Records from 1982 to 2011. Most recent: operational control imposed, 6 July 2011.
Inspection history · 57
6 July 2011
PII Safety Exam · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4071256
19 February 2008
Drydock Exam · Internal Structural Exam · Cargo Tank Internal · MTSA Verification · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3149730
30 May 2007
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2946329
6 March 2006
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2596663
30 January 2006
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2575968
22 January 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2570924
21 January 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2570877
2 November 2005
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2528669
14 October 2005
Permit to Proceed · In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2514500
19 July 2005
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2432447
14 June 2005
Re-Inspection · MTSA Verification
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2389464
22 April 2005
MTSA Verification · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2327814
8 June 2004
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2091609
12 January 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1982749
10 March 2003
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1754992
13 September 2002
Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1694979
11 June 2002
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1629377
7 May 2002
Type not recorded
No type recorded · USCGC KEY BISCAYNE (WPB 1339) · USCG Southeast District (CGD-SE) · Activity 1614993
13 March 2001
Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1429495
5 June 2000
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1444348
10 April 2000
Damage Survey · Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1432306
4 April 2000
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 44258
1 July 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 206696
1 July 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 753897
12 March 1999
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1365133
14 April 1998
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1123329
16 March 1998
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1419902
3 March 1998
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1422982
25 April 1997
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1102782
3 April 1997
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1430375
28 March 1997
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1093106
26 November 1996
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 872354
20 May 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 753993
18 May 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 190679
6 March 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 92290
21 February 1996
Re-Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1360420
18 May 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 109400
7 April 1995
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1412774
26 April 1994
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1168944
4 March 1993
COI Inspection · Hull Examination · Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 834601
28 September 1990
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1215558
24 July 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1243091
7 March 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1212295
11 July 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1345593
13 June 1989
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1037243
31 August 1988
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1041670
25 August 1988
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1038676
22 April 1988
COI Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1035198
5 June 1987
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1031705
19 May 1987
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1332484
8 May 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 985517
29 April 1986
COI Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1302382
21 May 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1283027
27 April 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974974
28 December 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966092
16 December 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 969619
20 April 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970160
Personnel › Certificates/Documents/Licenses › License, Chief Engineer
Issued 6 July 2011
Resolved
No Chief Engineer available during inspection. Inadition, no flag state endorsement.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 July 2011
Resolved 8 July 2011
Resolution: Received dociumentation that unlimited C/E enroute vessel w/proper Flag State endorsement.
Documentation › Certificates/Documents › International Tonnage Certificate
Issued 6 July 2011
Resolved
No ITC Tonnage Cert available during insp.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 July 2011
Resolved 8 July 2011
Resolution: Coppy of ITC onboard. Original in mail to vessel.
Personnel › Certificates/Documents/Licenses › STCW Endorsement
Issued 6 July 2011
Resolved
All officers required Flag State Endorsement along with STCW endorsement.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 July 2011
Resolved 8 July 2011
Resolution: Application for endorsement have been received for all licensed mariners, see narrative for details.
Documentation › Certificates/Documents › LRIT Conformance Test Report
Issued 6 July 2011
No resolution recorded
Vessel does not have LRIT Conformance Test Report. However, only operates sea area A1 & A2. See narrative for details.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 6 July 2011 — due date passed with no resolution recorded
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 6 July 2011
Resolved
New OWS was reported inoperable. See narrative for details.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 July 2011
Resolved 8 July 2011
Resolution: Technician attended vessel and repaired OWS satisfactorily, see narrative for details.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 March 2006
Resolved
Provide guards around vibration dampeners on propulsion engines and generators.
Condition: Improper Installation
Due 30 March 2006
Resolved 30 March 2006
Resolution: Received e-photos of the new installation
Fire Fighting › Fire Pumps › Gland Sealing
Issued 6 March 2006
Resolved
Repair or renew leaking seal on fire monitor pump
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2006
Resolution: Received repair receipt.
