properly store flammable liquids in approved storage compartments.
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Lifesaving
Issued 19 March 1998
Resolved
Replace rotted section of fore and aft seating on the starboard side of lifeboat #4.
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Fire Fighting
Issued 19 March 1998
Resolved
Provide means to secure natural ventilation to paint locker on bridge deckfrom outside the compartment, or automatically. Demonstrate proper closure.
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Accommodation/Occupational Safety
Issued 19 March 1998
Resolved
Remove oily rags and flammable liquids from elevator motor room on aft deck.
Condition: Unknown
Due 29 March 1998
Resolved 29 March 1998
Lifesaving
Issued 19 March 1998
Resolved
Properly repair damaged forward thwart in lifeboat #3.
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Construction/Loadline
Issued 19 March 1998
Resolved
Repair 3 weathertight doors to Damper spaces on the bridge deck. 2 have broken hinges and the other is twisted so far as to prevent closure.
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Accommodation/Occupational Safety
Issued 19 March 1998
Resolved
Submit repair proposal for the supports for both the port and starboard ladders leading from the SUN to BOAT deck aft. (By the pool).
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Fire Fighting
Issued 17 January 1998
Resolved
Repair pinhole, install flame putty, and replace missing structural insulation in forward bulkhead of Porthole Dining Room.
Condition: Unknown
Due 17 January 1998
Resolved 17 January 1998
Fire Fighting
Issued 17 January 1998
Resolved
Repair fusible link in vent closure in Porthole Dining Room.
Condition: Unknown
Due 17 January 1998
Resolved 17 January 1998
Electrical
Issued 17 January 1998
Resolved
Repair explosion proof light fixture in way of storeroom above paint locker.
Condition: Unknown
Due 17 January 1998
Resolved 17 January 1998
Fire Fighting
Issued 17 January 1998
Resolved
Replace missing structural insulation in way of overhead of mattress storeroom, hold 6.
Condition: Unknown
Due 17 January 1998
Resolved 17 January 1998
Accommodation/Occupational Safety
Issued 17 January 1998
Resolved
Remove Bedroom Attendant station from passageway near Cabin 299.
Condition: Unknown
Due 17 January 1998
Resolved 17 January 1998
Fire Fighting
Issued 17 January 1998
Resolved
Properly seal cable penetrations on Maui and Aloha decks in fwd crew stairtower.
Condition: Unknown
Due 17 January 1998
Resolved 17 January 1998
Electrical
Issued 6 January 1998
Resolved
Permanently mount overhead light in ships maintenance office.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Electrical
Issued 6 January 1998
Resolved
Hard wire overhead light above sewing machine in laundry room.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Electrical
Issued 6 January 1998
Resolved
Remove plastic tie wraps and properly support cables in way of #3 and 4 Lube Oil pumps in aft main space.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Accommodation/Occupational Safety
Issued 6 January 1998
Resolved
Install arrows for dead end passageways in low level lighting system.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Accommodation/Occupational Safety
Issued 6 January 1998
Resolved
Install low location light vertical exit strips to mark all fire screen door handles.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Accommodation/Occupational Safety
Issued 6 January 1998
Resolved
Repair leaks to sewage line located in #6 Cargo Hold on the Oahu deck.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Accommodation/Occupational Safety
Issued 6 January 1998
Resolved
Provide proper support for overhead sewage line located in #6 Cargo Hold onthe Oahu deck.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Electrical
Issued 6 January 1998
Resolved
Remove portable extension chords and hard wire fans in laundry room and crew gym.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Electrical
Issued 6 January 1998
Resolved
Permanently mount electrical outlet in clean linen room above sewing machine.
Condition: Unknown
Due 6 January 1998
Resolved 6 January 1998
Fire Fighting
Issued 2 October 1997
Resolved
PROVE PROPER OPERATION OF HEAT & SMOKE DETECTION SYSTEMS, AND MANUAL FIRE ALARM BOXES, PARTICULARLY IN MVZ 2 & 3.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Lifesaving
Issued 2 October 1997
Resolved
PROVE PROPER OPERATION OF THE EMERGENCY TALK BACK SYSTEM AT LIFEBOAT MUSTERSTATIONS.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Deck/Cargo
Issued 2 October 1997
Resolved
INSTALL SAFETY GUARDS IN WAY OF LIFEBOAT DAVIT ROLLERS.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Fire Fighting
Issued 2 October 1997
Resolved
INSTALL HAND OPERABLE CLOSING DEVICES ON MANUAL FIRE DAMPER CONTROLLER_x001C_ ACCESS PLATES, TO MAKE DAMPER CONTROLLERS READILY ACCESSIBLE WITHOUT TOOLS.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Construction/Loadline
Issued 2 October 1997
Resolved
ELIMINATE ROUTE OF WATER COMMUNICATION FROM MAUI DECK DOWN THROUGH HAWAII DECK TO KAUAI DECK, AFT OF BHD 181, PORT SIDE._x001C_ TO BE COMPLETED AT NEXT SHIPYARD PERIOD, OR NO LATER THAN DECEMBER 1998.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Fire Fighting
Issued 2 October 1997
Resolved
CLOSE DRAFT STOP OPENINGS, AND PROVIDE CHAFE PROTECTION FOR ELECTRICAL WIRING FIRE HAZARDS, IN OVERHEADS WHEREVER CEILING PANELS ARE OPENED.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Electrical
Issued 2 October 1997
Resolved
REPAIR EMERGENCY BATTERY LIDS TO MAKE THEM CLOSE.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Lifesaving
Issued 2 October 1997
Resolved
CORRECT 1MC AND CABIN RADIO EMERGENCY OVERRIDE SYSTEM DISCREPANCIES THROUGHOUT THE VESSEL.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Fire Fighting
Issued 2 October 1997
Resolved
INSTALL WHEEL CHAIR RAMPS THAT DO NOT PREVENT FIRE SCREEN DOORS FROM CLOSING.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Fire Fighting
Issued 2 October 1997
Resolved
REPLACE ALL PLASTIC TRASH BARRELS WITH METAL OR OTHER INCOMBUSTIBLE CONTAINERS. CONTAINERS SHOULD HAVE COVERS CAPABLE OF EXTINGUISHING SMALL FIRES.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Fire Fighting
Issued 2 October 1997
Resolved
REVISE SHIP'S FIRE CONTROL PLAN TO INDICATE ALL MANUAL FIRE DAMPERS IN MAINVERTICAL ZONE (MVZ) 1.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Unknown
Issued 2 October 1997
Resolved
MAKE PERMANENT REPAIRS TO PIPE IN HOLD 7, AFT, STBD, UNDER STERN THRUSTER STARTING ROOM.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Fire Fighting
Issued 2 October 1997
Resolved
PROVE PROPER OPERATION AND MARKING OF VENTILATION SYSTEM FIRE DAMPERS AT PAINT LOCKER AND CARPENTER SHOP; CLEAN AND COVER LARGE ELECTRICAL JUNCTIONBOX IN CARPENTER SHOP; REMOVE CARDBOARD FLOOR COVERING IN PAINT LOCKER;_x001C_ INSTALL SAFETY GUARD & REMOVE WOOD BLOCKS ON EXHAUST FAN IN PAINT LOCKER.
Condition: Unknown
Due 2 October 1997
Resolved 2 October 1997
Construction/Loadline
Issued 14 June 1997
Resolved
PROVIDE A WRITTEN PROPOSAL FOR DETERMINING THE CURRENT CONDITION AND MONITORING THE FUTURE CONDITION OF THE INTERNAL STRUCTURAL MEMBERS IN THE FIXED BALLAST TANKS; #3P, 3S, 12P & 12S.
Condition: Unknown
Due 14 June 1997
Resolved 14 June 1997
Construction/Loadline
Issued 14 June 1997
Resolved
PROVE WATER TIGHT CONDITION OF THE KONA SIDE PORTS, P & S, HAWAII DECK AFT.
Condition: Unknown
Due 14 June 1997
Resolved 14 June 1997
Fire Fighting
Issued 14 June 1997
Resolved
RESTORE PAINT LOCKER DOOR, MAUI DECK FWD, TO FULLY CLOSING CONDITION.
Condition: Unknown
Due 14 June 1997
Resolved 14 June 1997
Fire Fighting
Issued 14 June 1997
Resolved
PROVIDE SUITABLE STORAGE FOR ALL FALMMABLE LIQUIDS. PAINTS MAY BE STOWED TEMPORARILY IN LOWER BOSN'S STORES PROVIDED EXPOSED WIRES ARE SAFE-ENDED AND CLOSED IN JUNCTION BOX, CONSTANT FORCED DRAFT EXHAUST VENTILATION IS MAINTAINED, AND THE SPACE IS CHECKED HOURLY BY NIGHT SECURITY WATCH.
Condition: Unknown
Due 14 June 1997
Resolved 14 June 1997
Construction/Loadline
Issued 27 July 1996
Resolved
Temporarily repair the wasted steel deck in way of the Hartzel fan located in the forward stack.
Condition: Unknown
Due 27 July 1996
Resolved 27 July 1996
Lifesaving
Issued 20 July 1996
Resolved
Prove proper operation of all passenger stateroom emergency override for the public address system.
Condition: Unknown
Due 20 July 1996
Resolved 20 July 1996
Construction/Loadline
Issued 29 June 1996
Resolved
Crop and renew as original wasted bulkhead aft of the hartzell fan in forward stack space.
Condition: Unknown
Due 29 June 1996
Resolved 29 June 1996
Construction/Loadline
Issued 29 June 1996
Resolved
Crop and renew the wasted gooseneck vent in way of lifeboat winch no. 2.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Fire Fighting
Issued 10 April 1996
Resolved
Open vents above grills in the main and crew galleys to allow for inspection and demonstrate proper operation of the fusible link dampers.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Fire Fighting
Issued 10 April 1996
Resolved
Demonstrate proper operation of the CO2 discharge indicating system for theGyro room._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Fire Fighting
Issued 30 March 1996
Resolved
Prove that the supply ventilation for the fwd paint locker/carpenter shop will automatically stop upon CO2 activation.
Condition: Unknown
Due 30 March 1996
Resolved 30 March 1996
Accommodation/Occupational Safety
Issued 23 March 1996
Resolved
Provide proof of annual safety inspections conducted on #1 and #2 elevators._x001C_ _x001C_
Condition: Unknown
Due 23 March 1996
Resolved 23 March 1996
Deck/Cargo
Issued 21 March 1996
Resolved
Renew the deteriorated brake levers on both cargo boom winch assemblies.
Condition: Unknown
Due 25 March 1996
Resolved 25 March 1996
Deck/Cargo
Issued 21 March 1996
Resolved
Replace the defective traveling lizard block assembly located at the bottomof the stbd cargo boom.
Condition: Unknown
Due 30 March 1996
Resolved 30 March 1996
Deck/Cargo
Issued 21 March 1996
Resolved
Crop and renew all deteriorated steel within the foundation of the stbd cargo boom winch assembly.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Deck/Cargo
Issued 21 March 1996
Resolved
Crop and renew all deteriorated steel within the foundations of the port cargo winch assembly.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Lifesaving
Issued 21 March 1996
Resolved
Rig all lifeboat covers for all lifeboats and allow for inspection. Pictures of installed covers and statements from the ships officers will beacceptable. _x001C_ _x001C_
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Accommodation/Occupational Safety
Issued 21 March 1996
Resolved
Prior to allowing occupancy of the reconstructed cabins located forward of the aft steering room, conduct db noise intensity level measurements in thepresence of a CG marine inspector while underway and when the jacking gear is engaged.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Fire Fighting
Issued 21 March 1996
Resolved
Test the fixed fire fighting systems located in the engine room, emergency diesel generator room, fwd paint locker, aft paint locker, and dog kennel in the presence of a CG marine inspector or provide a written report attesting to the extent the ABS witnessed testing.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Fire Fighting
Issued 21 March 1996
Resolved
Provide annual servicing for fixed fire fighting systems located in the crew galley, the main galley, and the Ohana grill area. Test all safety devices and pull stations in the presence of a marine inspector.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Lifesaving
Issued 21 March 1996
Resolved
Provide boat covers for lifeboats 1 and 3. (Solas Reg 20.1.2 & 42.3.1-8)
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Lifesaving
Issued 21 March 1996
Resolved
Provide search lights for all lifeboats. (Solas Reg 41.8.29)
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Lifesaving
Issued 21 March 1996
Resolved
Repair oil leaks and replace brake shoes as needed on the centrifugal brakes for the #2 and #4 lifeboats. Upon completion, conduct speed of descent tests in the presence of a CG marine inspector.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Fire Fighting
Issued 21 March 1996
Resolved
Remove valves from exterior fire stations or otherwise provide ability to examine the fire main piping by removing concrete layment inside fire hose stations. Needle gun all valve mounting hardware, replace as needed and allow for inspection of all exterior fire stations.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Construction/Loadline
Issued 21 March 1996
Resolved
Replace the aft engine room bilge pump discharge valve.
Condition: Unknown
Due 21 March 1996
Resolved 21 March 1996
Fire Fighting
Issued 21 March 1996
Resolved
Repair the wasted/holed section of fire main piping on fire stations 32, and 113.
Condition: Unknown
Due 25 March 1996
Resolved 25 March 1996
Deck/Cargo
Issued 21 March 1996
Resolved
Needle gun or otherwise remove heavy scale from both cargo boom winch assemblies (hardware and foundations).
Condition: Unknown
Due 30 March 1996
Resolved 30 March 1996
Lifesaving
Issued 6 January 1996
Resolved
Identify and remedy source of condensation problems noted near the forward engine room maneuvering platform. Vsl reps and officers shall ensure all necessary precautions are taken to prevent condensation from causing electrical failures.
Condition: Unknown
Due 6 January 1996
Resolved 6 January 1996
Construction/Loadline
Issued 23 December 1995
Resolved
Crop and renew as original, the wasted ballast piping to 7P inboard dbl btmtank, located in 7P outboard dbl btm ballast tank IWO frame 115.
Condition: Unknown
Due 23 December 1995
Resolved 23 December 1995
Accommodation/Occupational Safety
Issued 26 November 1995
Resolved
Permanently repair the wasted 1-1/2" sanitary pipe, stbd lower level, 4 hold.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Make permanent repairs to the port garbage chute hull penetration. ConductNDT in presence of marine inspector when repairs complete.
Condition: Unknown
Due 22 December 1995
Resolved 22 December 1995
Accommodation/Occupational Safety
Issued 26 November 1995
Resolved
Replace worn deck flapper valves no. 3, 40 and 60 as per valve list.
Condition: Unknown
Due 22 December 1995
Resolved 22 December 1995
Accommodation/Occupational Safety
Issued 26 November 1995
Resolved
Temporarily repair the leaking 6" sewage piping in holds 1, 3 and 4.
Condition: Unknown
Due 22 December 1995
Resolved 22 December 1995
Engineering
Issued 26 November 1995
Resolved
Replace the wasted end bell nipple, for the aft stern thruster salt water cooler.
Condition: Unknown
Due 26 November 1995
Resolved 26 November 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Crop and blank the wasted dead ended pipe btwn holds 2 and 3, tween deck level.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Submit gauging report of all pits deeper than .499".
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Unknown
Issued 26 November 1995
Resolved
Submit tailshaft and rudder clearence report.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Submit copy of u/w hull video from this examination.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Properly secure all rose box suction screens in holds 1, 3 and 4.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Accommodation/Occupational Safety
Issued 26 November 1995
Resolved
Repair all Orca chlorinator/sanitary piping leaks in 6 hold.
Condition: Unknown
Due 22 December 1995
Resolved 22 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Prove proper operation of the 1-1/2" gate valve that is mounted on the fwd 3" ovbd pipe, located in the bosn' locker, and plug the same.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Make satisfactory temporary repairs to the aft bkhd of the #1 deep sewage tank and submit a repair proposal, with audio gaugings of wasted area, detailing extent of area to be cropped and renewed at next drydock.
Condition: Unknown
Due 23 December 1995
Resolved 23 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Crop and renew as original, the wasted aft vertical bkhd stiffener, # 2 from stbd, lower level of hold #2.
Condition: Unknown
Due 26 November 1995
Resolved 26 November 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Submit copy of last drydock video concerning hull markings.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Construction/Loadline
Issued 26 November 1995
Resolved
Submit copy of internal examination video conducted in (sewage) deep tank no. 1.
Condition: Unknown
Due 9 December 1995
Resolved 9 December 1995
Fire Fighting
Issued 21 October 1995
Resolved
Make proper repair and prove operation of FSD #14, Hibiscus Dining Room.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Electrical
Issued 21 October 1995
Resolved
Replace the wasted electrical junction box, forward davit arm area, lifeboat #12.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Provide additional exit direction signs at FSD 34, starboard side, Hawaii deck.
Condition: Unknown
Due 28 October 1995
Resolved 17 November 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Provide means to properly segregate and stow the corrosive material in the old scullery, Maui deck.
Condition: Unknown
Due 28 October 1995
Resolved 17 November 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Provide illuminated exit sign at FSD #22.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Locate illuminated exit sign identifying FSD 88 so that it is visible from the passageway.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Prove proper operation of the leaking Ohana Deck pool drain valve.
Condition: Unknown
Due 18 November 1995
Resolved 17 November 1995
Electrical
Issued 21 October 1995
Resolved
Properly repair gyro room light switch.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Electrical
Issued 21 October 1995
Resolved
Properly fasten "E" light fixture starboard Boat Deck vestibule.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Lifesaving
Issued 21 October 1995
Resolved
Provide suitable retainers for the stacked MSA cylinders located in the OBAlocker.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Correct leak in valve at F/S #85.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Lifesaving
Issued 21 October 1995
Resolved
Permanently mount vending machines in crew lounge.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Provide safety rail for the emergency hatch in the old wash down locker stbd side fan tail.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Make permanent repairs to the fresh water piping in the overhead near WTD #13, Hawaii deck.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Provide portable extinguisher at F/S #78.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Install a valve in the PVC pipe fwd of the aft bkhd in the #2 hold.
Condition: Unknown
Due 18 November 1995
Resolved 17 November 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Prove satisfactory closure of the door to fan room 5E.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Seal or restore individual deck integrity witin old elevator shaft.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Make permanent repairs to the soft patched MSD sewage line which passes through the fwd bkhd of the #2 hold at the upper level.
Condition: Unknown
Due 20 January 1996
Resolved 17 November 1995
Engineering
Issued 21 October 1995
Resolved
Repack the desuperheater stop and guardian valves on the #2 boiler.
Condition: Unknown
Due 18 November 1995
Resolved 17 November 1995
Unknown
Issued 21 October 1995
Resolved
Install proper sight glasses with proper guards on lube oil storage tanks.
Condition: Unknown
Due 16 December 1995
Resolved 17 November 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Prove operation of indicator lights for WTD's #10 and 19 on B-deck, #10 on C-deck, and #1 in the hold.
Condition: Unknown
Due 4 November 1995
Resolved 17 November 1995
Electrical
Issued 21 October 1995
Resolved
Place ground straps across rubber expansion joints on aux condensers sea water inlet lines.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Electrical
Issued 21 October 1995
Resolved
Place ground straps across rubber expansion joints on distiller plant piping.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Provide dogging wrench for Kona side port WTD
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Lifesaving
Issued 21 October 1995
Resolved
Ensure vsl name is marked on all PFDs.
Condition: Unknown
Due 28 October 1995
Resolved 17 November 1995
Engineering
Issued 21 October 1995
Resolved
Replace the forced draft fan air flow indicators located on the lower boiler flats control boards.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Prove operation of cargo handling WTDs.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Check valve for hydraulic pump on WTD #12, at b'head 127 (needs adjustment - hand crank turns freely after closing door.)
Condition: Unknown
Due 18 November 1995
Resolved 17 November 1995
Fire Fighting
Issued 21 October 1995
Resolved
Provide portable extinguisher at F/S 83.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Submit repair proposal for the wasted deck and bulkhead in the #6 hold of Maui deck.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Navigation
Issued 21 October 1995
Resolved
Provide additional black ball and diamond day shapes.
Condition: Unknown
Due 4 November 1995
Resolved 17 November 1995
Lifesaving
Issued 21 October 1995
Resolved
Remove drums from lifeboats, or reduce capacity of boats accordingly.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Adjust door to Fan Room 5A so that it closes completely and does not obstruct the closing of FSD #6BT.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Provide emergency signs for #2 elevator and service elevator ("in case of emergency...use stairs")
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Properly mark (label) all Boat Deck vents.
Condition: Unknown
Due 4 November 1995
Resolved 17 November 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Prove operation of bow thruster emergency hatch closure and provide guard rail for same.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Renew gasket in WTD, port Times square side port.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Free up all vent closures and prove watertight, boat deck.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Renew screen at #5 tank vent.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Electrical
Issued 21 October 1995
Resolved
Properly plug the light switch in the doctor's cabin.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Clean all ventilation vents in hospital.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Provide access to fire station #67.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Electrical
Issued 21 October 1995
Resolved
Properly attach light in escape hatch, hold #7.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Navigation
Issued 21 October 1995
Resolved
Provide proper bulbs for running lights.
Condition: Unknown
Due 18 November 1995
Resolved 17 November 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Repair oil leak at hand crank for stewards mess WTD.
Condition: Unknown
Due 18 November 1995
Resolved 17 November 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Repair sight glass potable water tank in pulper room.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Provide illuminated exit sign beyond FSD 27 through Independence lounge.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Lifesaving
Issued 21 October 1995
Resolved
Use proper lashing gear to stow metal sheets in Times Square.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Navigation
Issued 21 October 1995
Resolved
Prove operation of engine order telegraph alarm.
Condition: Unknown
Due 28 October 1995
Resolved 17 November 1995
Lifesaving
Issued 21 October 1995
Resolved
Provide more secure means to stow stokes litter, Hawaii deck, near emergency locker (do not obstruct hand rail).
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Prove operation of port fueling station WTD (gasket painted, dogs frozen).
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Electrical
Issued 21 October 1995
Resolved
Renew lamp in escape hatch at FSD 1B and fix hatch clasp.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Construction/Loadline
Issued 21 October 1995
Resolved
Make watertight the WTD at Kona side port.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Prove operation of door to fire station #9 (door frozen).
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Repair loose hose rack at F/S #85 (pulling away from b'head)
Condition: Unknown
Due 28 October 1995
Resolved 17 November 1995
Fire Fighting
Issued 21 October 1995
Resolved
Correct leak in valve at F/S #88.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Correct leak in valve at F/S #82.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Correct leak in valve at F/S #76.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Correct leak in valve at F/S #91.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Accommodation/Occupational Safety
Issued 21 October 1995
Resolved
Determine source of and remove standing water behind the washers in crew's laundry.
Condition: Unknown
Due 21 October 1995
Resolved 21 October 1995
Fire Fighting
Issued 21 October 1995
Resolved
Lower the portable extinguisher at F/S #91 to no higher than 5 feet above deck.
Condition: Unknown
Due 28 October 1995
Resolved 17 November 1995
Engineering
Issued 30 September 1995
Resolved
Crop and renew the wasted pipe elbow located on the desuperheated steam line located inside the water/steam drum of the #3 boiler. Approved welders and weld procedures to be provided prior to work. The #3 boiler notto be operated until repairs are complete and tested satisfactory.
Condition: Unknown
Due 10 October 1995
Resolved 10 October 1995
Fire Fighting
Issued 15 July 1995
Resolved
Update, revise, and submit for review, detailed fire load calculations forthe retail stores.
Condition: Unknown
Due 30 July 1995
Resolved 19 July 1995
Construction/Loadline
Issued 15 July 1995
Resolved
Replace the missing label plate located over WTD #11 on C-deck.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Engineering
Issued 15 July 1995
Resolved
Make proper repairs to previously repaired feed pump gage line. Leak is tobe shielded until corrected.
Condition: Unknown
Due 22 July 1995
Resolved 25 July 1995
Electrical
Issued 15 July 1995
Resolved
Relamp power indicator lamps for the oily water separators and the Ingersoll Rand Compressors.
Condition: Unknown
Due 18 July 1995
Resolved 25 July 1995
Lifesaving
Issued 15 July 1995
Resolved
Make proper repairs to soft patch in the grey water line above the starboard shaft at the aft bulkhead.
Condition: Unknown
Due 22 July 1995
Resolved 25 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Replace the door attached to the machinery room in the Hui Hui Showplace located at the aft end on stbd side with a door equal to structural fire boundary required for the space served.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Construction/Loadline
Issued 15 July 1995
Resolved
Prove proper operation of bilge suction in 3 hold.
Condition: Unknown
Due 18 July 1995
Resolved 25 July 1995
Electrical
Issued 15 July 1995
Resolved
Demonstrate that the public address/talk back system is powered by the emergency switchboard.
Condition: Unknown
Due 22 July 1995
Resolved 25 July 1995
Electrical
Issued 15 July 1995
Resolved
Submit documentation that the conductors for the PA system are approved.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Engineering
Issued 15 July 1995
Resolved
Provide welding procedures and welders qualification for repairs done to number one boiler and report of repair with tube identification.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Lifesaving
Issued 15 July 1995
Resolved
Reposition the PA speakers in the Ohana Bar for satisfactory coverage.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Electrical
Issued 15 July 1995
Resolved
Make proper repairs to breaker handle for number P-471 on the foreward switchboard.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Accommodation/Occupational Safety
Issued 15 July 1995
Resolved
Remove the portable fan and plastic vent extension duct surrounding the motor for the elevator serving the laundry. Determine exact cause of motor overheating problem, provide results to a CG marine inspector, and provide plans for eliminating the problem.
Condition: Unknown
Due 22 July 1995
Resolved 22 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Clear all alarm conditions from the heat detection system. Until such timeas the heat detection system is cleared, the Master shall take whatever action necessary to ensure that an equal level of protection is provided.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Fire Fighting
Issued 15 July 1995
Resolved
Test the smoke detectors located on the aft end of the main deck.
Condition: Unknown
Due 22 July 1995
Resolved 22 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Demonstrate that a responsible ships officer can perform routine maintenance on the smoke detection system.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Fire Fighting
Issued 15 July 1995
Resolved
Troubleshoot wiring for the heat detection system in the Ohana buffet, clear alarm condition, and retest heat detectors located in the Ohana buffet.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Construction/Loadline
Issued 15 July 1995
Resolved
Provide manufacturers recommended spares for the OWS._x001C_ _x001C_
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Fire Fighting
Issued 15 July 1995
Resolved
Test the manual pull stations located on the aft end of the main deck.
Condition: Unknown
Due 22 July 1995
Resolved 22 July 1995
Accommodation/Occupational Safety
Issued 15 July 1995
Resolved
Replace missing vent screen for vent trunk on fusible link damper located near entrance to the crews lounge on the port side fwd.
Condition: Unknown
Due 22 July 1995
Resolved 22 July 1995
Electrical
Issued 15 July 1995
Resolved
Make available for internal inspection A deck air receiver._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 August 1995
Resolved 12 August 1995
Fire Fighting
Issued 15 July 1995
Resolved
Update, revise, and submit for review, detailed fire load calculations forthe Kamaina Lounge.
Condition: Unknown
Due 30 July 1995
Resolved 19 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Update, revise, and submit for review, detailed fire load calculations forthe Hapa Hoele Bar.
Condition: Unknown
Due 30 July 1995
Resolved 19 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Submit for review, detailed fire load calculations for the Ohana Bar.
Condition: Unknown
Due 30 July 1995
Resolved 19 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Identify means of closing vent system for the vent located in the stair tower leading from the Ohana deck to the Commodores terrace on the port side, open for inspection, clean vent, lubricate any mechanical components, and test damper operation.
Condition: Unknown
Due 22 July 1995
Resolved 22 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
REMOVE OR REPLACE THE DETERIORATED HAND WHEEL FOR THE 1 1/2 INCH PIPE LINE AT FS 42.
Condition: Unknown
Due 22 July 1995
Resolved 22 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Lubricate all mechanical components, clean vent ducts, and test operation of all fusible link fire dampers located on Aloha deck.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Electrical
Issued 15 July 1995
Resolved
Replace missing light switch for Fire Zone #7 emergency gear locker.
Condition: Unknown
Due 30 July 1995
Resolved 19 July 1995
Electrical
Issued 15 July 1995
Resolved
Replace missing globe for the light fixture located outside the fire zone #7 emergency gear locker.
Condition: Unknown
Due 30 July 1995
Resolved 19 July 1995
Electrical
Issued 15 July 1995
Resolved
Replace the missing globe guard for the light fixture located in fire zone_x001C_#6 emergency gear locker.
Condition: Unknown
Due 30 July 1995
Resolved 19 July 1995
Lifesaving
Issued 15 July 1995
Resolved
Adjust and retest the GA bell near cabin 290C on Aloha deck.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Electrical
Issued 15 July 1995
Resolved
Make proper repairs and prove proper operation of the refrigeration system cooling water failure alarm.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Lifesaving
Issued 15 July 1995
Resolved
Adjust the #2 lifeboat release mechanism as needed in order to drop boat evenly when the falls are released under a weighted condition.
Condition: Unknown
Due 18 July 1995
Resolved 19 July 1995
Electrical
Issued 15 July 1995
Resolved
Replace missing electrical junction box cover located in port side fuelingstation.
Condition: Unknown
Due 18 July 1995
Resolved 19 July 1995
Documentation
Issued 15 July 1995
Resolved
Properly post oil transfer procedures on the bulkhead in the port side fueling station.
Condition: Unknown
Due 18 July 1995
Resolved 19 July 1995
Lifesaving
Issued 15 July 1995
Resolved
Adjust and retest the GA bell near cabin 154 on Ohana deck.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Electrical
Issued 15 July 1995
Resolved
Make proper repairs and prove operation of the lube oil failure solenoid for number 2 and 3 Ingersol Rand Compressors.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Lifesaving
Issued 15 July 1995
Resolved
Repair and retest the PA speakers located on the stbd side of Aloha deck in the crew area.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Lifesaving
Issued 15 July 1995
Resolved
Adjust and retest the PA speaker near crew cabin CA8.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Lifesaving
Issued 15 July 1995
Resolved
CONDUCT AN ABANDON SHIP DRILL IN THE PRESENCE OF A USCG MARINE INSPECTOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 July 1995
Resolved 19 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Reposition the heat detectors in the overhead of Cousin Suzies general store.
Condition: Unknown
Due 30 July 1995
Resolved 12 August 1995
Electrical
Issued 15 July 1995
Resolved
Make proper repairs and prove proper operation of number 3 Ingersol Rand Compressor.
Condition: Unknown
Due 22 July 1995
Resolved 25 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Make proper repairs and prove proper operation of pull actuator for fixed fire fighting system in the "dog" room.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Unknown
Issued 15 July 1995
Resolved
Conduct SOPEP training for appropriate vessel personnel.
Condition: Unknown
Due 22 July 1995
Resolved 25 July 1995
Electrical
Issued 15 July 1995
Resolved
Make available for internal inspection "A" deck air receiver.
Condition: Unknown
Due 15 August 1995
Resolved 12 August 1995
Lifesaving
Issued 15 July 1995
Resolved
Adjust and retest the GA bell located on the stbd side fwd of the Ohana Buffet.
Condition: Unknown
Due 30 July 1995
Resolved 12 August 1995
Engineering
Issued 15 July 1995
Resolved
Adjust and prepare for test of number one boiler safety's. Number one boiler is to remain off the line until this item is cleared.
Condition: Unknown
Due 22 July 1995
Resolved 25 July 1995
Accommodation/Occupational Safety
Issued 15 July 1995
Resolved
Replace deck layment removed against the aft bulkhead in the laundry, remove the current sub-pump installed to reduce water build-up, and provide proper drainage to laundry rose box.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Accommodation/Occupational Safety
Issued 15 July 1995
Resolved
Provide for staterooms approved incombustible waste paper baskets IAW 46 CFR 72.05-55(b).
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Electrical
Issued 15 July 1995
Resolved
Submit for approval PAMS system.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Engineering
Issued 15 July 1995
Resolved
Prove proper operation of the fuel oil high level alarm.
Condition: Unknown
Due 15 July 1995
Resolved 15 July 1995
Fire Fighting
Issued 15 July 1995
Resolved
Properly label the manual pull station near cabin 298C on Aloha deck.
Condition: Unknown
Due 22 July 1995
Resolved 22 July 1995
Engineering
Issued 15 July 1995
Resolved
Renew temperature gage for number two boiler at the boiler flat.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Engineering
Issued 15 July 1995
Resolved
Submit repair plan for 120 lb. reducing valve in the aft engine room.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Accommodation/Occupational Safety
Issued 13 May 1995
Resolved
Provide an alternate means of escape from the passageway located between the Bridge deck cabins. (46 CFR 72.10-5)
Condition: Unknown
Due 13 May 1995
Resolved 13 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
Make repair and demonstrate water tight integrity of stbd side, side port door near hold #7 entrance.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(KS 56) Provide most recent inspection and test reports for elevator safetydevices in elevators 3-7.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 7) Gouge out and properly weld both sides deck plate found fractured inthe fan space located aft of the bridge deck cabins.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(TL 88) Replace missing insect screen on port holes located in bicycle storage area.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 89) Remove unapproved "spider" type extension cord electrical connections installed in the ohana buffet for feeding electrical power to the P & S drink machines, and install proper outlets.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
Relamp emergency exit lights located on sun deck. Lamps have been extinguished an excessive amount of time. Repair or install additional illuminated exit signs.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
Provide fire and smoke test results for new floor and wall coverings installed after drydocking. New floor and wall coverings noted in Bridge & Main deck passenger cabins.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Electrical
Issued 8 April 1995
Resolved
Provide a list of new electrical equipment installed in passenger cabins and dining rooms. Include details regarding electrical characteristics and UL approval numbers. (Televisions, refrigerators, stereo equipment etc.)
Condition: Unknown
Due 14 May 1995
Resolved 28 May 1995
Electrical
Issued 8 April 1995
Resolved
Boat deck cabin electrical systems are not satisfactory. Reposition electrical outlets, remove extension cords, and remove all in-line splices.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(JM 6) Freshen paint for instructions of how to use the semi-portable extinguishing system located on the boiler flat of the aft engine room.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(JM 7) Repair and prove proper operation of the heat detector located in the refer store chute at time square.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
Properly secure the on off switch for the elevator machine room located on the bridge deck stbd side.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
Provide a proper cover plate for hole access into the elevator machinery room located on the bridge deck stbd side.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Bring lifeboat operating instructions into agreement with Westerbrook instructions.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
Properly label electric distribution panels located in the Ohana food scramble areas.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
Provide details of all electrical modifications made after the vessel left drydock.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 85) Properly dead end electrical cables located port side aft on the main deck IAW G-MTH ltr requiring UL end caps and circuit identification tags at each end.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Deck/Cargo
Issued 8 April 1995
Resolved
Replace the defective preventer wires on both port and stbd cargo booms.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Engineering
Issued 8 April 1995
Resolved
Make all air receivers passed due biennial exam available for internal exam/hydrostatic test.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 23) Repair aft hatch to capstan room on fantail. Repair hold open bar and reattach captive chain.
Condition: Unknown
Due 14 May 1995
Resolved 30 April 1995
Lifesaving
Issued 8 April 1995
Resolved
(KS 45) Remove pipes obstructing work area in walk way of knife handlers in veggie room - main galley.
Condition: Unknown
Due 8 July 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(PP 1) Replace missing or expired flares for the #3 lifeboat.
Condition: Unknown
Due 15 April 1995
Resolved 30 April 1995
Lifesaving
Issued 8 April 1995
Resolved
(PP 2) Replace missing or expired flares for the #1 lifeboat.
Condition: Unknown
Due 15 April 1995
Resolved 30 April 1995
Lifesaving
Issued 8 April 1995
Resolved
Renew as original the fwd limit switch for the #11 lifeboat. Open for inspection after repair and prove proper operation.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Make proper adjustments on the lever controlling the fwd limit switch for the #12 lifeboat. After repair demonstrate proper operation.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Renew as original the aft limit switch for the #3 lifeboat. Open for inspection after repair and demonstrate proper operation.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Renew as original the fwd limit switch for the #3 lifeboat. Open for inspection after repair and demonstrate proper operation.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 27) Repair and open for inspection fire damper #3 in fan room 3A - boatdeck.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Conduct a timed life raft inflation drill using the #7 and #9 davit launched liferaft stations in the presence of a marine inspector.
