Records from 1982 to 2015. Most recent: inspection, 9 December 2015.
Inspection history · 58
9 December 2015
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5778625
20 October 2014
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5006171
30 March 2014
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4826037
30 March 2014
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4826594
13 December 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4207951
16 August 2011
COI Inspection · DAPI Audit · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4117200
27 December 2010
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3916721
14 October 2010
Deficiency Check · Administrative Inspection · Drydock Exam · Annual Inspection · Damage Survey · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3869773
23 September 2010
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3856348
23 September 2010
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3858136
21 December 2009
Administrative Inspection · Ballast Water Examination · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3654607
5 November 2008
Hull Examination · Drydock Exam · Periodic Inspection · Internal Structural Exam · MTSA Verification · Deficiency Check · Cargo Tank Internal · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3360564
16 October 2007
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3082645
18 September 2006
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2781407
28 October 2005
Internal Structural Exam · Hull Examination · Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2522390
17 November 2004
Examination of Repairs · MTSA Verification · Internal Structural Exam · Hull Examination · Cargo Tank Internal · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2242878
30 January 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1998564
2 October 2003
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1919926
23 September 2003
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1911929
23 September 2003
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1937538
18 November 2002
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1707008
6 November 2002
Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1705873
16 October 2002
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1695673
16 April 2002
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1605218
28 August 2001
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1461431
24 August 2001
COI Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1445842
31 May 1999
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 801563
16 October 1998
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1441428
24 March 1998
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1469517
27 June 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1450060
23 May 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 155312
1 May 1996
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 871812
29 March 1996
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1465244
15 December 1995
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 676757
2 March 1995
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1457248
4 September 1994
Excursion Permit
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1175621
8 February 1994
Hull Examination · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 852959
4 March 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 840528
5 February 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1362697
5 August 1992
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 953726
8 July 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 963047
1 June 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1270732
19 May 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1256300
14 April 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1264403
6 February 1992
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1262614
29 October 1991
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1417430
24 April 1991
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1241574
8 February 1991
Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1305256
5 February 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 925437
4 February 1989
Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1198804
26 January 1988
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1324911
5 March 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1018172
27 January 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1014342
28 February 1986
COI Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1307815
21 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1287273
29 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278598
31 March 1982
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1274458
23 February 1982
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1276295
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 21 October 2014
Resolved
A 6" section of the jacket water cooling system piping was wasted on the #1 generator resulting in leaking. Renew the wasted section and demonstrate proper operation to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2014
Resolution: Wasted piping was replaced and witnessed by the [name withheld] was leak free. Cleared 835.
Engineering › Electric Propulsion System › Indicator Circuitry
Issued 20 October 2014
Resolved
The jacket water temp and oil pressure gauges on the bridge for the two main engines were inop. Demonstrate proper operation of engine gauges on the bridge to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2014
Resolution: The gauges were repaired and proper operation was witnessed by the attending MI. Cleared 835.
Engineering › Steering Gear System › Hydraulic Hose
Issued 20 October 2014
Resolved
Two hydraulic hoses on the #1 steering gear pump were chaffed and cracked to a point that they were required to be taken out of service. Replace hoses and provide adequate chaffing gear. To the satisfaction of the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2014
Resolution: Both hoses on the steering gear pump were replaced in kind and properly installed. Chaffing gear was also provided. Cleared 835.
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 20 October 2014
Resolved
The generator overspeed on the stbd generator did not operate as required. Repair overspeed device and demonstrate proper operation to the satisfaction of the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2014
Resolution: Witnessed proper operation and tested the stbd generator overspeed. Cleared 835.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 14 October 2010
Resolved
Vessel is missing a line diagram of the piping system for their Fuel Transfer Procedures.
Action required: 705 - Other - as specified
Due 3 January 2011
Resolved 27 December 2010
Resolution: Copy of fuel piping system was received.
