MAURY USCG vessel records Sign in
← All vessels

NABORS RIG P-54

NABORS RIG P-54 is a 1982 mobile offshore drilling unit. The Coast Guard has recorded 100 inspections since 1982, most recently in June 2012, along with 151 deficiencies.

Records from 1982 to 2012. Most recent: inspection, 26 June 2012.

Built
1982
Last inspected
26 June 2012
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8754243 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WRB2839
Flag
UNITED STATES
—
Maury page id
psix-53486

Inspections, by type

…with no type recorded28
Years with a record 28 calendar years (1982–2012)
The 100 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it2237 - Regulatory (Subpart C or D), Gross Ton
2237 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WRB2839MMSI not assigned · expired · voluntarily equipped · granted 12 March 1999, cancelled 9 October 2004 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

DYLAN'S QUEST Offshore Supply Vessel · MISLE 498125 · 12 April 2001 · activity 27251

Inspection history · 100

26 June 2012 Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4368396
22 May 2008 Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3213845
29 April 2008 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3195267
5 April 2007 Hull Examination · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3197352
1 August 2006 Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2727714
1 August 2005 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2516391
13 July 2005 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2415888
9 May 2005 COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2353444
2 August 2004 Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2133305
19 August 2003 Periodic Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1880792
5 September 2002 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1672825
14 August 2002 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1666714
15 May 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1616925
23 February 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1488709
12 June 2001 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1432529
12 April 2001 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 27251
12 September 2000 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 822568
1 September 2000 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1053621
24 August 2000 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 23281
8 August 2000 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1472469
6 June 2000 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1051200
19 May 2000 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1457791
6 March 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1046482
10 December 1999 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 812091
4 October 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1043410
8 July 1999 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1399149
18 June 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1192436
1 June 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 803523
24 May 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 799853
11 May 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1129268
4 May 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1130216
16 April 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1122882
29 July 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1129782
1 July 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1128657
20 May 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1126939
20 May 1998 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1395010
24 November 1997 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 773753
28 July 1997 Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1396761
27 June 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 778142
20 May 1997 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1097192
24 April 1997 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1104932
14 January 1997 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1098794
18 November 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 866430
31 July 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1089613
8 July 1996 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1087042
26 June 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1242236
20 May 1996 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1428633
1 February 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1193178
17 January 1996 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1409429
26 July 1995 Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1414493
8 May 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 899769
10 June 1994 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1015603
31 May 1994 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1425463
29 April 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1169011
15 April 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1167541
14 April 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 857043
11 April 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1167489
6 October 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 643619
6 October 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 682293
5 October 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 643622
3 October 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 88741
15 June 1993 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1150205
1 June 1993 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1444718
31 August 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 941381
27 July 1992 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 950876
2 July 1992 Deficiency Check · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 945110
17 June 1992 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1469384
3 April 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 934315
31 July 1991 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 941090
17 June 1991 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1345777
12 June 1991 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1042884
15 May 1991 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1216034
11 October 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 902678
11 July 1990 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 914789
2 July 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 900039
5 June 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 902887
5 June 1990 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 924494
28 April 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1234515
15 December 1989 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1229688
25 October 1989 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1016038
28 August 1989 Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1042799
15 June 1988 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 891923
25 June 1987 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1325212
19 May 1987 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1004261
17 June 1986 COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1304722
3 May 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1289460
1 April 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1289690
19 June 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1286737
13 May 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1280292
12 August 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1278311
2 March 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1277738
14 February 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1277237
19 June 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1283312
7 May 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1271140
4 May 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1271302
19 April 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 966067
8 April 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 963518
2 April 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 963469
31 March 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1275507
24 March 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1275379

Deficiency record · 151

Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 11 June 2008 Resolved
Service all Class "A" doors to ensure proper operation, doors must close properly.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 August 2009
Resolution: All Class "A" doors function properly. PATMS //s// [name withheld]
Fire Fighting › Structural - B Class Divisions › Doors
Issued 11 June 2008 Resolved
Service class B door to laundry room to ensure proper operation, replace latch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2008
Resolution: O/O completed repair on the spot. //s// [name withheld]
Lifesaving › Lifeboat › Rudder/Tiller/Steering
Issued 11 June 2008 Resolved
Number 1 lifeboat missing compass, supply lifeboat with operable lifeboat compass.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 August 2009
Resolution: New Compass provided for lifeboat. PATMS //s// [name withheld]
Construction/Loadline › Hull › Hull Plating
Issued 13 July 2005 Resolved
Complete Phase II of SEILOD before next rig move. Contact Port Arthur to schedule dive oversight inspection.
