Inspection history · 79
2 February 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4244398
19 July 2011
Type not recorded
No type recorded · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 4086852
18 July 2011
Administrative Inspection
Administrative · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 4086783
7 December 2010
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3928628
4 October 2010
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3862758
24 September 2010
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3857896
29 January 2010
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3706517
28 January 2010
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3671674
15 September 2009
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3594921
28 August 2009
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3579305
4 May 2009
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3466849
15 April 2009
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3453171
28 January 2008
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3150297
28 December 2007
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3121077
26 November 2007
Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3104332
17 August 2007
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3030647
2 July 2007
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2981195
26 March 2007
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2895201
8 March 2007
COI Inspection · Examination of Repairs · MTSA Verification · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2881844
28 December 2006
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2847155
12 December 2006
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2840253
17 October 2006
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2802278
6 October 2006
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2797223
27 April 2006
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2634573
27 December 2005
MTSA Verification · Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2573037
21 February 2005
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2296388
8 February 2005
MTSA Verification · Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2299250
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1985614
18 November 2003
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1962021
19 March 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1759494
10 March 2003
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1760589
6 March 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1753674
14 February 2002
COI Inspection · Cargo Tank Internal
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1483353
23 January 2002
Hull Examination · Internal Structural Exam
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1480613
8 March 2001
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1058195
16 January 2001
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1384645
5 January 2000
Re-Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 813791
5 February 1999
Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1127849
2 February 1998
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1107225
11 September 1997
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1122217
25 August 1997
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1119777
30 July 1997
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 785305
3 July 1997
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1112921
6 December 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1418052
21 December 1995
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 874896
21 December 1995
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 875779
11 December 1995
Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 878208
1 November 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 146716
29 August 1995
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1192069
17 January 1995
Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 867098
15 August 1994
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 868026
17 September 1993
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 841225
15 June 1993
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 841176
20 May 1993
Permit to Proceed
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 833243
11 February 1993
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 834656
15 December 1992
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1140027
5 November 1992
Hull Examination · Examination of Repairs · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 963220
10 September 1992
Permit to Proceed
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 938770
24 August 1992
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1260816
12 June 1992
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 956411
16 May 1992
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1253859
22 January 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1259096
9 January 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 952180
20 December 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1269482
15 February 1991
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1225218
5 April 1990
Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1225873
21 February 1990
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 925617
18 April 1989
COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1196748
14 June 1988
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1206110
28 April 1988
Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1350573
10 April 1987
Deficiency Check · Hull Examination · MARPOL Annex II Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1017977
7 July 1986
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 511719
15 January 1986
COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1303914
3 June 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 537641
2 January 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1286071
14 March 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1281192
29 April 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1277936
3 February 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271482
25 January 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1279842
Construction/Loadline › Hull › Bottom Plating
Issued 24 September 2010
Resolved
See attached 835 for details. Two 3/8" hole in bottom of sturn rake. Temp patch.
Action required: 705 - Other - as specified
Resolved 4 October 2010
Resolution: Examined welds and witnessed satisfactory air test of a 3.5'' x 12'' x 1/2" bilge knuckle insert and a 3'' x 9'' x 3/8" picture window insert to the stern void.
Construction/Loadline › Hull › Bottom Plating
Issued 15 September 2009
Resolved
THE PORT BOW VOID HAS 2" X 1/8" FRACTURE ON THE BOTTOM LOCATED APPROX. 2' INBOARD PORT CORNER AT 6" AFT OF THE TRANSOM BILGE. TEMPORARY CEMENT BOX APPLIED.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 20 October 2009
Resolution: See MISLE #3618504
Construction/Loadline › Hull › Bottom Plating
Issued 28 August 2009
Resolved
VESSEL REPORTS ASTBD STERN CORNER WRAPPER AT BOTTOM OF BARGE ON WELD SEAM, CORNER WRAPPER AND BILGE KNUCKLE MEET
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 October 2009
Resolved 20 October 2009
Resolution: See MISLE #3618504
Construction/Loadline › Structures › Deck Plating
Issued 15 April 2009
Resolved
Vessel is required to replace all cargo tank stiffners on the stern and threw out the cargo tank sides and top
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 4 May 2009
Resolution: All cargo tank stiffeners were replaced and air tested satisfactory.
Construction/Loadline › Hull › Double Hull
Issued 26 November 2007
Resolved
A 7' section of the gunwale in way of the port #1 void was set in approximately 2' by an allision with another vessel. All damage is aprox 5' above the water line and does not penetrate the hull. Damaged is to be cropped and renewed to original construction.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 27 December 2007
Resolved 28 December 2007
Resolution: Cropped and renewed 7'' section of port side #1 wing void gunwale and completed satisfactory air test.
