OCEAN COLUMBIA is a 1978 mobile offshore drilling unit. The Coast Guard has recorded 114 inspections since 1980, most recently in January 2012, along with 143 deficiencies and 1 casualty investigation in 2005.

Records from 1980 to 2012. Most recent: inspection, 6 January 2012.

Built
1978
Last inspected
6 January 2012
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8753031 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDB7235
Flag
MARSHALL ISLANDS
—
Maury page id
psix-51337

Inspections, by type

…with no type recorded39
Years with a record 29 calendar years (1980–2012)
The 114 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it4158 - Regulatory (Subpart C or D), Net Ton
1364 - Convention (Subpart B), Net Ton
4158 - Regulatory (Subpart C or D), Gross Ton
4549 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 5

Inspection history · 114

6 January 2012 COC-MODU Renew
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4219756
27 January 2011 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3935134
3 January 2011 COC-MODU Annual
Type not classified · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3913747
22 January 2010 COC-MODU Renew
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3676034
30 December 2009 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3660270
8 February 2006 Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2581607
25 October 2005 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2518548
28 July 2005 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2449308
15 November 2004 Periodic Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2241378
7 January 2004 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1980330
3 December 2003 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1958219
31 October 2003 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1939556
1 October 2003 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1919136
24 March 2003 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1762289
10 December 2002 Annual Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1716296
23 February 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1488662
4 December 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 773179
2 December 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 772687
21 November 2001 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1384935
18 November 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1075891
17 November 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 771967
26 January 2001 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1415539
27 September 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 822432
22 May 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1050217
15 March 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1047016
7 February 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1048139
22 November 1999 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1434957
14 July 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1096293
8 June 1999 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 806950
15 April 1999 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1388807
6 April 1999 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1360809
26 January 1999 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 789376
3 December 1998 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1460257
20 May 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1465412
5 May 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1123921
26 March 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1122633
5 March 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1118615
10 February 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 775427
16 January 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1112817
18 December 1997 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1445294
30 January 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 132350
10 January 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1096357
9 January 1997 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1435869
3 May 1996 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1082123
23 April 1996 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 754008
14 April 1996 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 101898
14 April 1996 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 111174
13 April 1996 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 201173
21 January 1996 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1394454
12 January 1996 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1183702
5 January 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1188532
4 January 1996 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1461679
8 December 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 877037
16 November 1995 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1358972
25 October 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 875399
19 September 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 875864
5 April 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 119084
5 April 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 149717
24 January 1995 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1424039
29 November 1994 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 132594
4 January 1994 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1423867
15 July 1993 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 842642
11 July 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 141056
20 May 1993 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1376982
30 April 1993 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1147854
16 March 1993 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 831930
16 February 1993 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1399808
18 September 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 63170
6 July 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 685115
27 June 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 68836
21 April 1992 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 945759
29 January 1992 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1269852
28 January 1992 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1270966
8 January 1992 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 952685
10 May 1991 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 904789
10 May 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1236870
22 April 1991 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1231200
14 January 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 903544
14 January 1991 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 903859
14 November 1990 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 905556
4 October 1990 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1223645
20 April 1990 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1226211
17 April 1990 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1238756
15 April 1990 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1224330
29 March 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1234817
16 February 1990 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1232373
15 February 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 926698
19 January 1990 Deficiency Check · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 917490
22 May 1989 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 888145
19 January 1989 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 892387
6 June 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 894072
23 May 1988 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1044555
20 April 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1035200
3 March 1988 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1027103
21 January 1988 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1324096
13 November 1987 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1337412
14 October 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1322854
8 July 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1330748
24 March 1987 Drydock Extension
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1014356
6 March 1987 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1007071
27 January 1987 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1321454
9 April 1986 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1306740
12 February 1986 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1294078
2 May 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 977828
10 April 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1290504
12 February 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1288091
11 December 1984 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 976199
14 November 1984 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1284153
28 May 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974248
14 February 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281688
11 December 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973064
6 December 1982 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 967931
4 February 1982 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 966101
6 February 1980 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1278094

Deficiency record · 143

Fire Fighting › Fire Pumps › Power Source
Issued 3 January 2011 Resolved
Identified that the emergency fire pump did not operate properly when power was supplied from the emergency generator. Make repairs to the satisfaction of rig's classification society.
