MIDNIGHT CHIEF

MIDNIGHT CHIEF is a 1982 freight ship. The Coast Guard has recorded 107 inspections since 1982, most recently in April 2026, along with 96 deficiencies and 5 operational controls.

Records from 1982 to 2026. Most recent: inspection, 17 April 2026.

Built
1982
Last inspected
17 April 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8115722 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
VANUATU
—
Maury page id
psix-54315

Inspections, by type

…with no type recorded25
Years with a record 40 calendar years (1982–2026)
The 107 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it756 - Convention (Subpart B), Gross Ton
226 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WCW5068MMSI not assigned · expired · compulsorily equipped · granted 1 May 1996, cancelled 1 July 2006 · licensed under a name not among this hull’s recorded names (not shown)
WTT7719MMSI not assigned · expired · compulsorily equipped · granted 27 October 1995, cancelled 11 February 2006 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

OCEAN WORKER Mobile Offshore Drilling Unit · MISLE 54641 · 11 April 2002 · activity 1603544

Inspection history · 107

17 April 2026 PSC A
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8351232
7 October 2025 CCSSC Examination · PSC B
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 8248642
31 March 2025 PSC B · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8102287
30 September 2024 PSC B · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8011463
25 March 2024 PSC B · CCSSC Examination
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7884498
28 September 2023 PSC B · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7799700
27 March 2023 PSC B · CCSSC Examination
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7657276
27 September 2022 PSC B · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7566867
30 December 2021 In-Service Inspection · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7368957
30 November 2021 CCSSC Examination · PSC B
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7359194
18 May 2021 CCSSC Examination · PSC A
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7199000
20 November 2020 Explosive Handling Operation-Commercial
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7098980
19 November 2020 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7098514
17 November 2020 CCSSC Examination · PSC A
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7094630
11 June 2020 PSC A · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6968758
12 December 2019 ISPS III Exam · PII Safety Exam · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6867661
10 July 2019 Ballast Water Examination · ISPS III Exam · PII Safety Exam · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6743553
8 February 2019 Ballast Water Examination · Deficiency Check · Administrative Inspection · PII Safety Exam · ISM Exam · ISPS III Exam · CCSSC Examination
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6621815
4 October 2018 NPV Safety Exam · Ballast Water Examination · CCSSC Examination · ISPS III Exam · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6554587
4 June 2018 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6433868
5 May 2018 ISPS II Exam · PII Safety Exam · CCSSC Examination · Ballast Water Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6406315
1 December 2017 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6316507
17 November 2017 ISPS II Exam · CCSSC Examination · PI Safety Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6308549
17 April 2017 Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6126634
16 May 2016 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5878358
6 May 2016 Ballast Water Examination · CCSSC Examination · ISPS III Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5869506
3 December 2015 Ballast Water Examination · CCSSC Examination · ISPS III Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5774418
16 August 2015 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5217261
15 June 2014 ISPS II Exam · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4888900
8 July 2012 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4371856
17 June 2012 PII Safety Exam · ISPS II Exam · Deficiency Check · CCSSC Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4346198
7 February 2012 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4239751
18 December 2011 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4210209
11 December 2011 CCSSC Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4205815
13 September 2011 PII Safety Exam · CCSSC Examination · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4145021
22 December 2010 PII Safety Exam · CCSSC Examination · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3914920
6 December 2010 Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3904993
28 November 2010 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3898427
22 September 2010 PII Safety Exam · ISPS II Exam · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3854710
7 February 2010 Administrative Inspection · CCSSC Examination · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3672916
1 February 2010 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3672644
17 February 2009 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3419037
6 February 2009 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3413233
31 January 2009 PII Safety Exam · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3403029
19 January 2009 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3396434
18 July 2008 CCSSC Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3271548
30 January 2008 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3138856
11 December 2007 Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3113338
19 October 2007 PII Safety Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3083295
17 October 2007 PII Safety Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3081819
29 September 2007 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3068984
26 September 2007 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3066934
11 July 2007 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2991341
23 April 2007 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2914035