Condition: Unknown
Due 7 May 1995
Resolved 30 April 1995
Lifesaving
Issued 8 April 1995
Resolved
Replace the missing or defective release hook retaining pins for the release hooks on the #1 and #2 life boats.
Condition: Unknown
Due 15 April 1995
Resolved 30 April 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 28) Repair and open for inspection fire damper #1 in fan room 5A - boat deck.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 30) Repair and open for inspection fire dampers #1 & 6 in fan room 4A - boat deck.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 31) Label dampers 1 & 2, repair and open for inspection fire damper #3in fan room 3C - boat deck.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 32) Repair and open for inspection fire damper #1 near boat #11 - Kamaina deck.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 33) Repair and open for inspection fire damper #2 in fan room 5B - Ohana deck.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 19) Crop and renew the vent pipe for the #1 deep tank located on the port side (focsle).
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 34) Provide reach rod for fire damper #1 - Buffet area - Ohana deck.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
Provide evidence that the table lamps in the passenger cabins are installedIAW 46 CFR 111.05-3(b) and 111.75-20.
Condition: Unknown
Due 20 May 1995
Resolved 20 May 1995
Deck/Cargo
Issued 8 April 1995
Resolved
Reattach the bonding straps for the king posts.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
Provide (1) hand crank device for each bridge deck cabin and designate at least one window in each cabin as an alternate emergency escape and label. Prove operation of window crank system upon completion.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Remove combustible waste baskets located aboard the vessel and replace withnon-combustible type, or provide evidence that existing trash receptacles are non-combustible.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Deck/Cargo
Issued 8 April 1995
Resolved
Replace port & stbd cargo boom king post shrouds due to excessive wear and parting wire strands. Cargo booms to be secured until shrouds are replaced.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Navigation
Issued 8 April 1995
Resolved
(KS 60) Replace the missing port shaft RPM indicator located in front of the helmsman.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(JM 12) Provide air solenoid valve for stbd bilge line located in #2 hold.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Navigation
Issued 8 April 1995
Resolved
(KS 53) Bring steering station located at aft end of Ohana deck into compliance with 46 CFR 58.25-50 and demonstrate proper operation of the steering station, the rudder angle indicator, the sound powered phone, the gyro and magnetic steering compasses.
Condition: Unknown
Due 29 May 1995
Resolved 29 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(TL 76) Prove ability of #4 lifeboat accumulator to maintain and hold the proper starting charges as required by 46 CFR 160.035-05 (d)(5)(ii)
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(TL 57) Demonstrate proper operation of the fore peak reach rod.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Documentation
Issued 8 April 1995
Resolved
(TL 18) 46 CFR 78.45 - Permanently exhibit plans as required: General arrangement for the guidance of the officers in charge of the vessel. Untilthe approved plan is returned to the vessel, a working plan is to be postedof the most accurate and required information.
Condition: Unknown
Due 8 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 55) Repair the heat detection system and prove proper operation of all zones. Troubleshoot and remove alarm condition in hold #2, and trouble shoot trouble indicator light function.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
Provide evidence that the newly installed entertainment center in cabins F & G is approved.
Condition: Unknown
Due 14 May 1995
Resolved 20 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Remove all open flame type candles from the vessel.
Condition: Unknown
Due 15 April 1995
Resolved 30 April 1995
Deck/Cargo
Issued 8 April 1995
Resolved
Replace the missing spanning wire originally located between king posts.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Deck/Cargo
Issued 8 April 1995
Resolved
Provide loose gear certificates for cargo gear and/or conduct the necessarytests as per the tables in 46 CFR part 71.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 67) Replace or repair the hatch access covers and dogs as needed to restore weather tight integrity to the after hatches leading to the rope locker, the aft capstan room, and the purple palace. Demonstrate weather tight with hose test upon completion.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(KS 62) Provide marine safety data sheets for all hazardous chemicals stored aboard the ship.
Condition: Unknown
Due 7 May 1995
Resolved 30 April 1995
Lifesaving
Issued 8 April 1995
Resolved
Renew as original the aft limit switch for the #11 lifeboat. Open for inspection after repair and prove proper operation.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 68) Replace or repair the hatch access covers and dogs as needed to restore weather tight integrity to the fwd hatches leading to the bosn stores, and the deck lounge. Demonstrate weather tight with hose test upon completion.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
Provide evidence that modifications made to the electric outlets in the Ohana food scramble area are approved.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(KS 64) Implement a hazardous chemical awareness program to educate ships personnel about the handling, storage and dangers of chemicals used aboard the ship.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(JM 15) Make repairs and prove proper operation of hose reel for number 112fire station in the engine room.
Condition: Unknown
Due 21 May 1995
Resolved 28 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
Make repair and demonstrate water tight integrity of stbd side, side port door at time square entrance.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
Make repair and demonstrate water tight integrity of #4, stbd side, side port door.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
Renew or properly repair as original the hinged cover for the #4 motor lifeboat, provide accurate starting instructions & prove accumulators hold a charge.
Condition: Unknown
Due 14 May 1995
Resolved 30 April 1995
Fire Fighting
Issued 8 April 1995
Resolved
(JM 16) Make repairs and prove proper operation of hose reel for number 111fire station in the engine room.
Condition: Unknown
Due 28 May 1995
Resolved 28 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 65) Replace the missing port light dead cover on side port access door located on the port side - time square area.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Deck/Cargo
Issued 8 April 1995
Resolved
Replace all defective turnbuckles and hardware associated with shrouds for king posts. Cargo booms to be secured until shrouds are replaced.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Deck/Cargo
Issued 8 April 1995
Resolved
Repair and demonstrate proper operation of the brake systems for the winches controlling the port and stbd cargo booms.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Navigation
Issued 8 April 1995
Resolved
(TL 20) Repair and prove proper operation of the stern light.
Condition: Unknown
Due 15 April 1995
Resolved 30 April 1995
Fire Fighting
Issued 8 April 1995
Resolved
(TL 44) Provide a proper control switch for Emergency activation of the Gaylord system vice the fire pull station now in use.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Lifesaving
Issued 8 April 1995
Resolved
(TL 33) Provide a total of 12 approved hand held rocket propelled parachutered flare distress signals IAW 46 CFR 75.90-5.
Condition: Unknown
Due 15 April 1995
Resolved 30 April 1995
Fire Fighting
Issued 8 April 1995
Resolved
(TL 45) Research, provide proper training, and demonstrate knowledge and ability of galley personnel to respond to emergencies within the main and crew galleys.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Electrical
Issued 8 April 1995
Resolved
(TL 25) Restore/renew/provide light and light fixtures as original in the machinery space bilges.
Condition: Unknown
Due 30 April 1995
Resolved 30 April 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(KS 11) Properly reconnect pipe extension off of the blower units located in the fan room forward of elevator #5 machinery room. Pipe unit ties into the base of the blower and appears to provide ventilation for the shaft ofelevator #5.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(TL 77) Properly adjust the tricing penants for the #1 and #2 lifeboats.
Condition: Unknown
Due 7 May 1995
Resolved 30 April 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 14) Crop and renew the wasted goose neck vents located on the focsle. Repair or replace closing devices, hardware, and gaskets as needed to restore to good order. Crop and renew vent assemblies as needed.
Condition: Unknown
Due 28 May 1995
Resolved 28 May 1995
Deck/Cargo
Issued 8 April 1995
Resolved
(KS 54) Provide evidence of compliance with 46 CFR 71.47-70 and 71.47-75 pertaining to the required tests and inspections of cargo gear.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 12) Double deck as need to repair holes in deck found in fan room fwd of elevator #5 machinery room.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 18) Crop and renew coaming to fwd hatch leading to the bosn's hold. Approx: 4" of top edge where wasted - renew hatch cover and gasket as needed to restore water tight integrity. Repair hinges and renew hinge pinsand hardware.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 51) Demonstrate operation of remote vent shutdowns including but not limited to those on the bridge, sun deck, and the main galley.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 9) Blower units located in the fan room across from the #2 elevator on bridge deck were found with fractures in the deck where feet of blower units tie to the deck - needle gun all areas where blowers are welded to the deck and allow for inspection.
Condition: Unknown
Due 3 June 1995
Resolved 3 June 1995
Fire Fighting
Issued 8 April 1995
Resolved
(TL 39) Counter top obstructing access to Gaylord hood controls, emergency pull box, and electrical box. Remove obstructions or repostion Gaylord installation.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Lifesaving
Issued 8 April 1995
Resolved
(TL 82) Repair or replace the auxiliary line storage locker located on the flying bridge.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(TL 87) Properly secure the the 2 1/2" pipe located in the overhead of the rope locker aft of the windlass power room.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(TL 22) Properly screen the drain located in the officers galley.
Condition: Unknown
Due 14 May 1995
Resolved 30 April 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(TL 32) Renew the wasted vent atop aft stack fidley.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(TL 34) Properly secure the pyro box adrift on the flying bridge
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(TL 35) Make area in way of mound stbd side flying bridge available for examination.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 36) Renew wasted kick pipes on the flying bridge.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(TL 41) Provide proper means of escape from vegetable box reefer IAW 46 CFR113.45
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Lifesaving
Issued 8 April 1995
Resolved
(TL 49) Clean contacts and electrical connections on the aft limit switch for lifeboat #11, and make weather tight.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 51A) Trouble shoot, repair and demonstrate proper operation of the emergency exit lights located on the port side of the Kamaina Lounge.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 56) Renew broken lens for bridge deck light located above map board in front of elevator entrance.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(KS 72) Demonstrate proper operation of the elevator stop switches associated with the emergency escape hatches located in elevators 3 & 4.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(KS 46) Repair electrical wires for blower motor in fan room 6A - Maui deck.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 26) Hose test all hatches on focsle and fantail for water tightness test.
Condition: Unknown
Due 14 May 1995
Resolved 30 April 1995
Electrical
Issued 8 April 1995
Resolved
(TL 58) Secure all loose wires located in the overhead of the theater. Portand stbd sides near stage.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(TL 61) Renew or repair laundry steam presses.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 7) Replace missing lens covers for indicator lights on walk-in reefers.
Condition: Unknown
Due 21 May 1995
Resolved 28 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(TL 75) Restore #4 elevator machinery room bulkhead penetrations to as original A class bulkheads.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(TL 60) Properly secure the washing machine control boxes to the washing machines, and restore as originally UL approved.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 28) Properly secure light fixtures and electric cable in the fan room located on the stbd side, aft end, of bridge deck, and prove proper operation. 46 CFR 111
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Electrical
Issued 8 April 1995
Resolved
(TL 8) Remove wire nuts from transformer cable connections and make available for inspection.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Accommodation/Occupational Safety
Issued 8 April 1995
Resolved
(TL 21) Provide a proper means of escape from the aft crew gym & submit drawings for approval to the Marine Safety Center.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Lifesaving
Issued 8 April 1995
Resolved
Make proper adjustments on the lever controlling the aft limit switch for the #4 lifeboat. After repair demonstrate proper operation.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 44) Repair and open for inspection fire damper #1 & 2 in the main galley.
Condition: Unknown
Due 14 May 1995
Resolved 28 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 29) Repair and open for inspection fire damper #1, 2, 3, & 4 in fan room 5F - boat deck.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 47) Repair and open for inspection fire damper #4 and provide reach rodfor damper #6 in fan room 7A - Fwd purple palace.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 21) Provide proper drain screens for deck scuppers - present design is inadequate and unsatisfactory.
Condition: Unknown
Due 8 July 1995
Resolved 28 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
(KS 42) Provide reach rod for fire damper #5 and add fire dampers 5 & 6 tolist for fan room 5D - across from A-271.
Condition: Unknown
Due 21 May 1995
Resolved 21 May 1995
Electrical
Issued 8 April 1995
Resolved
(KS 39) Properly address electrical wires found adrift in fan room 5C - fwdof beauty shop by FS 50.
Condition: Unknown
Due 14 May 1995
Resolved 15 May 1995
Fire Fighting
Issued 8 April 1995
Resolved
Bring all fire dampers into compliance with 46 CFR and NVIC 6-72. Gaps between the vent casing and the damper blade must not exceed 1/8 of an_x001C_ inch.
Condition: Unknown
Due 8 April 1995
Resolved 8 April 1995
Construction/Loadline
Issued 8 April 1995
Resolved
(KS 22) Repair aft hatch to rope locker on fantail. Provide hinge pin and replace captive chain.
Condition: Unknown
Due 14 May 1995
Resolved 30 April 1995
Electrical
Issued 25 February 1995
Resolved
PROVIDE PROPER LOGBOOK FOR BATTERIES AND MAINTAIN LOGBOOK WITHIN THE BATTERY ROOM.
Condition: Unknown
Due 11 March 1995
Resolved 4 March 1995
Electrical
Issued 25 February 1995
Resolved
REPLACE DEFECTIVE BATTERIES IN THE BATTERY ROOM - EMERG BANK #2 (#8, 9, 11,13, 38, 39, 41, 45) EMERG BANK #1 (17, 18, 19, 22, 35, 39, 40, 41, 42, 46, & 54)
Condition: Unknown
Due 25 February 1995
Resolved 25 February 1995
Lifesaving
Issued 25 February 1995
Resolved
PROVIDE PROPER PROTECTIVE CLOTHING, INCLUDING FULL FACE SHIELDS & RUBBER GLOVES FOR BATTERY ROOMS. _x001C_ _x001C_
Condition: Unknown
Due 11 March 1995
Resolved 4 March 1995
Construction/Loadline
Issued 18 February 1995
Resolved
CROP AND RENEW THE WASTED SECTION OF PIPE LEADING THROUGH THE BULKHEAD FROMTHE #4 HOLD PORT SIDE BILGE SUCTION. (SOFT PATCHED)
Condition: Unknown
Due 19 March 1995
Resolved 1 March 1995
Accommodation/Occupational Safety
Issued 18 February 1995
Resolved
CROP AND RENEW DEFECTIVE PIPES FOUND SOFT PATCHED IN #6 HOLD (MAUI DECK) NEAR DAMPER ACCESS PLATE.
Condition: Unknown
Due 19 March 1995
Resolved 1 March 1995
Fire Fighting
Issued 18 February 1995
Resolved
BLANK OFF THE CO2 LINES FOR THE ENGINEERS OFFICE (#3 HOLD HAWAII DECK), ANDCREW GYM (#2 HOLD ALOHA & MAUI DECK), OR INSTALL AN ALARM WITH A TIME DELAY._x001C_ _x001C_
Condition: Unknown
Due 19 March 1995
Resolved 1 March 1995
Lifesaving
Issued 18 February 1995
Resolved
CROP AND PART RENEW THE BOTTOM OF THE LADDER IN #2 HOLD AT TANKTOP WHERE WASTED.
Condition: Unknown
Due 19 March 1995
Resolved 1 March 1995
Accommodation/Occupational Safety
Issued 18 February 1995
Resolved
IN ALL ELEVATORS - RESTORE ABILITY TO IDENTIFY POSITION OF CAR WHEN ELEVATOR IS IN MOTION. (ANSI CODE)
Condition: Unknown
Due 18 February 1995
Resolved 18 February 1995
Fire Fighting
Issued 18 February 1995
Resolved
REPLACE THE HOLED SECTION OF C02 PIPE IN THE #7 HOLD (FWD THRUSTER SPACE) NEAR CO2 OUTLET FOR VALVE #9._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1995
Resolved 1 March 1995
Lifesaving
Issued 30 January 1995
Resolved
Prove operation of new public address system in #5 and #6 holds.
Condition: Unknown
Due 1 March 1995
Resolved 24 February 1995
Fire Fighting
Issued 30 January 1995
Resolved
Demonstrate proper operation of the vent supply shut off (pressure switch for the CO2 system in the gyro room.
Condition: Unknown
Due 25 March 1995
Resolved 25 March 1995
Electrical
Issued 30 January 1995
Resolved
Remove extension cord from forward stack space.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Fire Fighting
Issued 30 January 1995
Resolved
Air test CO2 lines fitted to various cargo holds and demonstrate operation of valves fitted in line for each hold.
Condition: Unknown
Due 1 March 1995
Resolved 24 February 1995
Fire Fighting
Issued 30 January 1995
Resolved
Provide (1) flame safety lamp for each required firemans outfit.
Condition: Unknown
Due 1 March 1995
Resolved 1 March 1995
Fire Fighting
Issued 30 January 1995
Resolved
Replace the wasted guide pipes for the CO2 pull cables located in the head inboard of the pull stations for the #2 engine room.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Fire Fighting
Issued 30 January 1995
Resolved
Make proper repairs to all defective key clocks, replace missing keys, or otherwise restore to as designed condition.
Condition: Unknown
Due 1 March 1995
Resolved 1 March 1995
Lifesaving
Issued 30 January 1995
Resolved
Renews covers for watertight lockers, #11 lifeboat.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Lifesaving
Issued 30 January 1995
Resolved
Add additional emergency /general announcement speakers in the following locations: in the crew accomodation are - centerline passageway between WTD15 & 17, in the vicinity of muster station L & M, in hold #6 near new workshop and in crew gymnasium.
Condition: Unknown
Due 1 March 1995
Resolved 24 February 1995
Engineering
Issued 30 January 1995
Resolved
Make repair and prove operation to access plate (lower-outboard) for #4 auxiliary condenser (soft patch).
Condition: Unknown
Due 1 March 1995
Resolved 4 March 1995
Lifesaving
Issued 30 January 1995
Resolved
Provide stateroom notices that indicate which lifeboat or liferaft passengers are assigned. (46 CFR 78.47-47(a)(1).
Condition: Unknown
Due 29 May 1995
Resolved 29 May 1995
Construction/Loadline
Issued 30 January 1995
Resolved
Make proper repairs to bulkhead penetrations for "PAMS" system conductors on stbd side forward in shaft alley.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Accommodation/Occupational Safety
Issued 30 January 1995
Resolved
Provide accomodations for the officers and crew that meet the requirements of 46 CFR 72.20-20 (a)(1), and 72.20-10(f).
Condition: Unknown
Due 1 March 1995
Resolved 24 February 1995
Fire Fighting
Issued 30 January 1995
Resolved
Properly mark portable fire extinguishers in the engine room.
Condition: Unknown
Due 1 March 1995
Resolved 4 March 1995
Lifesaving
Issued 30 January 1995
Resolved
Make repairs & prove operation of the public address speaker in the vicinity of room 12, Maui deck.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Electrical
Issued 30 January 1995
Resolved
Renew emergency exit light, forward of "Surf Rider" bar, stbd side.
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Lifesaving
Issued 30 January 1995
Resolved
Renew the embarkation gate for lifeboat #4.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Lifesaving
Issued 30 January 1995
Resolved
Conduct an inflation test of 3 training rafts and launch 3 boats simultaneously from the stbd side of the ship.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Fire Fighting
Issued 30 January 1995
Resolved
Service and test all fixed CO2 systems in the presence of a marine inspector. Except for main engine rooms #1 & #2, and the aux. machinery space.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Fire Fighting
Issued 30 January 1995
Resolved
Demonstrate proper operation of the CO2 shut down of the emergency generator.
Condition: Unknown
Due 1 April 1995
Resolved 24 April 1995
Fire Fighting
Issued 30 January 1995
Resolved
Replace the plywood inserts in the bulkhead located in the photo lab with inserts made of the same material as originally designed
Condition: Unknown
Due 1 March 1995
Resolved 1 March 1995
Lifesaving
Issued 30 January 1995
Resolved
Repair and prove proper operation of the general alarm bells located on Kauai deck near hold #4.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Electrical
Issued 30 January 1995
Resolved
Add metal cable clamps as needed to comply with IEEE-45, for new cables installed in the fan room located nearest to cabin 86 on the Kamaina deck.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Navigation
Issued 30 January 1995
Resolved
Repair the sound powered phone system on the fantail (stbd side) and demonstrate proper operation.
Condition: Unknown
Due 1 March 1995
Resolved 11 March 1995
Electrical
Issued 30 January 1995
Resolved
Provide cover for machinery electrical control box for #4 elevator.
Condition: Unknown
Due 1 March 1995
Resolved 17 February 1995
Lifesaving
Issued 17 December 1994
Resolved
Portside throw over liferaft canister damaged and broken. Provide_x001C_ servicing for liferaft, and repair/renew broken liferaft canister.
Condition: Unknown
Due 17 December 1994
Resolved 17 December 1994
Accommodation/Occupational Safety
Issued 17 December 1994
Resolved
Demonstrate to the satisfaction of the OCMI that crew members assigned to qrtrs containing friable asbestos are not exposed to airborne concentrationin excess of the OSHA permissible exposure limit. Crew members shall not beassigned to such qrtrs until 8 hour sampling data shows no hazard exists.
Condition: Unknown
Due 17 December 1994
Resolved 17 December 1994
Lifesaving
Issued 17 December 1994
Resolved
Steel banding strap installed on davit launched liferafts. Replace/renew steel liferaft canister banding strap with approved banding material.
Condition: Unknown
Due 17 December 1994
Resolved 17 December 1994
Fire Fighting
Issued 5 November 1994
Resolved
Clean and paint the fire main isolation valves in the machinery spaces and prove operation.
Condition: Unknown
Due 13 November 1995
Resolved 20 April 1995
Lifesaving
Issued 5 November 1994
Resolved
Provide adequate access to lifeboat 11 & 12 to provide for abandon ship at the embarkation station.
Condition: Unknown
Due 13 November 1995
Resolved 20 April 1995
Electrical
Issued 5 November 1994
Resolved
Provide proper electrical ground for the recently installed transformer in the photo lab.
Condition: Unknown
Due 13 November 1995
Resolved 20 April 1995
Electrical
Issued 5 November 1994
Resolved
Remove all of the improperly installed overhead lights in the photo lab andinstall proper lighting.
Condition: Unknown
Due 13 November 1994
Resolved 20 April 1995
Engineering
Issued 5 November 1994
Resolved
Adjust and prove satisfactory test of the aft drum safety hand release mechanism.
Condition: Unknown
Due 13 November 1995
Resolved 20 April 1995
Engineering
Issued 5 November 1994
Resolved
Provide a proper valve stem lifting cam on the forward drum and prove proper operation of the hand release mechanism.
Condition: Unknown
Due 13 November 1994
Resolved 20 April 1995
Electrical
Issued 31 October 1994
Resolved
Replace the broken electrical outlet located in the passageway near FSD #8 directly below the sign indicating "Female Berthing".
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Deleted requirement due to duplication.
Condition: Unknown
Due 31 October 1994
Resolved 14 November 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew as needed the wasted deck plate located on the outboard sidein fan room 5E.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Install missing light indicators for the 8 vent status indicator lights located in fan room 3B on Aloha deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Submit proof that the EDG battery charger meets UL1236.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Identify, cover and mark all deaded ended electrical cables through out vessel using UL approved rubber boots. Cable will be marked on both ends using metal tags indicating the location of terminated ends.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Unknown
Issued 31 October 1994
Resolved
Plug the open pipe penetrating the stbd shaft alley overhead at approx frame 209.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
Install protective guards to the fan belts located in fan room 3B on Aloha deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair approx 8 inch structural fracture located at the aft top corner of wood double door, aft and inboard of boat station No. 12, upper deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair structural fracture, located aft-top corner of window for stateroom M294, main deck portside aft.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted structure at the bottom corner of door on boat deck, on Starboard side just aft of ladder leading to starboard bridge wing.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair structural fracture, at top aft corner of wood double door located on main deck starboard aft, approx. frame 197. Also repair wasted structureat froward bottom corner.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair wasted deck in way of the fire station #83 on B deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair the leak from the wasted forward bottom outboard to starboard side of the aux drain tank in No. 1 engineroom on lower level.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew excessively wasted storm rail stiffeners in-way of the fantail.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair fracture in superstructure at forward bottom corner of 2nd most aft glass pane inboard of aft most life raft davit port side.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted flange plate seven feet above deck in transverse passageway in sports deck aft of door leading to the radio office.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair fractured structure four inches above deck, aft of fire station No. 10.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop & renew wasted structure six inches above deck, in the forward starboard corner of fan room, forward of the aft stack in the sports deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted structure just below vent terminal inboard of fire station No. 11 located in the boat deck aft.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted structure at aft-bottom corner of wood door, 30 foot aft of elevator trunk on boat deck starboard side.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair structural crack on the aft lower bottom corner of door, aft and inboard of port ladder leading to the bridge wing.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted structure bottom corner of door forward of fire station No. 10 boat deck port side.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted structure below bottom hinge of fire station No. 11 door on boat deck aft.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew top flange of rail in-way of vertical ladder froward of superstructure, sun deck on starboard side, forward.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair fractured structure, top forward corner of 1st glass window, on sun deck below bridge wing, starboard side.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew approx. 3 sq.ft. of wasted structure on starboard side aft of barefoot bar.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair the leaking pipe and associated valves for the #6 hold bilge drain lines located in the overhead of the stbd shaft alley (approx. frame 195).
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted structure, at the forward bottom corner of door inboard of lifeboat deck No. 11.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted boundary between stair well by open archway inboard of lifeboat deck No. 11 & stair well below.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair approx 8 inch structural fracture located at the aft-top corner of wood double door, aft and inboard of boat station No. 11, upper deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Clean vessel's entire ventilation system.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop & renew approx six sq.ft. of wasted structure forward of lifeboat davit No. 11.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Demonstrate shell plating in-way of pitted area from frame 43 to frame 63 on port side and frame 43 to frame 75 on starboard side meets requirements of class society by next drydock.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Blank off all vent penetrations to fan room.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Remove the vent opening that serves both the D deck laundry and stairway.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair wasted structure, at the forward bottom corner of wood door located on main deck, fantail on starboard side.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Prior to carrying passengers, install guard and globe to the electrical light fixture located behind the EDG switchboard.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Replace the bilge and ballast manifold located in the shaft alley thwart ship passage just aft of the #2 engine room aft bulkhead.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Replace the missing cover on the electrical light located in the passagewaynear FSD #8 directly above the sign indicating "Female Berthing".
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Navigation
Issued 31 October 1994
Resolved
Replace the broken glass face of the compass repeater in the steering gear room.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Replace all pad eyes attaching lifelines to davits.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop and renew wasted structure just below fire station No.1 door.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
Repair or repack the leaking steam valve located forward of the #3 boiler in way of the catwalk in the #2 ER.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair fracture in superstructure above door frame leading to life boat deck No. 2. Fracture is approx 6-8 inches.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair fracture in superstructure at forward corner of 1st glass pane forward of No. 2 life boat.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair or replace wasted vent duct above archway leading to life boat deck No. 12.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Deleted requirement due to duplication.
Condition: Unknown
Due 31 December 1994
Resolved 14 November 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Vessel will dry dock no later then 30 APR 1996 to make permanent repairs tothe wasted/holed side shell plating at the turn of the bilge on the stbd side at frame 138. In addition, gauge all areas enclosed by the port and stbd bilge keels and make permanent repairs as needed.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Complete vent modifications made in the EDG space by including supply fans,supply ducts, and CO2 actuated switches.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
Install missing valve handles throughout the machinery spaces.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
71. Prior to carrying passengers, prove proper operation of all elevators by providing certificates of testing and inspection.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Repair or replace leaking pipe on center line of engineroom, fwd of the #1 boiler on the upper level.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Unknown
Issued 31 October 1994
Resolved
46. Prior to carrying passengers, reinstall the sound powered phone systemsin the Captains and [name withheld] staterooms and offices as per original system design.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
47. Prior to carrying passengers, post signs throughout the machinery spaces that read "When alarm sounds vacate at once CO2 being released".
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
48. Prior to carrying passengers, restencil or clean as needed, all generalalarm bell signs located throughout the machinery spaces.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Unknown
Issued 31 October 1994
Resolved
49. Prior to carrying passengers, update and post appropriate Station Bill.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
54. Prior to carrying passengers, post required instructions for operation of the CO2 system near the pull station located outside the auxiliary paintlocker on the bridge deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
32. Prior to carrying passengers, post a drawing depicting the operation ofthe semi-portable, 50lb, CO2 systems located between boilers 1 & 2 in the #1 ER, and boilers 3&4 in the #2 ER.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
50. Prior to carrying passengers, update all signage throughout the vessel and verify compliance to the satisfaction of the cognizant OCMI/CG marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
55. Prior to carrying passengers, properly label the pull cables to the CO2release and the Emergency fuel shut off for the EDG.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
56. Prior to carrying passengers, install missing CO2 horn in the EDG room.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
57. Prior to carrying passengers, install a suitable door knob on the alternate escape door (approximate frame 149) located on "B" deck near linen locker #1.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Unknown
Issued 31 October 1994
Resolved
58. Prior to carrying passengers, restore a 3' X 1' breached A class boundary located between electric station 86 and the service pantry on the Promenade deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
59. Prior to carrying passengers, post or stencil required signs at all escape ladders located in the hold #6.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
60. Prior to carrying passengers, prepare the #4 boiler for inspection of wall tube headers to determine the possible source of water leaking from the bottom of the boiler.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE EACH MEMBER OF THE FIRE PATROL WITH ATWO-WAY RADIO IN ACCORDANCE WITH SOLAS II-2/41-2.1.2, AND DEMONSTRATE THAT RELIABLE COMMUNICATIONS EXIST THROUGHOUT THE SHIP TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
23. Prior to carrying passengers, conduct a timed test of 3 Davit launched life rafts to the satisfaction of the cognizant OCMI/CG marine inspector and in accordance with MVI Policy letter 8-93 dated 28 April 93.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
26. Prior to carrying passengers, conduct a hydrostatic test on the No 1, and the No. 3 boilers in the presence of the cognizant OCMI/CG marine inspector, and make each boiler available for a fireside and waterside examination.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
24. Prior to carrying passengers, conduct lifeboat and firefighting drills to the satisfaction of the cognizant OCMI/CG marine inspector and in accordance with SOLAS III/51,52, & 53.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
25. Prior to carrying passengers, On Aloha deck in-way of retail areas, photo area and hospital remove the ceiling panels and restore the B-15 draft stops in accordance with NVIC 6-80. Upon completion make repaired draft stops available for inspection by attending inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
27. Prior to carrying passengers, open the access panels for the automatic dampers located in the food scramble area leading to the grill, food prep area and Deli for inspection by the cognizant OCMI/CG marine inspectors.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
53. Prior to carrying passengers, submit all reports of surveys conducted by the Food and Drug Administration, and the Public Health Service and prove compliance with any worklists generated by each to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
28. Prior to carrying passengers, demonstrate to the cognizant OCMI/CG marine inspector that the temperature in the pizza oven installed in the food scramble area cannot exceed 300 degrees Fahrenheit.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
29. Prior to carrying passengers, provide two rescue boats that meet the requirements of SOLAS 83 regulation III/47 and allow for inspection by the cognizant OCMI/CG marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
30. Prior to carrying passengers, remove all paint and flammable liquids from the locker located in the after end of the shaft alley and verify compliance to the cognizant OCMI/CG marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
31. Prior to occupying Engineers log office, and electricians workshop located above cargo holds #3 and #4, make compartment gas tight or modify the existing CO2 system to operate with time delay alarms.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
33. Prior to carrying passengers, make proper and permanent repairs to the 10" fuel fill pipe where soft patched with fiberglass located behind the #4boiler.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
39. Prior to carrying passengers, restore the bulkheads and the door located in the forward paint locker to their original A class ratings.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
34. Prior to carrying passengers, label circuit breakers in the steering gear room power panels.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
36. Prior to carrying passengers, complete electrical connections to the motor operated damper located above and outboard of the CO2 bottles in the EDG room and prove operation to the attending marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
52. Prior to carrying passengers, restencil all exterior fire stations in accordance with 46 CFR 78.47-20 and verify compliance to the satisfaction of the cognizant OCMI/CG marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
37. Prior to carrying passengers, install retro reflective tape on all lifeboats in accordance with NVIC 1-83.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
38. Prior to carrying passengers, increase the volume of the Emergency PA systems located throughout the crew accommodation spaces and prove compliance with 46 CFR 113.50-15 to satisfaction attending marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
40. Prior to carrying passengers, remove the unapproved electrical fan unitfrom within the fwd paint locker and replace it with one that is designed for use in a hazardous location. IAW 46 CFR 111.105-23.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
43. Prior to carrying passengers, properly secure the electrical cable inside the escape trunk located inboard of the #2 lifeboat davit. Cable iscurrently attached to the escape ladder.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
41. Prior to carrying passengers, install an automatic shutdown device on the fan unit serving the fwd paint locker that activates upon discharge of the CO2 system and prove operation to the cognizant OCMI/CG marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
42. Prior to carrying passengers, restore the boundary located in the Hi Hai lounge separating the pantry from the lounge to an A60 rating.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
44. Prior to carrying passengers, restencil all markings on all life boats in accordance with 46 CFR 78.47-60 (a)-(p).
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS SUBMIT NEW FIRE LOAD CALCULATIONS FOR ALL CABINS AND PUBLIC SPACES.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
45. Prior to carrying passengers, provide warning signs in the carpenters shop warning of a CO2 discharge when alarm sounds in accordance with 46 CFR78.47-9
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
63. Prior to using the main laundry dryers, install guards over all exposedbelts, chain drives, & exposed electrical connections.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
Repair or replace 35 lb. galley steam gauge located at the steam relief valve station located in the #1 ER.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
Repair or replace piping supporting the 35 lb. steam relief valve located at the steam relief valve station located in the #1 ER.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
Repair wasted top panel of fire station No. 58. box located on main deck in-way of fantail on starboard side.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
64. Prior to carrying passengers, provide a CO2 alarm system to hold #6.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Restore deck integrity breached by wire penetration at electric station 47 located at approx. frame 80, on starboard side main deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Repair cable stuffing tube on sun deck on starboard side aft inboard of No.9 life raft davit.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Renew three broken cable stuffing tubes, located aft & outboard of aft mostarchway, port upper deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair wasted stanchion on port main deck on aft outboard of vertical deck drain piping.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
Install valves for the (white) PVC piping located in the stbd shaft alley aft of bkhd 145 and at deck penetration at approx. frame 169.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Renew bilge and ballast pump discharge manifold (currently soft patched) located in the #1 ER.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Crop out and renew approximately 2' X 18" of the wasted bulkhead located near the ladderway extending from FSD #7 to FSD #5A. The bulkhead has wasted away due to leakage of gray water from the shower area located behind the bulkhead.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Update and revise the fire and smoke detection zone location diagram and post all information required by 46 CFR 76.27-15 (f) near the fire detection cabinet in the fire control room.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Make permanent repairs to the holed 8" discharge pipe attached to Bilge/Ballast manifold.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
Repair or replace indicator for the fuel oil XFR pump in the #2 ER stbd side.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Install protective cover to the exposed lighting panel bus bars in the Emergency lighting panel 05-72-P1 on the bridge.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
Repair or replace #2 fire pump discharge gauge in the #1 ER.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Secure head and shower from further use until proper repairs are made to the deck in the shower and to the bulkhead as identified in item 0099.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
Repair or replace fire main discharge pressure gauge located in the fire control room on the bridge and prove satisfactory operation.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair or replace bilge manifold on starboard side of No. 2 engine room.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
75. Prior to carrying passengers, prove to the cognizant OCMI that the bulkheads at Fr 181 (main deck) aft of the shore excursion office are ratedB-15.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
62. Prior to carrying passengers, provide Class A fire screen door to the Bdeck stairway opening at Frame 157.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
65. Prior to carrying passengers, extend the B-0 bulkhead between the laundry room and corridors FR 210 on A deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Navigation
Issued 31 October 1994
Resolved
68. Prior to carrying passengers, prove operation of loss of power alarms for the port and starboard steering motors in way of aft engine room alarm panel.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
70. Prior to carrying passengers, prove automatic fire dampers are installed in the overhead of the food scramble area leading to grill, food prep area, & Deli.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
66. Prior to carrying passengers, prove retail store B-15 bulkhead tight orprovide a sprinkler system.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
Complete installation of fire zones 54,55,&57 to satisfaction of attending marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE TWO ADDITIONAL FIREMANS OUTFITS IN EACH MAIN VERTICAL ZONE WHICH ARE IN ADDITION TO THE REQUIREMENTS OF SOLAS REG. 17 AND IN ACCORDANCE SOLAS II-2/ 17.3.1.1, AND ALLOW LOCATIONS AND EQUIPMENT TO BE INSPECTED BY ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
20. Prior to carrying passengers, crop and renew where wasted the tank top of the No. 2 starboard outboard fuel tank at floor No. 97.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
PRIOR TO USING FOOD SCRAMBLE AREA, REMOVE HIGH TEMPERATURE ROTISSERIE OVEN OR INSTALL PROPER EXHAUST SYSTEM WITH GAYLORD HOOD.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
22. Prior to carrying passengers post an amended fire control plan, and verify its accuracy to the cognizant OCMI/CG marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Unknown
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE SHIPS PLANS AND BOOKLETS IN ACCORDANCE WITH REG. 20 OF 1992 SOLAS AMMENDMENTS IN FORMAT AS SPECIFIED BYIMO II-2/41-2.1.1.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
81. Provide a stairway from the physical fitness center added to hold #5.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
Repair or replace (see list In MINS MI case MI94033609) all fire screen doors to the satisfaction of attending marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
74. Prior to carrying passengers, prove to the cognizant OCMI that the stbdweather tight door leading to the Barefoot Bar has been repaired or replaced.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Repair or replace all water tight doors (see attached list) to the satisfaction of attending marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Restore bilge and ballast system to original configuration and remove all modifications allowing attachment of air driven pumps to system. Complete to satisfaction of attending marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
76. Prior to carrying passengers, prove to the cognizant OCMI that all firedampers are accessible, operational, and properly labeled.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
73. Prior to carrying passengers, make elevators No. 1 & 2 & associated modifications available for testing & comparison and with approved drawingsto the satisfaction of attending Marine Inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Documentation
Issued 31 October 1994
Resolved
Provide the OCMI in Honolulu with a copy of the approved fire control plan.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
Excavate and investigate material condition of deck plate above the CO2 room aft inboard corner at approx frame 99 in C deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
77. Prior to carrying passengers, replace or repair the #1 pilot ladder.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Properly pack cable penetration 3 ft. above wood double door approx frame 142, starboard side on promenade deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Navigation
Issued 31 October 1994
Resolved
79. Demonstrate proper operation of Gyro compass repeater located in aft steering.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Deck/Cargo
Issued 31 October 1994
Resolved
78. Repair or replace leaking swing check valve located in the bow thrustercompartment.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Engineering
Issued 31 October 1994
Resolved
80. Repair combustion leak in the casing of No. 3 boiler on upper level of engine room.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Electrical
Issued 31 October 1994
Resolved
Renew the three cable stuffing tubes at the entrance to the fan room, forward of the aft stack in the sports deck.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
Deleted requirement due to duplication.