Action required: 705 - Other - as specified
Due 3 February 2011
Resolved 27 January 2011
Resolution: Troubleshooting identified that the cause of the failure was in the E-gen rather than the fire pump. Generator was sent ashore and rebuilt/repaired by M.C. Electric, LLC of Amelia, LA. Installation and operational test was verified by rig''s Class (ABS)
Construction/Loadline › Hull › Hull Plating
Issued 25 October 2005 Resolved
Conduct gauging of hull and tank bulkheads and submit results to the local OCMI prior to rig movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 November 2005
Resolution: Received gauging reports from [name withheld].
Construction/Loadline › Hull › Hull Plating
Issued 25 October 2005 Resolved
Complete planned inserts in preload tanks and side shell prior to next rig movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2006
Resolution: Inspected finished repairs, all satisfactory.
Lifesaving › Lifeboat › Cooling Air Duct System
Issued 19 November 2004 Resolved
Renew deteriorated air intake hoses on #1 Lifeboat Capsule 46CFR108.520
Condition: Improper/Lack of Maintenance
Due 10 December 2004
Resolved 26 November 2004
Resolution: New hoses were installed
Lifesaving › Lifeboat › Propulsion Engine
Issued 19 November 2004 Resolved
Provide proper battery charger for #1 & 2 lifeboat capsules. (No ship service electrical 50V battery charger is installed. 46 CFR 108.530
Condition: Improper/Lack of Maintenance
Due 10 December 2004
Resolved 26 November 2004
Resolution: Verified battery charger installation.
Engineering › Compressed Air System (control) › Piping
Issued 15 November 2004 Resolved
Provide oil free purge air for drillers console...console and all internal components were heavily coated with compressor oil.
Condition: Design Flaw
Due 26 November 2004
Resolved 26 November 2004
Resolution: oil separator was installed on air supply line.
Construction/Loadline › Hull
Issued 31 October 2003 Resolved
CROP AND RENEW WASTED PLATE ON OUTBOARD SIDE #15 PRELOAD TANK IN WAY OF 4TH FRAM 10 FEET FROM LADDER. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Due 28 November 2003
Resolved 3 December 2003
Resolution: REPAIRS MADE TO # 15 PRELOAD TANK AS PER E-MAIL FROM OIM.
Construction/Loadline › Hull
Issued 31 October 2003 Resolved
COMPLETE PHASE II OF SEILOD EXAM UNDERWATER SURVEY .
Condition: Unknown
Due 28 February 2004
Resolved 11 April 2004
Fire Fighting
Issued 22 November 1999 Resolved
REPLACE RELIEF VALVES ON TWO FIRE PUMPS.
Condition: Unknown
Due 29 November 1999
Resolved 29 November 1999
Electrical
Issued 22 November 1999 Resolved
REPAIR/REPLACE INOPERABLE E-LIGHT LOCATED AT L/B #1 & #3 EMBARKATION AREA.
Condition: Unknown
Due 29 November 1999
Resolved 29 November 1999
Lifesaving
Issued 22 November 1999 Resolved
INSTALL 2ND LIMIT SWITCH ON ALL THREE LIFEBOATS.
Condition: Unknown
Due 29 November 1999
Resolved 29 November 1999
Engineering
Issued 22 November 1999 Resolved
PLACE FLAME SCREEN ON EMERGENCY DIESEL FUEL TANK VENT.
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Electrical
Issued 22 November 1999 Resolved
LABEL/STENCIL ALL E-LIGHTS THROUGHOUT ACCOMMODATION SPACES.
Condition: Unknown
Due 29 November 1999
Resolved 29 November 1999
Lifesaving
Issued 6 April 1999 Resolved
Conduct on load release test for the port and stbd lifeboats.
Condition: Unknown
Due 6 April 1999
Resolved 6 April 1999
Construction/Loadline
Issued 3 December 1998 Resolved
COMPLETE REPAIRS TO PRE-LOAD TANK #26, DRILL WATER TANK #19 & DRILL WATER TANK #20.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998 Resolved
COMPLETE SPUD-CAN INSPECTION PHASE II SEILODD & APPLICABLE REPAIRS TO BOW LEG SPUD CAN AS IDENTIFIED BY ABS. ITEM TO BE COMPLETED PRIOR TO RIG MOVINGTO NEW WELL AT NEW BLOCK LOCATION.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998 Resolved
ADJUST PORT AFT MAIN DECK WTD DAWG TO ENSURE PROPER SEAL.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Construction/Loadline
Issued 3 December 1998 Resolved
REPLACE DRILL WATER TANK VENT FLAME SCREENS NEAR FIRE STATION #9.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Construction/Loadline
Issued 20 May 1998 Resolved
COMPLETE PERMANENT REPAIRS TO FORWARD LEG SPUD CAN DEFICIENCIES IDENTIFIED BY ABS SURVEY 03JUN98.