8 March 2007 ISPS I Exam · PI Safety Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2884000
16 February 2007 ISPS II Exam · PII Safety Exam · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2873031
4 January 2006 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2560872
30 August 2002 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1676821
11 April 2002 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1603544
28 September 2001 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073848
29 August 2001 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 108875
29 August 2001 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1607649
21 March 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1053762
23 February 2000 Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1046950
18 February 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 815462
21 October 1999 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1378839
23 June 1999 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 471958
15 December 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 809070
26 October 1998 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 803839
2 December 1997 Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1114553
29 November 1997 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 138859
3 November 1997 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1364431
19 March 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1104429
4 November 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1168106
18 October 1996 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1455409
10 November 1995 COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1394417
6 October 1994 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1442197
22 March 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1166062
16 February 1994 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 9173
2 December 1993 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1465126
28 November 1992 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1472303
14 October 1992 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1391790
12 December 1991 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 650153
30 October 1991 Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1247670
6 September 1991 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 942107
28 January 1991 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1228786
13 November 1990 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1238532
22 October 1990 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 906191
27 June 1990 Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 923025
26 October 1989 Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1027896
12 July 1989 Damage Survey · Examination of Repairs
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1339703
22 October 1988 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 888159
20 January 1988 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1319881
25 November 1987 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1002419
24 October 1987 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1327400
20 October 1987 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1323581
15 July 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1031010
15 July 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1329312
6 November 1986 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1020216
1 November 1986 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1016305
1 November 1986 Hull Examination · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1023450
5 January 1986 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1312238
6 December 1985 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 996070
7 November 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973504
7 November 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1284291
1 November 1982 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 967720
19 August 1982 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1272832

Deficiency record · 96

09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 27 September 2022 Resolved
Sanitary accommodation shall comply with the following requirements: (c) cold fresh water and hot fresh water available in all wash spaces. Vessel does not have hot water. Hot water heater was inoperable - ILO - 147 Crew Accommodation/Sanitary Facilities/PG. 37
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 September 2022
Resolved 27 September 2022
Resolution: Vessel replaced hot water heater.
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 30 December 2021 Resolved
CARGO CARRIED ON OR UNDER DECK SHALL BE SO LOADED, STOWED AND SECURED AS TO PREVENT AS FAR AS IS PRACTICABLE, THROUGHOUT THE VOYAGE DAMAGE OR HAZARD TO THE SHIP AND THE PERSONS ON BOARD, AND LOSS OF CARGO OVERBOARD. PSCO ATTENDED VESSEL AFTER LOST PORTABLE TANK DUE TO HEAVY WEATHER. PROCEDURES ON THE CARGO SECURING MANUAL FOR INSPECTIONS AND MAINTENANCE WERE NOT BEING FOLLOWED. REQUEST AUDIT OF CARGO SECURING MANUAL BE PERFORMED TO INCLUDE THE SIZE AND AMOUNT OF SPARES CHAINS TO HAVE ONBOARD THE VESSEL. AMOUNT OF LASHINGS FOR PORTABLE TANKS SHOULD BE REVISED TO REQUIRE FORWARD AND AFT TIE DOWN POINTS.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 January 2022
Resolved 5 January 2022
Resolution: Rectified.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 8 February 2019 Resolved