Action required: 705 - Other - as specified
Resolved 1 August 2005
Resolution: Completed Phase II of SEILOD. Submitted ABS and dive reports to PATMS.
Communications › Alarms/Indicators › General Alarm
Issued 9 May 2005 Resolved
Prove proper operation of the vessels General Alarm system.
Condition: Improper/Lack of Maintenance
Due 11 May 2005
Resolved 20 May 2005
Resolution: General alarm system repaired. Sound survey completed and additional bells and lights were installed.
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 May 2005 Resolved
Complete repairs to the generator engine water cooler end cap and assess the condition of the salt water cooling loop.
Condition: Design Flaw
Due 11 May 2005
Resolved 25 May 2005
Resolution: New end cap installed and inspection of the salt water loop completed.
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 May 2005 Resolved
Provide a means to protect the salt water cooling and rig supply water system from overpressurization by the fire main system.
Condition: Improper/Lack of Maintenance
Due 11 June 2005
Resolved 25 May 2005
Resolution: Isolation valve was installed between the rig water and fire main systems. A 125psi PRV was installed on the fire main piping.
Operations/Management › Drills/Instruction › Fire
Issued 9 May 2005 Resolved
Perform a satisfactory fire drill under the supervision of the rig port engineer, [name withheld].
Condition: Unknown
Due 11 May 2005
Resolved 25 May 2005
Resolution: Drill completed.
Lifesaving › Lifeboat
Issued 19 August 2003 Resolved
Renew retroreflective tape on port and starboard life boats. Vessel is currently stacked, extended due dates by 30 days LEGACY COMPONENT DESC: Markings
Action required: 705 - Other - as specified
Due 25 October 2003
Resolved 17 October 2003
Construction/Loadline › Structures
Issued 19 August 2003 Resolved
Crop and renew, back to good steel, doublers on accommodations house. Inserts should be 18 x 18 inch minimum with radiused corners. Vessel is currently stacked, extended due dates by 30 days LEGACY COMPONENT DESC: Superstructure
Action required: 705 - Other - as specified
Due 25 October 2003
Resolved 17 October 2003
Fire Fighting › Fire Main
Issued 19 August 2003 Resolved
Crop and renew wasted fire main sections at fire stations 1 & 3. Vessel is currently stacked, extended due dates by 30 days. LEGACY COMPONENT DESC: Condition
Action required: 705 - Other - as specified
Due 25 October 2003
Resolved 17 October 2003
Engineering › Fuel Oil Service System
Issued 19 August 2003 Resolved
Crop and renew wasted sections of fuel lines leading from fuel pump near port aft leg. Vessel is currently stacked, extended due dates by 30 days. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 25 October 2003
Resolved 17 October 2003
Documentation › Certificates/Documents
Issued 14 August 2002 Resolved
PROVIDE RESULTS OF ANNUAL CRANE INSPECTION TO [name withheld] 30 days as per written request on 9/9/02
Due 13 October 2002
Resolved 5 November 2002
Resolution: Annual crane inspection completed by ABS. Via PATMS ON 25AUG03.
Engineering › Compressed Air System (start air)
Issued 14 August 2002 Resolved
MAKE ALL PRESSURE VESSELS AVAILABLE FOR INTERNAL EXAMINATION OR PROVIDE RESULTS OF NDT/UIA SHEETS TO CLASS SOCIETY OR CG INSPECTOR. PROVIDE REPORTS TO [name withheld] IS USED. Extended 30 days as per written request on 9/9/02
Due 13 October 2002
Resolved 6 September 2002
Resolution: UT tests on all pressure vessels completed by METCO SERVICES on 6 SEPT03. Via PATMS.
Electrical
Issued 14 August 2002 Resolved
PROVE PROPER OPERATION OF PURGE/PRESSURE SYSTEM PROTECTING DRILLERS CONSUL TO SATISFACTION OF CLASS SOCIETY OR CG INSPECTOR. PROVIDE REPORT TO USCG [name withheld] SOCIETY IS USED. Extended due date 30 days as per written request on 9/9/02
Due 13 October 2002
Resolved 25 August 2003
Resolution: Proper operation of purge/pressure system completed on 25AUGUST03 Via PATMS.
