Records from 1985 to 2020. Most recent: inspection, 19 February 2020.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 22 October 2014
Resolved
Provide Ground-fault detection at main switchboard IAW 46CFR 183.10-30, 46 CFR 111.05-23, & 111.05-27
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Neutral Ground
Issued 22 October 2014
Resolved
Provide Neutral-to-hull connnection at main switchboard IAW 46 CFR 183.10-30, 46 CFR 111.05-15, 46 CFR 111.05-17, and 46 CFR 111.05-31(b)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electric Generation Source (service) › Generator
Issued 22 October 2014
Resolved
Test insulation resistance of the windings for both ship service diesel generators IAW manufacturer's instructions or IEEE Std 43-1974 (Recommended Practice for Testing Insulation Resistance of Rotating Machinery).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 13 March 2015
Resolution: Vessel had both generators rewound. Received megger readings for rewound generators, all sat. Observed operational load tests of both generators after re-installation, all sat.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 22 October 2014
Resolved
Ensure all circuit breakers in the "AC Loads" panel are rated as primary branch circuit protection or UL listed under UL 489 and are designed to protect the circuit conductors.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 10 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 22 October 2014
Resolved
Properly protect feeder conductors for the fire pump panel with over-current protection IAW 46 CFR 120.380, or 46 CFR 183.10-35
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Conductor
Issued 22 October 2014
Resolved
Remove any temporary power cords (ie extension cords) which are installed to provide permanent power to equipment IAW 46 CFR 183.10-20(a)(2)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 10 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Bus Bar Connection
Issued 22 October 2014
Resolved
Properly terminate conductors onto the individual bus bars located in the "AC loads" panel. Ensure that no more than one wire is connected to each terminal unless manufacturer's data can be provided that shows the terminals are designed for more than one wire. 46 CFR 176.25-1(a), ref: NEC Article 110.14(A)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 October 2014
Resolved
Remove & replace any PVC conduit installed in the machinery space. Protection of cable and wires shall be made by metal coverings/conduit or other suitable means. 46 CFR 183.10-20(e) & 183.05-50(a)(2). Use of UL marine cable, UL boat cable or cable approved under 46CFR111.60-1 is also acceptable
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 22 October 2014
Resolved
Ensure all electrical equipment over 50volts installed in the machinery space and other damp or wet areas are made to be drip-proof protected. 46 CFR 183.10-10(a)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 22 October 2014
Resolved
Ensure all electrical junction boxes for systems over 50volts and installed in the machinery space or other damp/wet areas are watertight. 46 CFR 183.10-20(k)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Electrical › Electrical Distribution System (service) › Neutral Bus
Issued 22 October 2014
Resolved
Ensure neutral conductors and equipment grounding conductors are separated from one another at each distribution panel. There should only be one neutral-to-ground/hull connection on the vessel at the main switchboard. 46CFR 183.10-30, 46CFR 111.05-13, & 46CFR 111.05-15
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 22 October 2014
Resolved
Ensure machinery space bulkheads, overhead, access hatches, and bulkhead/deck penetrations meet applicable structural fire protection insulation/ratings IAW 46CFR 177.10-5/46CFR 72.05 subchapter H or 46CFR 116.400 thru 116.438 subchap K.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 19 February 2020
Resolution: Vessel was scuttled in accordance with USCG and EPA authorization on 1JAN2020.
Operations/Management › Drug and Alcohol Testing › Testing, Random
Issued 27 June 2012
Resolved
Provide proof of chemical testing program compliance with random testing IAW 46 CFR 16.230.
Action required: 705 - Other - as specified
Due 27 July 2012
Resolved 13 July 2012
Operations/Management › Equipment Service/Testing › EPIRB
Issued 27 June 2012
Resolved
Provide proof of EPIRB monthly tests IAW 46 CFR 185.728 (c).
Action required: 705 - Other - as specified
Due 27 July 2012
Resolved 13 July 2012
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 27 June 2012
Resolved
Provide proof that vessel's anchor light is in compliance with 46 CFR 183.420.