Condition: Unknown
Due 20 May 1998
Resolved 20 May 1998
Lifesaving
Issued 18 December 1997 Resolved
IMPLEMENT ALL OF NEW 46CFR 108 AND 109 REQUIREMENTS.
Condition: Unknown
Due 18 December 1997
Resolved 18 December 1997
Construction/Loadline
Issued 18 December 1997 Resolved
REPLACE GASKET ON NO#4 PRELOAD TANK HATCH COVER.
Condition: Unknown
Due 18 December 1997
Resolved 18 December 1997
Lifesaving
Issued 18 December 1997 Resolved
REPLACE OR REPAIR 2 DEAD END WIRES ON OVERHEAD IN NO # 1 LIFEBOAT.
Condition: Unknown
Due 18 December 1997
Resolved 18 December 1997
Accommodation/Occupational Safety
Issued 18 December 1997 Resolved
HOOK UP ELECTRICAL WIRING FOR VENTILATION SHUTDOWN ON GALLEY HOOD FIRE EXTINGUISHING SYSTEM AS PER FIREMASTER REPORT.
Condition: Unknown
Due 18 December 1997
Resolved 18 December 1997
Deck/Cargo
Issued 18 December 1997 Resolved
PERMANENTLY FIX DRAWWORKS MOTOR SUPPLY AIR VENTILATION DUCT PIPING.
Condition: Unknown
Due 18 December 1997
Resolved 18 December 1997
Lifesaving
Issued 18 December 1997 Resolved
HAVE 3RD PARTY CONDUCT INSPECTION ON CRACKS IN SHAFT AREA ON LIFEBOATS # 1,2 AND 3. CRACKS BETWEEN SEATING AND HULL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 December 1997
Resolved 18 December 1997
Engineering
Issued 9 January 1997 Resolved
CLEAN ALL GAUGES ON #1-#3 GEN SETS.
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Lifesaving
Issued 9 January 1997 Resolved
LABEL ALL ALARMS
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Lifesaving
Issued 9 January 1997 Resolved
CONFIGURE VENTILATION IN MUDPIT ROOM TO PROVIDE NEG VENTILATION AS REQUIRED.
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Lifesaving
Issued 9 January 1997 Resolved
LIFEBOAT #1- Change oil and repair the hull where it is delaminating in wayof the engine bed.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Lifesaving
Issued 9 January 1997 Resolved
Repair/replace float light at the starboard aft life ring station.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Lifesaving
Issued 9 January 1997 Resolved
Perform annual test of davit launched life raft hook.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Electrical
Issued 9 January 1997 Resolved
RENEW AND SHORTEN FLEX FUEL LINES TO THE EMERGENCY GENERATOR.
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Lifesaving
Issued 9 January 1997 Resolved
REPAIR DRILL FLOOR EYEWASH STATION.(NO PRESSURE)
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Lifesaving
Issued 9 January 1997 Resolved
REPLACE DUST COVERS ON DRILL FLOOR AND CEMENT ROOM EYEWASH STATIONS.
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Lifesaving
Issued 9 January 1997 Resolved
Perform annual stripping and cleaning of lifeboats. Change out fuel.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Electrical
Issued 9 January 1997 Resolved
LABEL BREAKERS IN PANEL L-C-8
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Construction/Loadline
Issued 9 January 1997 Resolved
Repair/replace gasket at watertight door on main deck serving the engine room.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Documentation
Issued 21 January 1996 Resolved
SUBMIT FINAL NDT REPORT AND VIDEO TO [name withheld] FOR REVIEW.
Condition: Unknown
Due 21 January 1996
Resolved 21 January 1996
Engineering
Issued 4 January 1996 Resolved
REPLACE EMERGENCY GENERATOR FUEL TANK.
Condition: Unknown
Due 4 January 1996
Resolved 4 January 1996
Documentation
Issued 4 January 1996 Resolved
POST LATEST REVISION OF FIRE CONTROL PLAN.
Condition: Unknown
Due 4 January 1996
Resolved 4 January 1996
Lifesaving
Issued 4 January 1996 Resolved
PROVIDE SEA ANCHORS FOR ALL LIFEBOATS.