Objective evidence discovered during an extended ISM exam revealed the following non-conformities: The vessel failed to fully implement the requirements of the ISM Code through their SMS procedures. These identified deficiencies are evidence that the ship and/or company are not meeting the SMS requirements. Recommend an external audit.The company should ensure that the policy is implemented and maintained at all levels of the organization, both ship-based and shore-based. The SMS has not been adequately implemented and maintained ashore or onboard as evidence by non-conformities being reported but no action taken by the company. On 12JAN2019, vessel reported the following 04 non-conformities to the company and have not yet been resolved: broken beams on ramp need welding, bridge water tight door not closing properly, port anchor needs to be welded to adjust crossbar, and ballast water pipe broken in engine room. Since reporting the non-conformities, the vessel has entered a U.S. port 20 times, its home port more than 10, and could have received the service/parts needed to correct the reported non-conformities; however, the company has not taken corrective action. In addition, multiple non-conformities were known to the crew but went unreported. Crewmembers were aware of Coast Guard issued deficiencies # 5, 8, 9, and 10 prior to the Port State Control boarding and did not fill out a non-conformity report in accordance with the SMS requirements. The company should ensure that all personnel involved in the company's safety management system have an adequate understanding of relevant rules, regulations, codes and guidelines. The identified material deficiencies 2, 3, 4, 6, 7 and 11 were unknown to the vessel's crewmembers, and no non-conformity reports were made.The company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship, and protection of the environment. No checklist is provided by the company instructing how often, procedures, or list of items to check regarding the ship's first aid kits. Both first aid kits carried onboard the vessel contained in excess of 75% expired and damaged items. In addition, the crew has multiple checklists for engineering and deck department rounds, maintenance, and regular task that are not listed in the vessel's SMS. In addition, the vessel's deck department found a wasted fire hydrant pipe that was verbally reported to the DPA; however, the engineering department was not aware and did not track the required corrective actions. 74 SOLAS 2014 Ch. IX / 3.1, ISM Code 1.3
Action required: 30 - Ship detained
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 8 February 2019 Resolved
- All ships, irrespective of size, shall have: nautical charts to plan and display the ship's route for the intended voyage and to plot and monitor positions throughout the voyage. An Electronic Chart Display and Information System (ECDIS) is also accepted as meeting the chart carriage requirements. The ship's electronic chart display does not meet the ECDIS performance requirements as stated in resolution A.817(19). The vessel used paper chart 25640 with scale 1:326,856 which does not display detailed navigational characteristics attributing to safe and efficient course plotting into Guayanilla Harbor. The appropriate chart for Guayanilla Harbor is chart 25681 with scale 1:10,000. - 74 SOLAS 2014 Ch. V/19.2.1.4
Action required: 30 - Ship detained
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 8 February 2019 Resolved
The quantity of water delivered shall be capable of supplying four nozzles of a size and at pressures as specified in regulation 10.2, capable of being trained on any part of the cargo space when empty. Three hydrants are provided on the cargo deck without means of supplying four nozzles (missing a Y to have 4 nozzle). In addition, one of the three hydrants is inoperable due to corrosion and damage. - CCSSC Ch 3.25.1, 74 SOLAS 2014 II-2/19.3.12
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 8 February 2019 Resolved
Means shall be provided for stopping forced and induced draught fans, fuel oil transfer pumps, fuel oil unit pumps and similar fuel pumps and shall be located outside the space concerned where they will not be cut off in the event of fire in the space they serve. The emergency fuel shutoff valve wrench is missing from fuel shutoff location rendering the remote fuel shutoff inoperable. - CCSSC Ch 3.17.5.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 February 2019 Resolved
Lifebuoys shall be so stowed as to be capable of being rapidly cast loose. Portside aft lifebuoy stowed behind cargo securing gear in such a way as to prevent it from being able to be rapidly cast loose. CCSSC Ch 4.12.5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 February 2019 Resolved
A vessel shall carry a first aid kit approved by the administration. PSCO observed both first aid kits carried onboard the vessel to contain in excess of 75% expired and damaged items, not consistent with the administration's approval of the kit. - CCSSC Ch8.8.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 February 2019 Resolved
The owner or master of every ship to which this code applies shall ensure that the condition of the ship and its equipment is maintained to conform with provisions of this code to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship, persons on board, or the environment. Starboard side hydraulic fluid tank for main steering gear empty of hydraulic fluid, rendering the duplicate means of providing hydraulic fluid to the steering pumps inoperable. CCSSC 1.11
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 8 February 2019 Resolved
Moving parts of machinery which are so exposed as to cause accidents shall be properly guarded. The vessel's fly wheel on both shipboard generators and the main shaft of the fire pump are missing guards. CCSSC 2.12.6
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 February 2019 Resolved
The owner or master of every ship to which this code applies shall ensure that the condition of the ship and its equipment is maintained to conform with provisions of this code to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship, persons on board, or the environment. The vessel was missing 3 out of 4 fire bowls on the main engine fuel filters. CCSSC 1.11
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 8 February 2019 Resolved
Heavy items of equipment such as batteries, cooking appliances, etc., shall be securely fastened in place to prevent movement due to severe motions of the vessel. PSCO observed the main cooking appliance in the galley to be free moving, with no device to fasten it in place. CCSSC 8.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 February 2019 Resolved
Each loading arm and each transfer pipe system, must not leak under static liquid pressure at least 1 ½ times the maximum allowable working pressure. The frequency of the tests and inspections required by this section must be: For vessels, annually or as part of the biennial and mid-period inspections. PSCO observed the date stenciled on the bunkering line was 2016, the crew could not produce any proof that the system had been tested since that date. 33 CFR 156.170(c)(4)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 8 February 2019 Resolved
