MAURY USCG vessel records Sign in
← All vessels

HOWARD MCCALL

HOWARD MCCALL is a 1981 offshore supply vessel. The Coast Guard has recorded 64 inspections since 1981, most recently in December 2024, along with 126 deficiencies and 1 casualty investigation in 2009.

Records from 1981 to 2024. Most recent: inspection, 9 December 2024.

Built
1981
Last inspected
9 December 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDD6428
Flag
UNITED STATES
367172830 (licence lapsed)
Maury page id
psix-52915

Inspections, by type

…with no type recorded11
Years with a record 34 calendar years (1981–2024)
The 64 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it97 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDD6428MMSI 367172830 · expired · compulsorily equipped · granted 14 March 2007, cancelled 20 May 2017
WRA5011MMSI not assigned · expired · compulsorily equipped · granted 29 July 1996, cancelled 9 December 2006 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

LADY ELLE Towing Vessel · MISLE 473146 · 13 December 2004 · activity 2258341

Inspection history · 64

9 December 2024 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8060238
2 May 2017 Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6137437
27 June 2016 Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5914244
2 June 2016 COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5887394
6 January 2016 Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5791045
18 January 2012 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4227893
14 July 2011 DAPI Audit
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4082177
20 October 2010 COI Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3873860
16 December 2009 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3651444
4 February 2009 Deficiency Check · Internal Structural Exam · Hull Examination · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3412594
23 January 2009 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3402195
7 January 2008 Hull Examination · Deficiency Check · Internal Structural Exam · Periodic Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3126102
29 January 2007 Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2863421
23 January 2007 Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2860618
20 January 2006 Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2569936
1 December 2005 Administrative Inspection
Administrative · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2543945
28 October 2005 Administrative Inspection
Administrative · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2523935
1 February 2005 Deficiency Check
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2285437
25 January 2005 Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2281027
13 December 2004 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2258341
30 January 2004 Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1997722
3 December 2003 Internal Structural Exam · Hull Examination
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1958127
7 March 2003 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1754202
5 February 2003 Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1740513
29 January 2002 Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1482091
31 October 2001 Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1076207
23 December 1999 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1384322
18 May 1999 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1360954
7 December 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 808431
29 October 1998 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1409984
26 October 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 801353
18 November 1997 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1457522
24 October 1996 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1434471
18 July 1996 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1380580
26 October 1995 COI Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1383080
26 October 1994 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1389930
5 July 1994 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1374106
28 October 1993 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 841318
28 October 1993 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 844676
29 October 1992 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1254386
30 June 1992 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 962925
3 February 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 950901
16 October 1991 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 942816
5 September 1991 COI Inspection · Drydock Extension
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 944132
12 February 1991 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 929622
13 September 1990 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1227271
28 February 1990 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1242098
15 September 1989 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 894595
4 January 1989 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1040571
12 December 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1209152
20 September 1988 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1350875
26 February 1988 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1026264
29 September 1987 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1321131
30 September 1986 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1316276
27 March 1986 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1305118
20 March 1986 Credit Drydock
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1305126
20 February 1986 Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 989544
31 October 1985 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1292764
11 April 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1290223
1 November 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 976724
3 November 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1274112
9 May 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1276731
4 November 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 963628
3 November 1981 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1277732