Condition: Unknown
Due 31 October 1994
Resolved 14 November 1994
Fire Fighting
Issued 31 October 1994
Resolved
72. Prior to carrying passengers, revise the ship board diagrams identifying the location of all fire dampers, verify accuracy of diagram, prove proper labeling, and demonstrate proper operation of all dampers to a CG Marine Inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Unknown
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, SUBMIT CERTIFICATES FOR TEMPERED GLASS.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Construction/Loadline
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, SUBMIT DRAWINGS OF ALL JOINER DETAILS TO MSC.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, RESTORE PASSENGERS HOSPITAL LOCATED ON MAIN DECK TO ORIGINAL OPERATIONAL STATUS.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, REPAIR ALL BROKEN SAFETY RAILS LOCATED ON THEAFT BOAT DECK, PORT AND STBD SIDES AND PROVE REPAIRS TO BE SAFE AND SATISFACTORY TO ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
19. Prior to carrying passengers, add an additional heat detecting device in the overhead of the storage area located behind the bar near the Independence lounge as per the spacing requirements of 46 CFR 76.05-1 (a) &the spacing requirements of 76.27-10(b).
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE TWO WATER FOG APPLICATORS IN EACH MACHINERY SPACE IN CATEGORY A, PROVIDE ONE WATER APPLICATOR ADJACENT TO EACH BREATHING APPARATUS, & 3 WATER APPLICATORS IN EACH SPECIAL CATEGORY SPACE IN ACCORDANCE WITH SOLAS II-2/41-2.1.3.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, ENSURE THAT ALL FIRE HOSE NOZZELS ARE CAPABLEOF DELIVERING WATER IN EITHER A FOG OR STRAIGHT STREAM PATTERN, AND ARE EQUIPPED WUTH A SHUT OFF VALVE IAW SOLAS II-2/41-2.1.5.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE 2 SETS OF INTERCHANGABLE BREATHING APPARATUS, SPARE CHARGES FOR EACH APPARATUS ONBOARD IN ACCORDANCE WITH SOLAS II-2/17.1.2.2., AND ALLOW LOCATION AND EQUIPMENT TO BE INSPECTED TO SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Accommodation/Occupational Safety
Issued 31 October 1994
Resolved
PRIOR TO OCCUPYING NEW CABINS, INSTALL PROTECTIVE GUARDS OVER NEW BATHROOM LIGHT FIXTURES IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
35. Prior to carrying passengers, install the cover to the pull cable conduit bend for the fire suppression system in the food scramble grill area.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE 1 PORTABLE FOAM APPLICATOR IN EACH SPACE WHERE THERE IS A BOILER, 1 SET OF PORTABLE AIR-FOAM EQUIPMENT IN EACHMACHINERY SPACE OF CATEGORY A, AND 1 PORTABLE FOAM APPLICATOR IN EACH SPECIAL CATEGORY SPACE IAW SOLAS II-2/41-2.1.4.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
51. Prior to carrying passengers, update all stateroom notices throughout vessel and verify compliance to the satisfaction of the cognizant OCMI/CG marine inspector.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, REPLACE THE MANUAL FIRE ALARM PULL STATION THAT WAS REMOVED DURING THE INSTALLATION OF THE FOOD SCRAMBLE AREA, (FIRE ZONE 38), AND DEMONSTRATE PROPER OPERATION TO THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, REPAIR THE BROKEN GLASS PLATES FOR THE MANUALFIRE ALARM PULL STATION ZONES: 16,27,30,40,46,49,65 AND DEMONSTRATE PROPER OPERATION TO THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, REMOVE ALL FLAMMABLE LIQUIDS,(LAQUER,THINNERS, AND OTHER PAINT SOLVENTS) FROM THE LINE LOCKER LOCATED FWD OF THE DC GENERATOR SWBD.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Fire Fighting
Issued 31 October 1994
Resolved
PRIOR TO CARRYING PASSENGERS, ADD ADDITIONAL HEAT DETECTION DEVICES IN THE OVERHEAD OF THE PHOTO AREA AND DEMONSTRATE PROPER OPERATION TO ATTENDING MARINE INSPECTOR. IAW 46 CFR 76.05-1 & 76.27-10(b).
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Documentation
Issued 31 October 1994
Resolved
21. Prior to loading or discharging any oil products in the Port of Honolulu, provide for review to the cognizant OCMI, an updated version of the vessel's oil transfer procedures, IAW 33 CFR 155.750,155.760 & 155.770.
Condition: Unknown
Due 31 October 1994
Resolved 31 October 1994
Lifesaving
Issued 9 April 1994
Resolved
DEMONSTRATE PROPER OPERATION OF HAND FLEMMING GEAR ON LIFEBAOT NO.5.
Condition: Unknown
Due 9 April 1994
Resolved 9 April 1994
Lifesaving
Issued 9 April 1994
Resolved
DESCALE FLEMMING GEAR HANDLE #1 AND RENEW PILLOW BLOCK BEARINGS ON HANDLE #1 ON LIFEBOAT #12.
Condition: Unknown
Due 30 April 1994
Resolved 2 May 1994
Unknown
Issued 9 April 1994
Resolved
REMOVE FLAMMABLES FROM ALL HOTEL STORAGE LOCKERS AND STOW IN A CO2 PROTECTED SPACE.
Condition: Unknown
Due 30 April 1994
Resolved 2 May 1994
Construction/Loadline
Issued 28 January 1994
Resolved
MAKE AVAILABLE FOR INTERNAL STRUCTURAL EXAMINATIONS OF ALL F.W. BALLAST TANKS, FIXED BALLAST TANKS, INTEGRAL MSD TANK, AND INTEGRAL COFFERDAM THAT WERE OVERDUE FOR INSPECTION ON THE NEXT SCHEDULED DRYDOCKING IN THE PRESENCE OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 28 January 1994
Resolved 28 January 1994
Lifesaving
Issued 28 January 1994
Resolved
REPAIR IN KIND THE INBOARD PILLOW BLOCK BEARING, NO.5 HANDLE, BOTH FLEMMINGGEAR T-BEAMS, AND THE AFT BREASTPLATE ON THE NO.7 LIFEBOAT.
Condition: Unknown
Due 28 January 1994
Resolved 28 January 1994
Lifesaving
Issued 28 January 1994
Resolved
REPAIR IN KIND THE WASTED FASTENERS ON BOTH ENDS OF RELEASE GEAR SHAFT AND DESCALE, PREP, & PAINT UNDERSIDE OF RELEASING GEAR HANDLE & AFT BREASTPLATEON THE NO.9 LIFEBOAT.
Condition: Unknown
Due 28 January 1994
Resolved 28 January 1994
Fire Fighting
Issued 28 January 1994
Resolved
INSTALL HEAT DETECTORS IN THE NO.4 & 6 HOLD "TWEEN DECKS". UNTIL SUCH TIME,CONDUCT HOURLY ROUNDS TO THE SPACES FOR FIRE SAFETY CHECK AND MAKE THESE ENTRIES TO THE OFFICIAL VESSEL LOG ON THE BRIDGE.
Condition: Unknown
Due 28 January 1994
Resolved 28 January 1994
Fire Fighting
Issued 28 January 1994
Resolved
REPAIR IN KIND THE LATCHES FOR THE FOLLOWING FIRE SCREEN DOORS: NO.2C, NO.12A, NO.4C, NO.1E AND NO.1D.
Condition: Unknown
Due 28 January 1994
Resolved 28 January 1994
Engineering
Issued 4 November 1993
Resolved
REPAIR/INSTALL MISSING AND TORN INSULATION ON THE AFT END OF NO.5 MAIN FEEDWATER PUMP, IN FAN ROOMS NO.5F "BT" DECK, AND NO.5E "B" DECK AS PER 46 CFR 72.05-1.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Unknown
Issued 4 November 1993
Resolved
PROVIDE PUBLIC ADDRESS SPEAKERS IN THE AREA OUTSIDE THE CARPENTERS SHOP ANDNEAR FSD6B. PROPERLY ADJUST THE VOLUME OF THE SPEAKERS NEAR CB36, CB52, AND CA23. REPAIR/REPLACE BROKEN SPEAKERS NEAR NO.5 ELEVATOR AND FORWARD OFMAIN GALLEY AS PER 46 CFR 113.50.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Engineering
Issued 4 November 1993
Resolved
CONDUCT HYDROSTATIC TEST AND THE TESTING OF THE MAIN BOILER SAFETY VALVES ON THE NO.4 MAIN PROPULSION BOILER IN THE PRESENCE OF AN ATTENDING MARINE INSPECTOR AS PER 46 CFR 61.05-10(b).
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Construction/Loadline
Issued 4 November 1993
Resolved
CROP-OUT & RENEW THE WASTAGE AREA IN THE FOREPEAK TANK LOCATED ON THE 2ND PLATFORM DECK FROM THE TOP ACCESS COVER (BOSN STORES) IN THE WAY OF LADDER & LIGHTING HOLE AREA.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Fire Fighting
Issued 4 November 1993
Resolved
REPAIR HOLES IN BULKHEAD NEAR FSD5B USING THE TABLE IN 46 CFR_x001C_ 72.05-10(d).
Condition: Unknown
Due 4 December 1993
Resolved 26 November 1993
Construction/Loadline
Issued 4 November 1993
Resolved
CROP-OUT & RENEW THE BUCKLED NO.4,5, & 7 (APPROXIMATE) SWASH TRANVERSE_x001C_ BULKHEADS FROM FRAME 216 AFT IN THE AFT PEAK TANK.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Construction/Loadline
Issued 4 November 1993
Resolved
CROP-OUT & RENEW THE WASTAGE ON THE FORWARD BULKHEAD PLATING OF THE NO.1 DEEP TANK AS INDICATED ON THE GAUGING REPORT LETTER DTD 13NOV93 BY AHC AND SHAKA ENGINEERING INC.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Engineering
Issued 4 November 1993
Resolved
MAKE PERMANENT REPAIRS TO THE TEMPORARY PATCH ON THE NO.1 MAIN CONDENSER FEEDWATER PUMP AS PER 46 CFR 50.05-10.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Fire Fighting
Issued 4 November 1993
Resolved
REPLACE THE EXISTING CLEAR PLEXIGLASS INSTALLED ON THE DOOR LEADING TO THE AFT MACHINERY SPACE ON THE "B" DECK WITH WIRE INSERTED GLASS AS PER 46 CFR 72.05-25(b)(4)&(c)(2).
Condition: Unknown
Due 4 December 1993
Resolved 18 November 1993
Accommodation/Occupational Safety
Issued 4 November 1993
Resolved
PROVE THE PROPER OPERATION OF THE MILK REEFER DOOR LOCK AND FREEZER "LOCK IN PERSON" ALARM AS PER 46 CFR 113.45.
Condition: Unknown
Due 4 December 1993
Resolved 26 November 1993
Construction/Loadline
Issued 4 November 1993
Resolved
HOSE TEST THE PORT AND STARBOARD SIDE PORTS LOCATED ON THE "A" AND "B"_x001C_ DECKS AS PER 46 CFR 71.25-25 TO THE SATISFACTION OF AN ATTENDING MARINE _x001C_ INSPECTOR.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Fire Fighting
Issued 4 November 1993
Resolved
REPAIR TORN INSULATION IN OVERHEAD OF FAN ROOM NO. 5F, ON THE "BT" DECK AS PER 46 CFR 72.05-1.
Condition: Unknown
Due 4 December 1993
Resolved 18 November 1993
Fire Fighting
Issued 4 November 1993
Resolved
REPAIR TORN INSULATION IN OVERHEAD IN FANROOM NO. 5E, ON THE "B" DECK AS PER 46 CFR 72.05-1.
Condition: Unknown
Due 4 December 1993
Resolved 18 November 1993
Construction/Loadline
Issued 4 November 1993
Resolved
DETERMINE CONDITION AND PROVIDE GAUGING REPORTS TO THE FOLLOWING AREAS: (a)DECK IN LOAD CENTER STATION, (b) DECK UNDER ICE MACHINES IN THE CREWS GYMNASIUM, AND (c) BULKHEAD LEADING FROM FSD5A TO MAIN DECK AS PER 46 CFR 71.30-10.
Condition: Unknown
Due 4 November 1993
Resolved 4 November 1993
Fire Fighting
Issued 22 October 1993
Resolved
AS PER 46CFR72.05, INSULATE TO A-15 THE DOORWAY SURROUNDS OF ALL FOUR FUELING STATIONS.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Fire Fighting
Issued 22 October 1993
Resolved
AS PER 46CFR72.05, INSULATE TO A-60 THE BULKHEAD BETWWEN THE FUEL OIL TANKSAND THE FORWARD ENGINEROOM.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Fire Fighting
Issued 22 October 1993
Resolved
AS PER 46CFR72.05, INSULATE TO A-60 THE DECKS BENEATH THE THE BATTERY ROOM AND EMERGENCY DIESEL GENERATOR ROOM.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Fire Fighting
Issued 22 October 1993
Resolved
AS PER 46CFR72.05, INSULATE TO A-30 THE BULKHEAD BETWEEN THE PAINT LOCKER AND SHAFT ALLEY.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Fire Fighting
Issued 22 October 1993
Resolved
AS PER 46CFR72.05, INSULATE TO A-60 THE BULKHEADS OF THE CO2 ROOMS.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Fire Fighting
Issued 22 October 1993
Resolved
AS PER 46CFR72.05, INSULATE TO A-60 THE DECK BENEATH THE CO2 ROOMS.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Fire Fighting
Issued 22 October 1993
Resolved
AS PER 46CFR72.05, EXTEND THE B-15 BULKHEADS BETWEEN THE CABINS AND CORRIDORS, MAIN DECK BETWEEN THE AFT FOYER AND TOURIST CLASS ENTRY SO THAT THE BULKHEADS ARE MADE INTACT DECK-TO-DECK.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Construction/Loadline
Issued 4 September 1993
Resolved
REPAIR AS NEW THE NONTIGHT FLOORS AT FRAMES 89 THRU 97 LOCATED BENEATH THE #1 DISTILLED WATER DEEP TANK IN THE FORWARD COFF'DAM. REPAIRS ARE TO BE COMPLETED NO LATER THAN THE NEXT SCHEDULED DRYDOCK. THE TANK CAPACITY SHALLBE LIMITED TO NO GREATER THAN 50% UNTIL PERMANENT REPAIRS ARE MADE.
Condition: Unknown
Due 4 September 1993
Resolved 4 September 1993
Fire Fighting
Issued 21 August 1993
Resolved
AS PER 46CFR72.05-25, REPAIR/RENEW LATCHING MECHANISM ON UPPER DECK FIRE SCREEN DOOR #16. REPAIRS TO BE COMPLETED DURING THE NEXT SCHEDULED DRYDOCKING.
Condition: Unknown
Due 21 August 1993
Resolved 21 August 1993
Construction/Loadline
Issued 21 August 1993
Resolved
REPLACE WASTED FLANGE BOLTS AND NUTS ON PORT SEACHEST FORWARD IN THE AFT ENGINE ROOM AS PER 46 CFR 56.25-20, AND 46 CFR 56.60-1.
Condition: Unknown
Due 21 August 1993
Resolved 21 August 1993
Construction/Loadline
Issued 31 July 1993
Resolved
PROVIDE A GAUGING REPORT OF THE STEEL DECK UNDER TEAK PLANKING ON THE AFTERDECK IN THE WAY OF STARBOARD WARPING CAPSTAN AS PER NVIC 7-68.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Engineering
Issued 31 July 1993
Resolved
HYDRO-TEST THE MAIN STEAM PIPING FOR THE FORWARD AND AFT MACHINERY SPACES IN THE PRESENCE OF AN ATTENDING MARINE INSPECTOR AS PER 46 CFR 61.15-5.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Construction/Loadline
Issued 31 July 1993
Resolved
RE-INSTALL BULKHEAD ACCESS PLATES REMOVED IN THE NO.3 PNEUMATIC VALVES STATION AND MAKE PERMANENT REPAIR TO TEMPORARY PATCH ON PIPING LOCATED OVERHEAD INSIDE THE NO.3 PNEUMATIC VALVES STATION ON "A" DECK AS PER 46 CFR 160.033 AND NVIC 6-80.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Engineering
Issued 31 July 1993
Resolved
RENEW/REPAIR THE 35 PSI STEAM REDUCING RELIEF VALVES IN FWD MACHINERY SPACEAND THE 285 PSI STEAM REDUCING RELIEF VALVES IN AFT MACHINERY SPACE AS PER 46 CFR 61.05-20.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Construction/Loadline
Issued 31 July 1993
Resolved
RENEW THE WASTED BILGE/BALLAST MANIFOLD FOR THE AFT MACHINERY SPACE AS PER 46 CFR 182.25.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Construction/Loadline
Issued 31 July 1993
Resolved
RENEW THE FLANGE BOLTS ON THE NO. 6 & 7 DOUBLE BOTTOM TANK VENTS LOCATED ONTHE BT DECK PORTSIDE AS PER 46 CFR 56.25-5.
Condition: Unknown
Due 14 August 1993
Resolved 16 August 1993
Deck/Cargo
Issued 31 July 1993
Resolved
RENEW/REPLACE THE DOGS ON ONE HATCH LEADING TO FORWARD LAZARETTE AND SECONDDOOR INTO DECK LOCKER LOCATED ON NO.1 FOREDECK HOUSE AS PER 46 CFR 171.120 (f).
Condition: Unknown
Due 14 August 1993
Resolved 16 August 1993
Engineering
Issued 31 July 1993
Resolved
MAKE PERMANENT REPAIR TO TEMPORARY PATCH ON THE SANITARY COOLING LINE FOR THE TO FEEDWATER PUMP IN THE WAY OF NO.2 EVAPORATOR IN AFT MACHINERY SPACE AS PER 46 CFR 56.50-30.
Condition: Unknown
Due 4 September 1993
Resolved 23 August 1993
Accommodation/Occupational Safety
Issued 31 July 1993
Resolved
REPAIR THE NO.1 SHIP SERVICE/SEWAGE EJECTION DAVEY MACHINERY AS PER 46 CFR 72.20-90.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Electrical
Issued 31 July 1993
Resolved
INSTALL THE MISSING GROUNDING STRAPS FOR ALL THE NON-METALLIC EXPANSION JOINTS IN THE FWD AND AFT MACHINERY SPACES AS PER 46 CFR 111.05-3(b).
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Deck/Cargo
Issued 31 July 1993
Resolved
REPAIR THE EXCESSIVE SALTWATER LEAKAGE FOR THE AFT THRUSTERS LOCATED IN THENO.7 CARGO HOLD AS PER 46 CFR 72.20-90 AND 46 CFR 71.25-35.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Electrical
Issued 31 July 1993
Resolved
THE LIGHTNING FIXTURES IN THE PORT AND STBD SIDE BUFFET AREA UPPER DECK MUST BE IN ACCORDANCE WITH 46 CFR 111.75-20(d).
Condition: Unknown
Due 3 August 1993
Resolved 3 August 1993
Lifesaving
Issued 31 July 1993
Resolved
INSTALL A GENERAL ALARM BELL IN VICINITY OF SERVICE PANTRY FORWARD OF THE_x001C_ GIFT SHOP AS PER 46 CFR 113.25-9.
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Deck/Cargo
Issued 31 July 1993
Resolved
RENEW THE GASKET AND GASKET COAMINGS ON HATCHES LEADING TO THE AFTER LAZARETTE AND TO WINDLASS MACHINERY SPACE AS PER 46 CFR 171.120 (f).
Condition: Unknown
Due 31 July 1993
Resolved 31 July 1993
Lifesaving
Issued 31 July 1993
Resolved
AS PER 46 CFR 160.33, RENEW ON THE NO.6 LIFEBOAT THE FORWARD RELEASE GEAR TUBE, AFTER RELEASE GEAR LINE BEARING, ACTUATING LEVER, AND BOLTS/NUTS TO COMPLY AS PER 46 CFR 56.25-20(a). VESSEL'S PASSENGERS IS LIMITED TO NOT MORE THAN 1250 PERSONS ONBOARD.
Condition: Unknown
Due 1 September 1993
Resolved 16 August 1993
Lifesaving
Issued 31 July 1993
Resolved
RENEW THE FORWARD RELEASING GEAR PIPE ON THE NO. 2 LIFEBOAT AS PER 46 CFR 160.033.
Condition: Unknown
Due 14 August 1993
Resolved 16 August 1993
Deck/Cargo
Issued 31 July 1993
Resolved
RENEW THE GASKET COAMING ON THE AFT DOOR LEADING TO NO. 2 FOREDECK HOUSE ASPER 46 CFR 171.120(f).
Condition: Unknown
Due 28 August 1993
Resolved 21 August 1993
Fire Fighting
Issued 31 July 1993
Resolved
IDENTIFY AND REPAIR THE BROKEN PIPE LINES IN THE FIRE STATION NO. 10 AS PER46 CFR 56.95.
Condition: Unknown
Due 28 August 1993
Resolved 21 August 1993
Lifesaving
Issued 31 July 1993
Resolved
RENEW THE BOLTS AT UPPER END OF THE AFTER RELEASE GEAR ON LIFEBOAT NO.4 AS PER 46 CFR 160.033.
Condition: Unknown
Due 7 August 1993
Resolved 16 August 1993
Deck/Cargo
Issued 31 July 1993
Resolved
REPAIR THE FLAME SCREEN ON STARBOARD GOOSE NECK VENT LOCATED OUTBOARD OF THE KING POST AS PER 46 CFR 56.50.
Condition: Unknown
Due 14 August 1993
Resolved 21 August 1993
Engineering
Issued 24 July 1993
Resolved
IN ACCORDANCE WITH 46CFR52.01-135, REMOVE & REBRICK THE REAR WALL FIREBRICKIN #1 MAIN PROPULSION BOILER, AS PER ABS REPAIR SPECIFICATIONS. REPAIRS TO BE COMPLETED PRIOR TO OPERATION OF THE #1 PROPULSION BOILER.
Condition: Unknown
Due 24 July 1993
Resolved 24 July 1993
Engineering
Issued 24 July 1993
Resolved
IN ACCORDANCE WITH 46CFR52.01-135, REMOVE CASTABLE REFRACTORY FROM THE BASEOF THE #1 MAIN PROPULSION BOILER SUPERHEATER SUPPORT TUBES. ALLOW COAST GUARD INSPECTION OF SUPPORT TUBES PRIOR TO RENEWAL OF CASTABLE REFRACTORY.
Condition: Unknown
Due 24 July 1993
Resolved 24 July 1993
Engineering
Issued 24 July 1993
Resolved
IN ACCORDANCE WITH 46CFR52.01-135, REPLACE MISSING CASTABLE REFRACTORY NEARTHE SUPERHEATER SCREEN TUBES IN THE VESTIBULE OF THE #1 MAIN PROPULSION BOILER AS PER ABS REPAIR SPECIFICATIONS. REPAIRS TO BE COMPLETED PRIOR TO OPERATION OF THE #1 BOILER.
Condition: Unknown
Due 24 July 1993
Resolved 24 July 1993
Construction/Loadline
Issued 3 July 1993
Resolved
PROVIDE ADEQUATE SUPPLY OF SPARE PARTS FOR OWS AS PER MANUFACTURE'S INSTRUCTIONS. DEMONSTRATE COMPLIANCE IN THE PRESENCE OF THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 14 August 1993
Resolved 16 August 1993
Construction/Loadline
Issued 3 July 1993
Resolved
IN ACCORDANCE WITH 33CFR 155.370, INSTALL THE OWS BILGE ALARM SYSTEM AS PERMANUFACTURE'S INSTRUCTIONS. DEMONSTRATE COMPLIANCE IN THE PRESENCE OF THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 14 August 1993
Resolved 16 August 1993
Construction/Loadline
Issued 3 July 1993
Resolved
RENEW DESSICATORS ON OWS BILGE ALARMS AS PER MANUFACTURE'S INSTRUCTIONS. DEMONSTRATE COMPLIANCE IN THE PRESENCE OF THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 14 August 1993
Resolved 16 August 1993
Construction/Loadline
Issued 3 July 1993
Resolved
IN ACCORDANCE WITH 33CFR 155.370, DEMONSTRATE PROPER OPERATION OF OWS BILGEALARM AS PER MANUFACTURE'S INSTRUCTIONS.
Condition: Unknown
Due 31 July 1993
Resolved 2 August 1993
Construction/Loadline
Issued 8 June 1993
Resolved
CROP-OUT AND RENEW MORE THAN 30% WASTED OF THE DECK PLATING IN THE AREA OF THE TRANSVERSE PASSAGEWAY "B" DECK BETWEEN FRAMES 123 TO 126 PORT & STBD SIDE, TIMES SQUARE AREA, IN ACCORDANCE WITH THE GAUGING REPORT DATED 18 JUN93 FROM AHC ON THE NEXT DRYDOCKING.
Condition: Unknown
Due 8 June 1993
Resolved 8 June 1993
Construction/Loadline
Issued 6 May 1993
Resolved
GAUGE THE DECK PLATING BENEATH THE DIAMOND PLATE DOUBLERS LOCATED IN THE ATHWARTSHIP PASSAGEWAY ON THE B-DECK AREA (TIMES SQUARE AREA). PROVIDE A GAUGING REPORT TO [name withheld] NOT LATER THAN 05JUN93.
Condition: Unknown
Due 6 May 1993
Resolved 6 May 1993
Accommodation/Occupational Safety
Issued 24 April 1993
Resolved
ON THE SPORTS, BOAT, SUN, AND PROMENADE DECKS, REPLACE/RENEW WASTED PORTIONS OF THE INSECT SCREENS AND THEIR ASSOCIATED FRAMES.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Electrical
Issued 24 April 1993
Resolved
Renew or replace all electrical outlet covers on the weater deck outlets sothe safety caps can be secured properly.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Lifesaving
Issued 24 April 1993
Resolved
ON ALL LIFEBOATS DAVITS, REPLACE/RENEW THE WIRE CLIPS THAT HAVE WASTED AWAY, WITH MARINE TYPE METAL CLIPS AND SECURE ALL WIRES PROPERLY.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Construction/Loadline
Issued 24 April 1993
Resolved
In the overhead of the fan room port side of the forward stack on the sports deck crop to good metal where wasted through to the forward stack fiddley and renew. renew insulation to A-60.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Lifesaving
Issued 24 April 1993
Resolved
Replace missing drain ball in lifeboat #11.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Engineering
Issued 24 April 1993
Resolved
ON THE BOAT DECK STARBOARD FORWARD GOOSE NECK TANK VENT FOR #2 AND #4 CENTERLINE DEEPTANKS RENEW THE 30 X 30 FLAME SCREENS.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Lifesaving
Issued 24 April 1993
Resolved
ON LIFEBOAT WINCHES #8 AND #10 REPLACE BRAKE PADS.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Fire Fighting
Issued 24 April 1993
Resolved
ON EXTERIOR FIRE STATIONS ON THE BOAT, SUN, AND SPORTS DECK RENEW ALL WASTED FLANGE BOLTS.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Engineering
Issued 24 April 1993
Resolved
ON #2 MAIN FEEDWATER PUMP, REPLACE MISSING LAGGING INSULATION.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Accommodation/Occupational Safety
Issued 24 April 1993
Resolved
IN THE BOATDECK FAN ROOM #5A, REPLACE THE A-60 INSULATION THAT WAS REMOVED IN THE PORT SIDE VESTIBULE.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Engineering
Issued 24 April 1993
Resolved
PERFORM INTERNAL EXAMINATION OF THE FOLLOWING PRESSURE VESSELS IN ACCORDANCE WITH 46CFR61.10-5: #302, 303, 304, 305, 306 AND 307. DEMONSTRATE COMPLIANCE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR NOT LATER THAN 22MAY93.
Condition: Unknown
Due 24 April 1993
Resolved 24 April 1993
Construction/Loadline
Issued 24 April 1993
Resolved
In the overhead of the fan room aft of the exercise solarium, crop to good metal where wasted through and renew.
Condition: Unknown
Due 8 May 1993
Resolved 4 May 1993
Electrical
Issued 24 April 1993
Resolved
In the BT deck fan room 3a remove the TV antennea wire penetrating into thestack supply vent and seal the holes. Renew insulation to A-60.
Condition: Unknown
Due 8 May 1993
Resolved 4 May 1993
Electrical
Issued 29 January 1993
Resolved
DEMONSTRATE PROPER OPERATION OF THE EMERGENCY GENERATOR HIGH COOLANT TEMPERATURE ALARM IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Lifesaving
Issued 29 January 1993
Resolved
DEMONSTRATE PROPER OPERATION OF HAND PROPELLED AND MOTOR LIFEBOATS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Engineering
Issued 29 January 1993
Resolved
OPEN THE FOLLOWING MOUNTS ON #4 BOILER FOR EXAMINATION BY A COAST GUARD MARINE INPSECTOR: (1) #1 FEED STOP, (2) #2 AUXILLARY FEED STOP, (3) #13 SUPERHEATER STEAM STOP.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Lifesaving
Issued 29 January 1993
Resolved
MAKE AVAILABLE FOR INSPECTION, IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR, ALL PERSONAL FLOTATION DEVICES.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Navigation
Issued 29 January 1993
Resolved
DEMONSTRATE PROPER OPERATION OF ALL BRIDGE, ELECTRONIC AND NAVIGATION GEAR IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Lifesaving
Issued 29 January 1993
Resolved
REPAIR OR RENEW GENERAL ALARM BELLS ACROSS FROM C552 AND IN THE THEATER (ONTHE STAGE). DEMONSTRATE PROPER OPERATION IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Lifesaving
Issued 29 January 1993
Resolved
PAINT AND LABEL GENERAL ALARM BELL LOCATED ACROSS FROM FIRE STATION #97.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Lifesaving
Issued 29 January 1993
Resolved
PROVIDE 61 ADDITIONAL ADULT LIFE PRESERVERS FOR INSPECTION. TOTAL NUMBER OF PASSENGERS ANDE CREW IS LIMITED TO 1339 UNTIL LIFE JACKETS HAVE BEEN INSPECTED BY A MARINE INSPECTOR._x001C_ _x001C_
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Lifesaving
Issued 29 January 1993
Resolved
PROVIDE COVERS FOR LIFEBOATS #7,9 AND 11.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Fire Fighting
Issued 29 January 1993
Resolved
DEMONSTRATE PROPER OPERATION OF THE SMOKE DETECTION SYSTEM IN THE #1 CARGO HOLD IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Fire Fighting
Issued 29 January 1993
Resolved
REPAIR OR RENEW LEAKING VALVE AT FIRE STATION #105. DEMONSTRATE PROPER OPERATION IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Construction/Loadline
Issued 29 January 1993
Resolved
DEMONSTRATE CLOSING OF WTD #3-D BY LOCAL AND REMOTE HAND CRANKS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Construction/Loadline
Issued 29 January 1993
Resolved
REPAIR OR RENEW WTD #3-D SO THAT DOOR SEATS AGAINST ALL SEALING SURFACES. DEMONSTRATE PROPER OPERATION IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Fire Fighting
Issued 29 January 1993
Resolved
RENEW HOSE PORT AND DOOR SILL ON FIRE SCREEN DOOR #1-E. RELABEL DOOR AS FSD#1-E. DEMONSTRATE PROPER OPERATION IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Fire Fighting
Issued 29 January 1993
Resolved
RENEW HOSE PORTS ON FIRE SCREEN DOORS 19-C, 22-C AND 5-D. DEMONSTRATE_x001C_ PROPER OPERATION IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Lifesaving
Issued 29 January 1993
Resolved
ON LIFEBOAT #7: (1) RENEW BRACKET BOLT ON OUTBOARD, LOWER, MIDSHIP SEAT (2)RENEW SEAT PLANK ON OUTBOARD, MIDDLE, MIDSHIP SEAT, (3) REPLACE TWO MISSINGINBOARD LIFTING GUNALE SEATS.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Construction/Loadline
Issued 29 January 1993
Resolved
PROVIDE LABELS FOR BOTH REMOTE WTD HAND CRANKS LOCATED IN THE MAIN GALLEY NEAR ELEVATOR #5.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Construction/Loadline
Issued 29 January 1993
Resolved
FREE UP HANDLES FOR REMOTE WTD HAND CRANKS ON WTD 10-C AND WTD 9-C. DEMONSTRATE PROPER OPERATION IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Construction/Loadline
Issued 29 January 1993
Resolved
PROVIDE HANDLE AND LABEL FOR REMOTE WTD HAND CRANK LOCATED IN GALLEY NEAR FIRE STATION #67. DEMONSTRATE PROPER OPERATION IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 February 1993
Resolved 22 February 1993
Fire Fighting
Issued 27 October 1992
Resolved
INSTALL HEAT DETECTOR IN CHEF'S OFFICE IN THE MAIN GALLEY._x001C_
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Accommodation/Occupational Safety
Issued 27 October 1992
Resolved
REINSTALL REFRIGERATION PRESSURE RELIEF VALVE PIPING IN THE AUXILIARY MACHINERY COMPARTMENT IN ACCORDANCE WITH 46CFR58.20-20(C).
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Accommodation/Occupational Safety
Issued 27 October 1992
Resolved
REPAIR OR REPLACE ALL FROZEN DOGS FOR PORT LIGHTS IN CREWS GALLEY.
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Lifesaving
Issued 27 October 1992
Resolved
REPLACE TWO CORRODED BOLTS IN AFT ROTTMER GEAR FOUNDATIONS ON #1 LIFEBOAT.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Construction/Loadline
Issued 27 October 1992
Resolved
REPAIR WATER THIGHT DOOR #1B SO THAT IT CLOSES AT A RATE OF 1 TO 2 INCHES PER SECOND.
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Construction/Loadline
Issued 27 October 1992
Resolved
INSTALL DOGGING WRENCHES ON BOTHS SIDES OF ALL DOGGED WATER TIGHT DOORS.
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Electrical
Issued 27 October 1992
Resolved
INSTALL GUARDS OVER DRIVE BELTS ON MOTORS IN FAN ROOM 7A AND STBD "B" DECK WINDLESS ROOM.