Bulkheads forming boundaries between cargo and machinery spaces of category A shall be insulated to "A-60" class standard, unless the dangerous goods are stowed at least 3 m horizontally away from such bulkheads. Other boundaries between such spaces shall be insulated to "A-60" class standard. The cargo deck has yellow lines to indicate where dangerous goods may not be stowed above the uninsulated category A machinery space; however, the lines are not 3 m away from the deck forming the engine room overhead.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 February 2019
Resolution: Received satisfactory flag report detailing repairs. All sat.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 8 February 2019 Resolved
Every crew member shall be familiar with the use of the ship's lifesaving appliances, including survival craft equipment, fire-fighting equipment and emergencies procedures before a voyage begins. PSCO observed a fire drill during which several key elements were lacking, there was no communication between on scene crew, team leader, and master. The master was not on the bridge throughout the drill, the crew experienced extreme difficulty and lack of familiarity while attempting to don the firefighting outfits, no general alarm was sounded, and the fuel shut off for the engine room, the location of the fire, was not simulated. Master conducted training with the crew and repeated the drill to the satisfaction of the attending PSCO. - CCSSC Ch 4.17.5
Action required: 10 - Deficiency Rectified
Resolved 8 February 2019
Resolution: Master conducted training with the crew and repeated the drill to the satisfaction of the attending PSCO
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 4 October 2018 Resolved
Each administration shall ensure that the provisions of this regulation are complied with. In order to recognize, by endorsement in accordance with regulation I/2, paragraph 7, a certificate issued by or under the authority of another party. Master and navigation officer do not have original endorsement on board. PSCO provided photo copies not originals. - STCW I/10.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 October 2018
Resolution: DEFICIENCY RECTIFIED.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 4 October 2018 Resolved
Rescue boat and launching arrangements shall be that the rescue boat can be boarded and launched in the shortest possible time. At the time of drill rescue boat was launched with an empty fuel tank and was not ready. - CCSSC 4.10.2.1
Action required: 10 - Deficiency Rectified
Resolved 4 October 2018
Resolution: Vessel replaced portable fuel tank with another one that contained fuel.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 4 October 2018 Resolved
The safety managmetn system should provide measures to ensure the company's organization can respond at any time to hazards, accidents and emergency situations including its ships. An empty fuel tank in the rescue boat does not ensure that the organization can respond to accidents and emergency situations. - ISM Code Part A, 8.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2018
Resolved 12 October 2018
Resolution: Vessel updated SMS to satisfaction of flag administration.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 4 October 2018 Resolved
The company should ensure that each ship is manned with qualified, certificated and medically fit seafarers in accordance with national and international requirements. The vessel was unable to provide original documents for senior crewmembers master and navigational officer in accordance with company safety management manual 2.3.2.3. - ISM Code Part A 6.2.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2018
Resolved 12 October 2018
Resolution: Flag administration provided circular allowing electronic certificates.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 5 May 2018 Resolved
VESSELS RESCUE BOAT ENGINE/HORSEPOWER DID NOT MATCH WHAT WAS LISTED ON THE CCSSC CERTIFICATE.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2018
Resolved 4 June 2018
Resolution: Received photos of engine.
Construction/Loadline › Structures › Door
Issued 17 November 2017 Resolved
1270 - The means used for making watertight bulkhead doors watertight and the means adapted for closing them shall be to the satisfaction of the administration. Both watertight doors to the engine room were found wired open, despite signage requiring closure while at sea. - CCSSC 2.7.4 - 10c
Action required: 705 - Other - as specified
Resolved 18 November 2017
Resolution: Vessel removed holdbacks and training was conducted.
Personnel › Certificates/Documents/Licenses › STCW Endorsement
Issued 6 May 2016 Resolved
Candidates for certification shall provide satisfactory proof that they meet the standards of comptetance prescribed by these regulations for the capacities, functions and levels that are to be identified in the endorsement to the certificate. PSCO observed that the engineering officer did not posess a valid Flag endorsement thus rendering the Minimum Safe Manning noncomlpiant.STCW Reg I/2.13.5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 May 2016
Resolution: Panama emailed appropriate documentation rendering valid endorsement.
Personnel › Training › Cargo Safety
Issued 6 May 2016 Resolved
A HAZMAT employeemust receive the training required by this subpart at least once every three years. PSCO observed necessary crew for cargo ops involving HAZMAT missing the required training. 49CFR172.704(c)(2) Prior to cargo ops.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2016
Resolution: Received proper documentation attesting to the crew receiving hazmat training per 49 CFR 172.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 6 May 2016 Resolved
Each loading arm and transfer pipe system must not leak under static liquid pressure at least 1.5 times the maximum allowable working pressure. PSCO observed vessel has not conducted tests of their bunker lines per this part. 33CFR156.170(c)(4) Prior to bunkering.
Action required: 703 - Prior to bunkering operations
Resolved 16 May 2016
Resolution: Received proper documentation attesting to the hydrostatic testing of ships' bunker lines.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 17 June 2012 Resolved
Expired red and white "Not under command" navigation lights to be in working order prior to departure.