Deficiency record · 126

Construction/Loadline › Markings › Vessel Name/Home Port
Issued 2 June 2016 Resolved
Vessel name on stern was covered by fenders.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 July 2016
Resolved 27 June 2016
Resolution: Vessel name visible from stern.
Stability › Unintentional Flooding › General
Issued 2 June 2016 Resolved
port and starboard shaft packing not satisfactory. Appears the packing was gone.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 June 2016
Resolution: Repacked both shafts.
Communications › Alarms/Indicators › Bilge Alarm
Issued 2 June 2016 Resolved
Engine room bilge alarm on bridge was not operable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 June 2016
Resolved 3 June 2016
Resolution: Alarm was repaired and tested prior to completion of inspection.
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 June 2016 Resolved
Vessel crew had not been conducting drills since vessel was laid up.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 June 2016
Resolution: Conducted and recorded drills.
Communications › Audible Communications › Bell
Issued 2 June 2016 Resolved
Nav bell was cracked in unable to make any audible sound.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 July 2016
Resolved 27 June 2016
Resolution: Installed new 12 inch bell.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 2 June 2016 Resolved
waterlight was filled with water due to worn gasket material.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 June 2016
Resolution: New waterlight was attached prior to completion of inspection.
Engineering › Compressed Air System (start air) › Valve
Issued 2 June 2016 Resolved
Gague did not show sufficient PSI range
Condition: Invalid
Action required: 705 - Other - as specified
Due 2 July 2016
Resolved 27 June 2016
Resolution: Installed new 300psi Gague.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 2 June 2016 Resolved
stations #2 and #3 were not seriviced in the past year
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 June 2016
Resolution: Third party inspector came on board and serviced both extinguishers prior to completion of inspection.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 2 June 2016 Resolved
Crew was not conducting lifesaving maintenance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 July 2016
Resolved 27 June 2016
Resolution: Conducted and recorded lifesavings equipment maintenance, created sheets for weekly and monthly checks and implemented it.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 2 June 2016 Resolved
Portable light for bridge could not be found.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 July 2016
Resolved 27 June 2016
Resolution: two new portable lights, tested sat.
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 2 June 2016 Resolved
Jacket water gauge for starboard MDE located on bridge not operational. Gauge located in E/R operated.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 July 2016
Resolved 27 June 2016
Resolution: Replace sensor for jacket water, tested sat.
Fire Fighting › Nozzles › Condition
Issued 18 January 2012 Resolved
Fire nozzles in unsatisfactory condition. Replace nozzles with operable nozzles.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2012
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 18 January 2012 Resolved
Port light not working as design.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2012
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 18 January 2012 Resolved
The two all round red lights "not under command lights" not position in a vertical line.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2012
Operations/Management › Drug and Alcohol Testing › CG Notification (positive results/refusals)
Issued 14 July 2011 Resolved
Failed to notify CG of one positive result. Mariner is not licensed.
Action required: 705 - Other - as specified
Due 15 August 2011
Resolved 18 January 2012
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 14 July 2011 Resolved
DER has not received 1 hour EAP training
Action required: 705 - Other - as specified
Due 15 August 2011
Resolved 18 January 2012
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 14 July 2011 Resolved
Failed to submit MIS report
Action required: 705 - Other - as specified
Due 15 July 2011
Resolved 18 January 2012
Navigation › Piloting/Steering › Magnetic Compass
Issued 16 December 2009 Resolved
NO LIGHT
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2009