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Fire Fighting
Issued 27 October 1992
Resolved
INSTALL HEAT DETECTOR OR REMOVE ALL FLAMMABLE MATERIAL FROM CLOSET STARBOARD SIDE AFT BY DINNING ROOM.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Fire Fighting
Issued 27 October 1992
Resolved
INSTALL HEAT DETECTOR OR REMOVE FLAMMABLE MATERIALS FROM ARTS AND CRAFTS LOCKER IN "A" DECK YOUTH CENTER.
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Fire Fighting
Issued 27 October 1992
Resolved
INSTALL HEAT DETECTOR OR REMOVE ALL FLAMMABLE MATERIALS FROM "B" DECK VIDEOLIBRARY.
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Lifesaving
Issued 27 October 1992
Resolved
REPAIR AND PROVE PROPER OPERATION OF FLEMMING GEAR ON #5,7 AND 9 LIFEBOATS.
Condition: Unknown
Due 27 October 1992
Resolved 27 October 1992
Lifesaving
Issued 27 October 1992
Resolved
REPAIR WASTED BREAST PLATES ON #3 LIFEBOAT.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Construction/Loadline
Issued 3 October 1992
Resolved
MAKE PERMANENT REPAIRS TO STBD SIDE SHELL AT STRAKE L AND M, FRAME 112, USING GUIDANCE IN ABS RULES FOR CLASSING STEEL VESSELS AND CG MARINE SAFETYMANUAL VOL IV SEC. 6.H.3. REPAIRS ARE TO BE MADE TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 3 October 1992
Resolved 3 October 1992
Construction/Loadline
Issued 3 October 1992
Resolved
IN WAY OF DAMAGE AT SEAM OF L AND M STRAKE, FRAME 112, STBD SIDE, MAKE TEMPREPAIRS TO SEAL LOOSE RIVETS (SIX LEAKING RIVETS) AND REPLACE BUCKLED FRAME (#112) AND BENT BRACKETS TOP AND BOTTOM WITH FITTED FRAME OF EQUAL SIZE. CONDUCT HOSE TEST ON RIVETS IN PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 3 October 1992
Resolved 3 October 1992
Lifesaving
Issued 9 August 1992
Resolved
RELOCATE LIFERING WATERLIGHT BT DECK PORT SIDE AFT TO ALLOW EASY REMOVAL OFLIFERING.
Condition: Unknown
Due 9 August 1992
Resolved 9 August 1992
Construction/Loadline
Issued 9 August 1992
Resolved
PROVE PROPER OPERATION OF BILGE MAIN CROSS CONNECTION AIR OPERATED VALVE.
Condition: Unknown
Due 9 August 1992
Resolved 9 August 1992
Lifesaving
Issued 9 August 1992
Resolved
PROPERLY LABEL FIRE ALARM MANUAL PULLS IN ZONES 28 AND 49.
Condition: Unknown
Due 9 August 1992
Resolved 9 August 1992
Lifesaving
Issued 9 August 1992
Resolved
CONDUCT WEIGHT TEST OF NO.6 LIFEBOAT UPON COMPLETION OF REPAIRS.
Condition: Unknown
Due 9 August 1992
Resolved 9 August 1992
Fire Fighting
Issued 9 August 1992
Resolved
REPAIR OR REPLACE 4" VALVE AT FIRE STATION 42 UPPER DECK._x001C_ _x001C_
Condition: Unknown
Due 9 August 1992
Resolved 9 August 1992
Lifesaving
Issued 25 July 1992
Resolved
ON LIFEBOAT #6 REPAIR HOLES AT AFTERMOST STBD PLATE, REPAIR RIVET AFT STBD THWART, AND CLEAN AND RE-CAULK SEAM PORT SIDE STRAKE #2 AFT.
Condition: Unknown
Due 25 July 1992
Resolved 25 July 1992
Lifesaving
Issued 25 July 1992
Resolved
ON LIFEBOAT #1 REPAIR HOLE AT FRAME #3 NEAR KEEL AND REPLACE MISSING RIVETSON STBD SIDE.
Condition: Unknown
Due 25 July 1992
Resolved 25 July 1992
Lifesaving
Issued 25 July 1992
Resolved
ON LIFEBOAT #10, REPAIR HOLE PORT SIDE OF KEEL TWO-THIRDS AFT, REPAIR FRACTURE UNDER STERN TUBE, AND RENEW ZIRC FITTING AT STERN TUBE.
Condition: Unknown
Due 25 July 1992
Resolved 25 July 1992
Lifesaving
Issued 25 July 1992
Resolved
ON LIFEBOAT #2, REPAIR HOLE AT #2 STRAKE & HOLE BY THE DRAIN AND CLEAN AND RE-CAULK THE DRAIN FITTING.
Condition: Unknown
Due 25 July 1992
Resolved 25 July 1992
Engineering
Issued 15 June 1992
Resolved
PROVE PROPER OPERATION OF #2 COFFIN FEED PUMP, FORWARD ENGINE ROOM.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Unknown
Issued 15 June 1992
Resolved
AFT PEAK: 1) REPAIR HOLE IN TANK TOP UNDER STEERING MOTOR (STBD),_x001C_ 2) REPAIR LEAK BETWEEN DOUBLER PLATE AT ROSE BOX EDGE STBD, 3) REWELD LEAKING DOUBLER WELD STBD, 4) REPAIR LEAKING DRAIN PORT SIDE IN AFT PEAK, 5) TANK TOP HOLE AND DOUBLED PLATE AT ROSE BOX TO BE RED HANDED CONT'
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Construction/Loadline
Issued 15 June 1992
Resolved
Make permanent repairs to shaft alley tank top in way of temporary "cement doubler" by the vessel's next DDX (approximately 15DEC93). The proposed repair shall be included in the repairs required to be submitted to G-MVI-1by 27AUG92. See COMDT letter 28MAY92 & MSO SF letters 01JUN92 & 22JUL92.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Engineering
Issued 15 June 1992
Resolved
REPLACE MISSING BRACKET FOR #2 BOILER FRONT WATER VALVE.
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Engineering
Issued 15 June 1992
Resolved
PRIOR TO OPERATING #3 BOILER, PROVE PROPER OPERATION OF #3 BOILER SAFETY VALVES TO INCLUDE: SUPER HEATER, DRUM PILOT, AND DRUM (2) SAFETIES. SET ASNECESSARY. COAST GUARD INSPECTOR TO SEAL WHEN COMPLETE.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Navigation
Issued 15 June 1992
Resolved
MAKE OPERATABLE STBD MOTOR STEERING GEAR ALARM TO ENGINE ROOM.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Documentation
Issued 15 June 1992
Resolved
SUBMIT TO [name withheld] WELDING PROCEDURE SPECS, PROCEDURE QUAL RECORDS, AND WELDER QUAL RECORD AND MATERIAL CERTIFICATIONS PERTAINING TO FABRICATION OF #2 FIREPUMP (FWD ENGINE ROOM) DISCHARGE ELBOW.
Condition: Unknown
Due 20 July 1992
Resolved 20 July 1992
Construction/Loadline
Issued 15 June 1992
Resolved
CROP AND RENEW THE OVERHEAD IN THE SWITCH GEAR ROOM FOR THE MACHINERY SPACE ELEVATOR, TO SOUND METAL. _x001C_
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Unknown
Issued 15 June 1992
Resolved
REPLACE AFT INBOARD MAIN CONDENSOR PUMP NON-METALLIC EXPANSION JOINT.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
CLAD WELD PITS WASTED BEYOND 25% OF ORIGINAL THICKNESS, INWAY OF #5 INBOARDDOUBLE BOTTOMS, UNDER POTABLE WATER TANKS.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Unknown
Issued 15 June 1992
Resolved
COMPLETE S/S INDEPENDENCE U/W RIDING CREW WORKLIST DTD 15JUN92. COMPLETE ITEM PRIOR TO ARRIVAL IN HONOLULU.
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Deck/Cargo
Issued 15 June 1992
Resolved
REPLACE MISSING GUARDS FOR SHAFTS OF #1 AND #2 FORCED DRAFT BLOWERS.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Deck/Cargo
Issued 15 June 1992
Resolved
INSERT DOUBLERS INWAY OF #9 PORT INBOARD, #9 STBD INBOARD AND #10 STBD DOUBLE BOTTOM AS PART OF SHAFT ALLEY DOUBLE BOTTOM TOP REPAIR.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
Further inspections must be conducted on & permanent repairs made to the #1Engine Room Main Circ. Ovbd. Discharge; #2 Engine Room Main Circ. Ovbd. Discharge; and #2 Engine Room Circ. Suction. See MSO SF letters 03JUN92 & 22JUL92._x001C_
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Lifesaving
Issued 15 June 1992
Resolved
LIFEBOAT STARTER SPRINGS: ADJUST LIFEBOAT DAVIT ARMS SO THAT IN THE STOWED POSITION THE STARTER SPRINGS ARE COMPRESSED A MINIMUM OF ONE INCH.
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Accommodation/Occupational Safety
Issued 15 June 1992
Resolved
RENEW AS ORIGINAL THE FORWARD VENTILATION DUCTING ON THE FOREDECK.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Documentation
Issued 15 June 1992
Resolved
SUPPLY APPROVED PLANS AND MAKE MODIFICATIONS AS OUTLINED IN MSC-2 LTR DTD 26MAY92, SERIAL E-20424, INWAY OF THE AFT MAIN SWITCHBOARD. IF POWER IS TO BE INTERRUPTED WHILE PASSENGERS ARE ONBOARD, A WRITTEN PROPOSAL SHALL BE SUBMITTED TO THE COGNIZANT [name withheld] OF MODIFICATION.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
GAUGE AND CONDUCT REPAIRS TO TWO AFTERMOST FRAMES INWAY OF BOTH PORT AND STBD STERN TUBE AREAS.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Accommodation/Occupational Safety
Issued 15 June 1992
Resolved
REPLACE MARINE SANITATION TANK VENT PCV PIPING WITH METAL PIPE IN ACCORDANCE WITH 46 CFR 56.60-25(a).
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
GAUGE BULKHEADS TO PERMANENTLY FIXED "IRON" BALLAST TANKS. THIS ITEM TO BE COMPLETED WHEN WATER REMOVED FROM ADJACENT TANKS, PRIOR TO COMPLETION OF NEXT DRYDOCK.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Lifesaving
Issued 15 June 1992
Resolved
DAVITS MUST BE SAND BLASTED (OR NEEDLE GUN) FOR CG INSPECTION AT NEXT DRYDOCK AS PER MSO SAN FRANCISCO LETTER DTD 12JUN92.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Engineering
Issued 15 June 1992
Resolved
REPAIR CRACKED PUMP MOTOR HOUSING ON 2 MOTORS INWAY OF AFT ENGINE ROOM, STBD.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Deck/Cargo
Issued 15 June 1992
Resolved
CONDUCT CG WITNESSED HYDRO TEST OF FOLLOWING DEEP TANKS: 1) ALL 4 #6 DOUBLE BOTTOM 2) ALL 4 #7 D/B, 3) ALL 4 #8 D/B, 4) #9 STBD OUTBOARD D/B, 5) #9 PORT OUTBOARD D/B, 6) #10 STBD D/B, 7) #11 STBD D/B. COMPLETE BEFORE SUBMITTING TANK TOP REPAIR PROPOSAL BUT NO LATER THAN COMPLIANCE DATE._x001C_
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
EXAMINE CONDITION OF GRAY WATER COLLECTION AND EJECTOR TANKS AND PIPING. ENSURE PIPING AND DRAIN LINES ARE IN ACCORDANCE WITH REGS AND GOOD MARINE PRACTICE.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Unknown
Issued 15 June 1992
Resolved
FORWARD STACK: 1) MAKE PERMANENT REPAIRS TO WASTED STACK DECK AND_x001C_ SIDEPLATE. 2) MAKE PERMANENT REPAIRS TO WASTED FLOOR AT TOP OF STACK._x001C_ 3) MAKE REPAIR TO 4'-6' OF TOP STACK VENT WASTED METAL.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
REPLACE LOOSE SEATS INWAY OF BOTH 36" SEA VALVES, TO STBD MAIN CONDENSOR OVERBOARD AND STBD MAIN CONDENSOR SCOOP. ITEM TO BE COMPLETED AT NEXT DRYDOCK.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Unknown
Issued 15 June 1992
Resolved
REPLACE AS ORIGINAL "WASTER" FLANGE INWAY OF PORT #1 MAIN CIRC. OVERBOARD_x001C_ SEA CHEST.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
MAKE PERMANENT REPAIR TO SOFT PATCH ON 8" BALLAST LINE INWAY OF SHAFT_x001C_ ALLEY, 2ND BAY FROM FWD END OF COFFERDAM UNDER POTABLE WATER TANK. COMPLETE ITEM AT NEXT DRYDOCK WHEN SHAFT ALLEY CONCRETE IS REMOVED.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Engineering
Issued 15 June 1992
Resolved
#2 STBD FUEL TANK (FR 88-98): 1) INSERT AS ORIGINAL DOUBLER INWAY OF FWD COFFERDAM BULKHEAD. 2) MAKE PERMANENT REPAIR TO LEAKING CAULKING/RIVETS INWAY OF FWD COFFERDAM BULKHEAD, SHELL FRAME INTERFACE. 3) REPLACE MISSING MANHOLE STUDS ON FUEL TANK MANHOLE AND COFFERDAM MANHOLE DIRECTLY ABOVE.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Engineering
Issued 15 June 1992
Resolved
ADD ADDITIONALLY FOUND SEA VALVES AND CLAPPER VALVES TO VESSEL'S SEA VALVE LIST. COMPLETE ITEM AT NEXT DRYDOCK.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Unknown
Issued 15 June 1992
Resolved
AFT STACK: 1) MAKE PERMANENT REPAIR TO WASTED AREA OF STBD SIDE METAL ABOVEDECK LEVEL. 2) MAKE PERMANENT REPAIR TO WASTED UPPER FLOOR INWAY OF AFT UPTAKE VENT.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Engineering
Issued 15 June 1992
Resolved
#2 STBD FUEL OIL TANK IS NOT TO BE FILLED WITH FUEL AND MUST BE MAINTAINED IN GAS FREE CONDITION UNTIL REPAIRS ARE COMPLETED.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Lifesaving
Issued 15 June 1992
Resolved
REPLACE PLAIN GLASS IN FIRE DOORS WITH WIRE INSERTED GLASS AS PER NAVIGATION AND VESSEL INSPECTION CIRCULAR 6-80.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
REPAIR DETERIORATED FRAMING UNDER STBD POTABLE WATER TANK, INWAY OF_x001C_ COFFERDAM, FRAME 87 TO 98.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Lifesaving
Issued 15 June 1992
Resolved
REPAIR STBD BUTT SEAMS AND LOOSEN 4TH STB FRAME AFT ON LIFEBOAT #7. ALSO _x001C_ REPAIR CONDEMNED SPARE L/B. THESE BOATS ARE NOT TO BE USED UNTIL APPROVED_x001C_ REPAIRS COMPLETED AND WITNESSED BY USCG. VSL'S L/B COUNT MUST BE CHECKED_x001C_ BY LOCAL [name withheld] PASSENGERS TO DETERMINE ALLOWANCE ONBOARD.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Fire Fighting
Issued 15 June 1992
Resolved
GIFT SHOP SPRINKLER SYSTEM MUST BE OPERATIONAL PRIOR TO CARRYING PASSENGERSAND TESTED BY COAST GUARD AS PER [name withheld] OF 03JUN92.
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Construction/Loadline
Issued 15 June 1992
Resolved
REMOVE FOR INSPECTION AND INSERT FLUSH DOCKING PLUGS INWAY OF #2 STBD DEEP TANK AND #11 STBD DEEP TANK.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
Repair remaining 49 lightening holes in No. 7 P/S Outboard Double Bottom Tanks. See MSO SF letters of 28MAY92 & 22JUL92.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
Gaugings submitted to G-MVI-1 as part of COMDT required repair proposal must be taken on one foot centers from the "topside" of the tank top deck. This is for the tank tops of the Forward Engine Room, Auxiliary Machinery Room and Shaft Alley. See MSO SF letters of 28MAY92 & 22JUL92.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Navigation
Issued 15 June 1992
Resolved
LABEL STEERING GEAR VALVES AS PER EMERGENCY PROCEDURE CHART.
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
Repair all lightening holes in No. 6 P/S Inboard Double Bottom Tanks. See MSO SF letters 28MAY92 & 22JUL92._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Construction/Loadline
Issued 15 June 1992
Resolved
Submit revised proposal for permanent repairs that addresses renewal of thevessel's double bottom tank tops to COMDT (G-MVI-1). Proposal must includeadditional gaugings sufficient to fully assess the degree & extent of wastage. See COMDT letter 28MAY92 & MSO SF letter 22JUL92._x001C_
Condition: Unknown
Due 15 June 1992
Resolved 15 June 1992
Unknown
Issued 15 June 1992
Resolved
AFT PEAK (CONTINUED): PRIOR TO DEPARTURE FROM SAN FRANCISCO BAY. WELD REPAIRS TO BE COMPLETED PRIOR TO CARRYING PASSENGERS. ENGINEERS ARE TO MAKEAN HOURLY ROUND OF STEERING ROOM UNTIL WELD REPAIRS ARE MADE. TANK NEEDS CGWITNESSED HYDRO AFTER REPAIRS.
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Electrical
Issued 26 April 1992
Resolved
MAKE PERMANENT REPAIRS TO SOFT PATCHED SECTION OF THE DISCHARGE LINE, No.3 CIRCULATION PUMP TO SSTG LUBE OIL COOLER.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Lifesaving
Issued 26 April 1992
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE KIDDE SMOKE DETECTOR SYSTEM FOR THE CARGO HOLDS. UNTIL REPAIRS ARE MADE, EACH CARGO HOLD MUST BE EXAMINED AT LEAST ONCE EVERY HOUR.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Construction/Loadline
Issued 26 April 1992
Resolved
REPLACE ALL NON-METALLIC EXPANSION JOINTS LOCATED IN WAY OF SEA CONNECTIONSTHAT CANNOT BE IDENTIFIED AS TO THE DATE OF MANUFACTURE EITHER BY STAMPINGSOR MFG AFFIDAVIT. JOINTS ARE REQUIRED TO BE REPLACED EVERY 10th YEAR FROM DATE OF MFG. REF 46CFR56.60-25 AND 61.15-12.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Lifesaving
Issued 26 April 1992
Resolved
REMOVE No.8 LIFEBOAT FROM VESSEL AND MAKE SATISFACTORY REPAIRS. PASSENGERSAND CREW WILL CONTINUE TO MUSTER AT L/B STATION No.8, BUT WILL BE DIRECTED TO ALTERNATE L/B'S BY MASTER OR NEXT IN COMMAND. TOTAL PERSONS ON BOARD SHALL BE REDUCED TO 1106.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Engineering
Issued 26 April 1992
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE AIR OPERATED F/O VALVE FOR No.1 PORT FUEL OIL SETTLING TANK, LOW SUCTION.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Electrical
Issued 26 April 1992
Resolved
MAKE PEMANENT REPAIRS AND SUPPLY WELDING DATA IN WAY OF REPAIRS TO RED HANDREPAIRS IN WAY OF THE SHELL OF No.1 AUX CONDENSER.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Electrical
Issued 26 April 1992
Resolved
DETERMINE THE CAUSE OF OVER HEATING OF THE No.2 SSTG EXCITER AND MAKE PERMANENT REPAIRS TO CORRECT. CONDUCT A TWO HOUR FULL LOAD TEST TO THE_x001C_ SATISFACTION OF THE ATTENDING MARINE INSPECTOR. _x001C_ _x001C_
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Lifesaving
Issued 26 April 1992
Resolved
ENSURE 14 CURRENTLY SERVICED LIFERAFTS ARE ON BOARD, PRESENTLY ONLY 12 _x001C_ LIFERAFTS ARE ON BOARD. TOTAL PERSONS ON BOARD SHALL BE REDUCED TO COMPLY WITH THE 25% RULE TO ACCOMODATE ALL PERSONS ON BOARD. REF 46CFR75.10- 10(B)(4)
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Lifesaving
Issued 26 April 1992
Resolved
REPAIR AND PROVE OPERATION OF THE DIESEL MOTOR IN WAY OF No.11 MTR LIFEBOAT.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Construction/Loadline
Issued 26 April 1992
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE FOLLOWING AIR OPERATED BILGE SUCTION VALVES: No.1 HOLD PORT BILGE, No.3 HOLD STBD BILGE, STBD BILGE SUCTION IN AUX MACHINERY SPACE, SHAFT ALLEY, No.6 HOLD PORT AND STBD,AND No.7 HOLD BILGE.
Condition: Unknown
Due 26 April 1992
Resolved 26 April 1992
Construction/Loadline
Issued 21 March 1992
Resolved
MAKE PERMANENT REPAIRS IN WAY OF REPLACING ALL BROKEN/WASTED MAN HOLE STUDSIN THE FWD MAN HOLE RING, RENEW WASTED SECTION OF LOWER SOUNDING TUBE, AND CROP AND INSERT BUCKLED FRAME LOCATED FR 129, OUTBOARD OF "C" STRAKE, NO.7 STBD OUTBOARD, DB TANK.
Condition: Unknown
Due 31 May 1992
Resolved 3 April 1992
Construction/Loadline
Issued 21 March 1992
Resolved
MAKE PERMANENT REPAIRS TO TANK TOP THAT HAS DOUBLER PLATE INSTALLED IN WAY OF NO.8 STBD OUTBOARD, BY MAN HOLE, FRAME NO. 145.
Condition: Unknown
Due 30 June 1992
Resolved 30 June 1992
Construction/Loadline
Issued 21 March 1992
Resolved
MAKE PERMANENT REPAIRS TO NO.11 DOUBLE BOTTOM TANK, PORT SIDE IN WAY OF WASTED LADDER RUNGS LOCATED FWD AND AFT, AND SOUNDING TUBE.
Condition: Unknown
Due 31 May 1992
Resolved 21 April 1992
Construction/Loadline
Issued 21 March 1992
Resolved
IN WAY OF #5 PORT & STBD INBOARD DOUBLE BOTTOMS & FWD COFFERDAM, MAKE PERMANENT REPAIRS TO: ALL WASTED MANHOLE RING STUDS, ALL WASTED PORTIONS OF LADDERS, ALL WASTED PORTIONS OF FRAMES BETWEEN WATER AND FUEL TANKS, STBD DB SOUNDING TUBE, AND DOUBLER OVER HOLE IN PORT DB.
Condition: Unknown
Due 30 June 1992
Resolved 30 June 1992
Engineering
Issued 21 March 1992
Resolved
REPLACE THE NON-METALLIC EXPANSION JOINT LOCATED FWD ENGINE ROOM MAIN CONDENSER IN WAY OF THE SEA SCOOP. EXPANSION JOINT REQUIRED TO BE REPLACEDEVERY EVERY 10TH YEAR FROM DATE OF MANUFACTURE. REF: 46CFR56.60-25 AND 61.15-12.
Condition: Unknown
Due 1 May 1992
Resolved 1 May 1992
Fire Fighting
Issued 21 March 1992
Resolved
REPLACE THE THREE SUCTION VALVES TO THE FIRE PUMPS LOCATED IN THE AFTER ENGINE ROOM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 May 1992
Resolved 8 May 1992
Construction/Loadline
Issued 21 March 1992
Resolved
MAKE PERMANENT REPAIRS TO LEAK IN #1 PORT F/O SETTLER BULKHEAD ON TANK SEAMAND TO LEAK IN #2 PORT F/O SETTLER IN WAY OF BULKHEAD DOUBLER.
Condition: Unknown
Due 30 June 1992
Resolved 30 June 1992
Construction/Loadline
Issued 21 March 1992
Resolved
MAKE PERMANENT REPAIRS IN WAY OF REPLACING ALL STUDS IN WAY OF NO.5 STBD INBOARD DOUBLE BOTTOM, FWD MAN HOLE.
Condition: Unknown
Due 31 May 1992
Resolved 8 May 1992
Construction/Loadline
Issued 21 March 1992
Resolved
RESUBMITT PLAN FOR USING STRAPPING AND LOCAL STIFFNERS (RESTORATION OF INNER BOTTOM PLATING DWNG NO.5026-1) TAKING INTO ACCOUNT FOUNDATIONS FOR BOILERS & MAJOR MACHINERY, MANHOLES & PIPING TO BE RELOCATED, AND SLOTTING FOR FOUNDATION GIRDER BRACKETS.
Condition: Unknown
Due 21 March 1992
Resolved 21 March 1992
Construction/Loadline
Issued 14 March 1992
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TANK TOPS OF ALL COFFERDAMS, DEEP TANKS AND DOUBLE BOTTOMS WHERE AREA HAS BEEN WASTED IN EXCESS OF 25%. ALL DOUBLERS SHALL BE REMOVED AND AREA CROPPED TO GOOD METAL AND INSERTED. UPONCOMPLETION, CONDUCT NDT OF REPAIRED AREA IN PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 14 March 1992
Resolved 14 March 1992
Construction/Loadline
Issued 14 March 1992
Resolved
MAKE AVAILABLE FOR INSPECTION THE INTERNALS OF ALL TANKS, AND COFFERDAMS NOT ALREADY INSPECTED FOR CREDIT; ENSURE ALL LIQUIDS HAVE BEEN REMOVED AND SPACES ARE CLEAN, GAS FREED, AND SAFE TO ENTER. ALL TANKS AND COFFERDAMS SHALL BE EXAMINED AND REPAIRED PRIOR TO COMPLETION OF CREDIT DRY DOCKING.
Condition: Unknown
Due 14 March 1992
Resolved 14 March 1992
Electrical
Issued 14 March 1992
Resolved
MAKE PERMANENT REPAIRS TO THE SHORTED ARMATURE IN WAY OF NO.2 TURBO GEN SETEXCITER. UPON SATISFACTORY REPAIRS OF APPARATUS, CONDUCT A TWO HOUR, FULL LOAD TEST TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. PLS SUPPLYCOPY OF TEST DATA AFTER REBUILD OF ARMATURE. REF:46 CFR SUBPART 71.55.
Condition: Unknown
Due 14 March 1992
Resolved 14 March 1992
Lifesaving
Issued 17 February 1992
Resolved
PROVIDE LIGHTS FOR 46 ADULT PERSONAL FLOTATION DEVICES AND 112 CHILDREN P.F.D.'S. UNTIL THIS ITEM IS COMPLETED VESSEL IS RESTRICTED TO 1354 TOTAL PERSONS ON BOARD AND NO MORE THAN 29 CHILD PASSENGERS.
Condition: Unknown
Due 8 March 1992
Resolved 24 February 1992
Lifesaving
Issued 17 February 1992
Resolved
NO.5 L/B HAS BEEN CONDEMNED AND WILL BE REMOVED FROM VSL UNTIL SATISFACTORYREPAIRS HAVE BEEN MADE. PASSENGERS & CREW WILL CONTINUE TO MUSTER AT L/B STATION NO.5 BUT WILL BE DIRECTED TO ALTERNATE L/B'S BY THE MASTER OR NEXT IN COMMAND. TOTAL PERSONS ON BOARD SHALL BE REDUCED T0 1106 TOTAL.
Condition: Unknown
Due 17 February 1992
Resolved 17 February 1992
Fire Fighting
Issued 17 February 1992
Resolved
PROVE OPERATION OF THE REMOTE CABLE PULL LOCATED OUTSIDE OF THE AFT FIRE ROOM FOR DISCHARGE OF CO2 PILOT BOTTLE NO.13.
Condition: Unknown
Due 24 February 1992
Resolved 24 February 1992
Fire Fighting
Issued 17 February 1992
Resolved
PROVE OPERATION OF THE REMOTE VENTILATION SHUT DOWN IN THE FWD FIRE ROOM IN CONJUNCTION WITH CO2 RELEASE.
Condition: Unknown
Due 24 February 1992
Resolved 24 February 1992
Lifesaving
Issued 1 February 1992
Resolved
LIFEBOAT NO.7, REPLACE WASTED BOLTS IN THE AFT ROTTMER RELEASING LIFTING GEAR BRACE. OVERHAUL ENTIRE RELEASE AND GREASE THOROUGHLY._x001C_
Condition: Unknown
Due 1 March 1992
Resolved 6 March 1992
Construction/Loadline
Issued 1 February 1992
Resolved
REMOVE WATER FROM NO.3 HOLD AND DETERMINE SOURCE OF WATER LEAKAGE.
Condition: Unknown
Due 15 February 1992
Resolved 24 February 1992
Lifesaving
Issued 1 February 1992
Resolved
REPLACE OR REPAIR GENERAL ALARM BELL AS FOLLOWS: MAIN DECK BY C-10, AND B- DECK BY ELEVATOR NO.6.
Condition: Unknown
Due 15 February 1992
Resolved 24 February 1992
Fire Fighting
Issued 1 February 1992
Resolved
SERVICE CO2 VALVES NO.23 AND 26 IN FIXED CO2 SYSTEM AND PROVE PROPER OPERATION OF SMOKE SENSORS IN CARGO HOLD NO.1.
Condition: Unknown
Due 15 February 1992
Resolved 24 February 1992
Construction/Loadline
Issued 1 February 1992
Resolved
REMOVE OIL IN WAY OF PIPE TUNNEL, NO.4 HOLD STARBOARD SIDE, DETERMINE SOURCE OF LEAK.
Condition: Unknown
Due 29 February 1992
Resolved 6 March 1992
Engineering
Issued 1 February 1992
Resolved
MAKE PERMANENT REPAIRS TO NO.1 PORT AND STBD SETTLER TANKS WHERE LEAKING.
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Construction/Loadline
Issued 1 February 1992
Resolved
REPLACE DECK IN WAY OF T'WEEN DECK NO.4 HOLD, AFT OF M.S.D. REPLACE TO GOODMETAL.
Condition: Unknown
Due 31 March 1992
Resolved 6 March 1992
Accommodation/Occupational Safety
Issued 1 February 1992
Resolved
IN WAY OF REFER FLAT, REPAIR AND PROVE OPERATION OF ALL LATCHES TO WALK IN REFER DOORS ON C AND D DECKS, REMOVE ALL LOCKABLE BARS, LATCHES, ETC, SO ALL DOORS MAY BE OPENED FROM THE INSIDE UNDER ANY CONDITIONS.
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Lifesaving
Issued 1 February 1992
Resolved
LIFE BOAT NO.9 REPLACE WASTED BOLTS IN THE AFT ROTTMER RELEASING LIFTING GEAR BRACE. OVERHAUL ENTIRE RELEASE AND GREASE THOROUGHLY.
Condition: Unknown
Due 31 May 1992
Resolved 6 March 1992
Construction/Loadline
Issued 1 February 1992
Resolved
MAKE TEMPORARY REPAIRS TO HOLED TANK TOP (5 HOLES) IN WAY OF AUX MACHINE SHOP, INSTALL DOUBLERS TO GOOD METAL, PRESS TANK TO DETERMINE IF OTHERS EXIST, MAKE TEMPORARY REPAIRS.
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Lifesaving
Issued 1 February 1992
Resolved
LIFEBOAT NO.5 REPAIRS AS FOLLOWS:VEE AND WELD FRACTURE IN STERN TUBE, OVERHAUL FLEMMING GEAR AND PROVE PROPER OPERATION, MAKE PERMANENT REPAIRS TO VARIOUS PITTED HOLES AND DETERMINE CAUSE OF PITS, REPLACE ALL WSTD /MISSING RIVETS, FAIR AND REPAIR OPEN RIVETED BUTT ON PORT SIDE MIDSHIP.
Condition: Unknown
Due 15 February 1992
Resolved 24 February 1992
Construction/Loadline
Issued 1 February 1992
Resolved
MAKE REPAIRS TO PORT SOUNDING TUBE NO.12 DOUBLE BOTTOM TANK.
Condition: Unknown
Due 22 February 1992
Resolved 6 March 1992
Accommodation/Occupational Safety
Issued 1 February 1992
Resolved
REPLACE CAGES IN VEGETABLE REFER, MILK AND BUTTER REFER DUE TO DETERIORATEDWASTED CONDITION.
Condition: Unknown
Due 22 February 1992
Resolved 6 March 1992
Electrical
Issued 1 February 1992
Resolved
REPAIR OR REPLACE SPEAKERS AS FOLLOWS:MAIN DECK BY C-10, C-DECK IN CREWS LAUNDRY FWD, B-DECK IN DECK MESS, ENGINE MESS, D-DECK BY STOREKEEPERS AREA.
Condition: Unknown
Due 15 February 1992
Resolved 24 February 1992
Construction/Loadline
Issued 1 February 1992
Resolved
REMOVE DECK PLATING FOR EXAMINATION OF NO.13 DOUBLE BOTTOM TANK TOP.
Condition: Unknown
Due 1 March 1992
Resolved 6 March 1992
Accommodation/Occupational Safety
Issued 1 February 1992
Resolved
CLEAN AND SANITIZE ALL REFER CONTROL STATIONS IN WAY OF FOOD STORAGE IN REFER BOXES. CLEAN ALL SLIME, MOLD, MILDEW FROM PIPES AND BULKHEADS.
Condition: Unknown
Due 15 March 1992
Resolved 6 March 1992
Construction/Loadline
Issued 1 February 1992
Resolved
CONDUCT GAUGING ON THE FOLLOWING DOUBLE BOTTOM TANK TOPS:AFT ENG ROOM, FWD ENG ROOM, SHAFT ALLEY, AUX MACHINERY SPACE.(NEW GAUGING REQUIRED DUE TO DETERIORATION FOUND THIS DATE)MAKE NECESSARY PERMANENT REPAIRS PRIOR TO COMPLETION OF NEXT DDX.SUPPLY GAUGING REPORT TO [name withheld]._x001C_
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Construction/Loadline
Issued 1 February 1992
Resolved
CONDUCT GAUGING ON NO.2 DOUBLE BOTTOM TANK TOP, REMOVE FLASHING IN WAY OF THE PORT AND STBD SIDE SHELL FOR INSPECTION OF FRAMING.
Condition: Unknown
Due 31 March 1992
Resolved 6 March 1992
Fire Fighting
Issued 1 February 1992
Resolved
REPLACE THE THREE SUCTION VALVES TO FIRE PUMPS LOCATED IN THE AFTER ENGINE ROOM.
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Construction/Loadline
Issued 1 February 1992
Resolved
CROP AND RENEW WASTED DECK IN WAY OF NO.2 HOLD T'WEEN DECK.
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Accommodation/Occupational Safety
Issued 1 February 1992
Resolved
RENEW SECTION OF BILGE SUCTION PIPE WHERE DETERIORATED IN AFTER ENGINE ROOM, IN WAY OF FRAME 145.
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Construction/Loadline
Issued 1 February 1992
Resolved
REPLACE BROKEN/WASTED HATCH BOARDS IN WAY OF NO.2 HOLD, LOWER T'WEEN DECKS.
Condition: Unknown
Due 1 February 1992
Resolved 1 February 1992
Lifesaving
Issued 1 February 1992
Resolved
LIFEBOAT NO.7 REPLACE WASTED BOLTS IN THE AFT ROTTMER RELEASING LIFTING GEAR BRACE AND PROVE OPERATION OF FLEMMING GEAR. OVERHAUL RELEASE AND GREASE.
Condition: Unknown
Due 1 March 1992
Resolved 24 February 1992
Construction/Loadline
Issued 18 January 1992
Resolved
MAKE PERMANENT REPAIRS IN NO.2 P&S D.B. TANK AS FOLLOWS: RENEW LADDER RUNGSP&S TANKS FWD, RENEW SOUNDING TUBE PORT TANK FWD, RENEW SOUNDING TUBE PORT TANK AFT. MAKE CENTER LINE COFFERDAM (FATHOMETER SPACE) OPEN FOR_x001C_ INSPECTION. REPAIRS SHALL BE COMPLETED PRIOR TO COMPLETION OF NEXT DDX.
Condition: Unknown
Due 31 May 1992
Resolved 6 March 1992
Construction/Loadline
Issued 18 January 1992
Resolved
REPAIR FRACTURED WELDS LOCATED NO.2 HOLD STBD SIDE, FWD STANCHION, LOCATED IN WAY TRANSVERSE UNDER DECK SUPPORT.