Action required: 705 - Other - as specified
Due 27 July 2012
Resolved 13 July 2012
Engineering › Steering Gear System › Rudder
Issued 22 August 2011
Resolved
Vsl unable to swing rudder full 30-30. Port side rudder seems to be hitting hull when swung over. Vsl is currently on a dry dock extension and did not notify USCG about discrepency.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 August 2011
Resolved 23 August 2011
Electrical › Electrical Distribution System (service) › Cable
Issued 27 July 2009
Resolved
Renew broken/disconnected electrical cable conduit upper deck stbd. side aft.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Electrical › Electrical Distribution System (service) › Junction Box
Issued 27 July 2009
Resolved
Repair/renew broken/disconnected juncion box in way of entrance to portside engine room ladder.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Electrical › Electrical Distribution System (service) › Junction Box
Issued 27 July 2009
Resolved
Renew electrical cable junction box to cover live wires in portside engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Engineering › Bilge Water Management System › Not Operational
Issued 27 July 2009
Resolved
Prove proper operation of portable bilge pumps.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Accommodation/Occupational Safety › Occupational Safety › Smoking
Issued 27 July 2009
Resolved
Make airtight the ventilation vent by the entrance to the portside engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Accommodation/Occupational Safety › Occupational Safety › Smoking
Issued 27 July 2009
Resolved
Renew corroded air duct box in way of portside engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Engineering › Lubricating Oil Service System › Gauge
Issued 27 July 2009
Resolved
Prove proper operation of propulsion machinery gauges at all operating stations.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 27 June 2012
Fire Fighting › Fire Pumps › Gears
Issued 27 July 2009
Resolved
Provide remote operation from operating station port and stbd. fire pumps.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Fire Fighting › Fire Pumps › Gears
Issued 27 July 2009
Resolved
Provide gauge at discharge side fire pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Engineering › Bilge Water Management System › Piping
Issued 27 July 2009
Resolved
Prove crossover system for bilge and firefighting water.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Fire Fighting › Fire Hydrants › Location/Position
Issued 27 July 2009
Resolved
Provide spanner wrenches for each fire station.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Fire Fighting › Fire Main › Valves
Issued 27 July 2009
Resolved
Repair leaking valve at fire station #3.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Operations/Management › Vessel Safety Management › External Certification/Verification/Control
Issued 27 July 2009
Resolved
Provide "Data Plate" for both ship's generators.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 7 August 2009
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 27 July 2009
Resolved
Provide "Data Plate" for water heater or any evidence (documentation) that such equipment is in compliance with 46 CFR 182.320.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 27 July 2009
Resolved
Provide hull markings/load markings.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 27 July 2009
Resolved
Provide signs/marking of uppder deck passenger count foward stairway.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 27 July 2009
Resolved
Provide "Data Plate" for dive air receiver.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Construction/Loadline › Structures › Superstructure
Issued 27 July 2009
Resolved
Provide approved plans for DJ booth and transverse bulkhead separating aft pantry and passenger area.
Action required: 705 - Other - as specified
Due 27 July 2012
Resolved 27 July 2009
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 27 July 2009
Resolved
Segregate adult lifejackets from child type.
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 28 August 2009
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 27 July 2009
Resolved
Provide rigging survey.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 September 2009
Resolved 27 June 2012
Stability › Incline Test › General
Issued 27 July 2009
Resolved
Stability letter yet to be drafted and pending for plan approvals from MSC.
Action required: 705 - Other - as specified
Resolved 3 September 2009
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 27 July 2009
Resolved
Provide proof to marine inspector that requirements issued on 7-27-09 have been resolved. Vessel restricted from carrying passengers. A "NO-SAIL" has been issued until requirements cleared by marine inspector. If requirements not cleared prior to 31JUL10 COI will cease to be valid.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 April 2010
Resolved 14 October 2010
Resolution: See Activity 3547814 for details.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 17 July 2009
Resolved
Failure to submit MIS report.
Action required: 705 - Other - as specified
Due 29 August 2009
Resolved 27 June 2012
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 17 July 2009
Resolved
No copy of consortium contract, LORC or list of employees covered.