Resolved 23 December 2009
Resolution: repaired light
Engineering › Pressure Vessel › Relief Valve
Issued 16 December 2009 Resolved
PAINTED PRESSURE RELIEF VALVE. UNABLE TO VERIFY RELIEF PRESSURE.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2009
Resolved 23 December 2009
Resolution: replaced relief valves.
Engineering › Reduction Gearing/Clutches › Bolt
Issued 16 December 2009 Resolved
SHAFT PACKING LEAKING EXCESSIVELY
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2009
Resolved 23 December 2009
Resolution: tightened shaft packing nuts.
Engineering › Steering Gear System › Hydraulic Hose
Issued 16 December 2009 Resolved
HYDRAULIC HOSES LEAKING,
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2009
Resolved 23 December 2009
Resolution: repaired hydraulic leaks
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 16 December 2009 Resolved
REMOVED OLD A/C LINES, DID NOT SEAL BULKHEAD PENETRATIONS PROPERLY.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2009
Resolved 23 December 2009
Resolution: plugged and welded watertight bulkhead.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 16 December 2009 Resolved
WATERLIGHTS HAD ONLY 4FT. OF LINE. MUST EXTEND LINE TO 18FT.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2009
Resolved 23 December 2009
Resolution: extended line to 18ft.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 4 February 2009 Resolved
Man overboard and fire drills not being conducted as required. Vessel captain to perform such drills and log.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Resolution: Conducted drills as required and logged.
Navigation › Piloting/Steering › Marine Charts
Issued 4 February 2009 Resolved
Vessel does not have onboard updated charts of sufficient scale to navigate the Calcasieu River.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Electrical › Electric Supply System (service) › Cable
Issued 4 February 2009 Resolved
Remove all household style wire nuts.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 4 February 2009 Resolved
Propely wire and install battery box on bridge used for emergency power
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 4 February 2009 Resolved
jacket water temp gauge on bridge for stbd engine not operating properly.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Resolution: New gauge and sensor was installed.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 4 February 2009 Resolved
Emergency exit in engine room not marked properly.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Resolution: Emergency exit was stenciled in the engineroom.
Lifesaving › Buoyant Apparatus › Lifeline
Issued 4 February 2009 Resolved
replace grab lineson lifefloats. Current lines are deteriorated.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Resolution: New lifefloats were ordered and installed vice spending money on old ones.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 4 February 2009 Resolved
Properly mark all life jacket stowage locations.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Lifesaving › Rescue Boat › Boarding Ladder
Issued 4 February 2009 Resolved
Rescue platform was not proper for recovering body from water. Rescue platform had no platform on it and was just a ladder.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Resolution: Rescue platform was found and installed.
Engineering › Generator (propulsion-electric) › Overcurrent Devices Circuitry
Issued 4 February 2009 Resolved
Repair frequency meter for stbd generator.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2009
Resolution: Exciter was found to be faulty. Replaced generator excitor.
Navigation › Piloting/Steering › Marine Charts
Issued 7 January 2008 Resolved
Vessel moored on Mermentau River but did not have navigation chart of river of sufficent scale to use for navigating. Chart to be placed and retained onboard so long as vessel navigates Mermentau River.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2008
Resolution: Procured chart.
Stability › Watertight Integrity › General
Issued 7 January 2008 Resolved
Watertight doors/hatches would not close or seal properly. Doors/hatches to be adjusted and tested to satisfaction of attending marine inspector prior to getting underway.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2008
Resolution: Repaired doors.
Lifesaving › Lifefloat › Float-free Link
Issued 7 January 2008 Resolved