Condition: Unknown
Due 29 February 1992
Resolved 24 February 1992
Construction/Loadline
Issued 18 January 1992
Resolved
MAKE PERMANENT REPAIRS IN NO.6 PORT INBOARD DOUBLE BOTTOM TANK AS FOLLOWS: REMOVE 3 DOUBLERS INSTALLED IN WAY OF TANK TOP "A" STRAKE FRAME 95, CROP TOGOOD METAL AND INSERT. CONDUCT HYDRO UPON COMPLETION OF REPAIRS IN PRESENCE OF CG INSPECTOR._x001C_
Condition: Unknown
Due 18 January 1992
Resolved 18 January 1992
Construction/Loadline
Issued 18 January 1992
Resolved
MAKE PERMANENT REPAIRS IN NO.6 STBD INBOARD DOUBLE BOTTOM TANK AS FOLLOWS: REPAIR WASTED TANK TOP IN WAY OF "A" STRAKE BETWEEN FR 97 & BLKHD 98, REPAIR WASTED TANK TOP IN WAY OF FR 107 AND 108 "A" STRAKE AND WASTED TANK TOP "A" STRAKE, BETWEEN FR 106 & 107, HYDRO UPON COMPLETION WITH CG.
Condition: Unknown
Due 18 January 1992
Resolved 18 January 1992
Accommodation/Occupational Safety
Issued 18 January 1992
Resolved
MAKE PERMANENT REPAIRS TO MISC WASTED SEWAGE PIPING,(MAKED WITH PAINT) LOCATED NO.2 HOLD AND WASTED VENT PIPE IN WAY OF NO.3 M.S.D SEWAGE COLLECTION TANK.
Condition: Unknown
Due 18 January 1992
Resolved 18 January 1992
Construction/Loadline
Issued 18 January 1992
Resolved
MAKE PERMANENT REPAIRS TO THE INTERNALS OF THE FWD PEAK TANK IN WAY OF FRACTURED BREAST PLATES, BROKEN BULKHEAD STIFFINERS, WASTED VENT AND SOUNDING TUBE, AND LADDER RUNGS. REPAIRS SIGHTED ON THE 1ST,2ND,3RD,6TH, AND 8TH FLOOR. REPAIRS SHALL BE COMPLETED PRIOR TO COMPLETION OF NEXT DDX.
Condition: Unknown
Due 6 March 1992
Resolved 6 March 1992
Construction/Loadline
Issued 18 January 1992
Resolved
MAKE PERMANENT REPAIRS IN NO.6 PORT OUTBOARD DOUBLE BOTTOM TANK IN WAY OF WASTED TANK TOP "C" STRAKE BETWEEN FRAME 107-108, AND "C" STRAKE BETWEEN FRAME 108-109, CONDUCT HYDRO UPON COMPLETION OF REPAIRS IN PRESENCE OF CG INSPECTOR.
Condition: Unknown
Due 18 January 1992
Resolved 18 January 1992
Construction/Loadline
Issued 28 December 1991
Resolved
CROP AND RENEW AREAS ON AFTERSTEERING TANK TOP THAT ARE LESS THAN 25% OF REQUIRED THICKNESS. REPAIRS TO BE COMPLETED PRIOR TO COMPLETION OF NEXT DRYDOCKING.
Condition: Unknown
Due 28 December 1991
Resolved 28 December 1991
Construction/Loadline
Issued 28 December 1991
Resolved
Vessel to gauge tank top of the aft peak tank, and supply report to MSO Honolulu._x001C_
Condition: Unknown
Due 1 January 1992
Resolved 10 January 1992
Electrical
Issued 28 December 1991
Resolved
No. 2 Turbo Generator is not to be placed in service until all safety devices are witnessed in the presence of a CG Marine Inspector and all mechanical and electrical plans have been received approved and systems inspected as per approved drawings.
Condition: Unknown
Due 15 February 1992
Resolved 10 February 1992
Fire Fighting
Issued 28 December 1991
Resolved
Vessel to complete repairs to transverse bulkhead at frame 113 in way of insulating to A-60 stnd.
Condition: Unknown
Due 31 January 1992
Resolved 27 January 1992
Engineering
Issued 28 December 1991
Resolved
NO. 2 PROPULSION BOILER SHALL REMAIN SECURED UNTIL SATISFACTORY COMPLETION OF BOILER REPAIRS.
Condition: Unknown
Due 28 December 1991
Resolved 28 December 1991
Electrical
Issued 4 November 1991
Resolved
CONDUCT THERMO GRAFT OF THE FWD AND AFT SWITCHBOARDS TO INCLUDE 440 GROUP FEED PANELS AND MAKE REPAIRS AS NECCESSARY.
Condition: Unknown
Due 4 November 1991
Resolved 4 November 1991
Construction/Loadline
Issued 4 November 1991
Resolved
IDENTIFY ALL NON-METALLIC PIPES PENETRATING WATERTIGHT BULKHEADS AND OVERHEADS TO BE INSTALLED WITH STEEL SPOOLS AND VALVES AS PER 46CFR56,60-25AND STRUCTURAL FIRE PROTECTION NAVIGATION AND VESSEL INSPECTION CIRCULAR 6-80. SUBMIT REPORT TO [name withheld].
Condition: Unknown
Due 4 November 1991
Resolved 4 November 1991
Electrical
Issued 4 November 1991
Resolved
INSTALL A VISUAL MEANS OF LOW LUBE OIL ALARM IN THE EMERGENCY GENERATOR ROOM FOR GENSET OR INSTALL A LOUDER ALARM.
Condition: Unknown
Due 4 November 1991
Resolved 4 November 1991
Electrical
Issued 4 November 1991
Resolved
REPLACE BROKEN PADDLE IN THE STBD STEERING GEAR CIRCUIT BREAKER LOCATED ON THE FWD ENGINE ROOM SWITCHBOARD.
Condition: Unknown
Due 4 November 1991
Resolved 4 November 1991
Construction/Loadline
Issued 4 November 1991
Resolved
SUBMIT GUAGING REPORT OF MAIN BATTERY ROOM OVERHEAD, REMOVE "RED HAND" AREAAND INSERT TO SOUND MATERIAL.
Condition: Unknown
Due 4 November 1991
Resolved 4 November 1991
Fire Fighting
Issued 4 November 1991
Resolved
PROVE PROPER OPERATION OF HEAT DETECTION SYSTEM IN ZONE 51.
Condition: Unknown
Due 18 November 1991
Resolved 18 November 1991
Construction/Loadline
Issued 4 November 1991
Resolved
MAKE PERMANENT REPAIRS TO ALL SOFT PATCHED PIPES IN THE #7 AND #4 HOLD THATARE LOCATED BEFORE THE FIRST BULKHEAD VALVE.
Condition: Unknown
Due 4 November 1991
Resolved 4 November 1991
Deck/Cargo
Issued 4 November 1991
Resolved
REMOVE ALL BUNKERS FROM THE CENTERLINE COFFERDAM AND WIRE CLEAN. LOCATED BETWEEN FRAME 87 AND 98. DETERMINE SOURCE OF LEAK, OPEN #5 INBOARD PORT ANDSTBD DOUBLE BTM TANKS TO ENSURE NON-CONTAMINATION. REF: HANDBOOK ON SANITATION OF VSL CONSTRUCTION STANDARDS OF SANITATION AND RATPROOFING.
Condition: Unknown
Due 4 November 1991
Resolved 4 November 1991
Construction/Loadline
Issued 19 July 1991
Resolved
INSTALL PROPER INSERT IN WAY OF FRACTURED #6 PORT OUTBOARD DOUBLE BOTTOM TANK LOCATED UNDER THE EVAPORATOR.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Lifesaving
Issued 19 July 1991
Resolved
PROPERLY LABEL PASSENGER SPACE LIFEBOAT EMBARKATION ROUTES AND ALTERNATE EMERGENCY ESCAPE ROUTES.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Fire Fighting
Issued 19 July 1991
Resolved
PROVE PROPER OPERATION OF INDICATOR FOR FIRE ZONE #37 ON HEAT DETECTION CONSOLE.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Engineering
Issued 6 July 1991
Resolved
PROVIDE APPROVED WELD PROCEDURES, WELDERS QUALIFICATIONS AND MATERIAL CERTSFOR REPAIRS CONDUCTED ON #4 BOILER SUPERHEATER DRAIN LINE._x001C_ NOTE: BOILER IS NOT TO BE RETURNED TO SERVICE UNTIL THIS ITEM IS SATISFIED AND NON DESTRUCTIVE TESTING IS WITNESSED BY A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 6 July 1991
Resolved 6 July 1991
Electrical
Issued 6 July 1991
Resolved
REPAIR OR RENEW NO. 2 GENERATOR SET AND PROVE OPERATION OF ALL SAFETY DEVICES IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 6 July 1991
Resolved 6 July 1991
Engineering
Issued 10 June 1991
Resolved
RENEW HOLED STEAM TUBES IN FORWARD ENGINE ROOM UPPER FUEL OIL HEATER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 July 1991
Resolved 29 October 1991
Navigation
Issued 10 June 1991
Resolved
RENEW UPPER RUDDER STOCK LINER AND MAKE STEADIMENT AND CARRIER BEARING _x001C_ AVAILABLE FOR INSPECTION AT NEXT DRYDOCKING.
Condition: Unknown
Due 10 June 1991
Resolved 10 June 1991
Engineering
Issued 10 June 1991
Resolved
REBUILD #1 BOILER SUPERHEATER HEADERS IN WAY OF HAND HOLES._x001C_ NOTE: THICKNESS AT SEATING SURFACES IS NOT TO BE LESS THAN THAT SPECIFIED BY MANUFACTURER. C.G. APPROVED WELDING PROCEDURES AND WELDER QUALIFICATIONS ARE TO BE USED IN REPAIRS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Unknown
Issued 27 April 1991
Resolved
MAKE PERMANENT REPAIRS TO LEAK IN #2 PORT AND STARBOARD SETLERS IN WAY OF BULKHEAD DOUBLERS, PRIOR TO COMPLETION OF NEXT DRYDOCKING.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
USING APPROVED PROCEDURES, AFFECT PERMANENT REPAIRS TO FRACTURE IN #3 BOILER AND RENEW WASTED TUBES IN GENERATING SECTION. UNIT TO BE RADIOGRAPHED AND HYDRO TESTED AT 1.5 MAWP FOLLOWING WELDED REPAIRS.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
REPAIR AND DEMONSTRATE OPERATION OF WATERTIGHT DOOR #C-9.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Construction/Loadline
Issued 27 April 1991
Resolved
RENEW DECK PLATING IN #7 HOLD WHERE BELOW MINIMUM SCANTLINGS._x001C_ REFERENCE: BRW GAUGING REPORT DATED 02FEB91._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
MAKE REPAIRS TO LEAKING PACKING GLAND ON MAIN ENGINE STEAM THROTTLE VALVE IN AFT ENGINEROOM.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
CROP AND RENEW WASTED DISCHARGE ELBOW ON #1 FIREPUMP WHERE CURRENTLY SOFT PATCHED.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
RENEW THE 42" NON-METALIC EXPANSION JOINT ON THE INLET SIDE OF THE AFT ENGINEROOM MAIN CONDENSOR.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
INSTALL RELIEF VALVE ON THE 140 PSI STEAM ATOMIZING LINE IN THE FORWARD ENGINEROOM, USING A DEVICE SUITABLE FOR SATURATED STEAM SERVICE.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
MAKE A CONTINUOUS FILET WELD ON THE SEAWARD SIDE OF THE NEW SPRINKLER PUMP SUCTION SPOOL PIECE (AFT ENGINEROOM),PRIOR TO COMPLETION OF NEXT DRYDOCKING.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
MAKE PERMANENT REPAIRS TO LEAK IN #2 PORT DEEP TANK AT FORWARD BULKHEAD OF FORWARD ENGINEROOM.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Construction/Loadline
Issued 27 April 1991
Resolved
RENEW LOWER SECTIONS OF VERTICAL STIFFNERS ON AFT BULKHEAD OF #2 CARGO HOLD. REFERENCE: BRW GAUGING REPORT DATED 02FEB91._x001C_
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
CLEAN SLIDING FEET SURFACES ON ALL FOUR BOILERS AND PROVIDE MEANS TO LUBRICATE OR ENSURE PROPER MOVEMENT DURING EXPANSION AND CONTRACTION OF WATER DRUM.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
FABRICATE SPOOL PIECE TO EXTEND BY APPROXIMATELY 1", THE DISCHARGE SIDE OF (NEW) AFT DRUM SAFETY VALVES BLOW-OFF PIPING ON BOILERS #1 AND #4.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Unknown
Issued 27 April 1991
Resolved
MAKE PERMANENT REPAIRS TO THE LEAKING SUPERHEATER SAFETY ACTUATOR LINE ON #1 BOILER.
Condition: Unknown
Due 27 April 1991
Resolved 27 April 1991
Construction/Loadline
Issued 23 March 1991
Resolved
CONDUCT PERMENANT REPAIRS TO BUCKLED FLOORS BELOW PORT SIDE POTABLE WATER TANK. (FRAMES 88 THROUGH 97)
Condition: Unknown
Due 23 March 1991
Resolved 23 March 1991
Unknown
Issued 9 March 1991
Resolved
COMPLETE ALL ITEMS ON WORK LISTS DATED 08 MAR 91._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 March 1991
Resolved 9 March 1991
Construction/Loadline
Issued 9 February 1991
Resolved
REMOVE FUEL OIL FROM COFFERDAM AT FRAME 87 AND #4 CARGO HOLD. DETERMINE ANDREPAIR CAUSES OF LEAKAGE INTO COFFERDAM AND FROM COFFERDAM INTO CARGO HOLD.ALL OIL SOAKED WOOD AND INSULATION IN CARGO HOLD IS TO BE REMOVED AS SOON AS POSSIBLE IN ACCORDANCE WITH A WRITTEN SCHEDULED PROVIDED TO OCMI.
Condition: Unknown
Due 9 February 1991
Resolved 9 February 1991
Engineering
Issued 30 January 1991
Resolved
RENEW BRICKWORK IN #2 BOILER FIREBOX AS ORIGINAL. REFER TO MANUFACTURE'S SPECIFICATIONS FOR DETAILS OF INTENDED REFRACTORY & INSULATION MATERIAL CONFIGURATION AND INTENDED INSULATING PROPERTIES (R VALUE).
Condition: Unknown
Due 30 January 1991
Resolved 30 January 1991
Engineering
Issued 18 January 1991
Resolved
AFFECT PERMANENT REPAIRS TO #4 FIREBOX REARWALL INNER CASING. #4 BOILER ISTO BE SECURED OR REPAIRS ARE TO COMPLETED PRIOR TO CARRIAGE OF PASSENGERS. UPON ARRIVAL IN HONOLULU, #4 BOILER IS TO BE SECURED FROM FURTHER SERVICE UNTIL REPAIRS ARE COMPLETED AND APPROVED.
Condition: Unknown
Due 18 January 1991
Resolved 18 January 1991
Unknown
Issued 10 August 1990
Resolved
COMPLETE ALL OUTSTANDING ITEMS ON WORKLIST ISSUED 10AUG90.
Condition: Unknown
Due 10 August 1990
Resolved 10 August 1990
Accommodation/Occupational Safety
Issued 25 July 1990
Resolved
MODIFY OR REMOVE BULKHEADS FORMING GIFT SHOP ON UPPER DECK OR INSTALL SPRINKLER SYSTEM WITHIN THE SPACES PER 46 CFR PART 76. REFERENCE: MSO PORTLAND LETTER 16711 DATED 24MAY90, REGARDING SIMILAR ARRANGEMENT ON S/S CONSTITUTION.
Condition: Unknown
Due 25 July 1990
Resolved 25 July 1990
Engineering
Issued 24 May 1990
Resolved
RENEW BRICKWORK AND REARWALL INNER CASING ON THE NUMBER 4 BOILER AS ORIGINAL PRIOR TO COMPLETION OF NEXT DRYDOCKING. OPERATION OF THIS BOILER IS LIMITED TO USE OF 3 OF THE 5 BURNERS UNTIL REQUIRED REPAIRS ARE COMPLETE
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Engineering
Issued 28 April 1990
Resolved
REPLACE LEAKING SEAL ON STERN THRUSTER PRIOR TO COMPLETION OF NEXT DRYDOCK.
Condition: Unknown
Due 28 April 1990
Resolved 28 April 1990
Engineering
Issued 28 April 1990
Resolved
BOILER #4 TO REMAIN OFF LINE UNTIL COMPLETION OF FIRESIDE EXAMINATION.
Condition: Unknown
Due 28 April 1990
Resolved 28 April 1990
Engineering
Issued 28 April 1990
Resolved
COMPLETE REFRACTORY, BURNER, AND CASING REPAIRS ON THE NUMBER 2 BOILER AND MAKE THE UNIT AVAILABLE FOR INSPECTION PRIOR TO PLACING THE UNIT BACK IN SERVICE.
Condition: Unknown
Due 28 April 1990
Resolved 28 April 1990
Fire Fighting
Issued 28 April 1990
Resolved
PROVE OPERATION OF CARGO HOLD/PAINT LOCKER SMOKE DETECTION SYSTEM. PATROL PERSON TO VISUALLY EXAMINE ALL AFFECTED SPACES HOURLY UNTIL SYSTEM RESTOREDTO NORMAL OPERATION.
Condition: Unknown
Due 28 April 1990
Resolved 28 April 1990
Construction/Loadline
Issued 3 March 1990
Resolved
RENEW PATCHED SECTION OF FORWARD ENGINEROOM STBD BILGE SUCTION LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Construction/Loadline
Issued 3 March 1990
Resolved
PROVE OPERATION OF FOLLOWING AIR ACTUATED BILGE SYSTEM VALVES: #3,#33,#32, AND PROVIDE EXPECTED DELIVERY DATE FOR FABRICATED VALVE BODIES FOR VALVES #4,#13,#26,#34,#30,#19,#24.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
RENEW INOPERATIVE FORCED DRAFT FAN FLOW GAUGES AT #2 BOILER FIRE CONTROL CONSOLE. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
RENEW DETERIORATED #1 MAIN CIRC PUMP FOUNDATION ASSEMBLY.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
RENEW DETERIORATING RUBBER EXPANSION JOINT AT #1 CONDENSER UPPER LUBE OIL COOLER INTAKE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
RENEW WASTED SECTION OF AFT ENGINEROOM MAIN CONDENSER AIR EJECTOR VENT PIPE
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Fire Fighting
Issued 3 March 1990
Resolved
REPAIR DETERIORATED SECTIONS OF STRUCTURAL FIRE PROTECTION INSULATION WHEREMISSING IN VICINITY OF OVERHEAD PENETRATIONS THROUGHOUT #5 AND #6 HOLD SPACES.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Accommodation/Occupational Safety
Issued 3 March 1990
Resolved
PROVIDE BILL OF MATERIALS FOR ALL CABLE AND ELECTRICAL FIXTURES BEING RENEWED/REPLACED INCIDENT TO LAUNDRY ROOM FIRE DAMAGE REPAIRS.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
RENEW #2 BOILER DESUPERHEATER OUTLET LINE AND SLUG UP ALL LOOSE BOLTING INSTEAM DRUM INTERIOR. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
REPAIR #2 BOILER LEAKY SECONDARY DESUPERHEATER STOP VALVE. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
REPOSITION MISORIENTED FEED WATER INLET LINE IN #2 BOILER. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Construction/Loadline
Issued 3 March 1990
Resolved
REPACK EXCESSIVELY LEAKY FWD MACHINERY SPACE PUMP SHAFT PACKINGS FOR ALL PUMPS AS INDICATED.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Fire Fighting
Issued 3 March 1990
Resolved
REPLACE BEEHIVE STYLE FOG APPLICATOR TIP AT FS#112 AFT MACHINERY SPACE WITHAPPROVED NON CLOG STYLE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Electrical
Issued 3 March 1990
Resolved
PROVE OPERATION OF FWD MACHINERY SPACE FUEL OIL TRANSFER PUMP REMOTE TRIP.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Fire Fighting
Issued 3 March 1990
Resolved
REPLACE MISSING FIRE ALARM BELL IN VICINITY OF OWNER'S SUITE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Accommodation/Occupational Safety
Issued 3 March 1990
Resolved
PROVIDE TRASH BARRELS OF INCOMBUSTIBLE MATERIAL IN ALL PASSAGEWAYS AND SPACES WHICH REQUIRE INCOMBUSTIBLE FURNISHINGS.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Construction/Loadline
Issued 3 March 1990
Resolved
PROVE OPERATION OF #4 HOLD STBD BILGE SUCTION VALVE. DEWATER #4 HOLD BILGE COFFERDAMS AND MAKE AVAILABLE FOR INTERNAL EXAM. FREE UP ALL HOLD FLOOR DRAINS AND RENEW DETERIORATED SECTIONS OF DRAIN PIPELINES. REPLACE PATCHED SECTION OF #4 PORT BILGE SUCTION LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Construction/Loadline
Issued 3 March 1990
Resolved
FREE UP #3 HOLD FLOOR DRAINS AND RENEW DETERIORATED SECTIONS OF DRAIN LINESAS NECESSARY.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Construction/Loadline
Issued 3 March 1990
Resolved
POSITIVELY LOCATE AND PERMANENTLY REPAIR SOURCE OF FRESH WATER LEAKAGE FROM#1S FRESH WATER TANK INTO #4 CARGO HOLD.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
REPLACE STRIPPED #2 BOILER FLOOR DRAIN PLUG. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Electrical
Issued 3 March 1990
Resolved
PROVE REMOTE TRIP FOR FWD MACHINERY SPACE VENT EXHAUST FANS #04-107 AND #04-102 AFTER REINSTALLATION FOLLOWING REPAIRS.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 3 March 1990
Resolved
MUCK OUT DEBRIS AND DESCALE BOILER #2 FOUNDATION BEDS AND PEDESTALS TO PERMIT ADEQUATE VISUAL EVALUATION OF STRUCTURAL CONDITION. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 3 March 1990
Resolved 3 March 1990
Engineering
Issued 10 February 1990
Resolved
REBRICK #2 BOILER REAR WALL & BURNER FRONT AREA, FWD & AFT SUPERHEATER VESTIBULE WALLS. RENEW DETERIORATED REGIONS OF CASTABLE REFRACTORY UNDER STEAM DRUM. RENEW WASTED SECTIONS OF SUPERHEATER VESTIBULE ACCESS PANELS INSULATION. BOILER TO REMAIN UNFIRED UNTIL COMPLETED.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 10 February 1990
Resolved
READJUST #3 BOILER FEEDWATER INLET LINE INSIDE STEAM DRUM SO THAT DISCHARGEPORTS ARE IN 12 O'CLOCK POSITION. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 10 February 1990
Resolved
REPAIR #3 BOILER EXHAUST PLENUM INNER ACCESS HATCH LOWER FRAME ASSEMBLY. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 10 February 1990
Resolved
RESECURE LOOSE DESUPERHEATER AND ATTEMPORATOR TUBE BUNDLE MOUNTING BRACKETSIN #3 BOILER STEAM DRUM. COMPLETE PRIOR TO PLACING BOILER ON LINE.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 10 February 1990
Resolved
RENEW FLEX GASKET IN #2 BOILER MAIN STEAM OUTLET LINE FLANGE. BOILER TO REMAIN UNFIRED UNTIL COMPLETED.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 10 February 1990
Resolved
COMPLETE WATERSIDE EXAMINATION OF #2 BOILER. BOILER NOT TO BE PLACED ON LINE UNTIL COMPLETED.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 10 February 1990
Resolved
READJUST #2 BOILER UPPER LEFT (WHEN FACING BOILER) BURNER ASSEMBLY TO ELIMINATE EXCESSIVE OIL OVERSPRAY ON TO SCREEN TUBES.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 10 February 1990
Resolved
REPAIR #3 BOILER LOOSE BRICKWORK AT UPPER REGIONS OF SUPERHEATER VESTIBULE ADJACENT TO VESTIBULE ACCESS DOORS. TO BE COMPLETED PRIOR TO PLACING BOILERON LINE.
Condition: Unknown
Due 10 February 1990
Resolved 10 February 1990
Engineering
Issued 3 February 1990
Resolved
RENEW WASTED CHEMICAL FEED LINE IN #3 BOILER STEAM DRUM.
Condition: Unknown
Due 3 February 1990
Resolved 3 February 1990
Engineering
Issued 24 November 1989
Resolved
REPACK LEAKY #2 MAIN CIRC PUMP SHAFT GLAND.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
REPAIR DETERIORATED SECTIONS OF #2 MAIN CIRC PUMP FOUNDATION ASSEMBLY.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
RENEW DETERIORATING #2 MAIN CIRC PUMP INLET RUBBER EXPANSION JOINT.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 24 November 1989
Resolved
PROVE OPERATION OF ALL AFT ENGINEROOM AND SHAFT ALLEY AIR OPERATED FUEL OILSYSTEM VALVES, AND CORRECTLY LABEL SAME.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
REPAIR #4 BOILER AFT INBOARD CORNER CASING LEAKS.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 24 November 1989
Resolved
PROVE OPERATION OF ALL AFT ENGINEROOM AIR OPERATED BILGE SYSTEM VALVES, ANDVALVES #26, #27, #34, #30, AND #31 IN SHAFT ALLEY, AND CORRECTLY LABEL SAME
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 24 November 1989
Resolved
PROVIDE BOLTS FOR COFFERDAM ACCESS HATCH COVER VICINITY OF CREW DISPENSARY B DECK.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
REPAIR DETERIORATED AREAS OF #1 BOILER CASTABLE REFRACTORY AROUND BURNERS, UNDER STEAM DRUM, SH VESTIBULE AND EXHAUST PLENUM.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 24 November 1989
Resolved
REPAIR FUEL OIL WEEPS AT #2 PORT OUTBOARD FOT, #1 STBD FO SETTLING TANK, & #2P FO SETTLING TANK AS PROPOSED IN YOUR LETTER OF 28 OCT 89; VELODUR/ DURMETAL REPAIR TO BE CONSIDERED TEMPORARY MEASURE SUBJECT TO EVALUATION ATNEXT SCHEDULED DRYDOCKING
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
COMPLETE BOILER MOUNTING OPENING EXAMINATION, FIRESIDE/WATERSIDE EXAM, AND HYDRO TEST OF #3 BOILER PRIOR TO RETURNING BOILER TO SERVICE.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
RENEW DETERIORATING AFT ENGINEROOM UPPER LUBE OIL COOLER UNIT INLET RUBBER EXPANSION JOINT.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
REPAIR LEAKY DIAPHRAM UNITS FOR COPES FLOWMATIC FEED WATER REGULATOR UNITS.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 24 November 1989
Resolved
REPACK #2 BILGE PUMP AND #2 BILGE/BALLAST PUMP LEAKY SHAFT GLANDS.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
REPAIR AFT ENGINEROOM EVAPORATOR LEAKY TUBE NEST COVER PLATE AND LEAKY HIGHSALINITY DISCHARGE SOLENOID VALVE.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 24 November 1989
Resolved
PROVIDE SEPARATE BOWL FOR EACH LUBE OIL PURIFIER UNIT.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Accommodation/Occupational Safety
Issued 24 November 1989
Resolved
PERMANANTLY REPAIR LEAKY AFT ENGINEROOM PORT SIDE GRAY WATER COLLECTION HEADER SHELL ASSEMBLY.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Navigation
Issued 24 November 1989
Resolved
IDENTIFY CAUSE AND MAKE PERMANANT REPAIR TO STEERING GEAR 6 WAY VALVE MOUNTING BRACKET ASSEMBLY.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Fire Fighting
Issued 24 November 1989
Resolved
REPAIR/REPLACE DEFECTIVE HOLDBACK ELECTROMAGNET COIL ASSEMBLY FOR FSD #20.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Accommodation/Occupational Safety
Issued 24 November 1989
Resolved
REMOVE COMBUSTIBLES AND UNAPPROVED ELECTRICAL INSTALLATIONS FROM "CLASS 5" CREW ACCOMODATIONS AS DISCUSSED IN [name withheld] OF 15NOV89.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Lifesaving
Issued 24 November 1989
Resolved
REPLACE DETERIORATED MOUNTING YOKE FOR LIFEBOAT #1 AFT ROTTMER RELEASE MECHANISM.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Accommodation/Occupational Safety
Issued 24 November 1989
Resolved
REPAIR DETERIORATED SECTIONS OF VENT SUPPLY DUCT LOCATED OVER #2 BOILER STEAM DRUM.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 24 November 1989
Resolved
PROVE OPERATION OF OIL/WATER SEPARATOR UNIT 15PPM MONITOR/ALARM AND ASSOCIATED AUTOMATIC RECIRC/OVERBOARD DISCHARGE SOLENOID VALVES.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Fire Fighting
Issued 24 November 1989
Resolved
REPACK LEAKY #3 FIREPUMP LOWER SHAFT GLAND.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 24 November 1989
Resolved
CROP AND RENEW HOLED REGIONS OF #6 STBD OTBD TANK TOP UNDER FWD ENGINEROOM FUEL OIL HEATER, AND #7 PORT OTBD TANK TOP ADJACENT TO ELEVATOR AND AUX MACHINERY SPACE ACCESS LADDER.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Accommodation/Occupational Safety
Issued 24 November 1989
Resolved
RESURFACE CRATERED/CRACKED REGIONS OF A,B,& C DECKS.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Lifesaving
Issued 24 November 1989
Resolved
REPLACE MISSING PADS FOR #1 LIFEBOAT WINCH CENTRIFUGAL BRAKE ASSEMBLY.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 15 November 1989
Resolved
REPLACE MISSING #1 HOLD SPACE AIR OPERATED BILGE MANIFOLD VALVE AND #2 HOLDPORT AND STBD BILGE SUCTION VALVES. REFERENCE FURTHER REQUIREMENTS LISTED IN [name withheld] RECEIVED 11NOV89 CONCERNING PROPOSED REPLACEMENT OF HOLD SPACE AIR OPERATED SUCTION VALVES WITH STANDARD NON RETURN TYPES.
Condition: Unknown
Due 15 November 1989
Resolved 15 November 1989
Engineering
Issued 28 October 1989
Resolved
REPLACE DETERIORATED DESUPERHEATER OUTLET LINE INSIDE #1 BOILER STEAM DRUM.PATCH DETERIORATED SECTIONS OF REFRACTORY AROUND BURNERS, UNDER STEAM DRUM,IN SH TUBE VESTIBULE, & EXHAUST PLENUM. COMPLETE HYDRO TEST OF RENEWED DESUPERHEATER LINE & #1 BOILER TO 1.25 MAWP PRIOR TO LIGHTING OFF.
Condition: Unknown
Due 28 October 1989
Resolved 28 October 1989
Construction/Loadline
Issued 7 October 1989
Resolved
MAKE AVAILABLE FOR INTERNAL EXAMINATION #12 FIXED BALLAST TANKS. PROVIDE NEW MANHOLE COVERS, BASE PLATES, STUDS, AND BOLTS AS MAY BE NECESSARY TO ENSURE WATERTIGHT INTEGRITY AFTER REMOVAL OF ORIGINAL COVERS.
Condition: Unknown
Due 7 October 1989
Resolved 7 October 1989
Engineering
Issued 7 October 1989
Resolved
CONDUCT WORKING PRESSURE INSTALLATION TEST OF FWD ENGINEROOM COFFIN FEED PUMP CLASS II PIPING COMPONENTS. PROVIDE MATERIAL SPECS AND WELDER QUALS FOR NEW PIPING FITTED INCIDENT TO COFFIN FEED PUMP INSTALLATION.
Condition: Unknown
Due 7 October 1989
Resolved 7 October 1989
Accommodation/Occupational Safety
Issued 1 September 1989
Resolved
PROVIDE A-0 CLASS ENCLOSURE AROUND AIR CONDITIONER UNITS LOCATED PORT AND STBD SIDES PROM DECK FWD OF INDEPENDENCE LOUNGE.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Construction/Loadline
Issued 1 September 1989
Resolved
LOCATE SOURCE AND MAKE PERMENANT REPAIR TO FUEL OIL WEEPS LOCATED AT #2 PORT OUTBOARD FOT VISIBLE FROM SIDESHELL/BKHD JUNCTION "D" DECK LVL, AND #1STBD FO SETTLING TANK VISIBLE FROM BELOW REDUCING STN.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
REPACK EXCESSIVELY LEAKY FWD ENGINEROOM CONDENSER SCOOP INJECTION INLET FLAPPER VALVE STEM.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Construction/Loadline
Issued 1 September 1989
Resolved
MUCK OUT AND PREPARE FOR INTERNAL EXAM #4 PORT OUTBOARD F.O./BALLAST TANK.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
CONDUCT HYDROSTATIC AND NON DESTRUCTIVE TESTS OF NEWLY INSTALLED FWD ENGINEROOM FEED PUMP PIPING.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Construction/Loadline
Issued 1 September 1989
Resolved
MAKE AVAILABLE FOR INTERNAL EXAM #3 AND #12 FIXED BALLAST TANKS AND PROVIDENEW MANHOLE COVERS, BASE PLATES AND BOLTS AS MAY BE REQUIRED TO ENSURE WATERTIGHT INTEGRITY AFTER REMOVAL OF ORIGINAL COVERS.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Fire Fighting
Issued 1 September 1989
Resolved
PROVIDE UPDATED, ACCURATE AND LEGIBLE FIRE CONTROL PLAN WHICH INCLUDES ALL INFORMATION SPECIFIED IN 46 CFR 78.45-1(A)(1)&(2) FOR AS IS CONDITION OF THE VESSEL
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Lifesaving
Issued 1 September 1989
Resolved
REPAIR/REPLACE CRACKED RUDDER FOR LIFEBOAT #4
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Accommodation/Occupational Safety
Issued 1 September 1989
Resolved
CROP AND RENEW DETERIORATED AC UNIT CHILLER WATER LINE (MAIN DECK FAN ROOM 5D) NOW POSING A DRIP HAZARD TO ELECTRIC MOTOR LOCATED UNDERNEATH LINE.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Accommodation/Occupational Safety
Issued 1 September 1989
Resolved
CONDUCT GENERAL CLEAN UP OF FWD BOSUN STORAGE SPACE & SECURE ALL PAINT CANS& COMBUSTIBLES TO ELIMINATE MISSILE HAZARDS; ONLY NEW, UNOPENED COMBUSTIBLECONTAINERS PERMITTED IN THIS SPACE; OPENED CONTAINERS, BRUSHES, SOLVENTS, ETC. TO BE STORED IN FWD "A" DECK PAINT LOCKER.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Electrical
Issued 1 September 1989
Resolved
INSTALL APPROVED HAZARDOUS LOCATION JUNCTION BOX FOR PRESENTLY IMPROPERLY SPLICED BLOWER MOTOR CONNECTION IN FWD "A" DECK PAINT LOCKER, AND REMOVE OUTLET BOX FROM THIS LOCATION.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
RENEW DETERIORATED SUPER HEATER HEADER DRAIN LINE ON #4 BOILER.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Lifesaving
Issued 1 September 1989
Resolved
ADJUST RELEASING GEAR ON #2 LIFEBOAT TO PROVIDE PROPER RELEASE SEQUENCING FROM TRAVELLING BLOCKS; DEMONSTRATE SAME WITH FALLS UNDER STRAIN
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Electrical
Issued 10 June 1989
Resolved
EFFECT PERMANENT REPAIRS TO POWER TRANSFORMER AND RELAY, #1 SSTG. PROVE OPERATION OF #1 KW METER (FORWARD ENGINE ROOM MAIN SWITCHBOARD).