Lifesaving › Lifebuoys › Serviceable
Issued 6 March 2006
Resolved
Renew deteriorated life ring buoy, 01 level on aft of pilot house.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2006
Resolution: New life buoy installed
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 6 March 2006
Resolved
Prove proper operation of both MDE and both Generator over speed trips.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2006
Engineering › Bilge Water Management System › Not Operational
Issued 4 November 2005
Resolved
Complete installation and prove proper operation of vessel's bilge/ballast pump. 46CFR56.50-50
Action required: 705 - Other - as specified
Resolved 7 November 2005
Resolution: Verified proper operation of the pump
Stability › Weathertight Integrity › General
Issued 4 November 2005
Resolved
Complete to and prove proper operation of vessel's watertight and weathertight doors. 46CFR42.15-10, 46CFR45.13
Action required: 705 - Other - as specified
Resolved 7 November 2005
Resolution: Watertight and weathertight fittings were repaired or renewed.
Stability › Weathertight Integrity › General
Issued 4 November 2005
Resolved
Repair andprove proper operation of weathertight vent closures. 46CFR92.15
Action required: 705 - Other - as specified
Resolved 7 November 2005
Resolution: Inspected Satisfactory
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 4 November 2005
Resolved
Remove refrigerators and dry stores from berthing spaces. 46CFR92.20-26
Action required: 705 - Other - as specified
Resolved 7 November 2005
Resolution: All non berthing appliances and dry stores were removed from berthing compartments.
Stability › Unintentional Flooding › General
Issued 4 November 2005
Resolved
Remove piping and blank off sea water supply line in engine room.
Action required: 705 - Other - as specified
Resolved 7 November 2005
Resolution: Verified piping was reconnected to bilge system.
Construction/Loadline › Hull › Hull Plating
Issued 14 October 2005
Resolved
BRING VESSEL INTO CONDITION AS REQUIRED TO MAINTAIN THE COI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 7 November 2005
Resolution: Vessel was attended on 4NOV05 to deliver COI. Vessel was not in satisfactory condition. Vessel was again attended on 7NOV05 and COI was delivered.
Construction/Loadline › Hull › Hull Plating
Issued 14 October 2005
Resolved
CROP AND RENEW MAIN DECK AREAS THAT ARE WASTED. INSPECT AND U/T UNDER REMAINING DECK BOARDS AND CROP AND RENEW AS NEEDED. RENEW AREAS WITH DOUBLERS ON THE MAIN DECK IWO ENGINE ROOM AND BALLAST TANKS.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 7 November 2005
Resolution: Main deck from approximately 8'' aft of the house to the transom and from side shell to side shell. ABS completed all NDT of the welds as well as a water test.
Engineering › Steering Gear System › Rudder Stock
Issued 14 October 2005
Resolved
MAKE PERMANENT REPAIRS TO STARBOARD RUDDER PACKING GLAND.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 7 November 2005
Resolution: Satisfactory repairs were made. Replacement is scheduled for the next dry dock. Entered special note.
Fire Fighting › Remote Fuel Shutoff › General
Issued 14 June 2005
Resolved
Prove peroper operation of remote fuel shut-off reach rods.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 June 2005
Resolved 17 June 2005
Resolution: Proper operation of reach rods demonstrated>
Construction/Loadline › Structures › Machinery Space Opening
Issued 14 June 2005
Resolved
Repair or replace water tight door from engine room to galley to ensure bootom of door seals without the need for double gasket material>
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2005
Resolution: Door repaired/adjusted to seal properly.
Construction/Loadline › Structures › Machinery Space Opening
Issued 14 June 2005
Resolved
Repair/replace water tight emergency escape hatch from engine room to ensure a water tight seal.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2005
Resolution: Door adjusted to ensure proper seal.