Action required: 705 - Other - as specified
Due 29 August 2009
Resolved 27 June 2012
Construction/Loadline › Structures › Deck Plating
Issued 16 July 2009
Resolved
Complete full-penetration weld between deck and vertical bulkhead from frame 70-82 at port side of center void
Action required: 705 - Other - as specified
Resolved 22 July 2009
Construction/Loadline › Structures › Deck Plating
Issued 16 July 2009
Resolved
Grind and reweld new weld bead on old plate between frame 78-82 starboard side on under deck 1 ft inboard of bulkhead running longitudinally.
Action required: 705 - Other - as specified
Resolved 22 July 2009
Construction/Loadline › Structures › Deck Plating
Issued 12 May 2009
Resolved
Make repairs as per approved plans detailed in Deck Repair Proposal 07May09.pdf
Action required: 705 - Other - as specified
Resolved 16 July 2009
Construction/Loadline › Hull › Hull Plating
Issued 2 April 2009
Resolved
Complete repairs as per approved plans (Shell Plating Proposal) and as marked on hull.
Action required: 705 - Other - as specified
Resolved 11 April 2009
Construction/Loadline › Hull › Bottom Plating
Issued 26 March 2009
Resolved
Complete repairs to center wing area (Marine Surveyor [name withheld] 26Mar09) as per plans submitted by marine surveyor approved by CG inspector.
Action required: 705 - Other - as specified
Resolved 16 July 2009
Construction/Loadline › Hull › Side Shell
Issued 26 March 2009
Resolved
Make repairs as per amendment/additional repair proposal for port/stbd pontoon area (Marine Surveyor Worklist 26Mar09).
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Hull Plating
Issued 16 March 2009
Resolved
Complete repairs as per approved plans submitted in Marine Surveyor report dated 14Mar09.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Bottom Plating
Issued 13 March 2009
Resolved
Determine cause if possible and make appropriate repairs to isolated pit on bottom plate just forward of port rudder post
Action required: 705 - Other - as specified
Resolved 11 April 2009
Construction/Loadline › Hull › Hull Plating
Issued 12 March 2009
Resolved
Make repairs as per approved repair proposal received 12Mar09, dated 11Mar09. See Marine Surveyor Worklist 11Mar09.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Transverse Frame
Issued 12 March 2009
Resolved
In fwd wing void, renew all corroded bottom transverse frames.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Transverse Frame
Issued 12 March 2009
Resolved
Submit gauging report for all transverse bulkhead and longitudinal bulkheads; (10) gauge readings on upper half and (10) on lower half.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: See Gauging Report 17Mar09.pdf
Construction/Loadline › Hull › Hull Plating
Issued 12 March 2009
Resolved
Submit gauging report for bottom plating for fwd wing void.
Action required: 705 - Other - as specified
Resolved 19 March 2009
Resolution: See Gauging Report 19Mar09 Wing Hull.pdf
Construction/Loadline › Hull › Bottom Plating
Issued 12 March 2009
Resolved
Submit gauging report for bottom plate f pontoons, 5 readings per void. Renew as necessary.
Action required: 705 - Other - as specified
Resolved 26 March 2009
Resolution: Received gauging report on 26Mar09. See Gauging Report 19Mar09 Pontoon Bottom.pdf. No renewal necessary.
Construction/Loadline › Hull › Side Shell
Issued 12 March 2009
Resolved
For corroded section in #1 stbd void @ junction of hull, deck and colision bkhd outboard, submit repair proposal. Include underdeck frame leading from corroded area.
Action required: 705 - Other - as specified
Resolved 26 March 2009
Resolution: Incorporated into Marine Surveyor Worklist 26Mar09.pdf
Construction/Loadline › Hull › Transverse Frame
Issued 12 March 2009
Resolved
Crop and renew frames 1-7 inboard and outboard from stem/keel to good metal in #1 stbd void.
Action required: 705 - Other - as specified
Resolved 16 March 2009
Resolution: Incorporated into Marine Surveyor Worklist 14Mar09.pdf
Construction/Loadline › Structures › Deck Plating
Issued 12 March 2009
Resolved
Submit repair proposal for corroded members, including both long members, deck and frames and hatch coaming in #1 stbd void.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Incorporated into Deck Worklist 07May09.pdf. Document received 12May09.
Construction/Loadline › Hull › Hull Plating
Issued 12 March 2009
Resolved
Submit gauging report for following locations in #1 stbd void. 1) Insert on B-Strake, outboard from stem to frame 7. 2) Insert on inboard hull, just aft of stem in upper void. 3) Inset on bow plate in upper level.
