Records from 2014 to 2024. Most recent: inspection, 28 August 2024.
Inspection history · 5
28 August 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8017801
31 July 2019
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6768572
4 June 2019
Internal Structural Exam · Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6702726
7 September 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6262015
25 April 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6132606
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 31 July 2019
Resolved
Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards. The starboard generator is missing a guard.
46CFR58.01-20
Action required: 10 - Deficiency Rectified
Due 1 August 2019
Resolved 1 August 2019
Resolution: Guard put in place.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 31 July 2019
Resolved
Vessel must have adequate emergency lighting. Collars on emergency lighting fixture missing, and starboard deck Emergency lighting battery is dead.
46CFR112.05-10
Action required: 10 - Deficiency Rectified
Due 1 August 2019
Resolved 1 August 2019
Resolution: Batteries replaced and collars installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 31 July 2019
Resolved
All vessels shall have efficient guard rails or bulwarks on decks and bridges. Vessel is missing a portion of the railing on the 01 deck, starboard side railing.46CFR92.25-5
Action required: 10 - Deficiency Rectified
Due 1 August 2019
Resolved 1 August 2019
Resolution: Rail replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 31 July 2019
Resolved
Adequate means for ground detection shall be provided on the ships service generator and distribution switchboard. Vessel ground detection gauge was not operable.
46CFR111.30-15 (b)(7)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2019
Resolved 2 August 2019
Resolution: Tech report accepted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 31 July 2019
Resolved
Pressure vessel piping corroded and leaking air. 46 CFR 54.15-1
Action required: 10 - Deficiency Rectified
Due 1 August 2019
Resolved 1 August 2019
Resolution: Piping replaced.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 31 July 2019
Resolved
Vessels shall be provided with an efficient means of communication between wheelhouse and engine room. Vessel sound powered phones did not ring or alert crewmembers.
46 CFR 113.30-1
Action required: 10 - Deficiency Rectified
Due 1 August 2019
Resolved 2 August 2019
Resolution: Phone replaced and tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 31 July 2019
Resolved
Each buoy water light must be of the approved automatic electric type. Vessel had waterlight with expired battery.
46CFR 94.43-5
Action required: 10 - Deficiency Rectified
Due 1 August 2019
Resolved 1 August 2019
Resolution: Batteries replaced.