Action required: 705 - Other - as specified
Due 17 June 2012
Resolved 18 June 2012
Resolution: Bulbs replaced.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 17 June 2012 Resolved
Repair port side RPM readout, main diesel engine.
Action required: 705 - Other - as specified
Due 1 July 2012
Resolved 8 July 2012
Resolution: Witnessed RPM readout in operation.
Electrical › Electrical Distribution System (emergency) › Outlet Box
Issued 11 December 2011 Resolved
Battery box lid in engine room missing.
Action required: 705 - Other - as specified
Due 18 December 2011
Resolved 18 December 2011
Resolution: PSCO Witnessed new battery box lid replaced in engine room.
Operations/Management › Navigation Safety › Arrival/Departure Tests
Issued 11 December 2011 Resolved
Pre-arrival checks not completed prior to arrival. Complete pre-arrival checks and make notation in ships log documenting the pre-arrival checks in accordance with 33CFR164.25.
Action required: 705 - Other - as specified
Due 11 January 2012
Resolved 18 December 2011
Resolution: PSCO witnessed pre-arrival checks being logged into bridge log.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 11 December 2011 Resolved
Obtain/repair rescue boat motor.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2011
Resolved 11 December 2011
Resolution: Motor repaired by by mechanic.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 11 December 2011 Resolved
Make port side running light operational.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2011
Resolved 11 December 2011
Resolution: Crew made light operational.
Navigation › Collision/Grounding Avoidance › Transponder
Issued 11 December 2011 Resolved
Replace SART batteries with non-expired batteries.
Action required: 705 - Other - as specified
Due 25 December 2011
Resolved 7 February 2012
Resolution: Vessel replaced SART batteries with non-expired batteries.
Fire Fighting › Fire Pumps › Gland Sealing
Issued 11 December 2011 Resolved
Repair leaking packing on main fire pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 December 2011
Resolved 18 December 2011
Resolution: Old fire pump replaced with new one. PSCO witnessed proper operation of new fire pump.
Fire Fighting › Fire Main › Pressure
Issued 11 December 2011 Resolved
Replace gauge on fire main to show proper water pressure discharge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 December 2011
Resolved 18 December 2011
Resolution: PSCO witnessed proper operation of fire pump pressure gauge.
Operations/Management › Port and Waterways Safety › Notice of Arrival, General
Issued 22 September 2010 Resolved
Flag State shall address the Caribbean Cargo Ship Safety Code (CCSSC) Equivalency and the issuance of certificates by Recognized Organizations (RO's) under the CCSS Code prior to next U. S. Port after sailing foreign.
Action required: 15 - Rectify deficiencies by next port
Due 23 September 2010
Resolved 24 September 2010
Resolution: As per PMA letter JIS 09/10/066 dated 23SEP2010 and e-mail from [name withheld] @ CGHQ''s dated 24SEP2010.
Lifesaving › Embarkation Appliances/Stations › Side Ropes
Issued 22 September 2010 Resolved
Provide lifeboat embarkation ladder as per CCSS Code Chapter 4.10. prior to next U. S. Port after sailing foreign.
Action required: 15 - Rectify deficiencies by next port
Due 23 September 2010
Resolved 24 September 2010
Resolution: As per O/O letter statement received 24SEP2010.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 31 January 2009 Resolved
STBD Side main engine cooling system intake pipe is leaking. Repair / replace pipe to the satisfaction of RO prior next US port.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 February 2009
Resolution: Recieved survey report from class stating that strbd side cooling system intake pipe has been replaced. Verified by MSD St. Thomas.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 8 January 2009 Resolved
33U.S.C.1321(j)(5)(G)-NTVRP #05741 must provide a signed certification that the vessel owner or operator have "ensured by contract or other means approved by the President, the availability of private personnel and equipment necessary to respond, to the maximum extent practicable, to a worst case discharge or a substantial threat of such a discharge".
Due 8 February 2009
Resolved 12 March 2009
Resolution: The plan holder submitted an acceptable certification statement allowing the vessel to be in compliance with 33 U.S.C. 1321(j)(5)(G). Vessel issued Interim Operating Authorization which expires 03/13/2011
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 8 January 2009 Resolved
33U.S.C.1321(j)(5)(D)(iii)-NTVRP #05741 should verify the worst case discharge for each vessel in the plan. 33U.S.C.1321(j)(5)(D)(i)-The NTVRP must be amended to provide individual tank capacities in a unit of volume such as barrels, gallons, or cubic meters.