Lifefloat weak link and seapainter removed from floats. Vessel master claims crew was in process of replacing painter and link. Appropriate weak link was onboard vessel. Weak link and painter to be re-attached and examined by attending marine inspector for proper installation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2008
Resolution: Replaced.
Engineering › Fuel Oil Service System › Gauge
Issued 7 January 2008 Resolved
MDE gauges not operating on staboard MDE. Repair or replace prior to getting underway
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2008
Resolution: Repaired gauge.
Engineering › Pressure Vessel › Relief Valve
Issued 7 January 2008 Resolved
safety relief valve was sticking in the open position and therefore draining air from reciever which in turn caused MDE not to be started.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2008
Resolution: Replaced relief valve.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 7 January 2008 Resolved
All independant battery operated smoke detectors were without batteries except one. However, that detectors battery was not connected.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 January 2008
Resolved 29 January 2008
Resolution: Batteries were installed on detectors.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 23 January 2007 Resolved
COD expired 31Dec05.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 January 2007
Resolved 29 January 2007
Resolution: New COD
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 23 January 2007 Resolved
2 lifejackets were unservicable.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 January 2007
Resolved 29 January 2007
Resolution: Purchased new lifejackets.
Navigation › Piloting/Steering › Marine Charts
Issued 25 January 2005 Resolved
Chart 11348, Mermentau River nav chart, not onboard vessel
Action required: 705 - Other - as specified
Due 2 February 2005
Resolved 1 February 2005
Resolution: Vessel has proper charts.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 25 January 2005 Resolved
EPIRB strobe light oversprayed with paint. Vessel master attempted to clean and clouded lens.
Action required: 705 - Other - as specified
Due 2 February 2005
Resolved 1 February 2005
Resolution: All lens were replaced with new.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 25 January 2005 Resolved
FWD mast light, Stern light, Port & Starboard running lights oversprayed with paint. Replace lenses
Action required: 705 - Other - as specified
Due 2 February 2005
Resolved 1 February 2005
Resolution: All lenses were replaced
Construction/Loadline › Structures › Superstructure
Issued 25 January 2005 Resolved
Pilot house mast, fwd struts rusted through at top junction with mast
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 February 2005
Resolved 1 February 2005
Resolution: New strut sections installed.
Construction/Loadline › Structures › Superstructure
Issued 25 January 2005 Resolved
Portside exhaust stack enclouser, rusted through in spots. Crop and renew with insert to repair wasted areas.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 February 2005
Resolved 1 February 2005
Resolution: Cropped and renewed 2'' X 2'' section of stack.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 January 2005 Resolved
STBD AFT deck light lens shattered, replace lens.
Action required: 705 - Other - as specified
Due 26 February 2005
Resolved 14 February 2005
Resolution: replaced light
Construction/Loadline › Penetrations › Gasket
Issued 25 January 2005 Resolved
Engine room watertight door gasket wasted, replace gasket
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 January 2005
Resolution: New door gasket installed
Electrical › Lighting (service) › Lighting Fixture
Issued 25 January 2005 Resolved
Engine room lighting not intrinsically safe. Replace lighting fixtures with proper equipment for engine room service
Action required: 705 - Other - as specified
Due 25 February 2005
Resolved 11 February 2005
Resolution: Replaced lighting
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 January 2005 Resolved
Wire runs throught vessel not properly supported in overhead
Action required: 705 - Other - as specified
Due 25 February 2005
Resolved 12 February 2005
Resolution: properly supported wiring
Fire Fighting › Structural - A Class Divisions › Windows
Issued 25 January 2005 Resolved
STBD FWD portlight glass cracked, replace glass
Action required: 705 - Other - as specified
Due 25 February 2005
Resolved 12 February 2005
Resolution: Replaced port light