Construction/Loadline › Hull › Hull Plating
Issued 23 September 2010
Resolved
Vessel has 1'x15' puncture IWO starboard fore peak near waterline.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 3 December 2010
Resolution: Repairs were completed during the vsl''s drydocking period in Oct- Dec 2010.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 3 October 2003
Resolved
Provide proof of original Certificate of Documentation.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Documentation › Certificates/Documents › Stability Letter
Issued 3 October 2003
Resolved
Provide proof of original stability letter.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Communications › Alarms/Indicators
Issued 3 October 2003
Resolved
Provide separate alarm indicators for each bilge space. LEGACY COMPONENT DESC: Bilge Alarm
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 3 October 2003
Resolved
Provide updated automation test procedures.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Navigation › Collision/Grounding Avoidance
Issued 3 October 2003
Resolved
Paint background of port sidelight flat black. LEGACY COMPONENT DESC: Navigation Lights
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 October 2003
Resolved
Renew port sidelight electrical cable.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Communications › Internal Communications System › Sound-powered Telephone
Issued 3 October 2003
Resolved
Renew sound powered phone cable in pilot house.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Operations/Management › Drills/Instruction › Logbook/Record (unofficial)
Issued 3 October 2003
Resolved
Log all drills and EPIRB checks.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 November 2003
Resolved 3 November 2003
Operations/Management › Drills/Instruction › Safety Orientation
Issued 3 October 2003
Resolved
Provide correct lifejacket donning placards for type onboard.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Construction/Loadline › Structures › Door
Issued 3 October 2003
Resolved
Adjust engine room watertight door.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 November 2003
Resolved 3 November 2003
Electrical › Electrical Distribution System (service)
Issued 3 October 2003
Resolved
Renew placards on engine room electrical service panel. LEGACY COMPONENT DESC: Panel board
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 3 October 2003
Resolved
Service portable fire extinguisher in engine room passageway.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 November 2003
Resolved 3 November 2003
Engineering › Diesel Engine (propulsion-direct drive)
Issued 3 October 2003
Resolved
Provide chaffing gear for all flexible hoses on all engines. LEGACY COMPONENT DESC: Flexible Hoses
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 3 October 2003
Resolved
Properly stencil embarkation zones.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 3 October 2003
Resolved
Label all portable fire extinguisher stations to coincide with the Fire Safety Plan. LEGACY COMPONENT DESC: Marking
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 October 2003
Resolved
Run dead-end wires into junction box in engine room above emergency rudder controls.
Action required: 705 - Other - as specified
Due 3 November 2003
Resolved 3 November 2003
Construction/Loadline › Hull
Issued 23 September 2003
Resolved
Repairs to be made to deck, mooring bits, rub-rail, bulkhead, and side shell iwo port side fwd mooring bits. Affect repairs prior to departure from LaRose, LA. LEGACY COMPONENT DESC: Hull Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 3 October 2003
Engineering › Steering Gear System
Issued 18 November 2002
Resolved
Repair leaking steering actuators IWO rudder room. LEGACY COMPONENT DESC: Actuator
Condition: Unknown
Action required: 705 - Other - as specified
Due 18 December 2002
Resolved 3 October 2003
Lifesaving › Embarkation Appliances/Stations
Issued 16 October 2002
Resolved
POST LIFERAFT PLACARDS ON PORT AND STARBOARD SIDES. LEGACY COMPONENT DESC: PLACARDS
Due 16 November 2002
Resolved 16 October 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 16 October 2002
Resolved
PROVIDE FLAME SCREEN FOR SEWAGE DECK VENT. LEGACY COMPONENT DESC: Flame Screens
Due 16 November 2002
Resolved 16 October 2002
Engineering › Fuel Oil Service System › Filter
Issued 16 October 2002
Resolved
PROVIDE METALLIC PLUG FOR PORT MAIN ENGINE RACOR FUEL FILTER.
Due 16 November 2002
Resolved 16 October 2002
Documentation › Safety/Response Plans/Programs
Issued 16 October 2002
Resolved
PROVIDE APPROVED FIRE SAFETY PLAN. LEGACY COMPONENT DESC: Fire Control Plans
Action required: 705 - Other - as specified
Due 16 November 2002
Resolved 18 November 2002
Resolution: Fire safety plan posted.