Construction/Loadline
Issued 8 August 2000 Resolved
CROP & RENEW WASTED LONGITUDINALS IN VOID #26 TO SATISFACTION OF CLASS.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Construction/Loadline
Issued 8 August 2000 Resolved
CONDUCT PHASE II SEILODD.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Unknown
Issued 19 May 2000 Resolved
REPLACE SAFETY RELIEF VALVES FOR ALL AIR RECEIVERS AND AIR COMPRESSORS.
Condition: Unknown
Due 19 June 2000
Resolved 19 June 2000
Unknown
Issued 19 May 2000 Resolved
COMPLETE OUTSTANDINGS ISSUED BY ABS FOR ANNUAL LOADLINE AND ANNUAL STATEMENT OF FACT ON BOTH CRANES.
Condition: Unknown
Due 13 June 2000
Resolved 13 June 2000
Unknown
Issued 19 May 2000 Resolved
SUBMIT SOPEP FOR FIVE YEAR APPROVAL RENEWAL.
Condition: Unknown
Due 19 May 2000
Resolved 19 May 2000
Construction/Loadline
Issued 19 May 2000 Resolved
REPAIR HOLES IN BULKHEAD / DECK WELDS ON STARBOARD ENGINE ROOM UNDER FUEL OIL TANK.
Condition: Unknown
Due 13 June 2000
Resolved 13 June 2000
Lifesaving
Issued 19 May 2000 Resolved
CONDUCT AND LOG 2 MONTH 46CFR109.213 TRAINING FOR ALL HANDS. COMPLY WITH FIRE AND BOAT DRILL LOGGING REQUIREMENTS. CONDUCT AND LOG WEEKLY AND MONTHLY RUNNING OF THE EMERGENCY GENERATOR. CONDUCT AND LOG SEMI-ANNUAL LOAD TEST OF EMERGENCY BATTERIES.
Condition: Unknown
Due 13 June 2000
Resolved 13 June 2000
Lifesaving
Issued 19 May 2000 Resolved
CONDUCT SATISFACTORY FIRE AND BOAT DRILLS FOR THE "B" CREW IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 13 June 2000
Resolved 13 June 2000
Lifesaving
Issued 19 May 2000 Resolved
RENEW MAIN VIEWING WINDOW ON BOTH LIFEBOATS, RENEW VIEWING PORTS (3) ON #2 LIFEBOAT. ADDRESS AND REPAIR STRESS CRACKS ON #2 LIFEBOAT.
Condition: Unknown
Due 19 May 2000
Resolved 19 May 2000
Lifesaving
Issued 8 July 1999 Resolved
REPLACE MISSING/DAMAGED SECTIONS OF LIFEBOAT #2'S RUB RAILS.
Condition: Unknown
Due 8 July 1999
Resolved 8 July 1999
Engineering
Issued 8 July 1999 Resolved
MAKE ALL FLEXIBLE FUEL OIL LINES FROM THE MAIN ENGINES TO THE FILTERS NMT 30 INCHES.
Condition: Unknown
Due 8 July 1999
Resolved 8 July 1999
Lifesaving
Issued 8 July 1999 Resolved
PROPERLY INSTALL MOTOR TO PUMP COUPLING GUARDS THROUGHOUT RIG AS NECESSARY.
Condition: Unknown
Due 8 July 1999
Resolved 8 July 1999
Documentation
Issued 8 July 1999 Resolved
SUBMIT FOR APPROVAL AN UPDATED AND REVISED FIREFIGHTING AND LIFESAVING PLAN.
Condition: Unknown
Due 8 July 1999
Resolved 8 July 1999
Lifesaving
Issued 20 May 1998 Resolved
Implement new training and drill requirements of 46CFR109.213. Initiate logging of individuals' drills and training.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Engineering
Issued 20 May 1998 Resolved
Install new self-closing sight glass stop valves on emergency generator fuel oil day tank.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Engineering
Issued 20 May 1998 Resolved
Provide accurate hand-held tachometer or make repairs to installed tachometer on emergency generator.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Construction/Loadline
Issued 20 May 1998 Resolved
Adjust dogging mechanisms and/or hinges and gaskets on starboard crane pedestal house watertight door to provide for effective sealing.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Electrical
Issued 20 May 1998 Resolved
Prove proper operation of emergency generator automatic start and automaticbus transfer upon loss of electrical potential from main generator bus.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Lifesaving
Issued 20 May 1998 Resolved
Make permanent repairs to port lifeboat davit winch. Install new forward window and make permanent repairs to diesel engine exhaust piping and bow skeg plate.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Documentation
Issued 20 May 1998 Resolved
Provide original of current stability letter onboard; must reference latest(1992) edition of operating manual.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Accommodation/Occupational Safety
Issued 20 May 1998 Resolved
Provide hot water to sink(s) in crew's head on 2nd level port side communalhead.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Fire Fighting
Issued 20 May 1998 Resolved
Prove proper operation of generator room ventilation fan shutdown upon activation of CO2 system pressure activated switch.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Deck/Cargo
Issued 24 November 1997 Resolved
CEASE CRANE OPERATIONS UNTIL UNIT IS CERTIFIED, INSPECTED AND TESTED IN ACCORDANCE WITH 46 CFR 107.258, 46 CFR 107.259 AND 46 CFR 107.260.