Navigation › Piloting/Steering › Compass Deviation Table
Issued 30 January 2004 Resolved
Verify accuracy of Compass deviation table.
Action required: 705 - Other - as specified
Due 29 February 2004
Resolved 25 January 2005
Resolution: compass card verified by third party
Engineering › Bilge Water Management System
Issued 5 February 2003 Resolved
Repair bilge high-water alarm in lazarette.
Condition: Damaged By Earlier Event
Due 5 March 2003
Resolved 5 February 2003
Resolution: Crew repairedbilge high-water alarm.
Accommodation/Occupational Safety › Occupational Safety
Issued 5 February 2003 Resolved
Replace three broken windows on pilot house deck.
Due 5 March 2003
Resolved 4 March 2003
Resolution: Facsimile reciept shows the order and replacement of bridge windows. Verbally spoke to representative at local glass company, who performed the work.
Navigation › Collision/Grounding Avoidance
Issued 5 February 2003 Resolved
Re-configure nav lights to allow all-round visibility (red/white/red). LEGACY COMPONENT DESC: Navigation Lights
Condition: Improper Installation
Due 5 March 2003
Resolved 4 March 2003
Resolution: Port Engineer rearranged nav lights in order to be properly viewed.
Communications › Radio Communications
Issued 5 February 2003 Resolved
Provide emergency radio broadcast placard.
Condition: Improper Installation
Due 5 March 2003
Resolved 5 March 2003
Resolution: Master of vessel provided emergency broadcast placard per 184.502.
Deck/Cargo
Issued 29 October 1998 Resolved
Replace missing securing nut to anchor windlass locking lever.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Electrical
Issued 29 October 1998 Resolved
Replace missing guard for overhead light in engine room.
Condition: Unknown
Due 29 October 1998
Resolved 20 November 1998
Lifesaving
Issued 29 October 1998 Resolved
Service one 15 man life float. (Grab lines beyond service life)
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Fire Fighting
Issued 29 October 1998 Resolved
Service position locking bolts to fire monitor. (Rusted, inoperative)
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Construction/Loadline
Issued 29 October 1998 Resolved
Service stbd main deck access hatch to engine room. (Guides to quick actingw/t hatch dogs requires cleaning/lube)
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Lifesaving
Issued 29 October 1998 Resolved
Provide GFI outlets: main deck bathroom, galley.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Engineering
Issued 29 October 1998 Resolved
Provide cap for lube oil tank drain. (Tank employs a hand valve installed in drain).
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Engineering
Issued 29 October 1998 Resolved
Provide safety guards for port and stbd shafts.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Construction/Loadline
Issued 26 October 1995 Resolved
REPAIR BILGE PIPE IN ENGINE ROOM WITH SOFT PATCH; RENEW AS ORIGINAL.
Condition: Unknown
Due 12 January 1996
Resolved 24 January 1996
Deck/Cargo
Issued 26 October 1995 Resolved
REPAIR/REPLACE VALVE ON ANCHOR WINDLESS HYDRO SYSTEM.
Condition: Unknown
Due 12 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 26 October 1995 Resolved
REPAIR/REPLACE REACH ROD ON FOREPEAK TANK BILGE VALVE.
Condition: Unknown
Due 12 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 26 October 1995 Resolved
PROVIDE HANDLE FOR GATE VALVE CROSS OVER AT BILGE PUMP.
Condition: Unknown
Due 12 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 26 October 1995 Resolved
REPLACE GASKET AND ADJUST WTD DOOR BETWEEN ENGINE ROOM AND QTRS.
Condition: Unknown
Due 12 January 1996
Resolved 24 January 1996
Navigation
Issued 26 October 1995 Resolved
REPAIR/REPLACE PORT SIDESTEERING HYDRO RAM.
Condition: Unknown
Due 12 January 1996
Resolved 24 January 1996
Engineering
Issued 26 October 1995 Resolved
INSTALL COTTER PINS IN CONTROL LINKAGE TURNBUCKLES ON STBD MAIN ENGINE.
Condition: Unknown
Due 12 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 26 October 1994 Resolved
REPLACE WEATHERTIGHT ELECTRICAL WIRE BULKHEAD PENETRATIONS IN AFT BULKHEAD OF PILOT HOUSE.
Condition: Unknown
Due 26 November 1994
Resolved 8 December 1994
Construction/Loadline
Issued 26 October 1994 Resolved
REPLACE BROKEN PORT LIGHT GLASS IN DECK HOUSE ON STARBOARD SIDE AFT.
Condition: Unknown
Due 26 November 1994
Resolved 8 December 1994
Navigation
Issued 26 October 1994 Resolved
MAKE NECESSARY ADJUSTMENTS TO RUDDER ARM IN WAY OF PORTSIDE RUDDER STOP.