Construction/Loadline › Structures
Issued 16 October 2002
Resolved
MAKE PERMANENT REPAIRS TO PORT VOID TANK IN ENGINEROOM. LEGACY COMPONENT DESC: Transverse Bulkhead
Action required: 705 - Other - as specified
Due 16 November 2002
Resolved 15 November 2002
Resolution: INSERTED 18" X 18" PLATE IN VOID TANK.
Navigation › Piloting/Steering
Issued 16 October 2002
Resolved
PROVIDE UPDATED COMPASS DEVIATION CARD. LEGACY COMPONENT DESC: Compass Deviation Table
Due 16 November 2002
Resolved 25 October 2002
Engineering
Issued 28 August 2001
Resolved
Prove proper operation of stbd main engine remote shutdown.
Condition: Unknown
Due 28 August 2001
Resolved 31 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Provide gauging reports for all lube oil tanks (port/stbd) in way of engineroom suppy and exhaust trunks.
Condition: Unknown
Due 28 August 2001
Resolved 31 August 2001
Unknown
Issued 28 August 2001
Resolved
Prove proper operation of port and stbd day tank high level alarms.
Condition: Unknown
Due 28 August 2001
Resolved 31 August 2001
Electrical
Issued 24 August 2001
Resolved
Prove proper operation of low l/o shutdown.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 August 2001
Resolved
Install sight glass shields for port and stbd l/o storage tank.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Fire Fighting
Issued 24 August 2001
Resolved
Submit updated fire control plan for review/approval. Submit prior to 21 Sep 01
Condition: Unknown
Due 21 September 2001
Resolved 4 June 2002
Resolution: Submitted and stamped approved.
Deck/Cargo
Issued 24 August 2001
Resolved
Prior to carriage of dry bulk cargo, provide safety relief valve service report.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Lifesaving
Issued 24 August 2001
Resolved
Provide means to meet rescue platform requirement.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Accommodation/Occupational Safety
Issued 24 August 2001
Resolved
Repair, prove proper operation of all toilets on board.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Navigation
Issued 24 August 2001
Resolved
Properly install steering ram pins and cotter pins on steering ram.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Navigation
Issued 24 August 2001
Resolved
Renew two chafed hydraulic hoses on steering ram.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 August 2001
Resolved
Prove proper operation of port remote MDE shutdown.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 August 2001
Resolved
Install drip pan/flame shield on Racor.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 August 2001
Resolved
Repair oil leak on port red gear pressure sending unit.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Lifesaving
Issued 24 August 2001
Resolved
Provide guard for deck locker ventilation fan.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Electrical
Issued 24 August 2001
Resolved
Repair wiring on air flapper solenoid
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 August 2001
Resolved
Mount and prove proper operation of port/stbd gov. shutdown solenoid.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 August 2001
Resolved
Renew three fuel oil hoses on stbd main engine.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 August 2001
Resolved
Install new lug on overspeed trip wiring.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Electrical
Issued 24 August 2001
Resolved
Install electric grade rubber matting in front of switchboard
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Navigation
Issued 24 August 2001
Resolved
Prove proper operation of fathometer.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Lifesaving
Issued 24 August 2001
Resolved
Provide face masks for SCBA's.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Lifesaving
Issued 24 August 2001
Resolved
Provide 12 parachute flares.
Condition: Unknown
Due 27 August 2001
Resolved 27 August 2001
Engineering
Issued 24 March 1998
Resolved
REATTACH NATURAL VENT SCREEN IN PASSAGEWAY FOR BOWTHRUSTER ROOM.
Condition: Unknown
Due 25 April 1998
Resolved 15 May 1998
Lifesaving
Issued 24 March 1998
Resolved
REMOVE EXISTING PLASTIC SIGHT TUBES AND NON SELF SECURING VALVES ON THE PORT AND STARBOARD FUEL TANKS AND RENEW WITH APPROVED SIGHT GUAGE PER_x001C_ 46CFR 58.01-5 AND ABS RULE 4/6.41.3.
Condition: Unknown
Due 1 April 1998
Resolved 13 April 1998
Navigation
Issued 24 March 1998
Resolved
REPAIR OR RENEW THE 4 PINS THAT CONNECT BOTH RUDDERS TO THE HYDRUALIC RAMS DUE TO EXCESSIVE WEAR ON THE PINS.