Condition: Unknown
Due 23 March 1998
Resolved 23 March 1998
Lifesaving
Issued 28 July 1997 Resolved
LABEL ALL GENERAL ALARM BELLS: "GENERAL ALARM-WHEN BELL RINGS GO TO YOUR STATION".
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Unknown
Issued 28 July 1997 Resolved
COMPLETE INTERNAL EXAMINATION OF ALL PRESSURE VESSELS.
Condition: Unknown
Due 31 July 1997
Resolved 31 July 1997
Electrical
Issued 28 July 1997 Resolved
INSTALL LINER IN EMERGENCY BATTERY BOX IN ENGINE ROOM.
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Accommodation/Occupational Safety
Issued 28 July 1997 Resolved
REPAIR OR REPLACE WASTED A/C UNITS.
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Lifesaving
Issued 28 July 1997 Resolved
REPLACE MISSING SAFETY RAIL STANCHION, PORT AFT CORNER.
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Lifesaving
Issued 28 July 1997 Resolved
WEIGHT TEST LIFE BOAT FALLS.
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Construction/Loadline
Issued 28 July 1997 Resolved
COMPLETE HULL REPAIRS TO THE SATISFACTION OF COGNIZANT [name withheld] MOVE.
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Construction/Loadline
Issued 27 June 1997 Resolved
THE POOL RIG 54 IS TO REMAIN AT EC-149 UNTILL ABS ISSUES A PROVISIONAL LOADLINE TO THE VESSEL. UPON RECEIVING LOAD LINE THE VESSEL CAN MOVE TO NEXT LOCATION(GI-9) TO COMPLETE REPAIRS TO THE VESSEL. NO DRILLING OPERATIONS CAN BEGIN UNTIL SATISFACTORY REPAIRS ARE COMPLETED AND CLEARED.
Condition: Unknown
Due 27 June 1997
Resolved 27 June 1997
Electrical
Issued 20 May 1996 Resolved
ADJUST REVERSE POWER RELAY ON #2 GENERATOR FOR PROPER OPERATION.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Lifesaving
Issued 20 May 1996 Resolved
OPERATE LIFEBOATS IN WATER PER 46 CFR 109.217.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Navigation
Issued 20 May 1996 Resolved
INSTALL DUAL-FILAMENT, MARINE TYPE BULB IN STBD. RUNNING LIGHT.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Accommodation/Occupational Safety
Issued 20 May 1996 Resolved
INSTALL DOOR CLOSER ON ONE DOOR TO STAIRWELL.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Accommodation/Occupational Safety
Issued 20 May 1996 Resolved
INSTALL SECOND MEANS OF ESCAPE FROM PORT AND STBD. STORE ROOMS.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Construction/Loadline
Issued 20 May 1996 Resolved
ADJUST STBD. ENGINE ROOM AND MAIN DECK CHANGING ROOM WATERTIGHT DOORS.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Engineering
Issued 20 May 1996 Resolved
RENEW WASTED SECTION OF FUEL LINE TO EMER.GEN..
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Electrical
Issued 20 May 1996 Resolved
REPLACE CIRCUIT BOARD ON PORT EMBARKATION LANDING EMERGENCY LIGHTING.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Electrical
Issued 20 May 1996 Resolved
SECURE LOOSE WIRING AND PLACE CLOSURE OVER ELECTRICAL JUNCTION BOX LOCATED ON SCR ROOM OVERHEAD.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Lifesaving
Issued 20 May 1996 Resolved
REPLACE GENERAL ALARM ON DRILL FLOOR AND IN MUD PIT AREA.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Construction/Loadline
Issued 17 January 1996 Resolved
PERFORM SWIM-BY INSPECTION OF UPPER AND LOWER PORTIONS OF THE MAT DURING NEXT RIG MOVE.