Condition: Unknown
Due 26 November 1994
Resolved 8 December 1994
Construction/Loadline
Issued 26 October 1994 Resolved
REPAIR/REPLACE VENT PIPE FOR FIREMAIN SEA CHEST.
Condition: Unknown
Due 26 November 1994
Resolved 8 December 1994
Lifesaving
Issued 28 October 1993 Resolved
REPLACE 30" RINGBUOY WITH DETERIORATED HAND LINES ON MAIN DECK LEVEL AFT. _x001C_
Condition: Unknown
Due 28 October 1993
Resolved 23 November 1993
Navigation
Issued 28 October 1993 Resolved
PROVIDE ONBOARD COPIES OF LIGHT LIST #4, TIDE TABLE AND TIDAL CURRENT TABLES AS REQUIRED.
Condition: Unknown
Due 28 October 1993
Resolved 23 November 1993
Navigation
Issued 29 October 1992 Resolved
PROVE OPERATION AND INSTALLATION OF 2ND VHF RADIO.
Condition: Unknown
Due 28 November 1992
Resolved 8 February 1993
Lifesaving
Issued 29 October 1992 Resolved
REMOTE SHUTDOWNS NEED TO BE LABELED.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Lifesaving
Issued 29 October 1992 Resolved
REPLACE NET/WEBBING FOR 2 LIFE FLOATS.
Condition: Unknown
Due 28 February 1993
Resolved 8 February 1993
Electrical
Issued 29 October 1992 Resolved
INSTALL GLOBE ON LIGHT AT ENGINEROOM ENTRANCE.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Electrical
Issued 29 October 1992 Resolved
PROVE OPERATION OF REMOTE SHUTDOWN FOR DIRTY OIL PUMP.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Electrical
Issued 29 October 1992 Resolved
GUARD FOR DIRTY OIL PUMP NEEDS TO BE BOLTED DOWN.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Electrical
Issued 29 October 1992 Resolved
WATER PUMP FOR POTABLE WATER NEEDS TO BE BOLTED DOWN.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Engineering
Issued 29 October 1992 Resolved
REPLACE ALL BROKEN PRESSURE GAGES.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Lifesaving
Issued 29 October 1992 Resolved
DRYER EXHAUST NEEDS TO BE ROUTED OUTSIDE.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Electrical
Issued 29 October 1992 Resolved
REPAIR BARE WIRES AND MOUNT AIRSTART SOILENOID ON ENGINE.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Construction/Loadline
Issued 29 October 1992 Resolved
BILGE PUMP NEEDS TO BE BOLTED DOWN.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Electrical
Issued 29 October 1992 Resolved
PROVE OVERSPEED OPERATION OF PORT GENERATOR.
Condition: Unknown
Due 28 February 1993
Resolved 9 February 1993
Electrical
Issued 29 October 1992 Resolved
BENEATH PILOTHOUSE CONSOLE TAPE OFF WIRES AND STRAIGHTEN OUT JUNCTION BOX IN ORDER TO CLOSE AND SECURE BOX.
Condition: Unknown
Due 28 February 1993
Resolved 8 February 1993
Unknown
Issued 5 September 1991 Resolved
INSTALL GUARDS ON OIL SIGHT GLASSES IN FWD BULKHEAD OF ENGINE ROOM.
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Engineering
Issued 5 September 1991 Resolved
RENEW WASTED WATER COOLING LINE FROM PORT EXHAUST MANIFOLD ON PORT MAIN DIESEL ENGINE OR EXTEND WATER HOSE OVER AND BEYOND WASTED MATERIAL.
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Engineering
Issued 5 September 1991 Resolved
INSTALL WHEEL HANDLE ON FUEL VALVE IN FUEL LINE TO PORT GENERATOR.
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Construction/Loadline
Issued 5 September 1991 Resolved
ADJUST WATERTIGHT DOOR BETWEEN ENGINE ROOM AND ACCOMODATIONS TO CLOSE PROPERLY
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Electrical
Issued 5 September 1991 Resolved
INSTALL GUARDS ON LIGHTS IN ENGINE ROOM AND CLOSET CONTAINING AIR CONDITIONING EQUIPMENT.
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Electrical
Issued 5 September 1991 Resolved
INSTALL PLACARD ON INSIDE OF DOOR TO PORT CIRCUIT BREAKER PANEL TO PROPERLYINDICATE FUNCTION OF BREAKERS.
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Electrical
Issued 5 September 1991 Resolved
REPAIR BUNK LIGHT COVERS AND INSTALL PROPERLY.
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Fire Fighting
Issued 13 September 1990 Resolved
PROVIDE FIRE SERVICING REPORT INCLUDING THE B-V SEMI PORTABLE.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Engineering
Issued 15 September 1989 Resolved
INSTALL OVERSPEEDS ON PORT AND STARBOARD MAIN ENGINES.
Condition: Unknown
Due 15 September 1989
Resolved 15 September 1989
Fire Fighting
Issued 15 September 1989 Resolved
REPLACE EX607 HOSE ON 150# DRY CHEM B-V WITH APPROVED HOSE.
Condition: Unknown
Due 15 September 1989
Resolved 15 September 1989
Unknown
Issued 12 December 1988 Resolved