Condition: Unknown
Due 1 April 1998
Resolved 15 May 1998
Lifesaving
Issued 24 March 1998
Resolved
REMOVE OILY WATER, PAINT CHIPINGS AND FUEL OIL MIXTURE FROM ENGINE ROOM, AFT STEERING AND BOW THRUSTER ROOM BILGE.
Condition: Unknown
Due 25 April 1998
Resolved 15 May 1998
Construction/Loadline
Issued 24 March 1998
Resolved
REPAINT LOAD LINE AND FWD & AFT DRAFT MARKS ON PORT AND STARDBOARD SIDES._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 April 1998
Resolved 15 May 1998
Documentation
Issued 29 March 1996
Resolved
SUBMIT TO VESSEL DOCUMENTATION OFFICE NEW TONNAGE CERTIFICATE REFLECTING CHANGES IN TONNAGE POST MODIFICATION TO LIQUID MUD TANKS.
Condition: Unknown
Due 29 March 1996
Resolved 29 March 1996
Documentation
Issued 29 March 1996
Resolved
PRIOR TO LOADING, TRANSFERING, OR DISCHARGING LIQUID MUD, UPDATE CARGO TRANSFER PROCEDURE IN ACCORDANCE WITH 33 CFR 155.750.
Condition: Unknown
Due 29 March 1996
Resolved 29 March 1996
Deck/Cargo
Issued 2 March 1995
Resolved
PROVE PROPER OPERATION OF REMOTE SHUTDOWN ON LIQUID MUD TRANSFER PUMP.
Condition: Unknown
Due 21 March 1995
Resolved 21 March 1995
Construction/Loadline
Issued 2 March 1995
Resolved
MAKE TEMP REPAIRS IN WAY OF CRACK IN PORT TRANSOM. PERMANENT REPAIRS TO BEMADE AT NEXT DRYDOCK.
Condition: Unknown
Due 21 March 1995
Resolved 21 March 1995
Deck/Cargo
Issued 2 March 1995
Resolved
HYDRO TEST CARGO TRANSFER HOSES AND MARK THEM WITH MAWP AND HYDRO DATE.
Condition: Unknown
Due 21 March 1995
Resolved 21 March 1995
Navigation
Issued 5 February 1993
Resolved
PROPERLY INSTALL MISSING ISOLATION VAVLE FOR STBD RUDDER STEERING RAM IN RUDDER ROOM.
Condition: Unknown
Due 5 February 1993
Resolved 5 February 1993
Deck/Cargo
Issued 5 February 1993
Resolved
MAKE AVAILABLE FOR INTERNAL INSPECTION ALL FOUR (4) DRY BULK TANKS DURING NEXT DRYDOCK PERIOD.
Condition: Unknown
Due 5 February 1993
Resolved 5 February 1993
Accommodation/Occupational Safety
Issued 6 February 1992
Resolved
MAKE PERMANENT REPAIRS IN WAY OF SEWAGE TANK VENT PIPING.
Condition: Unknown
Due 6 February 1992
Resolved 6 February 1992
Electrical
Issued 6 February 1992
Resolved
INSTALL MISSING LIGHT COVERS AS NECESSARY.
Condition: Unknown
Due 6 February 1992
Resolved 6 February 1992
Deck/Cargo
Issued 8 February 1991
Resolved
PROVIDE LETTER OF ACCEPTANCE FROM MSO NEW ORLEANS FOR OPERATION OF VESSEL_x001C_ WITH ONE ANCHOR.
Condition: Unknown
Due 8 February 1991
Resolved 8 February 1991
Engineering
Issued 8 February 1991
Resolved
REPAIR MAIN ENGINE PILOT HOUSE RPM AND SHAFT TACHS.
Condition: Unknown
Due 8 February 1991
Resolved 8 February 1991
Engineering
Issued 8 February 1991
Resolved
INSTALL EXHAUST MUFFLER BLANKETS IN PORT/STBD STACKS.
Condition: Unknown
Due 8 February 1991
Resolved 8 February 1991
Fire Fighting
Issued 8 February 1991
Resolved
PROVIDE DRAWING AND A BILL OF MATERIALS FOR FIRE MONITOR INSTALLATION_x001C_ TO MSO MORGAN CITY FOR REVIEW.