Condition: Unknown
Due 17 January 1996
Resolved 17 January 1996
Lifesaving
Issued 17 January 1996 Resolved
REPAIR WASTED AREAS ON 6" I-BEAM ON PORT LIFEBOAT DAVIT.
Condition: Unknown
Due 17 January 1996
Resolved 17 January 1996
Unknown
Issued 17 January 1996 Resolved
SUBMIT COPY OF FINAL DIVE REPORT AND VIDEO TAPE OF DIVE INSPECTION TO OCMI,MORGAN CITY, LA.
Condition: Unknown
Due 17 January 1996
Resolved 17 January 1996
Construction/Loadline
Issued 26 July 1995 Resolved
CONDUCT UNDERWATER NDE OF LEG/MAT CONNECTIONS AND SWIM-BY INSPECTION OF UPPER AND LOWER PORTIONS OF THE MAT DURING NEXT RIG MOVE.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Lifesaving
Issued 26 July 1995 Resolved
RENEW PRESSURE RELIEF VALVE FOR BREATHING AIR SYSTEM IN LIFEBOAT #2.
Condition: Unknown
Due 17 August 1995
Resolved 17 August 1995
Navigation
Issued 31 May 1994 Resolved
MAKE ALL OBSTRUCTION LIGHT POSITIONED ON THE SAME HORIZONTAL PLANE IAW 46CFR67.05-1(D).
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Lifesaving
Issued 1 June 1993 Resolved
CONDUCT HYDROSTATIC TEST ON BOTH LIFEBOAT AIR BOTTLES.
Condition: Unknown
Due 1 June 1993
Resolved 1 June 1993
Accommodation/Occupational Safety
Issued 1 June 1993 Resolved
REPAIR EMERGENCY VENTILATION SHUTDOWN ON DRILL FLOOR.
Condition: Unknown
Due 1 June 1993
Resolved 1 June 1993
Lifesaving
Issued 27 July 1992 Resolved
PAINT EXTERIOR OF BOTH LIFEBOATS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 July 1992
Resolved 27 July 1992
Lifesaving
Issued 27 July 1992 Resolved
REPAIR NO. 1 LIFEBOAT HULL BELOW RUB RAIL ON STARBOARD SIDE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 July 1992
Resolved 10 August 1992
Lifesaving
Issued 17 June 1992 Resolved
Provide test/installation documention of existing lifeboat falls or replacein kind.
Condition: Unknown
Due 17 July 1992
Resolved 10 August 1992
Lifesaving
Issued 17 June 1992 Resolved
Provide one additional boat hook and buoyant heaving line for each lifeboat.
Condition: Unknown
Due 10 August 1992
Resolved 10 August 1992
Unknown
Issued 17 June 1992 Resolved
When fully manned, prior to operating, conduct fire and boat drills.
Condition: Unknown
Due 17 July 1992
Resolved 10 August 1992
Construction/Loadline
Issued 17 June 1992 Resolved
Make permanent repairs to cracks found in leg/rack to mat connections (10" ind. inbd side of circum. weld on stbd. aft leg, 14" ind. inbd side of circum. weld port aft leg, 5" ind. aft mat side of weld aft rack of port fwd. leg, 4" ind. 2" aft of aft rack on stbd. fwd. leg in plate).
Condition: Unknown
Due 10 August 1992
Resolved 10 August 1992
Construction/Loadline
Issued 17 June 1992 Resolved
(Cont'd from #1) Repair proposal to be submitted to cognizant OCMI for approval. Rig shall not operate prior to completion of these repairs.
Condition: Unknown
Due 10 August 1992
Resolved 10 August 1992
Documentation
Issued 3 April 1992 Resolved
SUBMIT REVISIONS TO OPERATING MANUAL PER MSO PORT ARTHUR LETTER DATED 03APR92.