Condition: Unknown
Due 10 June 1989
Resolved 10 June 1989
Construction/Loadline
Issued 3 June 1989
Resolved
REMOVE ALL OIL AND SLUDGE FROM #4 STARBOARD OUTBOARD DEEP TANKS AND MAKE AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Construction/Loadline
Issued 3 June 1989
Resolved
CONTINUE CLEANING COFFERDAM LOCATED ABOVE #3 STARBOARD OUTBOARD FUEL OIL DEEP TANK. PROVIDE MARINE CHEMIST CERTIFICATE CERTIFYING SPACE GAS FREED.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Engineering
Issued 3 June 1989
Resolved
REMOVE BOILER #4 FROM SERVICE FOR INSPECTION OF PRIMARY AND SECONDARY AFT ENGINE ROOM FEED WATER VALVES. MAIN & AUXILIARY (4 TOTAL) VALVES TO BE BOTHVISUALLY EXAMINED AND SHOP HYDRO TESTED IN PRESENCE OF A COAST GUARD MARINEINSPECTOR.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Engineering
Issued 3 June 1989
Resolved
REMOVE BOILER #4 FROM SERVICE UNTIL ALL CASING WASTAGE IS REPAIRED. ONCE WASTAGE HAS BEEN CROPPED OUT AND PRIOR TO INSERTING, MAKE BOILER AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Engineering
Issued 3 June 1989
Resolved
REMOVE BOILER #2 FROM SERVICE FOLLOWING 06 JUN 89 TRANSIT FROM KAUAI TO HAWAII, FOR REPAIR OF ALL CASING LEAKS. BOILER TO REMAIN OUT OF SERVICE UNTIL PERMANENT REPAIRS COMPLETE.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Engineering
Issued 3 June 1989
Resolved
CLEAN FORWARD AND AFT FIDLEYS BY VACUUMING AND WATER WASHDOWN/SCRUBBING. STAGE AREAS AS NEEDED TO IDENTIFY AND PERMANENTLY REPAIR ANY BOILER CASING LEAKS.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Construction/Loadline
Issued 3 June 1989
Resolved
PROVIDE WRITTEN PROPOSAL FOR REPAIR METHOD/SCHEDULE ON #3 PORT OUTBOARD FUEL OIL DEEP TANK. UNTIL SUCH TIME AS THIS TANK IS PERMANENTLY REPAIRED, ALL PASSENGER STATEROOMS LOCATED ABOVE THIS TANK/COFFERDAM SHALL BE ISOLA- TED FROM REMAINING PASSENGER SPACES.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Electrical
Issued 3 June 1989
Resolved
PROVIDE COPY OF SERVICE REPORT BY ELECTRICAL CONTRACTOR WHO WORKED ON FORWARD AND AFT ENGINE ROOM MAIN SWITCHBOARDS.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Accommodation/Occupational Safety
Issued 3 June 1989
Resolved
INSTALL OVERFLOW ALARM SENSORS FOR FUEL OIL OVERFLOW LINES BETWEEN FUEL OILSYSTEMS AND #4 & 5 CENTERLINE DEEP TANKS (USED AS MSD HOLDING TANKS). UNTILSENSORS ARE INSTALLED, IMMEDIATELY PRIOR TO DISCHARGE, A VISUAL INSPECTION FOR OIL CONTAMINATION SHALL BE MADE AND LOGGED IN THE ENGINEERS LOG; (CONT)
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Accommodation/Occupational Safety
Issued 3 June 1989
Resolved
(CONT)OR, INSTALL PERMANENT BLANKS TO VENT AND OVERFLOW LINES TO COMPLETELYISOLATE FUEL AND MSD SYSTEMS.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Lifesaving
Issued 3 June 1989
Resolved
REMOVE AND PERMANENTLY REPAIR LIFEBOATS 1 AND 5. REPAIRS TO BE MADE UNDER THE SUPERVISION OF A COAST GUARD MARINE INSPECTOR. UNTIL REPAIRS COMPLETE,TOTAL PASSENGERS PERMITTED ABOARD VESSEL SHALL BE REDUCED BY 198 PERSONS.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Lifesaving
Issued 3 June 1989
Resolved
REPAIR AS MARKED BY RIVITING LIFEBOATS 2 AND 4. UNTIL REPAIRS COMPLETE ANDINSPECTED BY A COAST GUARD MARINE INSPECTOR, TOTAL PASSENGERS PERMITTED ABOARD VESSEL SHALL BE REDUCED BY 198 PERSONS.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Lifesaving
Issued 3 June 1989
Resolved
PROVIDE A WRITTEN PROPOSAL/SCHEDULE FOR REMOVAL AND REHABILITATION OF ALL LIFEBOATS AND A SCHEDULE FOR TURNING LIFEBOAT WINCH HAND BRAKE DRUMS. THE MINIMUM ACCEPTABLE TIME FRAME IS 1 LIFEBOAT PER MONTH AND 2 BRAKE DRUMS PERMONTH.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Electrical
Issued 3 June 1989
Resolved
REPLACE/REPAIR SHIP SERVICE TURBINE GENERATOR #1 KW METER LOCATED IN FORWARD ENGINE ROOM MAIN SWITCH BOARD.
Condition: Unknown
Due 3 June 1989
Resolved 3 June 1989
Accommodation/Occupational Safety
Issued 27 May 1989
Resolved
MAKE PROPER REPAIRS TO UNFLASHED DUCT ABOVE FIRE SCREEN DOOR AT FRAME 170 ON "B" DECK.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Construction/Loadline
Issued 27 May 1989
Resolved
REMOVE NEW NO. 1 FRESH WATER TANK OVERFLOW INTO FORWARD ENGINE ROOM AT FRAME 98 AND REINSTALL AT A LOCATION APPROVED BY THE COGNIZANT OCMI.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Electrical
Issued 27 May 1989
Resolved
PROPERLY SEAL PENETRATIONS FROM THE GALLEY INTO STAIR TOWERS AT FRAMES 129 AND 140, USING A COAST GUARD APPROVED FIRE STOP SYSTEM.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Accommodation/Occupational Safety
Issued 27 May 1989
Resolved
IN CREW'S GALLEY, PROPERLY CLOSE UP OPENINGS IN GALLEY HOOD TO OVERHEAD; "B" DECK, FRAME 105.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Accommodation/Occupational Safety
Issued 27 May 1989
Resolved
REPAIR DOOR AND LIMIT SWITCHES TO DUMB WAITER AT FRAME 132, SUN DECK; OR PLATE OVER OPENING INTO PANTRY.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Construction/Loadline
Issued 27 May 1989
Resolved
DETERMINE STATUS OF OPEN DRAIN LINE IN AFT CARGO HOLD; MAKE REPAIRS AS NECESSARY.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Accommodation/Occupational Safety
Issued 27 May 1989
Resolved
MAKE PERMANENT REPAIRS TO THE DRAIN PIPING OFF-STICKER WHICH IS PRESENTLY SEALED WITH A TEMPORARY PLATE, LOCATED ABOVE THE CLAPPER VALVE IN #2 HOLD.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Construction/Loadline
Issued 27 May 1989
Resolved
REPAIR WASTED TRANSFER LINE IN VOID SPACE ABOVE COFFERDAM, PORT SIDE, FRAME 148, "B" DECK.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Lifesaving
Issued 27 May 1989
Resolved
MAKE PROPER REPAIRS TO LIFEBOAT HULLS WHICH WERE HOLED BY SANDBLASTING. PROBLEMS IDENTIFIED IN LIFEBOAT NO. 5: OTHERS SHOULD ALSO BE CHECKED.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Construction/Loadline
Issued 27 May 1989
Resolved
MAKE READY THE FOLOWING FRESH WATER BALLAST TANKS FOR COAST GUARD INTERNAL INSPECTION: #4 SOB, #4 POB, #5 SOB, #5 POB.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Electrical
Issued 27 May 1989
Resolved
MAKE PERMANENT REPAIRS TO ELECTRICAL WIRING FOR LIGHTING IN OVERHEAD IN CARPENTER SHOP.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Engineering
Issued 27 May 1989
Resolved
HYDROSTATICALLY TEST TO 1050 PSI THE NEWLY INSTALLED FEED PUMP, FWD ENGINE ROOM AND #3 COFFIN FEED PUMP IN THE AFT ENGINE ROOM BEFORE PUMPS ARE PLACEDON LINE.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Construction/Loadline
Issued 27 May 1989
Resolved
SEAL - WELD EIGHT INCH PIPE CAP INSTALLED IN WATER TIGHT BULKHEAD, FRAME 169, "D" DECK, BETWEEN LINEN LOCKER & BAGGAGE LOCKER.
Condition: Unknown
Due 27 May 1989
Resolved 27 May 1989
Unknown
Issued 15 May 1989
Resolved
INSTALL PERMANENT BLANKS TO HEATING COILS FOR NO 4 & 5 CENTERLINE DEEP TKS.REMOVE ANY OIL FROM NO 4 & 5 CL DEEP TKS. CLEAN OIL FROM NO 6 CL DEEP TK AND FILL THIS TANK WITH FRESH WATER AS REQUIRED BY STABILITY BOOK.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Engineering
Issued 13 May 1989
Resolved
CROP AND RENEW BOTTOM CASING IN WAY OF WASTAGE ON #4 BOILER.
Condition: Unknown
Due 13 May 1989
Resolved 13 May 1989
Lifesaving
Issued 29 April 1989
Resolved
FOR L/B #8, RENEW MISSING RIVETS IN 3RD & 5TH PORT BUTT FROM BOW, AFT BREAST PLATE, DISENGAGING APPARATUS HANDLE,WATER BLAST BOTTOM THEN MAKE ANYOTHER REPAIRS AS DIRECTED BY ATTENDING CG INSPTOR, SECURE AFT FOOT BOARD, RENEW MASTER SWITCH MOUNTING BRACKET, CLEAN CONTACTS, AND RENEW INSULATOR.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Lifesaving
Issued 29 April 1989
Resolved
FOR LIFEBOAT #12, RENEW PADS ON SPEED LIMITING BRAKE, DISENGAGING APPARATUSHANDLE, AFT BREAST PLATE, UPPER SUPPORT PLATES ON AFT HOOK, PREVENTER BARS,& WINCH MOUNTING BRACKETS AFT SIDE. WATER BLAST HULL BOTTOM RENEW MISSING RIVETS & REPAIR AS DIRECTED BY ATTENDING INSPECTOR, CLEAN ELECT. CONTACTS.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Accommodation/Occupational Safety
Issued 29 April 1989
Resolved
DO NOT USE CABINS CBT15 AND CBT17 UNTIL ALL PLANS WITH BILL OF MATERIALS ARE SUBMITTED, REVIEWED AND APPROVED.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Lifesaving
Issued 29 April 1989
Resolved
FOR LIFEBOAT #10, REWELD CLIPS ON 6 SUPPORT BRACKETS FOR COVER, RENEW WASTED D-RINGS ON COVER, MASTER SWITCH BRACKET, AFT BREAST PLATE, DISENGAG-ING APPARATUS HANDLE, GASKET ON SPEED LIMITING BRAKE COVER, & PREVENTER BARON BOTH HOOKS. CLEAN ELECTRICAL CONTACTS LIMIT SWITCHES AND CONTROLLER.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Engineering
Issued 29 April 1989
Resolved
REPAIR OR REPLACE THE DEFECTIVE YARWAY REMOTE FEEDWATER INDICATOR FOR NO 2 BOILER MOUNTED AT THE BOILER FLAT CONTROL BOARD.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Navigation
Issued 29 April 1989
Resolved
REPACK RUDDER STOCK.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Accommodation/Occupational Safety
Issued 29 April 1989
Resolved
REMOVE AND RE-PIPE THE LEAKY GRAY WATER LINE PRESENTLY INSTALLED OVER THE AFT ENGINEROOM SWITCHBOARD.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Electrical
Issued 29 April 1989
Resolved
CLEAN AND TIGHTEN ALL CONNECTIONS IN ALL SWITCHBOARDS, CALIBRATE METERS, GENERATOR CIRCUIT BREAKERS, FEEDER BREAKERS, AND BUS TIE BREAKERS, AND TEST OPERATION AND REPAIR AS REQUIRED ON THE VOLTAGE REGULATOR FOR #3 GEN- ERATOR, CHECK GOVERNOR OPERATION AND GROUNDING OF EXCITERS.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Engineering
Issued 29 April 1989
Resolved
INSTALL MISSING HANGAR AND SUPPORT BRACKET TO ENSURE THAT THE 600 LB AUXILIARY STEAM LINE OFF OF #4 BOILER DOES NOT VIBRATE.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Lifesaving
Issued 29 April 1989
Resolved
FOR #5 LIFEBOAT, REALIGN FLEMING GEAR, CHANGE OIL, SECURE GEAR BOX, REPAIR TRANSMISSION GEAR HANDLE AND DEMONSTRATE OPERATION.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Fire Fighting
Issued 29 April 1989
Resolved
PROVIDE LABEL ON THE FIRE DAMPER LOCATED AFT LADDER FROM SUN DECK ON CENTERLINE AT FRAME 146-148.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Engineering
Issued 29 April 1989
Resolved
MAKE PERMANENT REPAIRS TO THE GOOSE NECK VENTS LOCATED, BT DECK STBD SIDE BY FS#3, SUN DECK PORT SIDE FWD, PORT SIDE AFT BY POOL, STBD SIDE AFT UNDERL/B #9, STBD SIDE FWD (INSTALL FLAME SCREEN & RENEW WASTED SECTION AND REINSTALL MISSING PIPE BRACKET).
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Lifesaving
Issued 29 April 1989
Resolved
REMOVE LIFEBOATS #2,4,5,6 & 7,WATER BLAST BOTTOMS AND MAKE AVAILABLE FOR INSPECTION BY A COAST GUARD INSPECTOR. MAKE REPAIRS AS PER HIS DIRECTION.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Accommodation/Occupational Safety
Issued 29 April 1989
Resolved
RENEW WASTED DECK PLATE IN WAY OF THE MSD TANKS IN #3 HOLD.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Accommodation/Occupational Safety
Issued 29 April 1989
Resolved
INSTALL EXPLOSION PROOF VENT FAN FOR THE A DECK FORWARD PAINT LOCKER WHICH WILL ADEQUATELY REMOVE PAINT FUMES.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Engineering
Issued 29 April 1989
Resolved
REMOVE THE EXISTING MODIFIED VENT GOOSE NECK PRESENTLY VENTED OVER THE SIDEFOR #3 OUTBD DEEP TANKS AND #2 SETTLERS AND RE-INSTALL AT EXISTING CATCH TRAYS.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Lifesaving
Issued 29 April 1989
Resolved
HAVE ALL LIFEBOAT WINCH HAND BRAKE DRUMS TURNED DOWN AND HAVE ANY PADS RENEWED WHERE RIVET HEADS ARE MAKING CONTACT WITH DRUM.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Accommodation/Occupational Safety
Issued 29 April 1989
Resolved
REINSTALL MISSING REFRIGERATION CIRCULATING PUMP ON THE STARBOARD SIDE AUX MACHINERY SPACE AND DEMONSTRATE OPERATION.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Electrical
Issued 29 April 1989
Resolved
INSTALL SEPARATE AUDIO ALARM FOR THE EMERGENCY GENERATOR HIGH JACKET TEMPERATURE ALARM AND LOW LUBE OIL PRESSURE ALARM ON THE ENGINEROOM THROTTLE ALARM PANEL IN THE AFT ENGINEROOM.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Accommodation/Occupational Safety
Issued 29 April 1989
Resolved
SUBMIT DRAWINGS ON THE AC UNIT INSTALLATIONS ON PROM DECK PORT AND STBD SIDE FORWARD OF THE INDEPENDENCE LOUNGE.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Fire Fighting
Issued 29 April 1989
Resolved
INSTALL AN APPROVED TIME DELAY BOTTLE WHICH WILL BE COMPATIBLE WITH THE EXISTING SYSTEM WHICH WILL PROVIDE FOR A MINIMUM OF A 20 SECOND DELAY FOR THE DISCHARGE OF CO2 IN THE MACHINERY SPACES AFTER THE SYSTEM IS ACTIVATED.SUBMIT DRAWINGS FOR APPROVAL PRIOR TO INSTALLATION.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Navigation
Issued 29 April 1989
Resolved
MAKE PERMANENT REPAIRS OR REPLACE LEAKING REDUCER SECTION ON THE STERN THRUSTER PIPING SYSTEM.
Condition: Unknown
Due 29 April 1989
Resolved 29 April 1989
Construction/Loadline
Issued 15 April 1989
Resolved
PROVIDE GAUGING FOR THE FOLLOWING DOUBLE BOTTOM TANK TOPS: 1, 3P, 3S, 4P, 4S, 5POB, 5PIB, 5SOB, 5SIB, 6SOB, 9POB, 10P, 12P & 12S. ALSO PROVIDE GAUGING FOR NO 3P AND 3S OUTBD DEEP TANK TOPS.
Condition: Unknown
Due 15 April 1989
Resolved 15 April 1989
Construction/Loadline
Issued 15 April 1989
Resolved
AT NEXT DRYDOCK SCHEDULED FOR MAY89, MAKE PERMANENT REPAIRS TO NO3 P & S OUTBD DEEP TANK, TANK TOPS WHERE WASTAGE IS 30% OR MORE. ALSO MAKE PERMANENT REPAIRS TO DOUBLE BOTTOM TANK TOPS WHERE WASTAGE IS 30% OR MORE.
Condition: Unknown
Due 15 April 1989
Resolved 15 April 1989
Construction/Loadline
Issued 15 April 1989
Resolved
MAKE TEMPORARY REPAIRS TO NO3 POB DEEP TANK TOP, IN THE 3RD BAY FROM THE AFT BULKHEAD IN THE COFFERDAM PRIOR TO THE VESSEL'S DEPARTURE FROM HONOLULU, HI THIS DATE OR REMOVE ALL PASSENGERS FROM THE ACCOMODATION AREA WHICH IS COMMON TO THE COFFERDAM ON C DECK.
Condition: Unknown
Due 15 April 1989
Resolved 15 April 1989
Construction/Loadline
Issued 15 April 1989
Resolved
OPEN UP, CLEAN AND GAS FREE NO #1 DOUBLE BOTTOM TANK FOR INTERNAL INSPECTION.
Condition: Unknown
Due 15 April 1989
Resolved 15 April 1989
Construction/Loadline
Issued 15 April 1989
Resolved
INSTALL NEW HYDRAULIC PUMP ON THE WATER TIGHT DOOR 2 BETWEEN AFT ENGINE ROOM AND THE AUXILIARY MACHINERY ROOM. A TEMPORARY MEANS MUST BE PROVIDED TO ALLOW CLOSING OF THE DOOR IN EVENT OF AN EMERGENCY UNTIL THE NEW PUMP IS INSTALLED.
Condition: Unknown
Due 15 April 1989
Resolved 15 April 1989
Construction/Loadline
Issued 15 April 1989
Resolved
MAKE PERMANENT REPAIRS TO THE AFT TRANSVERSE AND CENTERLINE LONGITUDINAL BULKHEADS AND ASSOCIATED STIFFENERS IN NO#1 PORT FRESH WATER TANK BETWEEN FRAME 88 TO 98. INSTALL NEW VENT LINE WHICH IS EQUAL TO OR GREATER THAN THE FILL LINE.
Condition: Unknown
Due 15 April 1989
Resolved 15 April 1989
Construction/Loadline
Issued 8 April 1989
Resolved
CROP AND RENEW ALL WASTED DECK PLATES AND ASSOCIATED SUPPORT BRACKETS AND FRAMES IN SHAFT ALLEY.
Condition: Unknown
Due 8 April 1989
Resolved 8 April 1989
Accommodation/Occupational Safety
Issued 8 April 1989
Resolved
INSTALL PERMANENT BLANKS TO VENT & OVERFLOW LINES & HEATING COILS FOR NO#4 &5 CL DP TKS. TANKS MAY NOT BE USED IN MSD SYSTEM UNTIL ALL OIL IS REMOVED& TANKS ARE ISOLATED FROM FUEL SYSTEM & EXISTING OVERFLOW PIPING IS CHANGEDFOR EXISTING FUEL TKS. CLEAN OIL FROM NO#6 CL DP TK & FILL WITH FRESH WATER
Condition: Unknown
Due 8 April 1989
Resolved 8 April 1989
Accommodation/Occupational Safety
Issued 11 March 1989
Resolved
SECURE VENT FROM CARPENTER SHOP TO THE FORWARD WINCH RESISTOR ROOM TO PREVENT WOOD DUST BUILD-UP ON ELECTRICAL EQUIPMENT. INSTALL VENT WITH GOOSE NECK TO MAIN DECK FORWARD FROM THE CARPENTER'S SHOP.
Condition: Unknown
Due 11 March 1989
Resolved 11 March 1989
Lifesaving
Issued 11 March 1989
Resolved
REMOVE #1 LIFEBOAT AND HAVE HULL BOTTOM SAND BLASTED. ARRANGE FOR COAST GUARD INSPECTOR TO SURVEY. AFTER SURVEY MAKE PERMANENT REPAIRS TO HOLE IN BOTTOM AT KEEL PORT SIDE FORWARD AND ANY OTHER AREAS AS DETERMINED BY COASTGUARD INSPECTOR.
Condition: Unknown
Due 11 March 1989
Resolved 11 March 1989
Lifesaving
Issued 25 February 1989
Resolved
MAKE PERMANENT REPAIRS TO THE PADEYE CONNECTIONS FOR ALL 12 LIFEBOAT EMBARKATION LADDERS.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Lifesaving
Issued 25 February 1989
Resolved
MAKE PERMANENT REPAIRS TO THE 8" X 10" HOLE IN THE BACK SIED OF VENT AT FIRE DAMPER NEAR BULKHEAD 181, C-DECK NEAR WTD 8C.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Accommodation/Occupational Safety
Issued 25 February 1989
Resolved
REPLACE ALL EXISTING HEAT SENSORS ON C & D DECKS WITH NEW TYPE SENSORS.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Lifesaving
Issued 25 February 1989
Resolved
CONDUCT NEW WEIGHT TEST ON #11 LIFEBOAT USING PROPER AMOUNT OF WEIGHT.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Engineering
Issued 25 February 1989
Resolved
CONDUCT HYDROSTATIC TEST ON ALL MAIN STEAM PIPING ABOVE 3 INCHES IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Engineering
Issued 25 February 1989
Resolved
ON #4 BOILER RENEW 8 PLUGGED SUBERHEATER TUBES ON THE FIRST PASS, REBRICK FRONT FURNACE WALL IN WAY OF THE BURNERS, REPAIR 3 DEFECTIVE BURNER REGISTERS, COMPLETE OVERHAUL OF MAIN, DESUPERHEATER & GENERATOR MAIN STEAM STOP VALVES, REPLACE SUPERHEATER GAGE LINE VALVE, REPAIR DEFECTIVE FLANGES.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Engineering
Issued 25 February 1989
Resolved
#4 BOILER MAY NOT BE USED UNTIL ALL WORK IS COMPLETED AND BOILER IS HYDROSTATICALLY TESTED AT IN PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Engineering
Issued 25 February 1989
Resolved
LOCATE AND MAKE PERMANENT REPAIRS TO THE CASING LEAKS ON #2 BOILER IN WAY OF THE MUD DRUM.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Engineering
Issued 25 February 1989
Resolved
AT NEXT SCHEDULED DRYDOCK INSPECTION OPEN UP FOR INTERNAL INSPECTION ALL BULKHEAD STOP STEAM VALVES AND THE PRIMARY AND SECONDARY FEED WATER MAIN AND AUXILIARY INLET VALVES ON ALL 4 BOILERS.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Engineering
Issued 25 February 1989
Resolved
AT NEXT SCHEDULED DRYDOCK INSPECTION LOCATE AND SEAL ALL CASING LEAKS IN ALL BOILERS IN BOTH FIDLIES.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Lifesaving
Issued 25 February 1989
Resolved
MAKE PERMANENT REPAIRS AND PROVE SATISFACTORY OPERATION OF #4 LIFEBOAT ENGINE. IE REPAIR HYDRAULIC PUMP ON ENGINE, SECURE FUEL LINES, DETERMINE AND REPAIR ENGINE KNOCK AND RENEW THROTTLE CABLE.
Condition: Unknown
Due 25 February 1989
Resolved 25 February 1989
Engineering
Issued 26 November 1988
Resolved
COMPLETE REPAIRS TO THE MAIN AND AUXILIARY FEED WATER STOPS, LOWER COPES ROOT VALVE WATER SIDE AND RENEW STEM PACKING GLANDS AND PITTED FLANGES ON BOTH TOP AND BOTTOM GAGE GLASS VALVES.
Condition: Unknown
Due 26 November 1988
Resolved 26 November 1988
Fire Fighting
Issued 26 November 1988
Resolved
OVERHAUL AND HAVE OPEN FOR INSPECTION THE FIREMAIN ISOLATION VALVE FOR #3 FIRE PUMP.
Condition: Unknown
Due 26 November 1988
Resolved 26 November 1988
Lifesaving
Issued 26 November 1988
Resolved
PROVIDE AND INSTALL THE LIFEBOAT BUILDERS INFORMATION PLACARDS FOR LIFEBOATS #5 & #7.
Condition: Unknown
Due 26 November 1988
Resolved 26 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
PROVIDE AND INSTALL PROTECTIVE GUARDS OVER THE HEAT DETECTORS IN THE TRASH STORAGE AREAS ON B DECK STBD SIDE.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
INSTALL MAGNETIC HOLD BACK DEVICE AT THE FORWARD ENTRANCE TO THE CHILDREN'SREC ROOM ON A DECK AT FRAME 196 AND LABEL DOOR AS A FIRE SCREEN DOOR.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
PROVIDE AND INSTALL NEW DIFFUSER HORN FOR THE SEMI-PORTABLE CO2 UNIT AT THE FWD ENGINE ROOM BOILER FLAT.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Construction/Loadline
Issued 19 November 1988
Resolved
CROP AND RENEW THE WASTED SECTION OF PIPING ON THE OVERBOARD SCUPPER NEAR THE LUBE OIL TANK IN THE AFT ENGINE ROOM.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
RENEW THE BOTTOM BLOW VALVE ON #2 BOILER.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
IN #4 HOLD CROP AND RENEW WASTED SECTION OF MSD PIPING AT THE BULKHEAD PENETRATION, INSTALL GUARDS OVER THE MOTOR/COMPRESSOR BELT DRIVES, REMOVE ALL TRASH AND JUNK AND INSTALL METAL VALVES ON THE PVC PIPING AT THE BULKHEAD PENETRATIONS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
IN # 2 HOLD INSTALL METAL VALVES AT BULKHEAD PENETRATIONS ON PVC PIPING. IN#3 HOLD CROP AND RENEW WASTED SECTION OF MSD PIPING AT BULKHEAD PENETRATIONINSTALL GUARDS OVER MOTOR/COMPRESSOR BELT DRIVES, REMOVE ALL JUNK & INSTALLMETAL VALVES AT BULKHEAD PENETRATIONS ON PVC PIPE RUNS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
STEAM CLEAN HOOD VENTS AND SECTIONS OF DUCTING NEAR FUSIBLE LINK IN PASSENGER GALLEY ON A DECK TO REMOVE ALL GREASE AND COOKING OIL.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Electrical
Issued 19 November 1988
Resolved
REWIRE EMERGENCY LIGHTS OUTSIDE OF CABINS 321 AND 322 ON A DECK & IN THE ENGINEERS GALLEY OVER THE COFFEE MAKER. ALSO REMARK E LIGHTS ON A AND B DECK WHERE NEEDED AND AS MARKED DURING THIS QUARTERLY INSPECTION.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
REINSTALL OR REPAIR DAMAGED OR MISSING INSULATION ON BOILER DRUMS, STEAM PIPING, FEED WTR PIPING, GLAND SEAL PIPING, FUEL OIL PIPING IN BOTH ENGINE ROOMS WHERE SURFACE TEMPERATURE EXCEEDS 150 DEGREES F.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Construction/Loadline
Issued 19 November 1988
Resolved
REMOVE ALL LUBE OIL AND FUEL OIL FROM THE ENGINE ROOM BILGES.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
REINSTALL CLOSING DEVICES ON FIRE SCREEN DOORS 6 AND 7 ON C DECK.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Lifesaving
Issued 19 November 1988
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE FLEMING GEAR ON #8 LIFE BOAT.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Electrical
Issued 19 November 1988
Resolved
REINSTALL COVERS OVER ELECTRICAL BOXES AT ELECTRICAL STATION #11 ON B DECK,AND IN THE FORMER CHEF'S LOCKER #2 ON B DECK, LABEL STATION AS ELECTRICAL STATION #2, REMOVE ALL EXTRANEOUS MATERIALS, AND REPLACE A-60 INSULATION REMOVED FROM THE BULKHEAD IN WAY OF THE NEW TRANSFORMERS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Lifesaving
Issued 19 November 1988
Resolved
RE-LABEL THE GENERAL ALARM BELLS IN THE MAIN GALLEY ON A DECK ON THE PORT SIDE, IN THE MEAT CUTTING ROOM ON B DECK AFT, ON B DECK NEAR CABIN 478 AND NEAR CABIN 444, AND THE BELL LOCATED IN THE MAIN DINING ROOM STBD SIDE.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
CORRECTLY LABEL THE MANUAL FIRE ALARM BREAK GLASS STATIONS FOR ZONE 45 AND 54.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE FIRE DETECTION SENSORS FOR ZONES 54 & 46. FIRE PATROLS ARE TO BE CONDUCTED EACH HOUR IN THESE AREAS UNTIL THE ZONES ARE REPAIRED.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Construction/Loadline
Issued 19 November 1988
Resolved
INSTALL NEW GASKET MATERIAL AND CLEAN SEALING SURFACES ON THE AFT SIDE PORTS BOTH PORT AND STBD SIDES.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Lifesaving
Issued 19 November 1988
Resolved
DEMONSTRATE OPERATION OF THE FIXED RADIO IN LIFEBOAT #3.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
REMOVE ALL TRASH AND JUNK FROM THE ESCAPE TRUNK IN WAY OF FIRE SCREEN DOOR #3 D DECK.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
FREE-UP AND PROVE OPERATION OF THE FIREMAIN ISOLATION VALVE FOR #3 FIRE PUMP.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
REINSTALL THE HAND RELEAVING DEVICE FOR THE D C HEATER RELIEF VALVE IN THE AFT ENGINE ROOM.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Lifesaving
Issued 19 November 1988
Resolved
REPAIR AND PROVE OPERATION OF THE LIMIT SWITCH ON THE FORWARD DAVIT ARM OF #4 LIFEBOAT.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Electrical
Issued 19 November 1988
Resolved
REINSTALL COVERS ON THE OPEN ELECTRICAL JUNCTION BOXES IN THE AFT CAPSTAN ROOM.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
REPLACE EXISTING FLORESCENT LIGHTS IN #2 HOLD IN WAY OF THE MSD SYSTEM AND INSTALL LIGHTS WITH UL APPROVED TYPE UL595. REMOVE ALL TRASH AND JUNK FROM #2 HOLD, REPLACE WASTED HATCH BOARDS ON UPPER LEVEL, INSTALL GUARDS OVER MOTOR/COMPRESSORS BELT DRIVES AND RENEW WASTED PVC PIPE.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
INSTALL CATCH TRAY UNDER THE FUEL OIL TRANSFER PUMP STRAINERS IN BOTH ENGINEROOMS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
REPAIR THE CRACKED SEAT ON THE MAIN STEAM STOP VALVE TO #2 BOILER.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
REMOVE ALL PIPING AND INSTALL BLANKS AT BOTH ENDS FOR SECTIONS WHICH CONNECT THE AFT ENGINE ROOM FIRE MAIN PIPING TO THE SANITARY SYSTEM, AND #3 AND #4 SALT WATER CIRCULATING SYSTEM.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
REMOVE ALL PIPING AND INSTALL BLANKS AT BOTH ENDS FOR SECTIONS WHICH CONNECT THE FORWARD ENGINE ROOM FIRE MAIN PIPING TO THE SANITARY SYSTEM, THE BILGE SYSTEM, AND FROM #1 AND #2 AUX SALT WATER CIRCULATING SYSTEMS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
OPEN UP BOTH FEED WATER INLET CHECK VALVES FOR THE MAIN AND AUXILIARY FEED WATER INLETS ON BOTH BOILER #1 AND #2 FOR INTERNAL INSPECTION.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
PROVIDE A NEW LUBE OIL PURIFIER BOWL FOR THE PURIFIER WHICH IS PRESENTLY MISSING THE BOWL.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
RENEW THE RUBBER EXPANSION JOINT ON THE LOWER LUBE OIL COOLER IN THE AFT ENGINE ROOM.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
CORRECT THE PIPING MISALIGNMENT ON #2 CONDENSATE PUMP IN WAY OF THE RUBBER EXPANSION JOINT.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Electrical
Issued 19 November 1988
Resolved
INSTALL GUARDS AND GLOBES ON ALL EXPOSED LIGHT FIXTURES ON A & B DECKS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
INSTALL BY PASS VALVE ON #4 BOILER MAIN STEAM STOP VALVE.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
INSTALL GUARDS OVER FAN BELTS AND ROTATING EQUIPMENT IN FAN ROOMS 7A AND 7C.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
MAKE PERMANENT REPAIRS TO THE MAGNETIC HOLD BACK DEVICE FOR THE VENT DAMPER LOCATED IN THE DUCTING OVER THE SERVICE BAR IN THE TOURIST CLASS GALLEY.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
MAKE PERMANENT REPAIRS TO THE BROKEN FIRE DAMPER IN FAN ROOM 7C STARBOARD SIDE. PROVIDE A TEMPORARY MEANS TO ALLOW SECURING THE VENT DUCTING UNTIL PERMANENT REPAIRS ARE COMPLETED.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
REMOVE ALL CARPET INSTALL ON THE BULKHEADS 4 INCHES ABOVE THE DECK IN THE SHORE EXCURSION OFFICE AND FOYER ON THE MAIN DECK AFT AND IN ALL PASSENGER ELEVATORS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Electrical
Issued 19 November 1988
Resolved
REPAIR OPEN ELECTRICAL OUTLETS IN THE SERVICE LOCKERS THROUGHOUT A & B DECK.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
REPAIR THE DEFECTIVE FUSIBLE LINK INSTALLATION IN THE MAIN DECK DINING ROOM ON THE STBD SIDE NEAR THE ALARM BELL.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Documentation
Issued 19 November 1988
Resolved
HAVE EXPIRED FCC CERTIFICATES RENEWED.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Lifesaving
Issued 19 November 1988
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE GENERAL ALARM BELL IN THEMEAT CUTTING ROOM ON B DECK.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Construction/Loadline
Issued 19 November 1988
Resolved
INSTALL BLANK ON THE OVERBOARD SCUPPER BEHIND THE AFT ENGINE ROOM LUBE OIL TANK WHERE THE PIPING IS WASTED AWAY.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Lifesaving
Issued 19 November 1988
Resolved
REMOVE OBSTRUCTIONS FROM THE ESCAPE STAIR LEADING FROM B DECK TO THE MAIN GALLEY AND LABEL DOOR TO IDENTIFY SAME AS AN ESCAPE AND NOT TO BE BLOCKED.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Electrical
Issued 19 November 1988
Resolved
REINSTALL ILLUMINATED EMERGENCY ESCAPE SIGN LEADING FROM B DECK TO MAIN GALLEY AT THE B DECK LEVEL. ALSO PROVIDE EMERGENCY LIGHTING IN THE PASSENGER GALLEY ON A DECK.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
REPAIR THE FROZEN HOSE REEL AT FIRE STATION #110.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
RENEW ALL OLD HENSCHEL HEAT DETECTORS ON A & B DECKS. FIRE PATROLS ARE TO BE CONDUCTED EACH HOUR ON THESE DECKS IN ZONES WITH OLD DEFECTIVE SENSORS UNTIL THE SENSORS ARE REPLACED.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
CLEAN OUT ALL SERVICE LOCKERS AND REMOVE ALL FLAMMABLE MATERIALS LOCATED IN ZONE 14 IN CREWS QUARTERS, #4 ON B DECK AND #5 ON B DECK.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
PROVE OPERATION OF THE OILY WATER SEPARATOR.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
SUBMIT DRAWINGS WITH MATERIAL SPECIFICATIONS TO COMDT(MSC) VIA [name withheld] ON ALL REFURNISHINGS AND FURNITURE INSTALLED DURING THE LAST DRYDOCK INSPECTION.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
INSTALL GUARD OVER THE TURBINE/PUMP COUPLINGS ON #3 AND #6 FEED PUMPS.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
REPAIR CASING LEAK ON #1 BOILER IN WAY OF THE B DECK ENTRANCE TO THE FORWARD ENGINE ROOM.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Fire Fighting
Issued 19 November 1988
Resolved
RELABEL FIRE SCREEN DOOR TO STAIR TOWER LEADING TO PANTRY FROM THE TOURIST CLASS GALLEY.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Accommodation/Occupational Safety
Issued 19 November 1988
Resolved
REINSTALL SAFETY RAILS ALONG THE WALKWAY IN WAY OF THE FIRE PUMPS IN THE AFT ENGINE ROOM.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 19 November 1988
Resolved
REPAIR AND PROVE OPERATION OF THE HAND BILGE PUMP FOR THE BOW THRUSTER COMPARTMENT.