Condition: Unknown
Due 4 January 1996
Resolved 4 January 1996
Construction/Loadline
Issued 16 November 1995 Resolved
RENEW 9TH BRACKET UP ON AFT INBOARD CORNER OF TANK #26.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
COMPLETE REPAIRS PER ABS OUTSTANDING RECOMMENDATIONS IN REPORT NUMBER MC 3457 DATED 16 NOV 95.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
CONDUCT PHASE 2 OF SEILODD PRIOR TO NEXT RIG MOVE.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
PRELOAD TANK P25: CROP AND RENEW UNDERDECK FRAMES AS INDICATED, GAUGE BULKHEAD AND ATTACHED FRAMING AS INDICATED.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
IN TANK 4S, RENEW 7TH AND 8TH BRACKETS FROM BOTTOM ON INBOARD SIDE AFT BULKHEAD, GOUGE AND REWELD FRACTURE IN SIDELONG #4 AND CROP AND RENEW APPROX. 12" SECTION OF SIDELONGS 5 AND 6.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
PRELOAD TANK 1P: CROP AND RENEW #1LADDER RUNG ON RIGHT SIDE; CROP AND RENEWFRAMING UNDERDECK ADJACENT TO MANHOLE AS INDICATED AND UNDERDECK FLANGE EDGE AS INDICATED, GAUGE SIDESHELL AND ATTACHED FRAMING AS INDICATED.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
PRELOAD TANK 11P: CROP AND RENEW APPROX. 20' OF UNDERDECK FRAMING AS INDICATED ADJACENT TO MANHOLE.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
PIT ROOM VOIDS: CROP AND RENEW 2 GUSSETS AS INDICATED IN BOTH VOID SPACES AND 7 UNDERDECK FRAMES ADJACENT TO MANHOLE. CROP AND RENEW BOTTOM DECK FRAMES AS INDICATED.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Construction/Loadline
Issued 16 November 1995 Resolved
PRELOAD TANK 3P: CROP AND RENEW FIRST AND SECOND SET OF LADDER BRACKETS, GAUGE SIDE SHELL AND ATTACHED FRAMING AS INDICATED.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Navigation
Issued 24 January 1995 Resolved
RENEW PORT & STBD NAV LIGHT LENSES & CLEAN STERN LENSE.
Condition: Unknown
Due 1 March 1995
Resolved 1 March 1995
Lifesaving
Issued 4 January 1994 Resolved
CONDUCT OPERATIONAL TEST OF LIFEBOAT NO. 3 IN WATER.
Condition: Unknown
Due 10 February 1994
Resolved 10 February 1994
Lifesaving
Issued 15 July 1993 Resolved
REPLACE BOTTOM FLANGE OF BOTH CAPSULES.
Condition: Unknown
Due 27 July 1993
Resolved 27 July 1993
Construction/Loadline
Issued 20 May 1993 Resolved
MAKE PHASE II OF VESSEL APPROVED PLAN FOR SPECIAL EXAM IN LIEU OF DRYDOCK AVAILABLE FOR COMPLETION PRIOR TO NEXT RIG MOVE.
Condition: Unknown
Due 20 May 1993
Resolved 20 May 1993
Lifesaving
Issued 16 February 1993 Resolved
TEST TOTAL RIG SHUTDOWN FROM ALL LOCATIONS. (UNABLE TO TEST DUE TO RIG OPERATION).
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Engineering
Issued 16 February 1993 Resolved
TEST OVSPD AND LOW LUBE SHUTDOWNS ON EMERGENCY GENERATOR.
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Documentation
Issued 8 January 1992 Resolved
PROVIDE APPROVED CONSTRUCTION PORTFOLIO FOR RIG. THE ONE PRESENTLY ABOARD HAS NOT BEEN COAST GUARD APPROVED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 February 1992
Resolved 28 January 1992
Construction/Loadline
Issued 8 January 1992 Resolved
LABEL VESSEL NAME AND HOME PORT ON STERN OF VESSEL HULL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Lifesaving
Issued 8 January 1992 Resolved
REPAIR LEG LADDERS TO PROVIDE ONE EMERGENCY ESCAPE LADDER FOR EACH SIDE OF VESSEL TO WATER SURFACE. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Documentation
Issued 8 January 1992 Resolved
PROVIDE OIL TRANSFER PROCEDURES TO MSO MORGAN CITY._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 February 1992
Resolved 29 January 1992
Lifesaving
Issued 8 January 1992 Resolved
PROVIDE EMERGENCY EMBARKATION LIGHTS TO COVER EMBARKATION STATION AND POINTOF WATER ENTRY FOR LIFERAFT STATIONS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Engineering
Issued 8 January 1992 Resolved
PROVE PROPER SHUTDOWN OF THE #1 FUEL TRANSFER PUMP FROM DRILL FLOOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Unknown
Issued 22 April 1991 Resolved
DAVIT-LAUNCHED LIFE RAFT SYSTEM INSTALLATION DEADLINE.
