Records from 2013 to 2019. Most recent: inspection, 1 November 2019.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 May 2019
No resolution recorded
Noted deformities in superstructure to include:
open seams/cracks in exterior bulkhead and broken, bulging and missing window glass. Remove interior paneling to allow inspection of interior structures.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 May 2019 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 22 May 2019
No resolution recorded
Noted water flowing in bilges of engineroom and tank compartment, accompanied by energizing of electric bilge pumps nearly once every minute. Noted "Great Stuff" household insulating foam sealant sprayed in the bilge area of the forward compartment. Remove unapproved material and identify source of flooding.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 May 2019 — due date passed with no resolution recorded
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 May 2019
No resolution recorded
Upon satisfactory completion of above noted items and addressing any necessary concerns, make vessel available for annual inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 May 2019 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 7 May 2018
Resolved
Clean engineroom of wood fibers and trash and wipe oil from all hot and/or spark producing surfaces.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 May 2018
Resolved 9 May 2018
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 7 May 2018
Resolved
Propose repairs to address dropping deck beams and exposed carvel fasteners as discussed and affect approved repairs.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 May 2018
Resolved 9 May 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2018
Resolved
Demonstrate operation of fixed bilge system in tank compartment.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 May 2018
Resolved 9 May 2018
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 7 May 2018
Resolved
Renew or remove broke light fixture in engineroom.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2018
Resolved 5 September 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2018
Resolved
Ensure all flexible hose in vital systems (i.e. bilge pump) are double clamped.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2018
Resolved 5 September 2018
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 May 2018
Resolved
Renew wasted junction box in way of fwd wheelhouse.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2018
Resolved 9 May 2018
09 - Working and Living Conditions › 092 - Working Conditions › Personal equipment
Issued 7 May 2018
Resolved
Remove all unneccessary gear, tools & supplies and/or stow securely. All flammable liquids should be removed.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 May 2018
Resolved 9 May 2018
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 May 2018
Resolved
Renew FCC Safety Radio Certificate to indicate accurate call sign.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2018
Resolved 5 September 2018
Documentation › Certificates/Documents › FCC SSL
Issued 1 May 2017
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Due 31 May 2017
Resolved 8 June 2017
Operations/Management › Drills/Instruction › Not Conducted
Issued 1 May 2017
Resolved
Develop and implement a means to record/log crew training, drills and EPIRB testing.
Due 31 October 2017
Resolved 22 November 2017
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 1 May 2017
Resolved
Re-attach MSD tank vent.
Due 31 May 2017
Resolved 8 June 2017
Engineering › Bilge Water Management System › Pump
Issued 1 May 2017
Resolved
Demonstrate operation of automatic bilge pump operation activation lights.
Due 31 May 2017
Resolved 8 June 2017
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 1 November 2016
Resolved
Renew fuel return hose to forward tank with that of an approved type (SEA J-1942)
Action required: 705 - Other - as specified
Resolved 5 December 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 1 November 2016
Resolved
Re-install lagging where noted missing on exhaust piping
Action required: 705 - Other - as specified
Resolved 6 December 2016
Electrical › Electrical Distribution System (service) › Panelboard
Issued 4 May 2016
Resolved
Ensure electrical panel door in engine room can be securely closed.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 11 May 2016
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 4 May 2016
Resolved
Close and secure the overboard discharge valve for the type III MSD.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 11 May 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 May 2016
Resolved
Remove dead-end wiring, port side engine room overhead.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 11 May 2016
Construction/Loadline › Structures › Deck Plating
Issued 4 May 2016
Resolved
Affect necessary repairs to ensure deck planking above aft engine room, both port and starboard, is watertight.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 11 May 2016
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 4 May 2016
Resolved
The vessel is currently equipped with 85 serviceable adult PFDs and shall carry no more than 82 adult passengers until outfitted as required by the current COI. If the quantity is not increased to 96 adult PFDs by June1, 2016, the number of pasengers allowed on board will be officially reduced on the COI.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 1 June 2016
Communications › Audible Communications › Bell
Issued 4 May 2016
Resolved
Install a 7.8" bell.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 11 May 2016
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 4 May 2016
Resolved
Mark stowage location for PFDs.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 11 May 2016
Operations/Management › Drills/Instruction › Not Conducted
Issued 4 May 2016
Resolved
Create and maintain a method for recording drills/training conducted on board vessel.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 11 May 2016