Action required: 705 - Other - as specified
Resolved 11 April 2009
Resolution: See Gauging Report 19Mar09 Old Inserts.pdf. Insert #1 addressed in hull repairs.
Construction/Loadline › Hull › Bottom Plating
Issued 12 March 2009
Resolved
Prove proposed insert in port rudder room outboard is welded to areas of sufficient metal thickness.
Action required: 705 - Other - as specified
Resolved 13 March 2009
Resolution: See Gauging Report 10Mar09.pdf. Apparently, gauging was already completed prior to issuance of requirement.
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Complete survey of vessel for deficiencies. Identify and generate detailed worklist submit worklist and repair proposal to attending CG inspector.
Action required: 705 - Other - as specified
Resolved 2 April 2009
Resolution: Upon completion of the sweep of the hull, initial inspection completed by attending CG inspector.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 10 March 2009
Resolved
Conduct NDT on port and stbd shaft in way of area forward of stern tube bearing.
Action required: 705 - Other - as specified
Resolved 20 March 2009
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 10 March 2009
Resolved
Make repairs to stbd propellers.
Action required: 705 - Other - as specified
Resolved 20 March 2009
Engineering › Sea-water System (primary cooling) › Valve
Issued 10 March 2009
Resolved
Prove proper operation of port & stbd generator cooling intake sea valve.
Action required: 705 - Other - as specified
Resolved 20 March 2009
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 10 March 2009
Resolved
Replace all stern tube and cutlass bearings.
Action required: 705 - Other - as specified
Resolved 13 March 2009
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Make side shell and under-deck plating available for further inspection.
Action required: 705 - Other - as specified
Resolved 2 April 2009
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 10 March 2009
Resolved
Prove adequacy of sea valve strainer grates and securing studs. Replace/renew as necessary.
Action required: 705 - Other - as specified
Resolved 2 April 2009
Construction/Loadline › Hull › Weld
Issued 10 March 2009
Resolved
Grind and continuously reweld upper weld of 1st strake above chine, port pontoon outboard side, from centerline to bow stem.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Construction/Loadline › Hull › Weld
Issued 10 March 2009
Resolved
Grind and reweld identified locations on chine on port pontoon, outboard from centerline to stem.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Construction/Loadline › Hull › Weld
Issued 10 March 2009
Resolved
Grind and reweld identified areas on bow stem, port and stbd pontoon from top of stem to turn.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Make repairs to hole in port inboard pontoon, C-Strake aft of frame 12.
Action required: 705 - Other - as specified
Resolved 20 March 2009
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Make repairs to 2 holes in wing section, each at connection of wing to pontoon in way of the end of the curve of the wing towards the bow.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Crop and renew apparent doubler on wing at connection to port pontoon aft of frame 15.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Make external hull plating available for further, more detailed inspections.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: Realized that this worklist item was entered twice. See item #07 dated 10Mar09.
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Make repairs to all identified issues on marine surveyor report dated 11Mar09. Copy of report is attached in the activity.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Submit repair proposal for all identified repair on hull plating, specifically detailing thickness and size of insert and location of insert relative to nearby bulkheads, frames, weld seams, penetrations and other inserts.
Action required: 705 - Other - as specified
Resolved 26 March 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Make repairs to identified holes on deck plating in port void #4.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
In stbd #3 void, outboard between frame 26 to 27 and between frame 19 to 20, prep overhead and make available for further inspection.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Hull › Transverse Frame
Issued 10 March 2009
Resolved
Stbd void #3 inboard side frame 24 tripped. Crop and renew to good metal.
Action required: 705 - Other - as specified
Resolved 6 May 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Stbd #3 void, outboard side, aft of frame 19, back gouge and weld old deck inserts that were never welded from under-deck.
Action required: 705 - Other - as specified
Resolved 16 July 2009
Construction/Loadline › Hull › Bottom Plating
Issued 10 March 2009
Resolved
Make port and stbd #5 view boxes available for further inspection.