MAKE PERMANENT REPAIRS TO THE BOW BULWARK. CROP OUT ALL TWISTED AND BENT BULWARKS AND REPLACE. REPLACE BENT AND HOLED MAIN DECK PLATING AND INTERNALFRAMES THAT ARE BENT AND BROKEN. ALL REPLACED STEEL TO BE SAME SCANTLINGS AS ORIGINAL. THE VESSEL IS NOT TO BE USED IN SERVICE UNTIL REPAIRED.
Condition: Unknown
Due 12 December 1988
Resolved 12 December 1988
Engineering
Issued 20 March 1986 Resolved
REPAIR INOPERATIVE BILGE ALARM FOR THE ENGINE ROOM.
Condition: Unknown
Due 20 March 1986
Resolved 20 March 1986
Construction/Loadline
Issued 20 March 1986 Resolved
PROVIDE A WRENCH FOR OPERATION OF THE FOREPEAK REACH ROD.
Condition: Unknown
Due 20 March 1986
Resolved 20 March 1986
Documentation
Issued 11 April 1985 Resolved
PROVIDE FCC SAFETY EQUIPMENT CERTIFICATE.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985
Documentation
Issued 11 April 1985 Resolved
HAVE VESSEL STABILITY LETTER ON BOARD VESSEL AND POSTED IN WHEELHOUSE.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985
Construction/Loadline
Issued 1 November 1984 Resolved
ENSURE THAT THE BULKHEAD BETWEEN THE ENGINE ROOM AND THE RUDDER COMPARTMENTIS WATERTIGHT.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Documentation
Issued 1 November 1984 Resolved
RENEW THE MASTER'S LICENSE.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Construction/Loadline
Issued 1 November 1984 Resolved
GAUGE AND REWELD THE 6 INCH FRACTURE ON THE AFT KEEL, PORT SIDE.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Construction/Loadline
Issued 1 November 1984 Resolved
RENEW WATERTIGHT DOOR GASKETS AS NECESSARY.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Lifesaving
Issued 1 November 1984 Resolved
BRING LIFEFLOAT ARRANGEMENT IN ACCORDANCE WITH NVIC 1-83.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Unknown
Issued 1 November 1984 Resolved
RENEW STARBOARD BILGE PUMP AND CLEAN THE AFT STATERM SUCTION.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Fire Fighting
Issued 1 November 1984 Resolved
RENEW THE FIRE AXE.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Fire Fighting
Issued 1 November 1984 Resolved
RENEW THE NON-UL APPROVED FIRE HOSE AND INSTALL A NEW PRESSURE GAUGE ON THEFIRE PUMP.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Engineering
Issued 1 November 1984 Resolved
INSTALL A GUARD ON THE FUEL OIL TRANSFER PUMP.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Engineering
Issued 1 November 1984 Resolved
INSTALL SAFETY RELIEF VALVES ON BOTH AIR COMPRESSORS.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Deck/Cargo
Issued 1 November 1984 Resolved
INSTALL A GUARD ON THE ANCHOR WINDLASS.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Electrical
Issued 1 November 1984 Resolved
REPAIR THE OVERSPEED TRIP ON THE PORT GENERATOR.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Electrical
Issued 1 November 1984 Resolved
RENEW THE BATTERY BOX IN THE ENGINE ROOM.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Unknown
Issued 1 November 1984 Resolved
ENSURE THAT ALL CIRCUITS AND CONTROLLERS ARE LABELED.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Navigation
Issued 1 November 1984 Resolved
PROVIDE THE VESSEL WITH THE FOLLOWING UP TO DATE NAVIGATION PUBLICATIONS: A. NAVIGATON RULES; B. COAST PILOT VOLUME #5; C. LIGHT LIST; D. NOTICE TO MARINERS; E. TIDE/CURRENT TABLES.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Navigation
Issued 1 November 1984 Resolved
RENEW STARBOARD RUNNING LIGHT WIRING AND HOUSING.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Documentation
Issued 1 November 1984 Resolved
ENSURE THAT THE OIL TRANSFER PROCEDURES ARE IN COMPLIANCE WITH THE REGULATIONS.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984
Unknown
Issued 3 November 1983 Resolved
PLACE THE FATHOMETER IN PROPER OPERATION.
Condition: Unknown
Due 3 November 1983
Resolved 3 November 1983
Unknown
Issued 3 November 1983 Resolved
RENEW THE GASKET IN THE AFT WHEELHOUSE DOOR AND THE EMERGENCY ESCAPE SCUTTLE FROM THE ENGINE ROOM.
Condition: Unknown
Due 3 November 1983
Resolved 3 November 1983
Unknown
Issued 3 November 1983 Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE HOWARD MCCALL, DN641964.
Condition: Unknown
Due 3 November 1983
Resolved 3 November 1983
Unknown
Issued 3 November 1983 Resolved
PROVIDE A CURRENT COAST PILOT, LIGHT LIST, AND CURRENT AND TIDE TABLES FOR THE AREA OF OPERATION.
Condition: Unknown
Due 3 November 1983
Resolved 3 November 1983

Casualty record · 1

23 January 2009Routine · role: Involved in a Marine Casualty · activity 3402195
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record