Condition: Unknown
Due 22 April 1991
Resolved 22 April 1991
Construction/Loadline
Issued 14 November 1990 Resolved
HAVE MAGNETIC PARTICLE TESTING CONDUCTED BY LEVEL II TECH ON ALL WELD REPAIRS MADE ON THE SHEAR PLATE TO CORD WELD CONNECTIONS ON EACH CORD OF PORT, STBD, AND BOW LEGS AFTER COMPLETION OF NEXT JOB AT SOUTH TIMBALIER BLOCK 76, GULF OF MEXICO, TO THE SATISFACTION OF THE ATTENDING CG INSPECTOR
Condition: Unknown
Due 14 November 1990
Resolved 14 November 1990
Electrical
Issued 19 January 1990 Resolved
PROVIDE TEMPORARY POWER SOURCE EMERGENCY LIGHTS IN SUFFICIENT QUANITY FROM THE DRILL FLOOR TO THE LIFE SAVING EQUIPMENT UL 924 TYPE LIGHT REQUIRED.
Condition: Unknown
Due 19 January 1990
Resolved 19 January 1990
Electrical
Issued 19 January 1990 Resolved
HOOH THE #2 FUEL OIL TRANSFER PUMP INTO THE REMOTE SHUTDOWN SWITCH.
Condition: Unknown
Due 19 January 1990
Resolved 19 January 1990
Electrical
Issued 19 January 1990 Resolved
REPAIR THE OBSTRUCTION LIGHTS SO THAT THEY (3) FLASH SIMULTANEOUSLY.
Condition: Unknown
Due 19 January 1990
Resolved 19 January 1990
Electrical
Issued 19 January 1990 Resolved
RENEW THE TYPE SO CABLE ON THE DRAW WORKS BLOWER MOTORS WITH APPROVED CABLEINSTALL WITH EYS FITTINGS OR OTHER CLASSED ELECTRICAL FITTINGS.
Condition: Unknown
Due 19 January 1990
Resolved 19 January 1990
Electrical
Issued 19 January 1990 Resolved
PROVIDE TEMPORARY POWER SOURCE EMERGENCY LIGHT FOR EACH 25 MAN LIFE RAFT UL 924 TYPE REQUIRED.
Condition: Unknown
Due 19 January 1990
Resolved 19 January 1990
Electrical
Issued 19 January 1990 Resolved
PROVIDE BATTERY POWER TO THE GAITRONICS SYSTEM USED FOR THE GENERAL ALARM SYSTEM.
Condition: Unknown
Due 19 January 1990
Resolved 19 January 1990
Fire Fighting
Issued 19 January 1989 Resolved
PROVIDE A STABILITY LETTER DATED 08JAN86 TO COINSIDE WITH THE APPROVED OPS MANUAL.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Unknown
Issued 19 January 1989 Resolved
REPLACE ALL FLAME SCREENS ON FUEL VENTS.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Electrical
Issued 19 January 1989 Resolved
PROVIDE A HAZARDOUS LOCATION PLAN FOR THE RIG IAW 46CFR 111.05-5(B)(22) OLD SUB CHAP"J" ALSO ABS RULES FOR CLASSING AND BUILDING MODU'S.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Unknown
Issued 19 January 1989 Resolved
CONDUCT A FIRE AND ABANDON RIG DRILL IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR WHEN THE RIG IS MANNED AND NOT STACKED.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Fire Fighting
Issued 19 January 1989 Resolved
REPLACE SECTION OF FIREMAIN WITH DOUBLER LOCATED ABOVE FIRE PUMPS. SCHEDULEHYDROSTATIC TEST WITH COAST GUARD AFTER COMPLETING REPAIRS.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Electrical
Issued 19 January 1989 Resolved
PROPERLY SECURED THE LOOSE ELECTRICAL WIRES ON THE DRILL FLOOR, DERRICK ANDIN THE MUD PIT ROOM.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Unknown
Issued 19 January 1989 Resolved
REPLACE THE WASTED STEEL DECK AT #1 LIFEBOAT.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Construction/Loadline
Issued 20 April 1988 Resolved
REPLACE THE SIDE SHELL PLATING IN WAY OF THE PRELOAD TANK #15 DAMAGE CONSISTS OF A SET IN AREA @ TB SQ. FT. AT THE KNUCKLE-PORT STERN.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Construction/Loadline
Issued 20 April 1988 Resolved
REPLACE THE SIDE SHELL PLATING IN WAY OF THE PRELOAD TANK #1. DAMAGE CONSISTS OF TWO SET M-AREAS OF @ 2 SQ. FT. EACH AT KNUCKLE-STBD BOW.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Construction/Loadline
Issued 20 April 1988 Resolved
REPAIR/FREE-UP THE FOLLOWING PRELOAD JUMP VALVES #2 REACH ROD SUPPORT BROKEN, #12-VALVE GATE NOT FULLY SEATING, #11-VALVE STEM WILL NOT RAISE OR LOWER FREELY. #4-REACH ROD SUPPORT NOT ATTACH TO ROD.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Construction/Loadline