Action required: 705 - Other - as specified
Resolved 2 April 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Submit proposal for hole cut on deck to access center void approximately amidships.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Make repairs to deck above port main engine after removing holed soft patch.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
In port void #4, back gouge and weld old deck inserts that were never welded from under-deck, and make repairs for identified holes in deck plating.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 10 March 2009
Resolved
Make repairs to tripped frames and cross-ties connected to bottom hull plating in middle of port void #3.
Action required: 705 - Other - as specified
Resolved 6 May 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Make repairs to identified holes in deck and inboard hull in port void #3.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Hull › Bottom Plating
Issued 10 March 2009
Resolved
Submit gauging report bottom plating in stbd rudder room
Action required: 705 - Other - as specified
Resolved 13 March 2009
Resolution: Gauging conducted. See attached report dated 10Mar09. All sat.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
In stbd rudder room, back gouge and weld old deck inserts that were never welded from under-deck.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
In stbd engine room, back gouge and weld old deck inserts that were never welded from under-deck.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Engineering › Bilge Water Management System › Piping
Issued 10 March 2009
Resolved
Provide mounting/support brackets for fuel lines and bilge pump piping in stbd engine room.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Engineering › Sea-water System (primary cooling) › Valve
Issued 10 March 2009
Resolved
Pull plastic piece of through hull fitting not in use on inboard side of stbd engine room.
Action required: 705 - Other - as specified
Resolved 22 July 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Most intermediate steps leading into seating area wasted or causing flexing/cracking of hull plating. Evaluate all intermediate steps and crop and renew as necessary.
Action required: 705 - Other - as specified
Resolved 16 July 2009
Construction/Loadline › Hull › Stiffener
Issued 10 March 2009
Resolved
Longitudinal stiffeners running underneath seating area along center void need to be renewed due to excessive corrosion.
Action required: 705 - Other - as specified
Resolved 16 July 2009
Construction/Loadline › Hull › Strut/Cross Tie
Issued 10 March 2009
Resolved
In stbd void #2, renew identified corroded angles in center strut piece. Remove rusting old sub deck to prevent spread of rust.
Action required: 705 - Other - as specified
Resolved 2 April 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Make repairs to identified holes around entrance hatch of stbd void #2.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
In stbd void #2, back gouge and weld old deck inserts that were never welded from under-deck. Also, clean, prep and paint insert.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Just aft of 3rd frame back from outboard deck need to be renewed in stbd #2 void.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Crop and renew aft most inboard deck where it meets wing seam in stbd void #2
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009
Resolved
Prep and renew weld between frame 4 and 5 under deck in stbd void #2.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Resolution: Worklist requirement incorporated in Deck Repair Proposal 07May09.pdf.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 10 March 2009
Resolved
Crop and renew wasted metal on outboard side of forwardmost stbd seating area, under seating, to good metal.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Bottom Plating
Issued 10 March 2009
Resolved
Submit gauging report for 20 random gaugings on deck of each seating area. If thin metal discovered, conduct 5 shot star pattern to determine location of good metal.
Action required: 705 - Other - as specified
Resolved 13 March 2009
Resolution: Received gauging report completed on 10Mar09. Determined that deck in decent shape. Did not require more shots beyond void 1-3 on stbd.
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2009
Resolved
Make repairs to all identified issued on marine surveyor report dated 14Mar09. Copy of report is attached in the activity.
Action required: 705 - Other - as specified
Resolved 18 June 2009
Construction/Loadline › Hull › Hull Plating
Issued 18 February 2009
Resolved
After visual inspection, provide gauging report for any hull plating of frames w/indicators of wastage and provide repair proposal for CG approval to crop and renew any areas of wastage that exceed 20% from original scantlings for bottom plating and internal structural members.
Action required: 705 - Other - as specified
Resolved 10 March 2009
Resolution: Cleared this CG-835 by giving more specific worklist items regarding gauging and repair plans. See item #1 of this project.
Construction/Loadline › Hull › Transverse Frame
Issued 20 March 2008
Resolved
Make permanent repairs to frames 4-8 and others as identified as being wasted beyond 25%. Repair proposal for all frames wasted beyond 25% must be submitted to and approved by [name withheld] prior to commencing repairs.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 11 April 2009
Construction/Loadline › Hull › Side Shell
Issued 20 March 2008
Resolved
Crop and renew wasted sideshell plating located in sideshell at port quarter IWO steering flat. Hole is located approximately 12" above the waterline along a weld seam. Repair proposal must be submitted to [name withheld] and approved prior to commencing any repairs.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 April 2009
Navigation › Piloting/Steering › Coast Guard Light List
Issued 26 October 2007
Resolved
Vessel was not able to provide CG Light List for inspection.