Due 8 February 2009
Resolved 12 March 2009
Resolution: The plan holder verified the worst case discharge for the vessel MIDNIGHT CHIEF. Vessel now in compliance with 33 U.S.C. 1321(j)(5)(D)(iii). Vessel issued Interim Operating Authorization which expires 03/13/2011.
Lifesaving › Inflatable Liferafts › Servicing
Issued 11 December 2007 Resolved
Vessels liferafts were last serviced16OCT2006. Recieved a letter from flag administration extending the annual servicing of the liferaft until January 15th 2008.
Action required: 705 - Other - as specified
Due 15 January 2008
Resolved 3 January 2008
Resolution: [name withheld] attesting to proper servicing of the vessel''s liferafts.
Documentation › Certificates/Documents › IOPP Certificate
Issued 19 October 2007 Resolved
Vessel is required a form A supplement to the IOPP. Form A is not on board. Vessel is to receive a valid form A on board prior to departure.
Action required: 705 - Other - as specified
Due 18 November 2007
Resolved 21 October 2007
Resolution: Vessel is 298 GT and has been issued Interim CCSSC, as such, vessel is not required to comply with MARPOL and IOPP has been removed by Panama.
Lifesaving › Inflatable Liferafts › Servicing
Issued 19 October 2007 Resolved
Vessel's life rafts were last serviced on 16OCT2006. Panama issued extension for liferafts until 21 November 2007.
Action required: 705 - Other - as specified
Due 21 November 2007
Resolved 11 December 2007
Resolution: Recieved a letter from flag administration extending the annual servicing of the liferaft until January 15th 2008.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 19 October 2007 Resolved
Hydrostatic Release Unit on both liferafts shows an expiration date of FEB07. Vessel must replace both units prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2007
Resolution: Upon further inspection, hydrostatic manufacture date on bottom of unit was stamped with August 2006 date, thus, correct expiry should be August 2008, regardless of installation date.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 19 October 2007 Resolved
Vessel was found to be by-passing the Oily Water Separator via PVC piping, rubber hose, and a sump pump located in the aft passageway bilge. The PVC piping was threaded into a connection on the overboard discharge line passed where the OWS discharge was located. After cutting a piece of the piping away as close to the overboard discharge as possible, Oily residue was found inside the piping.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2007
Resolution: PVC piping was removed. Piping was from previous owner of vessel. 1" Pipe nipple entering overboard discharge line (approx 4" ballast line) was capped.
Personnel › Certificates/Documents/Licenses › License, First Assistant Engineer
Issued 26 September 2007 Resolved
Engineering officer unable to provide official STCW engineering license. Must provide official STCW engineering license. To the satisfaction of the administration. STCW 95 I/2.9
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2007
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Personnel › Certificates/Documents/Licenses › License, Master
Issued 26 September 2007 Resolved
Master unable to provide official STCW Master's license. Must provide official STCW Master's license. (STCW 95 I/2.9)
Action required: 705 - Other - as specified
Resolved 26 September 2007
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 26 September 2007 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Resolved 30 September 2007
Resolution: ISM Audit by [name withheld],to be verified OCT 30,2007.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 26 September 2007 Resolved
Failure to generate/conduct monthly maintenance & submit reports on main engine, aux engine & related equipment. ISM Code 10.2.4
Action required: 705 - Other - as specified
Resolved 30 September 2007
Resolution: ISM Audit by [name withheld],to be verified OCT 30,2007.
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 26 September 2007 Resolved
Failure to generate monthly safety meetings required under their SMS plan to ensure non-conformities, accidents & hazardous situations are reported & analyzed for safety & pollution prevention. ISM Code 9.1
Action required: 705 - Other - as specified
Resolved 30 September 2007
Resolution: ISM Audit by [name withheld],to be verified OCT 30,2007.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 26 September 2007 Resolved
Failure to report non-conformities in accordance with vessel's Safety Management System. Vessel crew could not provide evidence of having ever reported a non-conformity. ISM Code 10.2
Action required: 705 - Other - as specified
Resolved 30 September 2007
Resolution: ISM Audit by [name withheld],to be verified OCT 30,2007.