Issued 20 April 1988 Resolved
HALIBURTON DUMP VALVE (CHECK-VALVE) FROZEN, REPAIR AS NECESSARY.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Construction/Loadline
Issued 20 April 1988 Resolved
FREE UP PRELOAD DUMP VALVE CHEDK VALCES IN PRELOAD TANKS #15,11,3 & 1.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Construction/Loadline
Issued 20 April 1988 Resolved
REPLACE THE LADDER IN PRELOAD TANK #15
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Construction/Loadline
Issued 20 April 1988 Resolved
COMPLETE THE SPECIAL EXAMINATION IN LIEU OF DRYDOCKING-LEG TO CAN CONNECTIONS. EXAMINATION REQUIRED WITHIN 30 DAYS OR THE NEXT RIG MOVE, WHICH EVER OCCUR JUST.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Fire Fighting
Issued 21 January 1988 Resolved
CONDUCT A TEST OF THE NUMBER ONE FIRE PUMP RELIEF VALVE TO THE SATISFACTIONOF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 21 January 1988
Resolved 21 January 1988
Electrical
Issued 21 January 1988 Resolved
CONDUCT A TEST OF THE REVERSE POWER RELAYS FOR ALL THREE GENERATORS TO THE SATISFACTION OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 21 January 1988
Resolved 21 January 1988
Accommodation/Occupational Safety
Issued 21 January 1988 Resolved
CONDUCT AN INTERNAL EXAMINATION OF THE RIG AIR RECEIVER TO THE SATISFACTIONOF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 21 January 1988
Resolved 21 January 1988
Unknown
Issued 14 October 1987 Resolved
SUBMIT IN WRITING REQUEST FOR DRYDOCK EXTENSION. WITHIN THE REQUEST ADDRESSTHE FOLLOWING; REASON(S) FOR THE REQUEST, WHEN THE VESSEL WILL BE MADE AVAILABLE FOR THE DRYDOCK EXAM, AND HOW LONG THE VESSEL WILL BE ON ITS PRESENT LOCATION IN EC151, GULF OF MEXICO.
Condition: Unknown
Due 14 October 1987
Resolved 14 October 1987
Lifesaving
Issued 27 January 1987 Resolved
REPLACE THE CRACKED GLASS WINDOW IN THE DOOR OF THE #2 LIFESAVING CAPSULE.
Condition: Unknown
Due 27 January 1987
Resolved 27 January 1987
Construction/Loadline
Issued 12 February 1986 Resolved
REPLACE THE MISSING DOGGING DEVICE TO THE ACCESS TO PRE-LOAD TANK #11 PRIOR TO THE NEXT RIG MOVE AND IN NO CASE LATER THAN 12MAR86
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Construction/Loadline
Issued 12 February 1986 Resolved
REPAIR THE WATER TIGHT DOOR DEAD LIGHT COVER HINGE AND MISSING DOGGING DEVICE TO THE MAIN DECK ACCESS (OUTER) TO THE PORT CHANGE ROOM PRIOR TO THENEXT RIG MOVE AND IN NO CASE LATER THAN 12MAR86
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Accommodation/Occupational Safety
Issued 12 February 1986 Resolved
MAKE EACH AIR RECEIVER AVAILABLE FOR INTERNAL INSPECTION BY A USCG MARINE INSPECTOR.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Deck/Cargo
Issued 12 February 1986 Resolved
PROVIDE DOCUMENTATION OF THE COMPLETION OF THE ANNUAL CRANE SURVEY TO A USCG MARINE INSPECTOR
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Fire Fighting
Issued 12 February 1986 Resolved
REPLACE OR HAVE A HYDROSTATIC TEST CONDUCTED ON THE PROPELLANT TANK (CYLINDER) OF THE HELIPORT BV SEMIPORTABLE EXTINGUISHER.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Construction/Loadline
Issued 12 February 1986 Resolved
REPLACE THE GASKET TO THE WATER TIGHT DOOR ACCESS TO ACCOMMODATION ROOM 107PRIOR TO THE NEXT RIG MOVE AND IN NO CASE LATER THAN 12MAR86.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Construction/Loadline
Issued 12 February 1986 Resolved
REPLACE THE GASKET TO THE WATER TIGHT DOOR AND REPAIR THE HINGE TO ITS DEAD LIGHT COVER FOR THE MESSDECK ENTRANCE PRIOR TO THE NEXT RIG MOVE AND IN NO CASE LATER THAN 12MAR86.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Construction/Loadline