Condition: Unknown
Due 9 November 2007
Resolved 9 November 2007
Navigation › Piloting/Steering › US Coast Pilot
Issued 26 October 2007
Resolved
Vessel did not have U.S. Coast Pilot onboard. Provide U.S. Coast Pilot for Coast Guard inspection.
Condition: Unknown
Due 9 November 2007
Resolved 9 November 2007
Engineering › Fuel Oil Service System › Hose
Issued 26 October 2007
Resolved
Found several hose clamps within the fuel system hoses that are broken and missing in both the port and starboard engine rooms.
Due 9 November 2007
Resolved 9 November 2007
Electrical › Electrical Distribution System (service) › Junction Box
Issued 26 October 2007
Resolved
Found junction box in the port engine room not fixed to the mounting bracket. (conduit broken) Secure junction box.
Condition: Unknown
Due 9 November 2007
Resolved 9 November 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 26 October 2007
Resolved
Found two lights with broken light covers in the port engine room. Replace broken light covers
Condition: Unknown
Due 9 November 2007
Resolved 9 November 2007
Construction/Loadline › Hull › Weld
Issued 26 October 2007
Resolved
Found broken welds on a longitudinal in the #2 hold on the starboard side approximately 5 feet from the keel. Grind and re-weld broken welds.
Condition: Unknown
Due 23 November 2007
Resolved 10 January 2008
Construction/Loadline › Hull › Longitudinal Frame
Issued 26 October 2007
Resolved
Found wasted frame in #3 hold approximately 5 feet above the keel. Submit repair proposal for wasted frame.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 January 2008
Resolved 23 January 2008
Resolution: Converted to special note per Sector Honolulu.
Engineering › Steering Gear System › Pin
Issued 26 October 2007
Resolved
Cotter pin missing from the port rudder post. Replace cotter pin.
Condition: Unknown
Due 9 November 2007
Resolved 9 November 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 23 May 2007
Resolved
Port main engine overheated and seized. Determine damage and make repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2007
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2007
Resolved
Crop and renew port and stbd bow areas around holes wasted through hull. Gauge surrounding area for wastage.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Scuttle
Issued 23 May 2007
Resolved
Crop and renew port and stbd #2 hatches including deck plating (wasted) around both hatches.
Action required: 705 - Other - as specified
Resolved 5 July 2007
Resolution: In lieu of replacing scuttles, gasket in lids were replaced and closure mechanism was serviced. Restored watertight integrity.
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Crop and renew wasted deck IWO aft sewage tank by space #4.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2007
Resolved
Crop and renew wasted bow cross over bottom plating IWO #3, 4, 5, 5, 6, 7 and 8 on port and stbd sides. Guage port aft crossover.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 23 May 2007
Resolved
Crop and renew both bow bits including deck area under and around bits, 40 in x 10 in o/l.
Action required: 705 - Other - as specified
Resolved 24 July 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Crop and renew main deck on stbd side of stage. Gauge to determine extent of wastage.
Action required: 705 - Other - as specified
Resolved 13 July 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Crop and renew galley floor. Gauge to determine extent of wastage
Action required: 705 - Other - as specified
Resolved 12 July 2007
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 23 May 2007
Resolved
Crop and renew deck and railing around boarding area. Guage area of deck to determine extent of wastage.
Action required: 705 - Other - as specified
Resolved 12 July 2007
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 23 May 2007
Resolved
Repair holed hand rail by aft wing helm station.
Action required: 705 - Other - as specified
Resolved 5 July 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Crop and renew inboard port corner aft. Same area on stbd side.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Guage area amidship under galley and fwd on stbd side.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Engineering › Fuel Oil Service System › Tank
Issued 23 May 2007
Resolved
Repair stbd fuel tank. Tank leaking into #3 void.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Superstructure
Issued 23 May 2007
Resolved
Evaluate extent of wastage on both make and female restrooms.