Condition: Unknown
Due 3 April 1992
Resolved 3 April 1992
Electrical
Issued 12 June 1991 Resolved
PROVE PROPER OPERATION IN PRESENCE OF CG INSPECTOR OF PURGE ALARM ON DRILLERS CONSOLE
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Fire Fighting
Issued 12 June 1991 Resolved
PROVIDE EXPLOSION PROOF BOX FOR THE GENERAL ALARM CONTACT MAKER IN THE _x001C_ SHALE SHAKER AREA
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Accommodation/Occupational Safety
Issued 5 June 1990 Resolved
REPAIR THE GENERAL ALARM ROTATING BEACON IN THE GENERATOR ROOM.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
RESERVICE THE STBD HELO DECK B 5 FIRE EXTINGUISHER.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REPAIR THE GENERAL ALARM BELLS ON THE DRILL FLOOR, MUD PUMP AREA, FWD UPPERQUARTERS, PORT AND STBD BOW LEGS, AND STBD LEG.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
FREE THE NOZZEL ON FIRE EXTINGUISHER #6.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REPAIR THE CABLE SPLICE IN THE OVERHEAD LOUDSPEAKER OUTSIDE THE HYDRAULIC ROOM.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
REPAIR THE MOUNTING BRACKET FOR THE FIRE EXTINGUISHER#23.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Navigation
Issued 5 June 1990 Resolved
REPLLACE LENS ON PORT NAV SIDE LIGHT.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Documentation
Issued 5 June 1990 Resolved
PLACE CURRENT OPERATIONS MANUAL (REVISIONS DATED 28SEP83) ON RIG
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990 Resolved
CLEAN OR REPLACE WINDOWS IN BOTH LIFEBOATS
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Navigation
Issued 5 June 1990 Resolved
CLEAN STARBOARD OBSTRUCTION LIGHT LENS
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990 Resolved
REATTACH RUB RAIL ON NO 2 LIFEBOATS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
REPAIR OR REPLACE GAGE ON STBD FIRE PUMP.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990 Resolved
REPAIR FIBERGLASS CANOPY ON #1 LIFEBOAT IN WAY OF STBD AFR DOOR.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990 Resolved
REPLACE GAGE IN BREATHIG AIR SYSTEM IN NO.2 LIFEBOAT, REFILL AS NECESSARY.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Unknown
Issued 5 June 1990 Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
RENEW THE JUNCTION BOXES ON THE A/C COMPRESSORS ON THE PORT BOW.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990 Resolved
REMOVE THE BRONZE PETCOCK FROM THE RACOR FUEL FILTER ON THE EMERGENCY GEN- ERATOR.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Accommodation/Occupational Safety
Issued 5 June 1990 Resolved
PROVIDE A SIGN FOR THE GENERAL ALARM BELL IN THE SCB ROOM STATING "GENERAL ALARM- WHEN BELL RINGS GO TO STATION."
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990 Resolved
REPAIR THE #1 AND #2 MAIN GENERATOR OVERSPEED TRIP INDICATOR LIGHTS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
RENEW THE GENERAL ALARM BELL IN THE MUD PUMP ROOM.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
RENEW THE SWITCHES BY THE PUMP ON THE STBD SIDE OF THE MUD PUMP ROOM.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REPAIR THE FIRE ALARM IN THE MUD PUMP ROOM ENSURING IT HAS EXPLOSION PROOF QUALITIES OR IS PROPERLY PURGED.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REPAIR THE FIRE ALARM IN THE MUD PIT AREA ENSURING THAT IT HAS EXPLOSION PROOF QUALITIES OR IS PROPERLY PURGED.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Construction/Loadline
Issued 5 June 1990 Resolved
REPAIR THE #2 BILGE/BALLAST PUMP.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Accommodation/Occupational Safety
Issued 5 June 1990 Resolved
REPAIR THE GENERATOR ROOM REMOTE VENTILATION SHUTDOWN.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REPAIR THE SPLICE IN THE CABLE LOCATED IN THE MUD PUMP AREA OVERHEAD OUTSIDE THE STORAGE AREAS(IN THE SKID CABLE CANTENARY)
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
PROVIDE THE PROPER ANSUL CO2 CATRIDGES FOR FIRE EXTINGUISHERS #27 AND #44.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
INSTALL A COVER ON THE A/C CONTROLLER/THERMOSTAT ON THE STBD BOW.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
PROVIDE EXPLOSION PROOF GENERAL ALARM ACTIVATION SWITCHES ON THE DRILL FLOOR AND THE SHALE SHAKER.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
PROVIDE A BRIGHTER LOSS OF PURGE ALARM LIGHT ON THE WMCO STROKE COUNTER AT THE DRILLER'S STATION.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
INSTALL A PROPER MOUNTING BRACKET FOR FIRE EXTINGUISHERS#'S 32,41, AND 42.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Navigation
Issued 5 June 1990 Resolved
PLACE PROPER BULBS IN NAVIGATION LIGHTS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990 Resolved