Issued 12 February 1986 Resolved
REPLACE THE MISSING DOGGING DEVICE TO PRE-LOAD TANK 2 PRIOR TO THE NEXT RIGMOVE AND IN NO CASE LATER THAN 12MAR86
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Accommodation/Occupational Safety
Issued 12 February 1986 Resolved
TEST THE SAFETY RELIEF VALVES FOR ALL RIG AIR RECEIVERS.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Accommodation/Occupational Safety
Issued 12 February 1986 Resolved
MAKE THE DRY BULK TANKS AVAILABLE FOR INTERNAL INSPECTION BY A USCG MARINE INSPECTOR.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Construction/Loadline
Issued 12 February 1986 Resolved
REPLACE THE MISSING DOGGING DEVICE TO THE WATER TIGHT DOOR TO THE PAINT LOCKER.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Construction/Loadline
Issued 11 December 1984 Resolved
MAKE JPERMANENT REPAIRS TO DUMP VALVE IN NO.11 PRE-LOAD TANK.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984 Resolved
MAKE PERMANENT REPAIRS TO OVERBOARD DUMP VALVE REMOTE CONTROL IN HALIBURTONROOM.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984 Resolved
MAKE OPERABLE ALL RETURN CHECK VALVES IN ALL PRE-LOAD TANKS.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984 Resolved
MAKE PERMANENT REPAIRS TO FAN SWITCH AT PAINT LOCKER.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984 Resolved
REPLACE DOOR GASKET AT ROOM BELOW MUD PIT ROOM, (LARGE W.T. DOOR).
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984 Resolved
REPAIR OR REPLACE BRACKETS, WHICH ARE WASTED, FOR THE MAIN WIRING IN MUD PIT ROOM.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984 Resolved
REPLACE WIRING WHERE INSULATIONS IS CRACKED IN MUD PIT ROOM. PIT ROOM.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Fire Fighting
Issued 11 December 1984 Resolved
HAVE ALL FIRE EXTINGUISHERS INSPECTED AND SERVICED PROFESSIONALLY.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984 Resolved
PROPERLY LABEL AND TEST ENGINE ROOM REMOTE FAN SHUTDOWNS.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984 Resolved
PROVIDE APPROVED INSULATION MATS AT GENERATOR SWITCHBOARD, BOTH SERVICE ANDEMERGENCY.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984 Resolved
PROVIDE BUNK LIGHTS IN ACCORDANCE WITH 46 CFR 108.203(I).
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Accommodation/Occupational Safety
Issued 11 December 1984 Resolved
MAKE PERMANENT REPAIRS TO, OR REPLACE, DECK IN CREW CHANGE ROOM.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Accommodation/Occupational Safety
Issued 11 December 1984 Resolved
MAKE PERMANENT REPAIRS TO HANDRAIL AT PORT SIDE AFT AND BELOW DRILL FLOOR.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984 Resolved
INSTALL RECESSED TIE DOWNS IN ACCORDANCE WITH 46 CFR 108.233-108.241 ON FLIGHT DECK. (THIS WAS OMITTED ON INITAL LIST BUT COMPANY REP. KEN SONGY, WAS INFORMED ON THIS).
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Lifesaving
Issued 11 December 1984 Resolved
REPLACE LIFE RUNG AFT MAIN DECK STARBOARD SIDE.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Lifesaving
Issued 11 December 1984 Resolved
REPAIR HINGES ON LIFE JACKET BOX MAIN DECK.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984 Resolved
PROVIDE AMBER LIGHT GLOBE COVERS AS NEEDED ON FLIGHT DECK.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Accommodation/Occupational Safety
Issued 11 December 1984 Resolved
RENEW NON-SKID AS NEEDED ON FLIGHT DECK AND WALKWAYS AND REPAINT FLIGHT DECK IN ACCORDANCE WITH 46 CFR 108.241 AND 46 CFR 108.653, AS APPLICABLE.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Unknown
Issued 14 February 1984 Resolved
PROVIDE ACCESS TO HELICOPTER DECK WITH A SIGN MARKED "BEWARE OF TAIL ROTOR"46 CFR 108.653 (C).