Action required: 705 - Other - as specified
Resolved 13 July 2007
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 23 May 2007
Resolved
Determine extent of wastage and repair where needed all handrails.
Action required: 705 - Other - as specified
Resolved 24 July 2007
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2007
Resolved
Determine condition of hull area 30 ft aft portside.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2007
Resolved
Gauge and renew as needed all vessel under deck longs.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Make deck under carpet open for inspection. Uncover random areas and gauge for wastage.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Crop and renew under deck longs port #1 void IWO hatch.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Renew deck area around port side freeing port #4.
Action required: 705 - Other - as specified
Resolved 13 July 2007
Engineering › Fuel Oil Service System › Tank
Issued 23 May 2007
Resolved
Test fuel tank after repairs.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Deck Plating
Issued 23 May 2007
Resolved
Replace holed plywood deck @ stern gate second deck.
Action required: 705 - Other - as specified
Resolved 5 June 2007
Construction/Loadline › Structures › Superstructure
Issued 23 May 2007
Resolved
Repair roofing thoughout vessel as needed.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 May 2007
Resolved
Reattach anchor light and determine proper nav light configuration for vessel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 20 July 2007
Construction/Loadline › Structures › Superstructure
Issued 23 May 2007
Resolved
Repair bulkhead IWO female restroom escape hatch.
Action required: 705 - Other - as specified
Resolved 12 July 2007
Construction/Loadline › Structures › Scuttle
Issued 23 May 2007
Resolved
Replace/repair all 4 emergency escape hatches for male and female restrooms. All are termite damaged.
Action required: 705 - Other - as specified
Resolved 20 July 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 23 May 2007
Resolved
Replace globes or guards on all exposed electrical bulbs.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 23 May 2007
Resolved
Repair loose and damaged steps thoughout vessel.
Action required: 705 - Other - as specified
Resolved 5 July 2007
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 23 May 2007
Resolved
Dewater and clean all voids and engine room bilges for further inspection.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Engineering › Sea-water System (primary cooling) › Valve
Issued 23 May 2007
Resolved
Remove all sea valves for inspection.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2007
Resolved
Guage all hull plating below waterline.
Action required: 705 - Other - as specified
Resolved 20 June 2007
Construction/Loadline › Structures › Superstructure
Issued 23 May 2007
Resolved
Submit rigging survey.
Action required: 705 - Other - as specified
Resolved 20 July 2007
Operations/Management › Equipment Service/Testing › EPIRB
Issued 25 January 2006
Resolved
Prove monthly tests of EPIRB and make log entries.
Due 25 February 2006
Resolved 30 January 2006
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 25 January 2006
Resolved
Conduct drills and training in the presence of CG Marine Inspector
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 February 2006
Resolved 27 January 2006
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 25 January 2006
Resolved
Make log entires for all drills
Due 25 February 2006
Resolved 30 January 2006
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 25 January 2006
Resolved
Provide valid copy of COD.
Due 25 February 2006
Resolved 27 January 2006
Lifesaving › Hand Flares › Expired
Issued 25 January 2006
Resolved
Replace three expired red flares
Due 25 February 2006
Resolved 27 January 2006
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 25 January 2006
Resolved
Have all fire-fighting serviced
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 February 2006
Resolved 30 January 2006
Documentation › Manifests/Lists › Emergency Checkoff List
Issued 25 January 2006
Resolved
Post emergency instructions
Due 25 February 2006
Resolved 27 January 2006
Lifesaving › Lifefloat › Serviceable
Issued 25 January 2006
Resolved
Remove old lifefloat or repair as needed (oar, paint orange, lifeline, etc.)
Due 25 February 2006
Resolved 27 January 2006
Documentation › Certificates/Documents › Stability Letter
Issued 25 January 2006
Resolved
Provide original copy of stability letter
Due 25 February 2006
Resolved 30 January 2006
Communications › Radio Communications › EPIRB
Issued 25 January 2006
Resolved
Replace EPIRB battery and hydrostatic release
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 February 2006
Resolved 27 January 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Distributor (fuel injection)
Issued 25 January 2006
Resolved
Secure stbd engine fuel leak
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 February 2006
Resolved 27 January 2006
Pollution Prevention/Response › Prevention Equipment › Annex VI
Issued 25 January 2006
Resolved
Verify all fuel in bilge from stbd engine room is properly disposed of
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 February 2006
Resolved 27 January 2006
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 25 January 2006
Resolved
Install retrofreflective tape to lifejackets as marked
Due 25 February 2006
Resolved 27 January 2006
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 18 October 2004
Resolved
Reinstall structural fir protection insulation in engine room.