Construction/Loadline › Hull › Transverse Frame
Issued 14 June 2005
Resolved
renew wasted transvers bottom frame in rudder room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2005
Resolution: Frame renewed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 14 June 2005
Resolved
Empty #7 (wraparound) ballast tank and cropp and renew wated/leaking sections of bulkhead in rudder room behind both port and starboard rudder post and at both the port and starboard ends of the fwd most transvers bottom frame.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2005
Resolution: Wasted sections fo bulkheads cropped, renewed and air tested.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 10 March 2003
Resolved
Prior to getting u/w, provide thrid party report attesting to port engine installation, statement from [name withheld] regarding emergency engine stops, bilge alarms, completed deck welding, and satisfactory sea trails NLT 11 MAR 2003.
Due 11 March 2003
Resolved 12 March 2003
Resolution: Rcvd reports.
Fire Fighting › Fire Pumps
Issued 10 March 2003
Resolved
Make permanent repairs to PTO fire monitor equipment. LEGACY COMPONENT DESC: Bearings
Due 10 April 2003
Resolved 12 March 2003
Communications › Audible Communications
Issued 10 March 2003
Resolved
Make permanent repairs to PA system. LEGACY COMPONENT DESC: SPD (Other)
Due 10 April 2003
Resolved 12 March 2003
Stability › Watertight Integrity
Issued 10 March 2003
Resolved
Make permanent repairs IWO aft WTD, 2nd deck, loosen dogs and replace gasket. LEGACY COMPONENT DESC: Doors
Due 10 April 2003
Resolved 12 March 2003
Lifesaving › Lifebuoys
Issued 10 March 2003
Resolved
Replace reflective tape IWO all liferings onboard. LEGACY COMPONENT DESC: Markings (ship name/port)
Due 10 April 2003
Resolved 12 March 2003
Lifesaving › Inflatable Liferafts
Issued 10 March 2003
Resolved
Permanently attach liferaft instructions IWO starboard liferaft. LEGACY COMPONENT DESC: Container Marking
Due 10 April 2003
Resolved 12 March 2003
Electrical › Lighting (emergency)
Issued 10 March 2003
Resolved
Install emergency light IWO emergency escape IWO engineroom. LEGACY COMPONENT DESC: Battery Operated Lantern
Due 10 April 2003
Resolved 12 March 2003
Electrical › Lighting (emergency)
Issued 10 March 2003
Resolved
Permanently repair emergency light IWO emergency escape in the engineroom. LEGACY COMPONENT DESC: Battery Operated Lantern
Due 10 April 2003
Resolved 12 March 2003
Engineering › Compressed Air System (start air)
Issued 10 March 2003
Resolved
Make air receivers available for internal examination. LEGACY COMPONENT DESC: Receiver/Bottle
Due 10 April 2003
Resolved 13 March 2003
Resolution: Satisfactorily inspected receivers.
Fire Fighting › Fire Main
Issued 11 June 2002
Resolved
Crop and renew fire monitor main piping in companionway.
Due 11 July 2002
Resolved 14 June 2002
Engineering › Diesel Engine (propulsion-direct drive)
Issued 11 June 2002
Resolved
Provide mechanic's report for satisfactory operation of all safety devices upon completion of installation.
Due 11 July 2002
Resolved 14 June 2002
Deck/Cargo › Ballast
Issued 11 June 2002
Resolved
Crop and renew Ballast Pump foundation and repair packing for pump. LEGACY COMPONENT DESC: Pumps
Due 2 September 2002
Resolved 20 August 2002
Construction/Loadline
Issued 13 March 2001
Resolved
Crop and renew wasted elbow in 2" bilge suction line iwo Ballest pump port fwd engine room.
Condition: Unknown
Due 15 March 2001
Resolved 14 March 2001
Construction/Loadline
Issued 13 March 2001
Resolved
Crop and renew engine room exhaust vent iwo fwd tunnel
Condition: Unknown
Due 13 April 2001
Resolved 14 March 2001
Lifesaving
Issued 13 March 2001
Resolved
Demonstrate fire and abandon ship drill to the satifaction of the local OCMI.
Condition: Unknown
Due 13 April 2001
Resolved 14 March 2001
Electrical
Issued 16 March 1998
Resolved
PERMENTANTLY MOUNT OIL PSI SWITCH, ON STBD ENG, OUTBOARD AFT AND REPLACE CABLE IF NECESSARY TO INSURE PROPER INSTALLATION. SUBCHAPTER "J".