Personnel › Training › Familiarization Training
Issued 26 September 2007 Resolved
Engineer officer could not perform a satisfactory test of the oily-Water separator (OWS) due to unfamiliarity with the equipment. Provide evidence of competency & capability to properly perform testing procedures and/or operation. STCW95 I/4.2.4, STCW95 A-III/3.1
Action required: 705 - Other - as specified
Resolved 30 September 2007
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Documentation › Logs/Records › Oil Record Book
Issued 26 September 2007 Resolved
The Oil Record Book (ORB) did not follow proper Oil Record Book entry requirements. Entries were missing/completed incorrectly, deleted, and not signed by the Master.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2007
Resolution: NOV Issued. ISM Audit by [name withheld],to be verified OCT 30,2007.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 26 September 2007 Resolved
Engineer Officer unable to read and comprehend written engine room procedures to include oil transfer and OWS operation checklists. Due to this factor, unfamiliarity with pollution prevention equipment and no evidence of proper oily bilge water & sludge disposal, the crew on onboard this ship is found negligent with the essential shipboard procedures relating to the prevention of oil pollution.
Action required: 705 - Other - as specified
Resolved 30 September 2007
Resolution: ISM audit performed by [name withheld]. operating manual was provided. Training for engineer was carried out by external personell. Instructions were translated found satisfactory. This item will be monitored at next audit.
Operations/Management › Ballast Water Managment › Submission of Report
Issued 26 September 2007 Resolved
Failure to comply with ballast water management reporting requirements. Prior to depature to the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2007
Resolution: NOV Issued.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 11 July 2007 Resolved
Vessel has not submitted a Vessel Response plan according to the E-VRP website. In accordance with ALCOAST398/05 a new regulation is going to be issued for non tank vessels over 400 gross tons to submit a Vessel Response Plan.
Action required: 705 - Other - as specified
Resolved 19 January 2009
Resolution: NTVRP now valid
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 16 February 2007 Resolved
Line diagram for OTP's missing. Post line diagram w/ OTP's at fueling station & engine room.
Due 21 February 2007
Resolved 21 February 2007
Lifesaving › Inflatable Liferafts › Painter
Issued 16 February 2007 Resolved
Secure liferaft painters & properly stow launching arrangements. Painters currently attached to hydro release units by way of bowline knots.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2007
Lifesaving › Emergency Outfit › Lifeline and Belt/Harness
Issued 16 February 2007 Resolved
Safety harness on board has manufacture date f 1994. Provide new safety harness in accordance w/ safety equipment certificate.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2007
Lifesaving
Issued 21 October 1999 Resolved
DEMONSTRATE COMPLIANCE WITH THE EIGHT CG DISTRICT RESCUE BOAT POLICY LETTERDTD 12 NOV 98, TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 21 October 1999
Resolved 21 October 1999
Navigation
Issued 26 October 1998 Resolved
Clean anchor light lens.
Condition: Unknown
Due 26 November 1998
Resolved 16 November 1998
Lifesaving
Issued 26 October 1998 Resolved
Provide caps for lube oil tank drains.
Condition: Unknown
Due 26 November 1998
Resolved 16 November 1998
Fire Fighting
Issued 26 October 1998 Resolved
Secure valve handle to fire monitor sea chest valve.
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Navigation
Issued 26 October 1998 Resolved
Double nut potentiometer relay linkages, replace missing cotter pin to rudder linkage._x001C_
Condition: Unknown
Due 26 November 1998
Resolved 16 November 1998
Lifesaving
Issued 26 October 1998 Resolved
Replace plastic oil filter drain container with metal container.
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Engineering
Issued 26 October 1998 Resolved
Update fuel transfer procedures to comply with 33CFR155. (missing piping line diagram)
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Engineering
Issued 26 October 1998 Resolved
Provide guard over port shaft.
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Accommodation/Occupational Safety
Issued 26 October 1998 Resolved
Provide GFI outlets in way of main deck bathroom (2), and 2nd deck bathroom(2).
Condition: Unknown
Due 26 November 1998
Resolved 16 November 1998
Electrical
Issued 26 October 1998 Resolved
Properly splice electrical lead to emergency battery charger located under navigation console.
Condition: Unknown
Due 26 November 1998
Resolved 16 November 1998
Deck/Cargo
Issued 6 October 1994 Resolved
Conduct P-tank internal examinations at next drydock._x001C_ _x001C_ (In accordance with MSO NOLA policy memo number 15)
Condition: Unknown
Due 6 October 1994
Resolved 6 October 1994
Navigation
Issued 14 October 1992 Resolved
MAKE PERMANENT REPAIRS TO PORT AND STBD SHAFT TACHS.
Condition: Unknown
Due 14 October 1992
Resolved 14 October 1992
Deck/Cargo
Issued 14 October 1992 Resolved
INSTALL REMOTE SHUTDOWN FOR LIQUID MUD PUMP.