Condition: Unknown
Due 19 November 1988
Resolved 19 November 1988
Engineering
Issued 29 October 1988
Resolved
PREPARE AFT D C HEATER FOR INTERNAL INSPECTION.
Condition: Unknown
Due 29 October 1988
Resolved 29 October 1988
Construction/Loadline
Issued 29 October 1988
Resolved
OPEN, CLEAN AND GAS FREE THE FOLLOWING DOUBLE BOTTOM TANKS FOR INTERNAL INSPECTION: #1, 5PIB, 5POB, 5SIB, 5SOB, 4P, 8POB, 8SOB, 9POB, 9SOB, 13P AND 13S.
Condition: Unknown
Due 29 October 1988
Resolved 29 October 1988
Fire Fighting
Issued 27 August 1988
Resolved
CHECK IN THE PRESENCE OF A MARINE INSPECTOR ALL FIRE DETECTORS IN FIRE ZONE38 LOCATED ON THE UPPER DECK.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Fire Fighting
Issued 27 August 1988
Resolved
REPAIR OR REPLACE THE SEVEN MARKED MALFUNCTIONING FIRE DETECTORS IN FIRE ZONE 16 ON THE MAIN DECK.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Fire Fighting
Issued 27 August 1988
Resolved
REPAIR OR REPLACE THE SIX MARKED MALFUCTIONING FIRE DETECTORS LOCATED IN FIRE ZONE 28 ON THE MAIN DECK.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
INSTALL HAND RELEASE DEVICES ON FWD ENGINEROOM STEAM REDUCING STATIONS FOR 100#, 35#, AND 140# RELIEF VALVES.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
UPON COMPLETION OF MOUNTING AND STUD INSPECTION ON NO.1 BOILER, CONDUCT HYDRO AT 1.5 MAWP IN PRESENCE OF COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Fire Fighting
Issued 27 August 1988
Resolved
REPLACE ACTUATOR LOOP ON MAIN CO2 BOTTLE NO.14 AMND TIGHTEN LOOPS ON BOTTLES 20 AND 28 ON MAIN BANK, AND BOTTLES 81,85,89,AND 87 ON RESERVE BANK
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Accommodation/Occupational Safety
Issued 27 August 1988
Resolved
REPLACE EXISTING PVC PIPING ON BUTCHER SHOP DRAIN SYSTEM AND INSTALL HEAVIER SCHEDULE PIPE, PROVIDE STEEL VALVES AT WATERTIGHT BULKHEAD PENETRATIONS ON BOTH SIDES, PROVIDE ADDITIONAL PIPE SUPPORTS AND PROVIDE METAL CLIPS ON MOTOR CABLE RUNS.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
RENEW WASTED SECTION OF BILGE SUCTION LINE IN ROSE BOX IN NO 2 HOLD.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
REPAIR AND REPLACE AIR ACTUATOR VALVES IN NO.3 AND NO.4 HOLDS, PROVIDE NEW VALVE FOR NO.1 HOLD BILGE MANIFOLD IN FWD ENGINEROOM AND ROSEBOX SUCTIONS IN NO.2 HOLD. HOLDS 1-4 TO BE CHECKED EACH WATCH UNTIL INSTALLED.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Accommodation/Occupational Safety
Issued 27 August 1988
Resolved
CROP AND RENEW LEAKS AND SOFT PATCHED MSD PIPING IN NO.3 AND 4 HOLDS ON UPPER LEVEL.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
REMOVE 2 VALVES FROM #285 REDUCING STASTION SENSING LINE AND INSTALL A NEW VALVE AND SENSING LINE.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Documentation
Issued 27 August 1988
Resolved
PROVIDE PIPING DIAGRAM FOR OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
COMPLETE VALVE OVERHAUL AND REPAIRS TO NO 1 BOILER. RENEW SEAT MAIN STEAM STOP, INSTALL EQUALIZING VALVE, RENEW SEAT AND DISC IN THE SECONDARY DESUP.STOP, OPEN SUPERHEATER ROOT VALVE SIDE FOR INSPECTION. CLEAN LAP, AND RENEW STUDS, BOLTS, AND GASKETS ON ALL VALVES. RENEW FLANGE FOR CHEM. INJ. VALVE
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Electrical
Issued 27 August 1988
Resolved
REPLACE FADED WIRING DIAGRAMS FOR BOTH 1 AND 2 FORCED DRAFT FAN CONTROLLERS
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Accommodation/Occupational Safety
Issued 27 August 1988
Resolved
INSTALL PIPE SUPPORTS FOR SANITARY LINES IN NO 3 AND 4 HOLD, AND FIREMAIN PRESSURE CONTROL LINE FOR ENGINEROOM, AND INSTALL SEA VALVE AT HULL SPOOL PIECE CONNECTION.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
RENEW EXPANSION JOINTS BELLOWS (NON-METALLIC), FOR NO. 1 AND 2 CONDENSATE PUMPS IN FWD ENGINEROOM.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Accommodation/Occupational Safety
Issued 27 August 1988
Resolved
CROP AND RENEW WASTED SECTION OF NO 6 SEWAGE COLLECTION TANK IN AFT ENGINEROOM. GAUGE TANK TO DETERMINE EXTENT OF WASTAGE. RENEW AS REQUIRED.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Lifesaving
Issued 27 August 1988
Resolved
MAKE PERMANENT REPAIRS AND PROVE HYDRAULIC STARTING SYSTEM NO 4 LIFEBOAT AIRTIGHT.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Engineering
Issued 27 August 1988
Resolved
REMOVE REMAINING TRASH AND INSTALL LIGHT BULBS IN NO.3 HOLD, CLEAN BILGE ROSE BOXES IN HOLDS NO.2,3 AND 4, AND INSTALL BILGE SUCTION SCREENS IN HOLDS NO.1,2,3 AND 4 BILGE ROSE BOXES.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Construction/Loadline
Issued 27 August 1988
Resolved
GAUGE DECK IN CONFERENCE CENTER TO DETERMINE THICKNESS. CROP AND RENEW ANY AREAS WITH 25% OR GREATER WASTAGE AND REMOVE TEMPORARY DOUBLER PLATE REPAIR
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Construction/Loadline
Issued 27 August 1988
Resolved
PROVIDE UT GAUGING REPORTS ON ALL DOUBLE BOTTOM TANK TOPS
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Navigation
Issued 27 August 1988
Resolved
INSTALL GUARDS OVER BOTH STEERING GEAR MOTOR COUPLINGS, NO 2 FORCE DRAFT FAN MOTOR COUPLING, STBD FAN FORWARD BELT IN FAN ROOM 4C, AND MOTOR FAN BELT IN FAN ROOM 5C
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Fire Fighting
Issued 27 August 1988
Resolved
REPAIR OR REPLACE THE EIGHT MARKED MALFUNCTIONING FIRE DETECTORS LOCATED IN THE FIRE ZONE 56 ON THE MAIN DECK.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Fire Fighting
Issued 27 August 1988
Resolved
REPAIR OR REPLACE THE SIX MARKED MALFUNCTIONING FIRE DETECTORS LOCATED IN FIRE ZONE 37 ON THE MAIN DECK.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Fire Fighting
Issued 27 August 1988
Resolved
REPAIR OR REPLACE THE THREE MARKED MALFUNCTIONING FIRE DETECTORS LOCATED IN FIRE ZONE 49 ON THE MAIN DECK.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Accommodation/Occupational Safety
Issued 27 August 1988
Resolved
FREE UP THE AUTOMATIC FIRE DAMPER LOCATED IN FAN ROOM 5D ON THE MAIN DECK OF ACCUMULATED RUST AND DIRT, AND OPEN THE VENT FOR INSPECTION OF THE FUSIBLE LINK.
Condition: Unknown
Due 27 August 1988
Resolved 27 August 1988
Construction/Loadline
Issued 25 June 1988
Resolved
REMOVE ALL OIL AND SEWAGE FROM NO.4, 5 & 6 CENTER DEEP TANKS AND MAKE READYFOR COAST GUARD INTERNAL INSPECTION.
Condition: Unknown
Due 25 June 1988
Resolved 25 June 1988
Construction/Loadline
Issued 25 June 1988
Resolved
REMOVE NO.6 CENTER DEEP TANK FROM THE SEWAGE HOLDING TANK SYSTEM AND USE AS LOCKED IN FRESH WATER BALLAST TANK AS PER STABILITY BOOKLET DATED 26 MARCH 1986.
Condition: Unknown
Due 25 June 1988
Resolved 25 June 1988
Construction/Loadline
Issued 25 June 1988
Resolved
INSTALL BLANKS AT ALL FILL AND SUCTION LINES TO ISOLATE NO.1, 4, 5 & 6 CENTER DEEP TANKS AND ALL DOUBLE BOTTOM AND OTHER LOCKED IN FRESH WATER BALLAST TANKS FROM THE FUEL SYSTEM.
Condition: Unknown
Due 25 June 1988
Resolved 25 June 1988
Engineering
Issued 9 June 1988
Resolved
RENEW WASTED SECTION OF CASING ON NO.1 BOILER AT FORWARD BOTTOM OUTER CASING, REAR INNER LOWER OUTBOARD OF SUPERHEATER HEADER, REAR INNER TOP IN WAY OF WATERWALL TUBES AND BOTTOM OUTER CASING.
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Engineering
Issued 9 June 1988
Resolved
CROP AND RENEW WASTED SECTION OF FOOTING LOWER LEFT ON NO.1 BOILER.
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Electrical
Issued 9 June 1988
Resolved
PROVIDE NEW EXPLOSION PROOF LIGHT FOR PAINT LOCKER TO REPLACE EXISTING LIGHT FIXTURE WHICH WAS TAPPED FOR CABLE RUN. ALSO, REMOVE FAN FROM PAINT LOCKER BULKHEAD AND SECURE OPENING.
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Electrical
Issued 9 June 1988
Resolved
EXTEND VENT DUCTING FOR NEW PAINT LOCKER TO OPEN DECK OR PROVIDE EXPLOSION PROOF ELECTRICAL FIXTURES FOR ALL SPACES COMMON TO VENT.
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Fire Fighting
Issued 9 June 1988
Resolved
PROVIDE MAGNETIC HOLD BACK DEVICES ON FIRE SCREEN DOORS FSD-2, FSD-14 AND FSD-21A.
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
IN CARGO HOLD #5, PERMANENTLY REPAIR MSD TREATMENT TANK NO.9 IN WAY OF HOLEIN UPPER OUTBOARD CORNER.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.1: LOCATE AND CORRECT FEED WATER VALVE LEAKS TO STEAM DRUM.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.1: WATERWASH FIRESIDES OF GENERATING AND SUPERHEATER TUBES.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
REPAIR WIRING AT STUFFING TUBES AT #4 L/B BATTERY CHARGER CABLE JUNCTION BOX; PA SYSTEM NEAR #12 L/B; 3 STBD AFT L/B EMBARKATION LIGHTS; AND #'S 2, 3,5,6 AND 7 PORTSIDE L/B EMBARKATION LIGHTS.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
FIRE STATION 20 - REPLACE HANDWHEEL FOR FIREMAIN VALVE. REPLACE HOSE RACK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF REMOTE HULL VENTILATION SHUTDOWN FROM FIRE CONTROL ROOM.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
RENEW ELECTRIC CONTROL BOXES FOR GANGWAYS, LOCATED ON SUN DECK PORT AND STARBOARD SIDE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
REMOVE DEAD END CABLES AT FOLLOWING LOCATIONS: A) STARBOARD BRIDGE WING OVERHEAD. B) HARNESS NEAR LIFEBOAT #9, SUN DECK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF HEAT DETECTOR ZONE 30, PANTRY, PORT SIDE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
DEMONSTRATE OPERATION OF VENTILATION SHUTDOWNS AND EQUIPMANT SHUTDOWNS DURING CO2 RELEASE IN GYRO AND EMERGENCY GENERATOR ROOMS. PRESSURE SWITCHESALREADY PROVEN WITH CO2.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
REROUTE AND PROPERLY SUPPORT TV ANTENNA CABLE NEAR LIFEBOAT #12, UTILIZING ELECTRICAL CABLE RUNS.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
RENEW LOWER FAN SCREEN IN FAN ROOM 5F STARBOARD SIDE, BOAT DECK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Lifesaving
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF AFT LIMIT SWITCH #11 LIFEBOAT DAVIT.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
RENEW WASTED LIGHT BRACKET #3 STARBOARD SIDE, SPORT DECK OUTSIDE OF SOLARIUM.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
REPLACE MISSING AND BROKEN GLOBES AND GUARDS FOR DECK LIGHTING ON SPORT DECK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Lifesaving
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF GENERAL ALARM BELL AT 1ST ASST. ENGINEER'S ROOM - PORT SIDE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
INSTALL DECK LIGHTING GLOBE GUARDS THROUGHOUT BOAT DECK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Lifesaving
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER FORWARD AND ASTERN OPERATION OF #'S 5,6 AND 10 LIFEBOATS.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
AUXILIARY MACHINERY SPACE, REPLACE FIRE SCREEN DOOR AND DOOR JAMB AT BOTTOMOF STAIR TOWER.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
AUXILIARY MACHINERY SPACE VENT FANS, REPAIR AND DEMONSTRATE PROPER OPERATION OF INDICATOR LIGHTS FOR FAN 05-129 SUPPLY AND FAN 06-130 EXHAUST.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Navigation
Issued 19 May 1988
Resolved
STEERING GEAR ROOM, REPLACE ALL BROKEN STEERING PUMP GAUGES (5 OF 6), LABEL, AND DEMONSTRATE PROPER OPERATION.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Navigation
Issued 19 May 1988
Resolved
AFT STEERING STATION (UPPER DECK), REPAIR RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Navigation
Issued 19 May 1988
Resolved
REPAIR SOUND POWERED PHONE BETWEEN AFT STEERING STATION AND STEERING GEAR ROOM, AND DEMONSTRATE PROPER OPERATION.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.1: WATERWASH WATERSIDE OF GENERATING TUBES AND SUPERHEATER AS NEEDED.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.1: USING CERTIFIED WELDER AND APPROVED PROCEDURES, IN STEAM DRUM GRIND OUT AND REWELD FRACTURED WELDMENT AROUND DRY PIPE MOUNTING BOLT, PRIOR TO PLACING BOILER IN SERVICE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Construction/Loadline
Issued 19 May 1988
Resolved
FOR DOUBLE BOTTOM TANK 6 STARBOARD OUTBOARD, INSTALL SPRING LOADED GATE VALVE AND PLUG ON SOUNDING TUBE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF MIDSHIP AFT LIGHTS ON BOAT DECK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
PROPERLY REPAIR PA SPEAKER WIRING, PORT AFT BOAT DECK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
REPAIR EXHAUST VENT DUCTING LOCATED NEAR #4 FIRE STATION. (HOLED UNDER HANDRAIL.)
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
INSTALL GLOBE CAGES PORT AND STARBOARD SIDE FOR DECK LIGHTS, SUN DECK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
REPAIR INOPERATIVE VENT CLOSURES AT BOAT STATIONS 1 & 2, FORWARD BOAT STATION 1 AND BELOW TEMPORARY LIFERAFT STOWAGE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
REPAIR VENT CLOSURE, PORTSIDE, BESIDE EMERGENCY GEAR LOCKER, SUN DECK. (SCREEN KEEPER WASTED, NO GASKET ON BACK SIDE.)
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
FORWARD ENGINEROOM SUPPLY FAN ROOM: DETERMINE PURPOSE OF SQUARE VENT TRUNK THROUGH DECK AND PROVIDE PROTECTIVE GRATING.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.1: IN STEAM DRUM, RECONNECT CHEMICAL FEEDLINE AND PROVIDE CORRECTLY SIZED BRACING FOR DESUPERHEATER TUBE BUNDLES.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.1: IN SUPERHEATER VESTIBULE, REPAIR FORWARD WALL BRICKWORK.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Construction/Loadline
Issued 19 May 1988
Resolved
AFT ENGINEROOM SUPPLY FAN 05-137-2: CROP AND INSERT WASTED DECK IN WAY OF FAN.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
FORWARD ENGINEROOM SUPPLY FAN 5-107-2: REPLACE BLADING, PROTECTIVE GRATING AND REBALANCE FAN.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
FORWARD ENGINEROOM SUPPLY FAN 05-100-1: REPLACE BLADING, PROTECTIVE GRATINGAND REBALANCE FAN.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Construction/Loadline
Issued 19 May 1988
Resolved
FORWARD ENGINEROOM SUPPLY FAN 05-107-1: CROP AND INSERT WASTED/FRACTURED DECK IN WAY OF FAN.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
AFT ENGINEROOM, REPLACE SANITARY PUMP INLET VALVE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
AFT ENGINEROOM, OFF SEA CHEST, STARBOARD SIDE FORWARD; REPLACE SEA SUCTION VALVE FOR FIRE AND SANITARY SERVICE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.3: REPLACE 600 LB AUXILIARY STEAM CROSS CONNECTION VALVE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
AFT ENGINEROOM, #3 AUXILIARY AIR EJECTOR: PROVIDE LAGGING ON ALL EXPOSED STEAM LINES.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
AFT ENGINEROOM, MAIN SWITCHBOARD: REPLACE ENGINEROOM VENTILATION CIRCUIT BREAKER (600 AMP) IN KIND.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
AFT ENGINEROOM: LOCATE AND CORRECT STACK GAS LEAKS IN FIDLY.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
AFT ENGINEROOM FIDLY EXHAUST FAN 04-132-1: INSTALL PROTECTIVE SCREEN OVER FAN.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
AFT ENGINEROOM SUPPLY FAN 05-135-2: DEMONSTRATE PROPER OPERATION IN FAST AND SLOW SPEED.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
IN CARGO HOLD #4, PERMANENTLY REPAIR MSD TREATMENT TANK NO.5 IN WAY OF PATCH.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
IN LOWER LEVEL OF CARGO HOLD #4, REINSTALL MAN HOLE COVERS ON MAN HOLES IN WAY OF AFT BULKHEAD, PORT AND STARBOARD SIDES, AND REINSTALL BILGE SUCTION VALVES.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF SMOKE/HEAT DETECTORS, ZONES 38 & 42, HENSCHEL FIRE DETECTION SYSTEM. MAINTAIN AN HOURLY FIRE WATCH IN THESE ZONES UNTIL THE SYSTEM IS REPAIRED.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF ANNUNCIATOR BELL ON BRIDGE FOR CO2 RELEASE IN GYRO ROOM AND EMERGENCY GENERATOR ROOM. PRESSURE SWITCHES ALREADY PROVENWITH CO2.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Construction/Loadline
Issued 19 May 1988
Resolved
REPAIR AS NEEDED AND DEMONSTRATE PROPER OPERATION OF THE BILGE AND BALLAST PNEUMATIC VALVE SYSTEM.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
IN EMERGENCY GENERATOR ROOM, RESERVICE THE FIXED CO2 SYSTEM AND INSURE THE FLEX LOOP CONNECTIONS ARE TIGHT.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
IN MAIN CO2 ROOM, RESERVICE SYSTEM AND INSURE THE FLEX LOOP CONNECTIONS ARETIGHT.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Fire Fighting
Issued 19 May 1988
Resolved
IN EMERGENCY GENERATOR ROOM, LABEL CO2 PNEUMATIC SWITCH (1 OF 2 MISSING LABEL).
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
FORWARD ENGINEROOM "B" DECK ENTRY DOOR, REMOVE AND REPLACE DOOR, DOOR JAMB AND CLOSURE DEVICE.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
FORWARD ENGINEROOM, NO.2 AUXILIARY AIR EJECTOR, REPLACE BROKEN STEAM VALVE TO FIRST STAGE (OUTBOARD VALVE).
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
BOILER NO.2: RENEW THE 7 SIDE WATERWALL TUBES THAT ARE DAMAGED AND MARKED.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 23 April 1988
Resolved
REPAIR DAMAGE TO BRICKWORK AT THE FORWARD PORT CORNER OF NO.3 BOILER.
Condition: Unknown
Due 23 April 1988
Resolved 23 April 1988
Engineering
Issued 23 April 1988
Resolved
REMOVE ALL BRICKWORK AND REFRACTORY FROM THE FRONT WALL OF NO.3 BOILER. NO BRICKWORK IS TO BE REINSTALLED UNTIL BOILER'S FRONT WALL IS INSPECTED FOR DAMAGE BY A USCG MARINE INSPECTOR.
Condition: Unknown
Due 23 April 1988
Resolved 23 April 1988
Construction/Loadline
Issued 23 April 1988
Resolved
REMOVE ALL STANDING WATER IN NO.6 PORT INBOARD, NO.6 PORT OUTBOARD, NO.11 PORT AND NO.11 STBD. DOUBLE BOTTOMS FOR BOTTOM PLATE INSPECTION.
Condition: Unknown
Due 23 April 1988
Resolved 23 April 1988
Construction/Loadline
Issued 23 April 1988
Resolved
GAUGE OUTER TWO FEET ABOVE THE OUTERMOST LAP JOINT ON THE PORT SIDE OF NO.6PORT OUTBOARD D/B TANK FROM THE THIRD FLOOR SECTION FORWARD.
Condition: Unknown
Due 23 April 1988
Resolved 23 April 1988
Construction/Loadline
Issued 23 April 1988
Resolved
REMOVE ALL OIL FROM NO.6 PORT OUTBOARD AND NO.10 PORT DOUBLE BOTTOMS. THESETANKS ARE NOT TO BE USED UNTIL OIL FREE AND INSPECTED BY A USCG MARINE INSPECTOR.
Condition: Unknown
Due 23 April 1988
Resolved 23 April 1988
Engineering
Issued 23 April 1988
Resolved
CONDUCT HYDROSTATIC TEST AT 1 1/2 MAWP ON NO.3 BOILER IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 23 April 1988
Resolved 23 April 1988
Accommodation/Occupational Safety
Issued 2 April 1988
Resolved
MAKE PERMANENT REPAIRS TO MSD TANK NO.6 IN WAY OF NO.2 HOLD.
Condition: Unknown
Due 2 April 1988
Resolved 2 April 1988
Engineering
Issued 2 April 1988
Resolved
REMOVE NO.1 BOILER FROM SERVICE AND REPLACE 16 PRESENTLY PLUGGED SUPERHEATER TUBES IN FIRST PASS. IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR, HYDROSTATICALLY TEST BOILER PRIOR TO PLACING BACK IN SERVICE.
Condition: Unknown
Due 2 April 1988
Resolved 2 April 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
PERMANENTLY REPAIR HOLED MSD TREATMENT TANK #12.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
POVIDE COPY OF U. T. GAGING REPORT OF ALL MSD TREATMENT AND COLLECTION TANKS
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Electrical
Issued 26 February 1988
Resolved
DETERMINE SOURSE OF HYDRAULIC OIL LEAK ON SSTG#2 THROTTLE VALVE.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Construction/Loadline
Issued 26 February 1988
Resolved
REPAIR ALL DISCREPANCIES IN #6 PORT OUTBOARD, #6 PORT INBOARD, AND #6 STBD OUTBOARD DOUBLE BOTTOM TANK AS PER WORKLIST.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
PRIOR TO PLACING BOILER #4 IN OPERATION, COMPLETE ALL WORKLIST ITEMS.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
RELABEL AS NEEDED AND PROVE OPERATION OF REEFER BOX ALARMS.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
REPAIR AND PROVE OPERATION OF ALL AFTER ENGINE ROOM FIDDLY VENT FANS.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
INSTALL PERMANENT DRAIN LINE WHERE FIRE HOSE IS NOW IN USE FOR FAN ROOM DRAIN, IN WAY OF FORWARD ENGINE ROOM D. C. HEATER.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
REPLACE SEWAGE EJECTOR AIR RECEIVER RELIEF VALVE AND DEMONSTRATE PROPER OPERATION.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
IN BOTH FIRE ROOMS, REPAIR AND PROVE OPERATION OF ALL FUEL OIL SERVICE AND FORCED DRAFT FAN INDICATOR LIGHTS, AND PROVIDE COVERS WHERE MISSING.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
IN AFTER ENGINEROOM, REPLACE STEAM TO FUEL OIL HEATER AFT GAGE.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
INSTALL PROTECTIVE GUARD OVER STERN THRUSTER SHAFT COUPLINGS.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
REPAIR ALL STEAM LEAKS AS PER WORKLIST.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
REPAIR ALL WATER LEAKS AS PER WORKLIST.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
REMOVE ANY CROSS OVER CONNECTIONS BETWEEN FIRE MAIN PIPING AND SANITARY SYSTEM LINES, OR SUBMIT PLANS FOR APPROVAL TO COMMANDANT, U. S. COAST GUARD(MSC).
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
REMOVE ANY CROSS-OVER CONNECTIONS BETWEEN FIRE MAIN PIPING AND SANITARY SYSTEM LINES, OR SUBMIT PLANS FOR APPROVAL TO COMMANDANT, U. S. COAST GUARD, MARINE SAFETY CENTER.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
UPON COMPLETION OF REPAIRS, MAKE BOILER #2 WATERSIDE AVAILABLE FOR INSPECTI0N.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
UPON COMPLETION OF REPAIRS, HYDROSTATICALLY TEST BOILER #2 TO 1.5XMAWP IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
INSTALL AND PROVE OPERATION OF FAN IN WAY OF AFTER ENGINEROOM D. C. HEATER.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988
Resolved
PRIOR TO PLACING BOILER #2 INTO SERVICE HAVE ALL SAFETY VALVES SET AND SEALED IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
PROVIDE A COMPLETE LIST OF ALL CHANGES TO FURNISHINGS AND INTERIOR FLOORS, WALLS AND CEILING COVERINGS, INCLUDING SPECIFICATION SHEETS PERTAINING TO FIRE SAFETY STANDARDS.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
REPAIR AND PROVE OPERATION OF AFTER ENGINE ROOM VENTILATION SUPPLY FAN 05- 137-1 IN FAST AND SLOW SPEED.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
REPAIR AND PROVE OPERATIONS OF FORWARD ENGINE ROOM VENT FANS IN FAST AND SLOW SPEED; EXHAUST 04-107, EXHAUST 04-103 AND SUPPLY 05-106-2.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
REPLACE CRACKED DIFFUSER ON THE FORWARD ENGINEROOM CO2 HOSE REEL IN WAY OF THE FIREROOM FLAT.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
CONDUCT HYDROSTATIC TEST ON THE CO2 BOTTLE AND FLEXIBLE HOSE LOCATED IN THE AFT ENGINEROOM.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
REMOVE DEBRIS FROM THE SAND BARREL IN THE AFT ENGINEROOM AND FILL TO THE TOP WITH SAND.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
CHIP AND REMOVE ALL SCALE AND RUST FROM THE DECK AREA OF FIRE STATION LOCKER NO.75.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Construction/Loadline
Issued 26 February 1988
Resolved
OVERHAUL ALL DEAD COVER DOGS AND FREE-UP TO ALLOW PROPER CLOSING OF ALL PORT LIGHT COVERS IN THE CREWS GALLEY AND MESS.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
OVERHAUL AND FREE-UP ALL FIRE HOSE STATION VALVES TO ALLOW OPENING BY HAND FROM B DECK AND BELOW.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
CLEAN OUT FIRE MAIN LINES FOR HOSE STATIONS 78 AND 93 TO ALLOW PROPER WATER FLOW AND PRESSURE AT THE VALVES.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Lifesaving
Issued 26 February 1988
Resolved
RENEW SEALS AND BRAKE PADS ON SPEED LIMITING BRAKES FOR LIFEBOAT,S 1, 9, 10AND 11; AND REPLACE WORN PADS ON NO 4 LIFE BOAT SPEED LIMITING BRAKE.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
CONDUCT SURVEY AND MAKE PERMANENT REPAIRS AS REQUIRED TO ALLOW PROPER OPERATION ALL 137 MANUAL FIRE DAMPERS ON ALL DECKS EXCEPT B AND 34 FUSIBLE FIRE DAMPERS A DECK AND ABOVE.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
STEAM CLEAN ALL 4 EXHAUST DUCTS IN CREWS GALLEY TO REMOVE GREASE/OIL BUILD-UP, PROVIDE GREASE FILTERS, OVERHAUL AND FREE-UP DAMPERS TO ALLOW FREE MOVEMENT AND RENEW BROKEN FUSIBLE LINK ON DAMPER LOCATED IN DUCT AT FRAME 104-105 PORT SIDE.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
MAKE PERMANENT REPAIRS TO ALLOW FREE MOVEMENT FOR FUSIBLE LINK FIRE DAMPERS LOCATED ON C DECK, MIDDLE FRAME 42-43, PORT & STBD FRAME 43-44, PORT FRAME 60-61, MIDDLE FRAME 84-86, MIDDLE FRAME 86-87 AND D DECK STBD SIDE FRAME 180-181.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
MAKE REPAIRS OR REPLACE THE PORTABLE FIRE EXTINGUISHER BRACKET AT FIRE STATION NO. 77.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Construction/Loadline
Issued 26 February 1988
Resolved
CLEAN-UP AND OVERHAUL WATER TIGHT DOOR (WTD) 2C TO ALLOW CLOSING OPERATION WITHIN THE SAME TIME PERIOD AS OTHER WTD IN THE SAME AREA.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
MAKE PERMANENT REPAIRS TO ALLOW PROPER OPERATION OF FIRE SCREEN DOOR (FSD) 12B, FSD LOCATED AFT ENGINEROOM B DECK, FSD LOCATED IN WAY OF THE ELEVATOR AUX MACHINERY SPACE (FIX DOOR JAM), AND FSD TO FWD ENGINEROOM (REPAIR DOOR AND DOOR JAM).
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
REMOVE METAL HOLD BACK HOOKS AND INSTALL MAGNETIC HOLD BACK DEVICES ON FIRE SCREEN DOORS 20A, 22B, 31A,,2B, AND 9A.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
MAKE PERMANENT REPAIRS TO FIRE SCREEN DOOR 14C TO ELIMINATE 1/4-1/2 GAP BETWEEN THE TWO DOORS AND ADJUST FSD 9C TO ALLOW PROPER CLOSING.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
REMOVE HOLD BACK DEVICE ON THE COUNTER-WEIGHT ARM FOR THE FUSIBLE LINK FIRE DAMPER LOCATED A DECK PORT SIDE AT FRAME 196 AND MAKE PERMANENT REPAIRTO ALLOW IT TO FUNCTION AS DESIGN.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
PROVIDE ONE C-II PORTABLE FIRE EXTINGUISHER IN THE STERN THRUSTER ROOM.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988
Resolved
MAKE PERMANENT REPAIRS TO THE HENSCHEL FIRE DETECTION SYSTEM TO ALLOW ALARMAND RESET FOR STATIONS 25, 26, 33 & 53. MAINTAIN AN HOURLY FIRE WATCH IN THESE ZONES UNTIL THE SYSTEM IS REPAIRED.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Navigation
Issued 26 February 1988
Resolved
REPAIR AND PROVE OPERATION OF THE FORWARD ENGINEROOM ENGINE ORDER TELEGRAPHSYSTEM.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988
Resolved
CROP AND RENEW UPPER DUCT AREA OF THE GOOSE NECK VENTS LOCATED ON THE FORWARD MAIN DECK BOW PORT AND STARBOARD SIDES, RENEWS SCREENS AND REATTACH COVER FOR THE PORT VENT.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Lifesaving
Issued 26 February 1988
Resolved
CROP AND RENEW WASTED FORWARD AND AFT BREAST PLATES, AND COTTER PINS FOR THE FORWARD AND AFT DISENGAGING APPARATUS HOOK ASSEMBLES FOR LIFEBOAT 7&9.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Construction/Loadline
Issued 16 January 1988
Resolved
IDENTIFY THEN CAP OR RENEW ALL PIPES WHICH LEAD THRU AFT BULKHEAD OR TANK TOP OF #4 LOWER CARGO HOLD.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Construction/Loadline
Issued 16 January 1988
Resolved
INSTALL PERMANENT CAPS ON ALL TANKTOP PENETRATIONS FROM INSIDE THE DOUBLE BOTTOM TANKS 7P OUT, 7P INNER, 7S OUT, 7S INNER.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Construction/Loadline
Issued 16 January 1988
Resolved
ENSURE ALL PORT HOLE COVER DOGS ARE FREED UP AND FUNCTIONING NORMALLY.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Fire Fighting
Issued 16 January 1988
Resolved
REMOVE SCRAP MATERIAL AROUND FIRESTATION #106 AND ATTACH NOZZLE TO HOSE.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Lifesaving
Issued 16 January 1988
Resolved
CONDUCT FOUR HOUR TEST OF #11 LIFEBOAT ENGINE IN ACCORDANCE WITH MAILBOX FROM JACKSONVILLE, FL TO PORTLAND, OR.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Electrical
Issued 16 January 1988
Resolved
INSTALL EXPLOSION PROOF GLOBES AND GUARDS AROUND LIGHT FIXTURES IN LAMP ROOM, PAINT LOCKERS AND BUNKER STATIONS PORT & STARBOARD.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Construction/Loadline
Issued 16 January 1988
Resolved
OPEN, CLEAN AND GAS FREE AND HAVE INSPECTED THE FOLLOWING DOUBLE BOTTOM TANKS: 1P, 1S, 4P, 4S, 5P OUT, 5P IN, 5S OUT, 5S IN, 6P OUT, 6P IN, 6S OUT, 6S IN, 8P OUT, 8P IN, 8S OUT, 8S IN, 9P OUT, 9P IN, 9S OUT, 9S IN, 10P, 10S, 11P, 11S, 13P, 13S. ALSO INSPECT FOREPEAK TANK.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Lifesaving
Issued 16 January 1988
Resolved
PROVIDE PLAN APPROVAL FOR DAVIT MODIFICATION MSEC DRAWING # D9-F-224.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Electrical
Issued 16 January 1988
Resolved
PROVIDE PLAN APPROVAL FOR ELECTRICAL PLANS ASSOCIATED WITH COVER LETTER FROM AMERICAN HAWAII CRUISES DATED 14 DECEMBER 1987 FOR MODIFICATION OF STEERING GEAR AND INSTALLATION OF NEW GYRO AND RADAR.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Accommodation/Occupational Safety
Issued 16 January 1988
Resolved
REMOVE WATER AND EXCESS STEEL AND SCRAP MATERIAL FROM STERN THRUSTER COMPARTMENT ANY REMAINING USABLE SPARE PIECES OF EQUIPMENT SHOULD BE SECURELY TIED DOWN.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Construction/Loadline
Issued 16 January 1988
Resolved
MAKE PERMANENT REPAIRS TO SOUNDING TUBE IN #7 STARBOARD DOUBLE BOTTOM.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Accommodation/Occupational Safety
Issued 16 January 1988
Resolved
REMOVE EXCESS WATER FROM LAUNDRY ROOM. IDENTIFY SOURCE OF LEAK AND CORRECTAND MAKE PERMANENT REPAIRS TO BILGE PUMP IN THAT SPACE.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Construction/Loadline
Issued 16 January 1988
Resolved
ENSURE ALL DOUBLE BOTTOM HATCH COVERS ARE IN PLACE AND TIGHT WITH ALL STUDSAND BOLTS SECURED.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Construction/Loadline
Issued 16 January 1988
Resolved
PLUG, CAP OR RECOUPLE THE PIPE LEADING THRU THE FORWARD BULKHEAD STARBOARD SIDE OF AFT-PEAK TANK.
Condition: Unknown
Due 16 January 1988
Resolved 16 January 1988
Construction/Loadline
Issued 16 December 1987
Resolved
IN NUMBER 2 STBD DOUBLE BOTTOM TANK, PERMANENTLY PLUG LEAKING STEAM HEATINGLINE ON FORWARD BULKHEAD AND REPAIR AFTER LADDER.
Condition: Unknown
Due 16 December 1987
Resolved 16 December 1987
Construction/Loadline
Issued 16 December 1987
Resolved
IN NUMBER 7 PORT OUTBOARD DOUBLE BOTTOM TANK, PERMANENTLY PLUG LEAKING STEAM HEATING LINE ON FORWARD BULKHEAD AND REPAIR FORWARD LADDER.
Condition: Unknown
Due 16 December 1987
Resolved 16 December 1987
Construction/Loadline
Issued 16 December 1987
Resolved
IN NUMBER 7 STBD OUTBOARD DOUBLE BOTTOM TANK, REPAIR LEAKING (HOLED) ROSE- BOX INBOARD AFTER CORNER AND REPAIR AFTER LADDER.