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Accommodation/Occupational Safety
Issued 14 February 1984 Resolved
PROVIDE HELICOPTER DECK WITH A NONSKID SURFACE, 46 CFR 108.235.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Deck/Cargo
Issued 14 February 1984 Resolved
PROVIDE MECHANICAL PROTECTION FOR LIQUID LEVEL INDICATORS (SIGHT GLASSES) ON FUEL OIL AND LUBE OIL DAY TANKS, 46 CFR 58.50-10.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Navigation
Issued 14 February 1984 Resolved
PROVIDE WHISTLE IN COMPLIANCE WITH INTERNATIONAL RULES OF THE ROAD.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Deck/Cargo
Issued 14 February 1984 Resolved
PROVIDE A MOTOR CONTROLLER SUITABLE FOR HAZARDOUS LOCATION FOR THE BUG BLOWER, 46 CFR 111.92.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Lifesaving
Issued 14 February 1984 Resolved
REPAIR OR REPLACE FORWARD LIMIT SWITCH ON PORT CAPSULE DAVIT.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Electrical
Issued 14 February 1984 Resolved
PLACE BLANKS IN UNUSED POSITIONS OF PORT CRANE'S SWITCH PANEL.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Deck/Cargo
Issued 14 February 1984 Resolved
REPLACE BOOM ANGLE INDICATOR ON AFT CRANE, 46 CFR 108.601.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Electrical
Issued 14 February 1984 Resolved
MOUNT SPEAKER SWITCH IN PORT CRANE.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Unknown
Issued 14 February 1984 Resolved
SUBMIT OPERATING MANUAL, PREPARED IN ACCORDANCE WITH 46 CFR 109.121 (D). TOOFFICER IN CHARGE MARINE INSPECTION, NEW ORLEANS FOR REVIEW.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Lifesaving
Issued 14 February 1984 Resolved
OBTAIN 500 FOOT AUXIALLARY LINE FOR LINE THROWING APPLIANCE, 46 CFR 108. 517.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Deck/Cargo
Issued 14 February 1984 Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO [name withheld], DN599308
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Lifesaving
Issued 14 February 1984 Resolved
PROVIDE 14 ADDITIONAL CANS OF WATER TO NUMBER ONE CAPSULE (FOR TOTAL OF 252CANS), 46 CFR 108.503.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Electrical
Issued 14 February 1984 Resolved
PROVIDE EMERGENCY LIGHTS TO ILLUMINATE THE BOARDING AREA OF EACH SURVIVAL CAPSULE, NVC 4-78, 46 CFR 111.75.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Electrical
Issued 14 February 1984 Resolved
REPAIR THE LOSS OF PURGE AIR ALARM ON THE DRILLERS CONSOLE. NVC 4-78 D(10).
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
PROVIDE AN ADDITIONAL FLASHING LIGHT ON THE GENERAL ALARM SYSTEM IN THE MOTOR ROOM. LABEL FLASHING LIGHT NVC
Condition: Unknown
Due 13 March 1984
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Fire Fighting
Issued 14 February 1984 Resolved
REPAIR GENERAL ALARM HORN IN MOTOR ROOM AND LABEL, 46 CFR 108.625.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
PROVIDE GENERAL ALARM BELL IN SCR ROOM NVC 4-78, 46 CFR 113.25-10 (C).
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
PROVIDE TEN FOOT LOW VELOCITY APPLICATOR FOR FLIGHT DECK FIRE STATION AS DEPICTED IN FIRE CONTROL PLAN.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
(CONTINUE FROM 18) STATION BILL TO INDICATE EMERGENCY SIGNALS IN ACCORDANCEWITH 46 CFR 109.503.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
CHANGE RIG PROCEDURES TO SOUND BOTH FIRE AND ABAND ON RIG SIGNALS ON THE GENERAL ALARM SYSTEM. SIGNALS ARE TO COMPLY WITH 46 CFR 109.503. CORRECT
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
REPAIR GENERAL ALARM HORN ON DRILL FLOOR AND MARK IN ACCORDANCE WITH 46 CFR108.625.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
OBTAIN SECOND OXYGEN AND EXPLOSIVE METER WITH UNDERWRITERS LABORATORIES OF FACTORY MUTUAL LABEL, 46 CFR 108.497.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Fire Fighting
Issued 14 February 1984 Resolved
PROVIDE FIREMAN'S OUTFIT(PORT SIDE) WITH ELECTRICALLY NONCONDUCTIVE GLOVES,46 CFR 108.497.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984
Electrical
Issued 14 February 1984 Resolved
MARK EACH EMERGENCY LIGHT IN QUARTERS WITH "E". 46 CF4 108.639.
Condition: Unknown
Due 14 February 1984
Resolved 14 February 1984

Casualty record · 1

28 July 2005Routine · role: Involved in a Marine Casualty · activity 2449308
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.