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Electrical
Issued 16 March 1998
Resolved
INSTALL THREE (3) ADDITIONAL TWIN LAMP EMERGENCY LIGHTS IN ENGINE ROOM TO ADEQUATELY LIGHT EGRESS.
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Electrical
Issued 16 March 1998
Resolved
INSTALL JUNCTION BOX FOR ELECTRICAL WIRING FROM EMERGENCY BATTERY BOX TO SWITCH BOX ON BRIDGE.
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Electrical
Issued 16 March 1998
Resolved
INSTALL METAL WIRE CLAMPS ON WIRING RUNS WITH PROPER SPACING, ON BULKHEADS AND OVERHEADS. IAW 46 CFR SUBCHAPTER "J".
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Lifesaving
Issued 16 March 1998
Resolved
PROVE TO COGNIZANT OCMI THAT VSL IS ARRANGE AND EQUIPPED TO RESCUE A HELPLESS PERSON FROM THE WATER USING THE VSL AS A RESCUE PLATFORM OR EQUIP VSL WITH RESCUE BOAT AND DAVIT IAW 46 CFR SUBCHAPTER "L".
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Lifesaving
Issued 16 March 1998
Resolved
RENEW RETRO TAPE ON RING BUOYS AND RENEW LINE USING PROPER COLOR AND STOWAGE.
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Lifesaving
Issued 3 April 1997
Resolved
REPAIR JACOB'S LADDER.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 3 April 1997
Resolved
REPAIR/REPLACE/ADJUST DOGS ON QUICK ACTING CLASS I WATER TIGHT DOORS IN ENGINEROOM AS FOLLOWS:_x001C_ (A) TOP STARBOARD DOG ON FORWARD DOOR. (B) TOP 2 DOGS ON PORT EMERGENCY ESCAPE DOOR. (C) TOP 2 DOGS ON AFT DOOR._x001C_
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Accommodation/Occupational Safety
Issued 3 April 1997
Resolved
REPAIR FRACTURED STBD RAIL, FWD OF STACK.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Accommodation/Occupational Safety
Issued 3 April 1997
Resolved
REPAIR/REPLACE CENTER POST ON STERN RAIL.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 3 April 1997
Resolved
REPLACE ALL PADEYES ON DECK.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Navigation
Issued 3 April 1997
Resolved
PROVIDE UP TO DATE LIGHT LIST.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Navigation
Issued 3 April 1997
Resolved
PROVIDE DEVIATION CARD FOR MAGNETIC COMPASS.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 3 April 1997
Resolved
REPAIR FRACTURE PORT RAIL NEAR PORT LIFEBOAT.
Condition: Unknown
Due 15 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 3 April 1997
Resolved
REPAIR RAIL PORT SIDE AT BASE OF LADDER ON MAIN DECK.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Accommodation/Occupational Safety
Issued 3 April 1997
Resolved
REPAIR RACK LIGHT IN ENGINEER'S STATEROOM.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Lifesaving
Issued 3 April 1997
Resolved
RENEW ALL OUTDATED FIRST-AID ITEMS.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Fire Fighting
Issued 3 April 1997
Resolved
REPLACE/REPAIR SUPPORT BRACKET ON NUMBER 3 FIRE STATION.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 7 March 1990
Resolved
PLACE FLAME SCREEN ON VENT TO PAINT LOCKER
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Fire Fighting
Issued 7 March 1990
Resolved
PROVIDE FIRE SERVICING REPORT FOR ONBOARD PORTABLE AND SMEI PORTABLE EXTINGUISHERS.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Engineering
Issued 7 March 1990
Resolved
SUBMIT TO THE COAST GUARD FOR APPROVAL A TEST PROCEDURE FOR ENGINEROOM AUTOMATION PACKAGE AS PER NVIC 1-78
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Fire Fighting