REPAIR WATERSPRAY SYSTEM IN NO 1 AND NO 2 LIFEBOATS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990 Resolved
PERFORM QUADRENNIAL INSPECTION OF PORT AND STBD CRANES.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990 Resolved
REFILL PORT BREATHING AIR BOTLE IN NO.1 LIFEBOAT.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
INSTALL THE MISSING BOLTS ON THE EXPLOSION PROOF JUNCTION BOXES BEHIND THE DRILLER'S STATION.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
REDIRECT THE RELIEF VALVE DISCHARGES IN THE PORT SIDE FIRE PUMP TO A SAFE DIRECTION.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
CLEAN THE PAINT FROM THE METAL TO METAL CONTACT SURFACES ON THE EXPLOSION PROOF SWITCHES ON THE DRILL FLOOR, MUD PIT AREA, SHALE SHAKER, AND MUD PUMP AREA.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REMOVE GASKET MATERIAL FROM THE DRAWWORKS CUT OUT SWITCHES(EXPLOSION PROOF)
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
LABEL THE STOP VALVE ON THE GENERATOR ROOM CO. FLOORING SYSTEM.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
LABEL THE FIRE AND ABANDON RIG BEACONS IN THE ENGINE ROOM.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Navigation
Issued 5 June 1990 Resolved
REPLACE HOLED FLAMESCREEN ON FUEL TANK VENT.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Navigation
Issued 5 June 1990 Resolved
PAINT NAV SIDELIGHT SCREENS FLAT BLACK, PROVIDE PROPER ARC OF VISIBILITY FOR SIDELIGHTS
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
CONDUCT EMERGENCY BATTERY TEST REQUIRED BY 46 CFR 109.211(A)(3)
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REPAIR THE CABLE TO THE DRILL FLOOR SUBSTRUCTURE LIGHT PORT AFT SIDE.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990 Resolved
REPAIR DRAWWORKS CONSOLE LOSS OF PURGE ALARM.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990 Resolved
PROVIDE A PROPER GENERAL CO2 CARTRIDGE FOR FIRE EXTINGUISHER #27.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 28 August 1989 Resolved
REPAIR THE EMERGENCY LIGHT AND THE EMERGENCY LIGHT AT THE STARBOARD LIFEBOAT.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
RENEW THE GENERAL ALARM BATTERY CONNECTORS WITH SWEDGED OR SOULDERED FITTINGS.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
INSTALL A PURGED SYSTEM FOR ALL THE EQUIPMENT INCLUDUNG THE DRAW WORKS MOTOR JUNCTION BOXES WITH LOSS OF PURGE ALARMS ON EACH PIECE OF EQUIPMENT.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
INSTALL AND POUR AN EYS FITTING FOR THE AGITATOR FOR THE MUD PITS.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Lifesaving
Issued 28 August 1989 Resolved
PROVIDE ONE RED HAND FLARE FOR A TOTAL OF 12 AND A TABLE OF LIFESAVINGS SIGNALS MOUNTED ON THE LIFEBOAT BULKHEAD FOR THE STARBOARD NO.2 LIFEBOAT.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Lifesaving
Issued 28 August 1989 Resolved
PROVIDE ONE REWINDING SPINDLE FOR A TOTAL OF THREE FOR THE LINE THROWING GUN.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Navigation
Issued 28 August 1989 Resolved
REPAIR THE FOGHORN.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
REPAIR THE OVERSPEED AND LOW LUBE OIL TRIP ON THE EMERGENCY GENERATOR.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
INSTALL A FLAME SHIELD FOR THE RACOR FILTER ON THE EMERGENCY GENERATOR FUELSYSTEM.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
LABEL EMERGENCY FUEL SHUTOFFS ON THE MAIN AND EMERGENCY GENERATOR FUEL SYSTEMS.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
REPAIR THE GROUND IN THE NSOV DISTRIBUTION BOARD.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
RENEW THE EMERGENCY DIESEL GENERATOR BATTERY CONNECTORS WITH SWEDGED OR SULDERED CONNECTORS.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Electrical
Issued 28 August 1989 Resolved
POUR THE EYS FITTING FOR THE LIGHT ON THE STARBOARD SIDE OF THE MUDPIT.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Documentation
Issued 28 August 1989 Resolved
PROVIDE AN APPROVED COPY OF THE CONSTRUCTION PORTFOLIO ABOARD THE RIG.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Lifesaving
Issued 28 August 1989 Resolved
REPAIR THE FORWARD LIMIT SWITCH ON THE STARBOARD (NO.2) LIFEBOAT.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Lifesaving
Issued 28 August 1989 Resolved
PROVIDE A BUCKED WITH 6' LINE AND A TABLE OF LIFESAVING SIGNALS MOUNTED ON THE LIFEBOAT BULKHEAD FOR THE PORT NO.1 LIFEBOAT.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Unknown
Issued 15 June 1988 Resolved
PROVIDE EVIDENCE OF HYDRO TEST OF OIL TRANSFER HOSES AT A MINIMUN OF 225PSI
Condition: Unknown
Due 15 June 1988
Resolved 15 June 1988
Electrical
Issued 15 June 1988 Resolved
INSTALL EMERGENCY GENERATOR CIRCUT BOARD AND TEST THE AUTOMATIC STARTING SYSTEM AND LOW LUBE OIL PRESSURE ALARM.