Condition: Unknown
Due 8 February 1991
Resolved 8 February 1991
Deck/Cargo
Issued 27 January 1987
Resolved
AIR COMPRESSOR FAN.
Condition: Unknown
Due 27 January 1987
Resolved 27 January 1987
Electrical
Issued 27 January 1987
Resolved
REPAIR REMOTE SHUTDOWNS FOR MACHINERY SPACE VENTS
Condition: Unknown
Due 27 January 1987
Resolved 27 January 1987
Lifesaving
Issued 21 March 1985
Resolved
PRIOR TO GETTING UNDERWAY PROVIDE LIFERAFTS FOR 100 PERCENT OF TOTAL PER- SONS ALLOWED ONBOARD. PRESENT VESSEL FOR INSPECTION TO VERIFY PROPER INSTALLATION OF LIFERAFTS NO LATER THAN 26MAR85.
Condition: Unknown
Due 21 March 1985
Resolved 21 March 1985
Unknown
Issued 21 March 1985
Resolved
THE FOLLOWING DEFICIENCY PERTAIN TO THE VESSEL, COASTAL [name withheld]619821 AND IS TO BE COMPLIED WITH BY 26MAR85.
Condition: Unknown
Due 21 March 1985
Resolved 21 March 1985
Construction/Loadline
Issued 29 February 1984
Resolved
REPLACE (2) TWO INBOARD VENT COVERS IN WAY OF AFTER BULKHEAD TO PORT DECK LOCKER.
Condition: Unknown
Due 29 February 1984
Resolved 29 February 1984
Unknown
Issued 29 February 1984
Resolved
SERVICE OR REMOVE SEMI-PORTABLE KIDDE DRY CHEMICAL FIRE EXTINGUISHER LOCATED ON MAIN DECK.
Condition: Unknown
Due 29 February 1984
Resolved 29 February 1984
Unknown
Issued 29 February 1984
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN THE VESSEL COASTAL [name withheld]619821.
Condition: Unknown
Due 29 February 1984
Resolved 29 February 1984
Deck/Cargo
Issued 29 February 1984
Resolved
PROVIDE AND MAINTAIN ONBOARD OIL TRANSFER PROCEDURES IN ACCORDANCE WITH 33 CFR 156.
Condition: Unknown
Due 29 February 1984
Resolved 29 February 1984
Deck/Cargo
Issued 29 February 1984
Resolved
PROVIDE MECHANICAL PLUGS FOR POLLUTION CONTAINMENT ON MAIN DECK.
Condition: Unknown
Due 29 February 1984
Resolved 29 February 1984
Electrical
Issued 29 February 1984
Resolved
REPLACE BLUE LENS TO ALARM LIGHT LOCATED IN ENGINE ROOM.
Condition: Unknown
Due 29 February 1984
Resolved 29 February 1984
Construction/Loadline
Issued 23 February 1982
Resolved
FAIR THE SET IN AREA OF THE SIDE SHELL PLATE IN WAY OF THE PORT ANCHOR.
Condition: Unknown
Due 23 February 1982
Resolved 23 February 1982
Construction/Loadline
Issued 23 February 1982
Resolved
EFFECT PERMANENT REPAIRS TO THE FRACTURED SIDE SHELL PLATE IN WAY OF PORT ANCHOR.
Condition: Unknown
Due 23 February 1982
Resolved 23 February 1982
Construction/Loadline
Issued 23 February 1982
Resolved
EFFECT PERMANENT REPAIRS TO UPSET GUSSETS IN WAY OF THE VERTICAL SIDE SHELLSTIFFENESS IN THE FOREPEAK TANK, PORT SIDE.
Condition: Unknown
Due 23 February 1982
Resolved 23 February 1982
Construction/Loadline
Issued 23 February 1982
Resolved
EFFECT PERMANENT REPAIRS TO THE FRACTURED HORIZONTAL FRAME ON THE PORTSIDE IN THE FORE PEAK TANK.
Condition: Unknown
Due 23 February 1982
Resolved 23 February 1982