Issued 7 March 1990
Resolved
REPLACE OR HYDRO CO2 EXTINGUISHERS IN BOW THRUSTER AND PAINT LOCKER STATION
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Engineering
Issued 7 March 1990
Resolved
RESET OVERSPEED TRIPS TO PROPER PARAMETERS ON BOTH MAIN ENGINES AND GENERATORS.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Engineering
Issued 7 March 1990
Resolved
REPLACE BRASS PETCOCKS WITH STEEL FITTINGS ON ALL DIESEL ENGINES
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Navigation
Issued 7 March 1990
Resolved
RESET ELECTRICAL STOPS ON STEERING GEAR TO PREVENT EQUIPMENT FROM HITTING MECHANICAL STOPS.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Engineering
Issued 7 March 1990
Resolved
MAKE STUFFING TUBE ON ALARM PANEL IN ENGINE ROOM WATER PROOF AND REPLACE BURNED OUT BULBS FOR ALARM INDICATING LIGHTS
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Fire Fighting
Issued 7 March 1990
Resolved
MOVE FIRE DETECTOR SENSOR TO A NEW LOCATION OVER THE STBD ENGINE WHERE THE VENTILATION SYSTEMM WON'T EFFECT IT.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Engineering
Issued 7 March 1990
Resolved
RENEW OR REPAIR OUTBOARD AIR RECEIVER RELIEF VALVE
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Deck/Cargo
Issued 7 March 1990
Resolved
RENEW FLAME SCREENS FOR LUBE OIL AND STBD AND PORT FUEL TANKS.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Electrical
Issued 7 March 1990
Resolved
REPAIR AND TEST BILGE ALARMS IN ENGINE ROOM, BOW THRUSTER ROOM, AND STEERING COMPARTMENT.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Engineering
Issued 7 March 1990
Resolved
AFTER APPROVAL OF ENGINE ROOM AUTOMATION TEST PROCEDURES, TEST ALL ALARMS IN PRESENCE OF MARINE INSPECTOR.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Fire Fighting
Issued 7 March 1990
Resolved
PROVIDE ANOTHER FIRE HOSE FOR THE ONE THAT FAILED HYDRO TEST.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Navigation
Issued 7 March 1990
Resolved
PROVIDE AN AUDIBLE ALARM TO NAVIGATION LIGHT PANEL AND CIRCIUT DIAGRAM FOR PANEL WITH FUSES AS INDICATED.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Navigation
Issued 7 March 1990
Resolved
MAIN STEERING STATION IN FOLLOW-UP MODE REQUIRES CALIBRATION/REPAIR
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Navigation
Issued 7 March 1990
Resolved
POWER FAILURE ALARMS AND OVERLOAD INDICATORS AND FUSES NEED REPAIR AND/OR MADE OPERATIONAL TO STEERING MOTOR CONTROL PANEL IN WHEELHOUSE.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Fire Fighting
Issued 13 June 1989
Resolved
PROVIDE ONE ORIGINAL AND THREE COPIES OF FIRE CONTROL PLAN TO [name withheld], TX FOR CG APPROVAL.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Fire Fighting
Issued 13 June 1989
Resolved
REPLACE OR HAVE HYDROSTATICALLY TESTED, 3 CO2 PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Construction/Loadline
Issued 25 August 1988
Resolved
REPLACE MISSING DOG AND ADJUST AS REQUIRED, PORT WATER TIGHT DOOR TO ESCAPETRUNK FROM MACHINERY SPACE.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Construction/Loadline
Issued 25 August 1988
Resolved
ADJUST FORWARD WATERTIGHT DOOR TO MACHINERY SPACE.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Electrical
Issued 25 August 1988
Resolved
REPAIR GENERAL ALARM ROTATING BEACON IN ENGINE ROOM.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Fire Fighting