Condition: Unknown
Due 14 October 1992
Resolved 14 October 1992
Unknown
Issued 22 October 1990 Resolved
PROVIDE 1 SERVICE LINE AND 1 SET OF INSTRUCTIONS FOR THE LINE-THROWING GUN
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROVIDE ONE AIR-BOTTLE FOR MSA SCBA UNIT ONBOARD
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
LINE BATTERY BOXES WITH CORROSION-RESISTANT MATERIAL
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
REPAIR INDICATOR DIAL FOR SOUND POWERED PHONE AT FWD END OF FWD TUNNEL NEARBOW THRUSTER
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
REMOVE ALL BRASS PETCOCKS ON DETROIT DIESEL FUEL FILTERS/STRAINERS AND INSTALL STEEL FITTINGS IN THEIR PLACE
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
INSTALL HIGH LUBE OIL TEMPERATURE ALARMS ON MAIN ENGINES AND GENERATOR ENGINES AS PER NVIC 1-78
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
INSTALL HIGH LEVEL ALARM FOR PORT DIESEL DAY TANK AS PER NVIC 1-78
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROVIDE ON BOARD AN APPROVED AUTOMATION TEST PROCEDURE TO REFLECT ACTUAL CONDITIONS ON BOARD VESSEL
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROVIDE A BRACKET FOR FIRE EXTINGUISHER NO 8 AND REPAIR BRACKET FOR FIRE EXTINGUISHER NO 7
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
ADJUST PACKING TO STOP EXCESSIVE LEAKAGE FROM STBD STERN TUBE
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
HYDROSTATICALLY TEST AIR RECIEVER ATTACHED TO CARGO AIR COMPRESSOR TO 1.5 MAWP IN THE PRESENCE OF A MARINE INSPECTOR AND PROVIDE MANUFACTURE'S DATA REPORT FOR RECIEVER OR REMOVE RECIEVER FROM VESSEL
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
RENEW ALL ELECTRIC FITTINGS IN PAINT LOCKER TO BE EXPLOSION PROOF
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
REPLACE PLASTIC HOSE ON BOW THRUSTER OIL TANK SIGHT GLASS WITH GLASS
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
FREE UP PORT SIDE LOW SUCTION DAY TANK REACH ROD VALVE
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
REPAIR STEERING LOW SUMP OIL ALARMS
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROVIDE ONBOARD A CURRENT CERTIFICATE OF DOCUMENTATION
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROVIDE ONBOARD AN UPDATED, APPROVED FIRE CONTROL PLAN
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROPERLY MARK THE LOADLINE DECK REFERENCE MARK
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROVIDE ONBOARD A WASTE/GARBAGE DISPOSAL PLAN
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
PROVIDE ONBOARD APPROVED NAV LIGHT FIXTURES AND BLUBS TO COMPLY WITH 46 CFR PART 111.75
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Unknown
Issued 22 October 1990 Resolved
HYDROSTATICALLY TEST ALL FUEL OIL TRANSFER HOSES IAW 33 CFR PART 155
Condition: Unknown
Due 22 October 1990
Resolved 22 October 1990
Engineering
Issued 1 November 1986 Resolved
PROVIDE A PROFESSIONAL ENGINEERS CERTIFICATION OF 80 PSI MOISTURE SEPERATORAIR RECEIVER IN THE BULK SYSTEM SO THE VESSEL MAY BE STAMPED AND ADDED TO THE CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 1 November 1986
Resolved 1 November 1986
Unknown
Issued 7 November 1984 Resolved
PROVIDE ASME REPORT ON REPAIR OF AIR RECIEVERS LOS 82-171 PRIOR TO INSTALL-ING AIR RECIEVERS.
Condition: Unknown
Due 7 November 1984
Resolved 7 November 1984
Engineering
Issued 7 November 1984 Resolved
REPAIR MAIN ENGINE REMOTE SHUTDOWNS
Condition: Unknown
Due 7 November 1984
Resolved 7 November 1984
Unknown
Issued 7 November 1984 Resolved
PROVIDE COAST GUARD APPROVAL FOR STARBOARD AIR RECIEVER (NATIONAL BUREAU #371710) PRIOR TO 07DEC84.
Condition: Unknown
Due 7 November 1984
Resolved 7 November 1984
Unknown
Issued 7 November 1984 Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE VESSEL STATE [name withheld]652259
Condition: Unknown
Due 7 November 1984
Resolved 7 November 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.