Construction/Loadline › Hull › Hull Plating
Issued 2 July 2007
Resolved
1/4" hole in the port stern orange peel. Shingles and epoxy patch installed.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 August 2007
Resolved 17 August 2007
Resolution: 17AUG07 - Conducted repair check. Examined welds and witnessed satisfactory air tested welds of 24"x36"x3/4" section of orange peel in way of the port stern.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 March 2007
Resolved
When conducting the ISE, noticed many broken welds, rolled side long, improperly fitted trip brakets and angle.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 16 March 2007
Resolution: Conducted ISE and inspected all repairs. All sat.
Construction/Loadline › Hull › Side Shell
Issued 12 December 2006
Resolved
3/8" pin hole discovered in the stern box bilge knuckle prior to loading.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 December 2006
Resolved 13 December 2006
Resolution: Received report form Kirby Inland Marine that temp repairs had been completed at [name withheld] Marine using shingles and a cement box patch. Barge will transit empty to the Houston AOR for permanent repairs.
Construction/Loadline › Hull › Hull Plating
Issued 6 October 2006
Resolved
The 1 1/2" X 1/4" fracture IWO port stern bilge knuckle.
Action required: 705 - Other - as specified
Due 8 November 2006
Resolved 18 October 2006
Resolution: Inserted a 18" X 18" insert in the port side of the side shell in the stern box.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 6 October 2006
Resolved
Install dow pins on vapor collection manifold flanges both port and STBD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 November 2006
Resolved 6 October 2006
Resolution: Pressed in new pins in the vapor collection manifold connection.
Construction/Loadline
Issued 16 January 2001
Resolved
PTLC, repair small fractures, port bow deck, just fwd of tank top corner; stbd side bow deck edge, just fwd of tank top ladder; stbd side fwd bow (aft) button.
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Deck/Cargo
Issued 16 January 2001
Resolved
PTLC, prove proper operation of vapor header P/V valve, all rising stick indicators, all deck spill valves and all closed gauging sight glasses (wired shut).
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Deck/Cargo
Issued 16 January 2001
Resolved
PTLC, renew vapor recovery line markings.
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Construction/Loadline
Issued 16 January 2001
Resolved
PTLC, replace all wasted, tank top side longitudinal angles, located on thefwd port side.
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Deck/Cargo
Issued 16 January 2001
Resolved
PTLC, access vapor recovery line for internal exam. Vessel authorized to carry polymerizing cargoes.
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Construction/Loadline
Issued 16 January 2001
Resolved
PTLC, replace wasted, stripping line bracket, on fwd tank top by prime mover.
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Lifesaving
Issued 16 January 2001
Resolved
PTLC, replace Danger Keep Out sign on 1S cargo ullage.
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Deck/Cargo
Issued 16 January 2001
Resolved
Prior to loading cargo (PTLC), hydro cargo header and test relief valve on header and steam line.
Condition: Unknown
Due 16 January 2001
Resolved 16 January 2001
Construction/Loadline
Issued 3 July 1997
Resolved
PROCEED TO PORT LAVACA, TEXAS, OFF LOAD CARGO, GAS FREE AND MAKE PERMANENT_x001C_REPAIRS TO LEAK IN PORT STERN CORNER WRAPPER AT THE 4' DRAFT MARK PRIOR TO LOADING CARGO.
Condition: Unknown
Due 3 July 1997
Resolved 3 July 1997
Accommodation/Occupational Safety
Issued 3 July 1997
Resolved
FIX HANDRAILS SO IT IS UPRIGHT IN WAY OF STERN WALKWAY.
Condition: Unknown
Due 3 July 1997
Resolved 3 July 1997
Construction/Loadline
Issued 11 December 1995
Resolved
Make barge safe for hot work, and make permanent repairs to fracture on port stern corner at the deck knuckle. Barge has approximately 15" fracturewith deck plating peeled back. Repairs to be inspected by a Marine Inspector, and prior to cargo operations.
Condition: Unknown
Due 11 December 1995
Resolved 11 December 1995
Deck/Cargo
Issued 9 January 1992
Resolved
REPLACE THE CURRENT SPILL VALVES IN THE VAPOR RECOVERY SYSTEM, WITH THE VALVES PROPOSED IN OWNER LTR DTD 17DEC91 (ERL SUPERAC II SPILL VALVE).
Condition: Unknown
Due 9 January 1992
Resolved 9 January 1992
Deck/Cargo
Issued 20 December 1991
Resolved
VAPOR RECOVERY OPERATIONS SHALL NOT BE CONDUCTED UNTIL THE VAPOR RECOVERY SYSTEM HAS BEEN APPROVED BY USCG (G-MSC) IN ACCORDANCE WITH 46 CFR 39.10-13AND THE COI HAS BEEN AMENDED TO AUTHORIZE VAPOR RECOVERY OPERATIONS._x001C_
Condition: Unknown
Due 20 December 1991
Resolved 20 December 1991
Construction/Loadline
Issued 5 April 1990
Resolved
HAUL OUT VESSEL, AND MAKE PERMANENT REPAIR TO THE HOLE IN THE CENTER STERN VOID NO LATER THAN 07PAR90 TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 5 April 1990
Resolved 5 April 1990