Issued 22 April 1988
Resolved
REPAIR FIRE DETECTION SYSTEM TEST SWITCH.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Navigation
Issued 22 April 1988
Resolved
REPAIR AND MAKE OPERABLE AFT EXTERIOR STEERING STATION SOUND POWERED PHONE.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Unknown
Issued 22 April 1988
Resolved
PROVIDE PLUGS FOR FUEL DISCHARGE CONTAINMENT.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Navigation
Issued 22 April 1988
Resolved
SERVICE MAGNETIC COMPASS TO REMOVE AIR BUBBLE IN FLUID.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Lifesaving
Issued 22 April 1988
Resolved
REPAIR NETTING ON THE PORT SIDE RESCUE PLATFORM.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Navigation
Issued 22 April 1988
Resolved
PLACE CORRECT FUSES IN NAVIGATION LIGHT PANEL AND REPLACE INDICATOR LIGHT BULBS.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Unknown
Issued 22 April 1988
Resolved
REPAIR PORT MAIN DIESEL TACHOMETER DRIVE.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Construction/Loadline
Issued 22 April 1988
Resolved
MAKE PERMANENT REPAIRS IN LIEU OF TEMPORARY REPAIRS TO HATCHWAYS OF BOTH PORT AND STBD. CHAIN LOCKERS.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Navigation
Issued 22 April 1988
Resolved
PROVIDE APPROVED NAVIGATION LIGHT BULBS FOR ALL NAVIGATION LIGHT FIXTURES.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Electrical
Issued 29 April 1986
Resolved
REPAIR PORT GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 29 April 1986
Resolved 29 April 1986
Electrical
Issued 29 April 1986
Resolved
REPLACE MISSING COVER OVER PULLEY AFT END OF STARBOARD GENERATOR.
Condition: Unknown
Due 29 April 1986
Resolved 29 April 1986
Navigation
Issued 29 April 1986
Resolved
REPAIR OR REPLACE STARBOARD STEERING RAM.
Condition: Unknown
Due 29 April 1986
Resolved 29 April 1986
Unknown
Issued 27 April 1984
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 27 April 1984
Resolved 27 April 1984
Electrical
Issued 27 April 1984
Resolved
REMOVE THE EXISTING FIXED LIGHT IN THE PAINT LOCKER OR REPLACE IT WITH A U/L APROVED EXPLOSION LIGHT FIXTURE.
Condition: Unknown
Due 27 April 1984
Resolved 27 April 1984
Navigation
Issued 27 April 1984
Resolved
PLACE THE VESSEL'S RECORDING FATHOMETER IN PROPER OPERATION
Condition: Unknown
Due 27 April 1984
Resolved 27 April 1984
Electrical
Issued 27 April 1984
Resolved
PLACE AN ACCEPTABLE LINING IN THE EMERGENCY BATTERY BOXES AFT OF THE WHEEL-HOUSE
Condition: Unknown
Due 27 April 1984
Resolved 27 April 1984
Unknown
Issued 16 December 1982
Resolved
RETURN LIGHT SHIP TO MORGAN CITY NOT LATER THAN 0800 CST, 20DEC82 AND PROCEED TO DRYDOCK TO EFFECT PERMANENT REPAIRE TO SHEER/STRINGER PLATE
Condition: Unknown
Due 16 December 1982
Resolved 16 December 1982
Unknown
Issued 16 December 1982
Resolved
I.W.O #5 STARBOARD CARGO TANK.
Condition: Unknown
Due 16 December 1982
Resolved 16 December 1982
Navigation
Issued 16 December 1982
Resolved
EFFECT REPAIRS TO STEERING SYSTEM FOLLOW UP CONTROL SYSTEM DURING SAME YARDPERIOD AS FOR REQUIREMENT #1 ABOVE.
Condition: Unknown
Due 16 December 1982
Resolved 16 December 1982
Deck/Cargo
Issued 16 December 1982
Resolved
VESSEL TO PROCEED ON A VOYAGE OT EAST CAMERON BLOCK 57 FOR PURPOSE OF DELIVERING 600 BBL CACI AND APPOXIMATELY 25 [name withheld] VESSEL TO
Condition: Unknown
Due 16 December 1982
Resolved 16 December 1982