Condition: Unknown
Due 16 December 1987
Resolved 16 December 1987
Construction/Loadline
Issued 16 December 1987
Resolved
ON FOREDECK IN WAY OF DECKHOUSE, STBD SIDE, REMOVE TEMPORARY CONCRETE PATCHAND PERMANENTLY PLUG HOLE IN DECK WHERE ELECTRICAL CONDUIT WAS REMOVED.
Condition: Unknown
Due 16 December 1987
Resolved 16 December 1987
Construction/Loadline
Issued 16 December 1987
Resolved
IN NUMBER 2 PORT DOUBLE BOTTOM TANK, PERMANENTLY PLUG LEAKING STEAM HEATINGLINE ON FORWARD BULKHEAD AND REPAIR AFTER LADDER.
Condition: Unknown
Due 16 December 1987
Resolved 16 December 1987
Lifesaving
Issued 3 December 1987
Resolved
IN LIFEBOAT #5, RENEW BILGE PUMP SUCTION AND DISCHARGE LINES.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Electrical
Issued 3 December 1987
Resolved
RENEW OIL SEAL RING TO GOVERNOR ON S/S TURBO GENERATOR #3 IN THE AFTER ENGINE ROOM.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Construction/Loadline
Issued 3 December 1987
Resolved
PRIOR TO DEPARTURE FROM HAWAIIAN WATERS, PEPAIR OR REPLACE AND MAKE FULLY OPERATIONAL ALL WATERTIGHT ENCLOSURES AND VENT GOOSENECKS ON FOREDECK.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Electrical
Issued 3 December 1987
Resolved
REPAIR OR REMOVE ELECTRIC OUTLET ON FOREDECK ON STBD SIDE OF DECKHOUSE.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
IN LIFEBOAT #3, RENEW DAMAGED ACCUMULATOR GAUGE, PROPERLY SUPPORT FUEL LINES AND COOLING WATER LINE THROUGH ENGINE BOX. RENEW HAND PUMP SUCTION AND DISCHARGE LINES.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Engineering
Issued 3 December 1987
Resolved
REINSTALL BOILER SUPERHEATER TEMPERATURE GAUGES FOR ALL FOUR BOILERS.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Engineering
Issued 3 December 1987
Resolved
IN FORWARD ENGINE ROOM, MAIN THROTTLE CONTROL, ENSURE ALL ALARMS AND TEST SWITCHES ARE LABELED.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Electrical
Issued 3 December 1987
Resolved
IN AFTER ENGINE ROOM, REPAIR AND DEMONSTRATE PROPER OPERATION OF VENTILA- TION SUPPLY FAN #05-137-1 IN BOTH HIGH AND LOW SPEED SETTINGS.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Engineering
Issued 3 December 1987
Resolved
REPAIR FUEL OIL SOLENOID TRIP VALVES FOR BOILERS #3 AND #4 AND DEMONSTRATE PROPER OPERATION IN CONJUNCTION WITH FORCED DRAFT FAN REMOTE TRIPS.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Accommodation/Occupational Safety
Issued 3 December 1987
Resolved
CONDUCT SURVEY OF SOUNDING TUBES TERMINATING BELOW THE FREEBOARD DECK, ENSURING PROPER OPERATION OF SPRING LOADED GATE VALVES AND CAP OR PLUG INSTALLED.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Fire Fighting
Issued 3 December 1987
Resolved
SURVEY ALL FIRE DOORS FOR PROPER OPERATION. REMOVE HOOK AND INSTALL HANDLEON FSD #8, ENGINE ROOM EXIT, AND FSD #20, GALLEY. ADD HIGH TRAFFIC DOORS IN GALLEY TO MAGNETIC HOLD BACK SYSTEM.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
FOR LIFEBOATS #7 AND #12, RENEW AFT DAVIT TRICING PENDENT GUSSET.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
REPLACE RING BUOY BRACKET ON PORT AFT FANTAIL.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Electrical
Issued 3 December 1987
Resolved
FREE UP AND DEMONSTRATE PROPER OPERATION OF EMERGENCY GENERATOR SPACE LOUVER VENTS.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Fire Fighting
Issued 3 December 1987
Resolved
AT THE NEXT SCHEDULED DRYDOCK, REPAIR ALL BROKEN/FROZEN FORE DAMPERS IN FANROOMS 6A,6B, 7A, AND 7C AND DEMONSTATE PROPER OPERATION. SURVEY ALL OTHER FAN ROOM FIRE DAMPERS AND VENTILATION TRUNKS.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
IN LIFEBOAT #2, PROPERLY SUPPORT FUEL LINES.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
IN ALL LIFEBOATS, INSTALL AUTOMATIC DRAIN BALLS. ENSURE ALL DRAIN CAPS ARECHAIN EQUIPPED.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
IN LIFEBOATS #6 AND #9, RENEW WASTED RELEASING GEAR HANDLES.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
INSTALL ILLUMINATION FOR STBD AFT SET OF 5 INFLATABLE LIFERAFTS PER 46 CFR 111.75-16.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
FREE UP ALL LIFEBOAT AND LIFERAFT OVER-THE-SIDE ILLUMINATION FIXTURES.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
INSTALL OPERATING INSTRUCTIONS ON BOTH ENDS OF EACH REQUIRED INFLATABLE LIFERAFT (15 TOTAL).
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
CONDUCT BOAT DRILLS USING ALL PORT SIDE LIFEBOATS. ALL LIFEBOATS SHALL BE LOWERED TO THE WATER AND RELEASED.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 3 December 1987
Resolved
CONDUCT QUARTERLY TEST OF LINE THROWING APPARATUS.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Accommodation/Occupational Safety
Issued 3 December 1987
Resolved
REPAIR STEAM LEAK IN FORWARD STBD CORNER OF LAUNDRY.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Fire Fighting
Issued 3 December 1987
Resolved
SURVEY ALL FIRE DAMPERS AND ENSURE ALL ARE IN GOOD ORDER AND OPERATIONAL.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Accommodation/Occupational Safety
Issued 3 December 1987
Resolved
INSTALL CLOSURES ON ALL VENT TRUNKS TO OPEN DECK.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Electrical
Issued 3 December 1987
Resolved
CONDUCT SURVEY AND ENSURE LIGHTING GLOBES AND GUARDS ARE PROPERLY INSTALLEDTHROUGHOUT VESSEL.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Engineering
Issued 3 December 1987
Resolved
AT NEXT SCHEDULED DRYDOCK, REMOVE FOR EXAMINATION ALL BOILER MOUNTINGS AND ATTACHMENTS ON BOILERS #1, #2 AND #4.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Construction/Loadline
Issued 3 December 1987
Resolved
AT NEXT SCHEDULED DRYDOCK, PROVIDE ACCESS TO CARGO HOLD NO. 1.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Electrical
Issued 3 December 1987
Resolved
AT NEXT SCHEDULED DRYDOCK, REINSTALL "MISCELLANEOUS NON-VITAL BUS" CIRCUIT BREAKER ON THE MAIN ELECTRICAL SWITCHBOARD IN THE AFT ENGINE ROOM.
Condition: Unknown
Due 3 December 1987
Resolved 3 December 1987
Lifesaving
Issued 11 September 1987
Resolved
WEIGHT TEST LIFEBOAT #10.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Lifesaving
Issued 11 September 1987
Resolved
WEIGHT TEST LIFEBOAT #12.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Lifesaving
Issued 11 September 1987
Resolved
WEIGHT TEST LIFEBOAT #5.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Accommodation/Occupational Safety
Issued 11 September 1987
Resolved
CONDUCT GENERAL HOUSEKEEPING CLEANUP IN PASSAGEWAYS AND LADDERWAYS IN WAY OF SHIP'S LAUNDRY, IN PARTICULAR NEAR BHD 157 WTD 13 B DECK.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Electrical
Issued 11 September 1987
Resolved
REINSTALL KW METER FOR SST6 #4 NOW REMOVED FROM FORWARD ENGINE ROOM MAIN SWITCHBOARD.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Unknown
Issued 11 September 1987
Resolved
REPLACE AUXILIARY (120 LB) STEAM GAUGE ON CONTROL BOARD OF LOWER LEVEL FORWARD ENGINEROOM.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Engineering
Issued 11 September 1987
Resolved
SUBMIT PROPOSAL FOR PERMANENT REPAIRS TO ACCESS DOOR TO AFTER ENGINEROOM, B DECK LEVEL, NOW MODIFIED FOR EQUIPMENT HANDLING.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Lifesaving
Issued 11 September 1987
Resolved
WEIGHT TEST LIFEBOAT #8 AND MAKE READY FOR INSPECTION ALL LIFEBOAT PROVISIONS AND EQUIPMENT.
Condition: Unknown
Due 11 September 1987
Resolved 11 September 1987
Fire Fighting
Issued 27 August 1987
Resolved
REPAIR AND PROVE OPERATION OF FIRE DETECTION ZONE NO. 17.
Condition: Unknown
Due 27 August 1987
Resolved 27 August 1987
Fire Fighting
Issued 27 August 1987
Resolved
SERVICE MAIN GALLEY GRIDDLE FIXED FIRE EXTINGUISHER UNIT.
Condition: Unknown
Due 27 August 1987
Resolved 27 August 1987
Accommodation/Occupational Safety
Issued 27 August 1987
Resolved
MAKE AVAILABLE FOR FINAL INSPECTION THE NEWLY INSTALLED MSD VENT LINES.
Condition: Unknown
Due 27 August 1987
Resolved 27 August 1987
Unknown
Issued 11 July 1987
Resolved
MAKE PERMANENT REPAIRS TO NO. 2 BOILER TO THE SATISFACTION OF THE ATTENDINGCOAST GUARD INSPECTOR AND PRIOR TO PLACING BOILER IN OPERATION.
Condition: Unknown
Due 11 July 1987
Resolved 11 July 1987
Unknown
Issued 13 June 1987
Resolved
REPAIR FORGED DRAFT FAN AND PROVE OPERATION FOR BOILER #3.
Condition: Unknown
Due 13 June 1987
Resolved 13 June 1987
Unknown
Issued 28 May 1987
Resolved
IN THE PRESENCE OF A COAST GUARD INSPECTOR, DEMONSTRATE PROPER OPERATION OFTHE FIRE AND SMOKE DETECTION SYSTEM.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
PROVIDE SATISFACTORY SERVICING REPORT FOR SMOKE AND FIRE DETECTION SYSTEM.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
DUE TO EXCESSIVE WASTAGE OF FLEMMING GEAR REMOVE #12 LIFEBOAT FROM SERVICE FOR COAST GUARD INSPECTION. MAKE PERMANENT REPAIRS AS REQUIRED BY THE CG INSPECTOR.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
PERMANENTLY REPAIR BROKEN AND WASTED FLEMMING GEAR PROPELLING HANDLES IN #5 LIFEBOAT.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
IN THE PRESENCE OF A COAST GUARD INSPECTOR, ALL FIXED CO2 LINES SHALL BE BLOWN THROUGH AND ALL ALARMS, TIME DELAYS AND DUMP VALVES SHALL BE TESTED.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
AS PER FIRE EXTINGUISHER REPORT DATED MAY 1987, ALL PORTABLE FIRE EXTINGUISHERS WITH A HYDROSTATIC TEST DATE EXCEEDING 5 YEARS, SHALL BE REMOVED FROM THE VESSEL FOR HYDROSTATIC TESTING.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
PROVIDE CURRENT SERVICING CERTIFICATES FOR ALL ELEVATORS.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
DEMONSTRATE PROPER OPERATION OF EMBARKATION LIGHTS IN WAY OF #11 LIFEBOAT.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
WEIGHT TEST LIFEBOAT #9 IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
WEIGHT TEST #8 LIFEBOAT IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
REMOVE ALL PAINTS AND ASSOCIATED EQUIPMENT FROM PAINT LOCKER IN WAY OF CARPENTER SHOP OR INSTALL AN APPROVED FIXED FIRE EXTINGUISHING SYSTEM AFTER OBTAINING PLAN APPROVAL.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
MAKE PERMANENT REPAIRS TO THE EMERGENCY GENERATOR AUTO TRANSFER SYSTEM AND DEMONSTRATE PROPER OPERATION. UNTIL THIS ITEM IS COMPLETED, A 24-HOUR LIVE WATCH SHALL BE MAINTAINED AT THE EMERGENCY GENERATOR SWITCHBOARD.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
PRIOR TO PLACING #4 BOILER IN SERVICE, ALL BOILER SAFETY VALVES MUST BE SETAND SEALED AND #4 FORCED DRAFT FAN OPERATED IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
DUE TO EXCESSIVE WASTAGE OF FLEMMING GEAR, REMOVE #10 LIFEBOAT FROM SERVICE FOR COAST GUARD INSPECTION. MAKE PERMANENT REPAIRS AS REQUIRED BY ATTENDING CG INSPECTOR.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
REPLACE MISSING LAGGING ON ALL STEAM PIPES IN SHIP'S LAUNDRY.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
REPAIR OR REMOVE ALL ELECTRICAL JURY RIGS IN WAY OF PORTABLE CORDS, LIGHT FIXTURES AND ELECTRICAL PANELS IN SHIP'S LAUNDRY.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
REPAIR OR REPLACE THE 5 DILAPIDATED RING BUOYS.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
REPAIR THE SELF CLOSING DEVICE AND DEMONSTRATE PROPER OPERATION OF FIRE SCREEN DOOR #10 LOCATED ON C DECK.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF THE GENERAL ALARM BELLS LOCATED (1) ON PROM DECK BETWEEN S/R P-57 & P-63; (2) PROM DECK IN PACIFIC SHOW PLACE; (3) MAIN DECK OUTSIDE HOTEL MANAGER'S OFFICE; (4) B-DECK IN STEWARD'S LOUNGE.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987
Resolved
REPAIR THE DECK DRAIN SYSTEM IN THE SHIP'S LAUNDRY AND DEMONSTRATE PROPER DRAINAGE.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 10 April 1987
Resolved
HYDROSTATICALLY TEST TO 1 1/4 MAWP, IN THE PRESENCE OF A COAST GUARD INSPECTOR, ALL STEAM PIPING SUBJECT TO BOILER PRESSURE AND GREATER THAN 3 INCHES NOMINAL DIAMETER AT THE NEXT SCHEDULED DOCKSIDE AVAILABILITY OR NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987
Unknown
Issued 12 March 1987
Resolved
REMOVE #9 LIFEBOAT FROM VESSEL FOR EXAMINATION AND REPAIRS AS REQUIRED BY THE COAST GUARD INSPECTOR.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
PROVIDE BILGE PIPING DIAGRAM AND OPERATION/MAINTENANCE MANUAL OF SAREX OIL WATER SEPARATOR TO MSO HONOLULU.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
RENEW PROPELLER ON #4 MOTOR LIFEBOAT.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
INSTALL BONDING CABLE ON RUDDER STOCKI.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
PROVIDE AND INSTALL NONCLOGGING TIPS ON ALL FIRE STATION APPLICATORS.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
HYDROSTATICALLY TEST TO 144 MAWP, ALL STEAM PIPING SUBJECT TO BOILER PRESSURE AND GREATER THAN 3 INCHES IN NOMINAL DIAMETER TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR AT THE NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
NONDESTRUCTIVELY TEST WELD JUNCTION OF BRACKETS AND SHELL PLATE OF TEMPORARY REPAIR ON FORWARD ENGINE ROOM BOILER BLOWDOWN.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
RENEW VALVE HANDLES ON FIRE STATION 106.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
REMOVE PVC PIPING THAT GOES THROUGH WATERTIGHT BULKHEAD ID AND REINSTALL USING STEEL NIPPLE AND VALVES ON BOTH SIDES OF THE BULKHEAD.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
PERMANENTLY REPAIR THER FORWARD ENGINE ROOM BOILER BLOWDOWN HULL PENETRATION AT THE NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
PROVIDE 5108 OUNCES OF COAST GUARD APPROVED WATER FOR #11 LIFEBOAT. UNTIL THIS ITEM IS COMPLETED, THE VESSEL IS LIMITED TO 1116 TOTAL PERSONS.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
REMOVE BLOCKING HOOKS ON MAIN FUEL OIL SOLENOIDS ON ALL BOILERS.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
PROVIDE REPAIR PROCEDURE FOR FLANGE ON DESUPERHEATER COIL OF BOILER #4. UPON COAST GUARD APPROVAL OF THE REPAIR PROCEDURE, EFFECT PERMANENT REPAIR ON THE FLANGE, SUBJECT TO APPROVAL BY THE ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
PROVIDEE AND INSTALL LOCKING DEVICES ON ALL CABLE CONNECTIONS IN SWITCHBOARD AT NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
REMOVE AND PROPERLY INSTALL PVC SOIL LINE LOCATED IN OVERHEAD ABOVE SWITCHBOARD IN FORWARD ENGINE ROOM. USE OF RED HAND AND HOSE CLAMPS ARE NOT ACCEPTABLE.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 12 March 1987
Resolved
RENEW PROPELLER ON #3 MOTOR LIFEBOAT.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 20 December 1986
Resolved
MAKE PERMANENT REPAIRS TO THE TEMPORARY REPAIR LOCATED AMIDSHIPS, STARBOARDSIDE, TWO FEET FROM THE KEEL ON THE NO. 7 LIFEBOAT PRIOR TO 27 DECEMBER 1986.
Condition: Unknown
Due 20 December 1986
Resolved 20 December 1986
Unknown
Issued 11 December 1986
Resolved
SUBMIT FOR APPROVAL PLANS FOR THE INSTALLATION OF A MOTOROLA POWER UNIT ANDASSOCIATED CABLES FOR THE NEWLY-INSTALLED PA SYSTEM. UNTIL APPROVED, REMOVE THE SYSTEM FROM THE FAN ROOM ON 5C MAIN DECK.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
DEMONSTRATE THE HAND PROPELLING GEAR FOR #5 AND #11 LIFEBOAQTS.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
INSTALL CONTINUOUS UNSPLICED ELECTRICAL CABLE FOR THE #10 LIFEBOAT LIMIT SWITCH TO CORRECT A SPLICED CABLE.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
REPAIR THE WASTED BREAKDOWN STORAGE BOX LOCATED ON FLYING BRIDGE.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
PROVE PROPER OPERATION OF THE EMERGENCY VENTILATION SHUTDOWNS FOR BOTH ENGINE ROOMS.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
PERMANENTLY REPAIR THE GAYLORD HOOD SYTSTEM LOCATED IN THE MAIN GALLEY.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
REPAIR AND DEMONSTRATE THE WATERTIGHT DOOR #1 LOCATED ON "D" DECK.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
REPAIR OR REPLACE THE FRESH WATER PIPING IN NO. 7 HOLD.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
REPAIR OR REPLACE THE SANITARY PIPING IN NO. 7 HOLD.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
DEMONSTRATE THE EMERGENCY GENERATOR 117 VOLT BUS TRANSFER FOR ALL MOTOR GENERATOR SETS.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
REPAIR A LEAK IN THE CHILL UNIT FOR THE AIR CONDITIONING UNIT LOCATED IN FAN ROOM 3B ON "A" DECK.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
CROP AND RENEW WASTED SIDE SUPPORT BRACKETS FOR THE SOLID RAILING ON STACK DECK.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
REPAIR STEAM LEAK AT LOWER GOVERNOR BODY OF #5 FEED PUMP.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 11 December 1986
Resolved
PROVE PROPER OPERATION OF THE #1 AND #2 FIRE PUMP RELIEF VALVES.
Condition: Unknown
Due 11 December 1986
Resolved 11 December 1986
Unknown
Issued 6 December 1986
Resolved
MAKE PERMANENT REPAIRS TO AFT LIFEBOAT DAVIT FOR #3 LIFEBOAT AND PERFORM A SATISFACTORY WEIGHT AND OPERATIONAL TEST OF SAME. UNTIL THIS IS COMPLETED THE AMOUNT OF PASSENGERS IS LIMITED TO 902.
Condition: Unknown
Due 6 December 1986
Resolved 6 December 1986
Unknown
Issued 13 November 1986
Resolved
MAKE PERMANENT REPAIRS TO A LEAKING STEAM LINE FROM THE SUPER HEATER DRAIN LINE ON #3 BOILER. LOCATION IS BEHIND THE BOILER, LOWER LEVEL, RIGHT SIDE OF BOILER WHERE THE VALVE PENETRATES THE CASING.
Condition: Unknown
Due 13 November 1986
Resolved 13 November 1986
Unknown
Issued 23 September 1986
Resolved
PERMANENTLY REPAIR LOWER GUDGEON ON LIFEBOAT #11.
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986
Unknown
Issued 11 September 1986
Resolved
CONDUCT SATISFACTORY WEIGHT TEST OF #2, #4, AND #6 LIFEBOATS.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
REPAIR OR REPLACE #1 FIREPUMP.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
CONDUCT 1 1/2 MAWP HYDRO OF #4 BOILER UPON COMPLETION OF MAJOR REPAIRS WITH CG INSPECTOR IN ATTENDANCE. AFTER COMPLETION, SET AND SEAL SAFETYS.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
CONDUCT 1 1/4 MAWP HYDRO OF #2 BOILER UPON COMPLETION OF SUPERHEATER HANDHOLE REPAIR WITH CG INSPECTOR IN ATTENDANCE. AFTER COMPLETION, SET ANDSEAL SAFETYS.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
REPAIR FUEL OIL LEAK IN BULKHEAD 145, 03 LEVEL STARBOARD SIDE.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
REMOVE CROSSOVER PIPING FROM FIRE MAIN SYSTEM TO SANITATION SYSTEM AFTER COMPLETED REPAIRS TO SANITARY PUMPS.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
REPAIR #10 UPPER DECK FIRE SCREEN DOOR.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
PROVE SATISFACTORY OPERATION OF #11 LIFEBOAT FLEMMING GEAR.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
REPAIR OR REPLACE FORCE DRAFT PRESSURE GAUGE FOR #2 BOILER.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 11 September 1986
Resolved
REPAIR OR REPLACE #1 AND #2 SANITARY PUMPS.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Unknown
Issued 6 June 1986
Resolved
DEMONSTRATE OPERATION OF THE LOW LUBE OIL ALARM FOR NO. 2 AUXILIARY GENERATOR.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Unknown
Issued 6 June 1986
Resolved
PROVIDE DECK COVERINGS AS SPECIFIED BY 46 CFR 111.30-11 IN FRONT OF AND BEHIND EACH SWITCH BOARD.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Unknown
Issued 6 June 1986
Resolved
DEMONSTRATE THE EMERGENCY LIGHT SYSTEM AND FIRE SCREEN DOORS IN CONJUNCTION WITH A TEST OF THE EMERGENCY BATTERIES AND THE EMERGENCYH GENERATOR.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Unknown
Issued 6 June 1986
Resolved
MARK ALL EMERGENCY LIGHTS WITH A VISIBLE "E" AT LEAST 1/2 INCH HIGH.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Unknown
Issued 6 June 1986
Resolved
PROVIDE SERVICING REPORTS FOR ALL ELEVATORS.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Unknown
Issued 6 June 1986
Resolved
DEMONSTRATE BILGE PUMPING CAPABILITIES IN ALL SPACES FORWARD OF THE FORWARDENGINE ROOM.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Unknown
Issued 6 June 1986
Resolved
REPLACE ALL DAMAGED EMERGENCY BATTERIES AND DEMONSTRATE THEIR PROPER OPERATION.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Construction/Loadline
Issued 15 February 1986
Resolved
DRYDOCK VESSEL AND MAKE PERMANENT REPAIRS TO DAMAGED SIDE SHELL PLATING LOCATED NO. 6 STARBOARD BALLAST TANK ON OR BEFORE 01 JUNE 1986.
Condition: Unknown
Due 15 February 1986
Resolved 15 February 1986
Unknown
Issued 11 January 1986
Resolved
REPAIR WASTED AND DAMAGED FRAMING IN WAY OF SUPPORTS FOR UPPER WHEELS ON FORWARD ARM OF NO. 6 LIFEBOAT DAVIT.
Condition: Unknown
Due 11 January 1986
Resolved 11 January 1986
Unknown
Issued 28 December 1985
Resolved
EFFECT PERMANENT REPAIRS TO #1 BOILER AND CONDUCT A HYDROSTATIC TEST TO THESATISFACTION OF A CG MARINE INSPECTOR.
Condition: Unknown
Due 28 December 1985
Resolved 28 December 1985
Unknown
Issued 28 December 1985
Resolved
EFFECT REPAIRS TO RETURN TO OPERATIONAL CONDITION #2 DISTILLING PLANT.
Condition: Unknown
Due 28 December 1985
Resolved 28 December 1985
Electrical
Issued 5 December 1985
Resolved
THE FOLLOWING TELEPHONE STATIONS SHALL BE MADE OPERABLE: AUXILIARY STEERING STATION AT FLYING BRIDGE AND AFT WEATHER DECK, ALSO PORT AND STARBOARD BRIDGE WINGS.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Lifesaving
Issued 5 December 1985
Resolved
NO. 9 LIFEBOAT FALLS FORWARD ELEVATOR BLOCK SHALL BE RENEWED DUE TO EXCESSIVE DETERIORATION. UPON COMPLETION FALLS SHALL BE WEIGHT TESTED.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Construction/Loadline
Issued 5 December 1985
Resolved
NO. 2 HOLDS WEATHER DECK HATCH COVER SHALL BE MADE WEATHERTIGHT BY GASKET REPAIRS OR RENEWAL WITHIN THE TWO HATCH HALF MATING BUTTS.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Lifesaving
Issued 5 December 1985
Resolved
GENERAL ALARM BELLS, FIRE ALARM BELLS AND PA SYSTEM SPEAKERS THROUGHOUT THE CREW'S SPACES SHALL BE REPAIRED.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Construction/Loadline
Issued 5 December 1985
Resolved
B' DECK TIME SQUARE AND WASTE STOWAGE AREAS DECKING SHALL BE RECONSTRUCTED AND ARRANGED SO THAT IT CAN ALWAYS BE KEPT CLEAN AND IN A SANITARY CONDITION. SUBMIT DETAILS WITH MATERIAL SPECS.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Accommodation/Occupational Safety
Issued 5 December 1985
Resolved
CREW'S GALLEY SHALL BE MADE SANITARY BY THE EXTERMINATION OF ALL INSECTS AND FITTING OF INSECT SCREENS IN AIR PORTS.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Lifesaving
Issued 5 December 1985
Resolved
MOTOR LIFEBOATS #2 AND #3 WATERTIGHT ENGINE COMPARTMENTS SHALL BE MADE THE SAME AND TESTED.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Accommodation/Occupational Safety
Issued 5 December 1985
Resolved
PASSENGER'S GALLEY, ADJOINING SERVICE ELEVATORS AND STAIR TOWERS SHALL BE MADE CLEAN AND SANITARY.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Electrical
Issued 5 December 1985
Resolved
ELECTRICAL POWER PANELS NO. 11, 49, 53, AND PS-98-P GUARDED ENCLOSURES SHALL BE REPLACED PREVENTING A SHOCK HAZARD.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Fire Fighting
Issued 5 December 1985
Resolved
FIRE SCREEN DOOR #25 CLOSURE ARM BINDS ON LOCKING LATCH PREVENTING CLOSURE.REPAIRS SHALL BE MADE ALLOWING FULL CLOSURE AND LATCHING.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Fire Fighting
Issued 5 December 1985
Resolved
FIRE DETECTING ZONE #37 SHALL BE MADE OPERABLE, HEAT DETECTING AND MANUAL ALARM SYSTEM SHALL BE SATISFACTORILY TESTED.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Electrical
Issued 5 December 1985
Resolved
ALL REFRIGERATION SPACES, INCLUDING COLD STORAGE BOXES WHICH ARE ACCESSIBLETO PERSONNEL, SHALL HAVE OPERABLE LOCK IN ALARM SYSTEM IN ACCORDANCE WITH 46 CFR 113.45.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Lifesaving
Issued 5 December 1985
Resolved
LIFEFLOAT #1'S WATERTIGHT COVERING IS DAMAGED AND HOLED. USCG APPROVED REPAIRS OR UNIT REPLACEMENT SHALL BE MADE.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Lifesaving
Issued 5 December 1985
Resolved
LIFEBOATS #2, 8 AND 12 RELEASING GEAR SHAFTING IS DETERIORATED AS MARKED. AFTER RUST REMOVAL DETERIORATED SECTIONS SHALL BE CROPPED TO GOOD METAL ANDINSERTED OR COMPLETE SHAFT REPLACEMENT IS REQUIRED.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Deck/Cargo
Issued 5 December 1985
Resolved
CERTIFIED PROOF OF CONDITION OR SUITABILITY OF SHIPBOARD CARGO GEAR CANNOT BE LOCATED. AN INSPECTION AND TEST SHALL BE MADE PRIOR TO THE USE OF ANY CARGO GEAR.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Unknown
Issued 5 December 1985
Resolved
NO. 3 MAIN BOILER STEAM STOPS MAIN, AUX. AND GENERATOR MOUNTINGS SHALL BE REMOVED AND STUDS TESTED OR RENEWED TO COMPLETE 8 YEARS REQUIREMENT.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Lifesaving
Issued 5 December 1985
Resolved
NO. 6 LIFEBOAT HULL PLATING DETERIORATION SHALL BE CROPPED TO GOOD METAL AND INSERTED USING APPROVED CG PROCEDURES.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Unknown
Issued 14 September 1985
Resolved
DEMONSTRATE THE PROPER OPERATION OF THE GALLEY GAYLORD VENTILATION SYSTEM.
Condition: Unknown
Due 14 September 1985
Resolved 14 September 1985
Engineering
Issued 14 September 1985
Resolved
MAKE BOILER NO. 4 AVAILABLE FOR A WATER SIDE EXAMINATION AND SET/SEAL SAFETY RELIEF VALVES.
Condition: Unknown
Due 14 September 1985
Resolved 14 September 1985
Engineering
Issued 22 June 1985
Resolved
MAKE PERMANENT REPAIRS TO PORT PROPELLER AT NEXT CREDIT DRYDOCKING.
Condition: Unknown
Due 22 June 1985
Resolved 22 June 1985
Accommodation/Occupational Safety
Issued 6 June 1985
Resolved
PLACE INSERT IN DECK PENETRATION LOCATED ON 'D' DECK PORTSIDE OF STERN THRUSTER ROOM.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Engineering
Issued 6 June 1985
Resolved
RENEW MANUFACTURES NAME PLATES PRESENTLY MISSING FROM THE MAIN PROPULSION BOILERS.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Deck/Cargo
Issued 6 June 1985
Resolved
HYDRO OR INTERNALLY EXAMINE AFTER ENGINE ROOM DC HEATER.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Engineering
Issued 6 June 1985
Resolved
PROVE AFTER ENGINE ROOM DC HEATER RELIEF VALVE.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Engineering
Issued 6 June 1985
Resolved
HYDRO NUMBER ONE BOILER 1 1/2 MAXWP UPON COMPLETION OF REPAIRS TO SUPERHEATER TUBES.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Engineering
Issued 6 June 1985
Resolved
SET AND SEAL SAFETY VALVES ON NUMBER 1 BOILER
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Lifesaving
Issued 22 March 1985
Resolved
RENEW AFTER RELEASING HOOK GUSSET BRACKET FOR NO. 7 LIFEBOAT.
Condition: Unknown
Due 22 March 1985
Resolved 22 March 1985
Engineering
Issued 22 March 1985
Resolved
SATISFACTORILY COMPLETE 1 1/4 HYDRO TEST OF #2 BOILER THEN SET AND SEAL SAFETY VALVES.
Condition: Unknown
Due 22 March 1985
Resolved 22 March 1985
Accommodation/Occupational Safety
Issued 22 March 1985
Resolved
PROVIDE PROPER CLOSURES TO ALL GOOSENECK VENTS ON THE FOC'SLE HEAD.
Condition: Unknown
Due 22 March 1985
Resolved 22 March 1985
Engineering
Issued 22 March 1985
Resolved
RENEW ALL OUTSIDE F.O. VENT FLAME SCREENS.
Condition: Unknown
Due 22 March 1985
Resolved 22 March 1985
Lifesaving
Issued 22 March 1985
Resolved
RENEW NO. 7 LIFEBOAT WINCH FORWARD FOUNDATION PEDESTAL AND BOLTS.
Condition: Unknown
Due 22 March 1985
Resolved 22 March 1985
Engineering
Issued 20 January 1985
Resolved
HAVE #2 BOILER SURVEYED IN PRESENCE OF USCG INSPECTOR ON ARRIVAL HONOLULU 26 JAN.REPAIRS TO REAR WALL REFRACTORY&CASING TO BE MADE TO SATISFACTION OF COGNIZANT OCMI.
Condition: Unknown
Due 20 January 1985
Resolved 20 January 1985
Engineering
Issued 20 January 1985
Resolved
SUPERHEATER SAFETY VALVE #2 BOILER TO BE SET&SEALED BY USCG INSPECTOR WHEN BOILER REPAIRS COMPLETED.
Condition: Unknown
Due 20 January 1985
Resolved 20 January 1985
Engineering
Issued 20 January 1985
Resolved
ENCAPSULATE DAMAGED STEAM PIPING LAGGING IN ENGINE ROOMS WITH PLASTER TO ELIMINATE FURTHER ASBESTOS CONTAMINATION.
Condition: Unknown
Due 20 January 1985
Resolved 20 January 1985
Construction/Loadline
Issued 20 January 1985
Resolved
HAVE REPAIRS TO #1&2 FRESHWATER TANKS EXAMINED BY USCG ON ARRIVAL HONOLULU.
Condition: Unknown
Due 20 January 1985
Resolved 20 January 1985
Engineering
Issued 20 January 1985
Resolved
REBUID REACH ROD TO STBD SEA SCOOP SUCTION GATE VALVE.PROVE OPERATION TO USCG INSPECTOR NLT FEB 10,85.
Condition: Unknown
Due 20 January 1985
Resolved 20 January 1985
Unknown
Issued 20 January 1985
Resolved
UNTIL OILY WATER SEPARATOR IS REPAIRED(DUE 26 JAN 85)OILY BILGE SLOPS ARE ONLY TO BE PUMPED FROM SLOP TANK,AFTER GRAVITY SEPARATION,DURING DAYLITE HOURS ONLY.NO QUANTITY OF VISIBLE OIL IS TO BE DISCHARGED OVERBD.
Condition: Unknown
Due 20 January 1985
Resolved 20 January 1985
Engineering
Issued 20 January 1985
Resolved
STERN THRUSTER INSTALLATION (MACHINERY & ELECTRICAL)TO BE COMPLETED UNDER COGNIZANCE [name withheld] FOR ELECTRICAL MODS TO MAIN SWITCHBD #2 ER(BUS TIE MODS)TO BE PROVIDED.
Condition: Unknown
Due 20 January 1985
Resolved 20 January 1985
Lifesaving
Issued 13 December 1984
Resolved
RENEW OR RESERVICE SHACKLES AND PELICAN HOOKS FOR ALL LIFEBOATS AND DAVITS. OUT OF 38 DEFICIENCIES 32 WERE CORRECTED PRIOR TO THIS REPORT AND WILL NOT BE SHOWN.
Condition: Unknown
Due 13 December 1984
Resolved 13 December 1984
Engineering
Issued 13 December 1984
Resolved
RENEW INSULATION AND REPAIR HOUSING TO NO. 3 BOILER AIR PREHEATER CHAMBER.
Condition: Unknown
Due 13 December 1984
Resolved 13 December 1984
Engineering
Issued 13 December 1984
Resolved
RENEW ALL BAFFLE PLATES LOCATED IN NO. 3 BOILER STM. DRUM. INSPECT AND RENEW AS NECESSARY ALL BAFFLE PLATES IN NR 1, 7 AND 4 BOILER STM. DRUMS.
Condition: Unknown
Due 13 December 1984
Resolved 13 December 1984
Lifesaving
Issued 13 December 1984
Resolved
RENEW OR RESERVICE ALL BRAKE LININGS FOR LIFEBOAT WINCHES.
Condition: Unknown
Due 13 December 1984
Resolved 13 December 1984
Lifesaving
Issued 13 December 1984
Resolved
PROVIDE #3 LIFEBOAT WITH SERVICING PLATE.
Condition: Unknown
Due 13 December 1984
Resolved 13 December 1984