Condition: Unknown
Due 15 June 1988
Resolved 15 June 1988
Unknown
Issued 19 May 1987 Resolved
REINSTALL THE STERN LIGHT IN AN UNOBSTRUCTED LOCATIONS.
Condition: Unknown
Due 19 May 1987
Resolved 19 May 1987
Deck/Cargo
Issued 17 June 1986 Resolved
REPLACE BROKEN WINDOWS IN THE PORT CRANE.
Condition: Unknown
Due 17 June 1986
Resolved 17 June 1986
Accommodation/Occupational Safety
Issued 17 June 1986 Resolved
PROVIDE HAND RELIEVING DEVICE ON THE RELIEF VALVE FOR THE PORTABLE AND SANITARY PRESSURE TANKS RELIEF VALVES.
Condition: Unknown
Due 17 June 1986
Resolved 17 June 1986
Lifesaving
Issued 17 June 1986 Resolved
PROVIDE 500" OF AUXILIARY LINE FOR THE LINE THROWING APPLIANCE PER 46 CFR 160.031-4
Condition: Unknown
Due 17 June 1986
Resolved 17 June 1986
Electrical
Issued 17 June 1986 Resolved
REPAIR THE COVER ON TE PHONE BOX LOCATED IN THE MUD PUMP ROOM. THE BOX IS AIR PURGED AND THE LOSE COVER DOES NOT PROVIDE THE REQUIRED PROTECTION.
Condition: Unknown
Due 17 June 1986
Resolved 17 June 1986
Fire Fighting
Issued 17 June 1986 Resolved
PROVIDE MEANS TO RAPIDLY CLOSE THE LOUVER ON THE EXHAUST CLUCT TO THE EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 17 June 1986
Resolved 17 June 1986
Lifesaving
Issued 17 June 1986 Resolved
PROVIDE THE REQUIRED AMOUNT OF DRINKING WATER IN THE PORT CAPSULE. 3 QUARTS OF WATER PER PERSON REQUIRED.
Condition: Unknown
Due 17 June 1986
Resolved 17 June 1986
Lifesaving
Issued 17 June 1986 Resolved
CLEAN OR REPLACE THE WINDOWS IN BOTH CAPSULES. WINDOWS ARE OPAQUE AT THIS TIME OBSTRUCTING THE VIEW FROM THE HELM STAND.
Condition: Unknown
Due 17 June 1986
Resolved 17 June 1986
Unknown
Issued 19 June 1984 Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE MODU POOL RIG 54, DN648557
Condition: Unknown
Due 19 June 1984
Resolved 19 June 1984
Electrical
Issued 19 June 1984 Resolved
COMPLETE STRAPPINGS OF CABLES WITH METAL BANDS AS NECESSARY THROUGHOUT RIG.
Condition: Unknown
Due 19 June 1984
Resolved 19 June 1984
Unknown
Issued 19 June 1984 Resolved
PROVIDE PROPER FLAME BOWLS FOR RACOR FUEL FILTERS.
Condition: Unknown
Due 19 June 1984
Resolved 19 June 1984
Electrical
Issued 19 June 1984 Resolved
REPAIR OR REPLACE ROTATING BEACON ON ENGINE ALARM FOR #2 GENERATOR AND LOW LUBE OIL ALARM FOR #1 GENERATOR.
Condition: Unknown
Due 19 June 1984
Resolved 19 June 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.