Records from 2005 to 2026. Most recent: inspection, 18 May 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 14
18 May 2026
Excursion Permit
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8375424
4 September 2025
Internal Structural Exam · Deficiency Check · Vessel Attendance · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8209441
10 January 2025
Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8060118
7 December 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7846941
17 October 2023
Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7799804
12 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7807270
22 August 2023
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7773998
6 October 2022
Administrative Inspection · In-Service Inspection · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7572574
14 March 2022
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7409392
20 December 2021
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7370688
6 May 2019
Administrative Inspection
Administrative · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6678250
12 December 2017
Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6323069
3 November 2016
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6034424
21 January 2016
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5801021
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 September 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accoredance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. On both rudder posts, the packing flange bolts are loose and bent. Provide evidence that the bolts are properly torqued prior to 2025 Hull Exam credit.
Action required: 705 - Other - as specified
Resolved 6 October 2025
Resolution: Attended vessel, verified flange bolts were tightened as required.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 10 January 2025
Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry—
(1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121; and
(2) Six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. During inspection, vessel flares onboard had just recently expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 January 2025
Resolved 29 April 2025
Resolution: Vessel has new flares onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 January 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including the following: Operational test of the means provided for pumping bilges. During inspection, inspector was able to witness satisfactory bilge suction in forepeak void, however, the rest of the bilge suction points throughout the vessel required additional arrangements in order to test due to tight proximity of the suction point in way of the hull. Crew shall make arrangements necessary to conduct bilge suction test to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 January 2025
Resolved 29 April 2025
Resolution: Crew replaced corroded portions of bilge piping and demonstrated proper suction from all suction points.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 January 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. During the internal structural exam, several cracked welds were discovered in the forepeak void and up forward on the starboard side. Starboard bow railing is still structurally sound, however, the vertical support structures have cracked welds that have begun to separate from the deck. In the forepeak void, on the upper starboard side near the hatch, there are also cracked welds along the transverse beams meeting with the starboard side shell. Crew shall monitor for crack progression until permanent repairs are made prior to next drydock credit (due by 30SEP2025).
Action required: 705 - Other - as specified
Due 30 September 2025
Resolved 6 October 2025
Resolution: Attended vessel and verified all damaged portions of starboard bow were cropped and renewed. All cracked welds were also gouged and renewed. All satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 17 October 2023
Resolved
Each vessel constructed of a material other than wood certificated to operate on a coastwise route must be provided with life floats of an aggregate capacity that will accommodate at least 100% total number of persons permitted in board. At the time of inspection, vessel was missing one of two 25 person liferafts listed on the vessel's COI. Vessel currently has one 25 person liferaft. Vessel is limited to carrying no more than 25 total persons on board until second liferaft is onboard and installed.
Action required: 705 - Other - as specified
Due 17 October 2023
Resolved 2 November 2023
Resolution: Verified second liferaft installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 October 2023
Resolved
A fire hose with the nozzle must be attached to each fire hydrant at all times. While testing the fire pump it was identified that the hose and nozzle on board were not compatible and could not be connected. Replace hose or hose with an approved type and prove proper operation of hose and nozzle.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2023
Resolved 2 November 2023
Resolution: Verified replacement of hose and nozzle.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 October 2022
Resolved
Each life jacket must be marked with Type 1 retroreflective material approved under 164.018.
46CFR180.25-25
Life jackets were found with failing retroreflective tape.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 21 October 2022
Resolution: Life jackets were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 October 2022
Resolved
Vessels shall carry sufficient life floats for all persons onboard that comply with 160.027.
03 Life Floats were unsatisfactory condition and deemed unfit for service. 46CFR180.10-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 17 October 2023
Resolution: Inspected satisfactory lifesaving listed on COI.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 October 2022
Resolved
A vessel 20 meters or more must be provided with a bell and whistle.
Whistle was not operational.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2022
Resolved 21 October 2022
Resolution: Ship's whisle was fixed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 October 2022
Resolved
At each inspection all machinery essential to operation including cooling systems shall be examined.
Port and STBD main propulsion engines had coolant leaks. STBD generator also had a coolant leak.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2022
Resolved 21 October 2022
Resolution: All coolant leaks were fixed.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 19 October 2022
Resolved
A placard must be posted next to all radios with emergency broadcast instructions specific to the vessel.
The required emergency broadcast placard was missing.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 21 October 2022
Resolution: Emergency broadcast placard was posted.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 19 October 2022
Resolved
A bilge high level visual and audible alarm must be provided at the operating station.
The audible alarm was not load enough to be heard over machinery.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 2 November 2022
Resolved 21 October 2022
Resolution: Engine room bilge alarm was fixed and was now audible from the operation station.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 19 October 2022
Resolved
When operating on a body of water where the discharge of
sewage is prohibited the overboard valve must be secured
The sewage overboard valve was not secured in the closed
position.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2022
Resolved 21 October 2022
Resolution: The sewage overboard valve was locked.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 19 October 2022
Resolved
Crew accommodation and work spaces must be adequately constructed to provide for safe accommodation and protection of the crew.
A hole was found in the galley floor that must be securely covered.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 21 October 2022
Resolution: Hole in galley floor was patched.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 October 2022
Resolved
Electrical equipment must be installed and maintained to protect passengers and crew from electrical hazards to include fire and electrical shock.
Multiple power strips were observed onboard the vessel and emergency lighting in the engine room was hanging by the wire.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2022
Resolved 21 October 2022
Resolution: Power strips were removed and the e light was hung properly.
09 - Working and Living Conditions › 091 - Living Conditions › Galley, handlingroom (maintenance)
Issued 19 October 2022
Resolved
Doors shall be provided with heavy duty hinges and locking devices to prevent accidental opening in heavy seas.
The oven and refrigerator do not have a means to lock the door/doors.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 21 October 2022
Resolution: Locking devices were installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 6 October 2022
Resolved
Vessel is limited to operating with a max of 12 persons until the full compliment of life floats IAW the COI, are onboard.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 17 October 2023
Resolution: Verified adequate lifesaving for required number of persons onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 October 2022
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Starboard diesel generator and all three main diesel engines missing guards for exposed rotating machinery on forward area.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2022
Resolved 21 October 2022
Resolution: Guards were installed.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 6 October 2022
Resolved
Every vessel must be fitted with a suitable magnetic compass. Except on a vessel limited to day time operations, the compass must be illuminated.
Compass was not iluminated. deviation table missing.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 27 October 2022
Resolved 21 October 2022
Resolution: Compass light was fixed and a deviation card was completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 October 2022
Resolved
A vessel must be provided with a steering gear that is capable of steering the vessel at all service speeds.
Steering was hunting/jerking when moving to STBD.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2022
Resolved 21 October 2022
Resolution: Air was perged out of the system and system was tested sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 October 2022
Resolved
Each vessel mus the equipped with two portable battery lights, one at the operating station and one at the propulsion room entrance.
Vessel had no portable lights onboard.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 21 October 2022
Resolution: Portable lights were place at the operation station and near the entrance to the engine room.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 6 October 2022
Resolved
The general construction of the vessel as to minimize fire hazards.
The dry vent hose had holes and lint trap was behind a bulkhead where it could not be cleaned.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2022
Resolved 21 October 2022
Resolution: Dryer vent hose was cleaned and remounted with a lint trap.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 21 January 2016
Resolved
Vsl hit a submerged log and bent the port and center propellors
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 February 2016
Resolved 21 January 2016
Resolution: Vsl replaced the port and center propellors and conducted satisfactory test of propulsion.