Due 18 December 2004
Resolved 18 January 2005
Engineering › Steering Gear System › Motor
Issued 5 January 2004
Resolved
Provide means to secure the port & stbd propulsion engines at the vessel's aft operating station. In addition, provide means to operate the port & stbd rudders at the aft operating station.
Action required: 705 - Other - as specified
Due 5 March 2004
Resolved 18 October 2004
Documentation › Certificates/Documents
Issued 4 December 2003
Resolved
Provide Bridge-to-Bridge radiotelephony certificate.
Action required: 705 - Other - as specified
Due 4 January 2004
Resolved 4 May 2004
Documentation › Certificates/Documents › Stability Letter
Issued 4 December 2003
Resolved
Provide a stability letter authorizing the vessel to be used on partially protected waters. The vessel's route is reduced to only operate between Keahole Pt and Keawekaheka Pt, no more than 3 miles from shore until a proper stability letter is obtained.
Action required: 705 - Other - as specified
Due 4 March 2004
Resolved 30 January 2006
Documentation › Logs/Records
Issued 4 December 2003
Resolved
Provide documentation that the company is participating in a drug and alcohol program. LEGACY COMPONENT DESC: Drug Test Records
Action required: 705 - Other - as specified
Due 4 January 2004
Resolved 5 January 2004
Communications › Internal Communications System
Issued 4 December 2003
Resolved
Provide a public address system that is operable form the operating station.
Action required: 705 - Other - as specified
Due 4 January 2004
Resolved 4 May 2004
Engineering › Generator (propulsion-electric)
Issued 4 December 2003
Resolved
Replace the port & stbd generator exhaust piping.
Action required: 705 - Other - as specified
Due 4 January 2004
Resolved 4 May 2004
Construction/Loadline › Structures
Issued 28 May 2003
Resolved
Gouge and reweld stiffners as marked. Crop and renew as orginial damaged hull plate, frames and stiffners, as marked. LEGACY COMPONENT DESC: Center void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
Crop and renew as original damaged hull plate, frames and stiffners as marked. LEGACY COMPONENT DESC: #1 starboard void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
Bay #1: Crop and renew as original 3rd long stiffner outboard side. Bay #2: Crop and renew hull plating as marked on outboard side. Bay #3: Crop and renew all inboard long stiffners. Bay #4: Crop and renew #4 inboard long. stiffner. Bay #5: Crop and renew all inboard long. stiffners. LEGACY COMPONENT DESC: #2 Stbd void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
Gouge and reweld overhead insert. LEGACY COMPONENT DESC: #3 stbd void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
Crop and renew aft bulkhead near soft patch. LEGACY COMPONENT DESC: #4 Stbd void
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
Crop and renew 3 vertical stiffners as marked. Crop and renew long. deck frames outboard of hatch, approx. 3 feet as marked. LEGACY COMPONENT DESC: #5 port void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
18" x 18" insert IWO hole inboard side. 18"x 18" insert IWO hole approx. 15 feet aft of fwd bulkhead, inboard side. 18"x18" insert IWO hole approx. 20' aft of fwd bulkhead inboard side. 2nd frame aft of fwd bulkhead - whole underwing at inboard hull, min. 18x18 insert. LEGACY COMPONENT DESC: #2 port void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
3rd bay: Crop and renew bottom long. to aft bulkhead. Crop and renew deck stiffner inboard side approx. 1 ft as marked. Crop and renew 14"x36" insert inboard side. Crop and renew #3 inboard long as marked. Crop and renew #2 long. LEGACY COMPONENT DESC: #2 port void (con''t)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
18"x18" insert inboard side approx. 10' aft of fwd bulkead. Bay 3: 18x18 insert underdeck insert. Gouge and reweld crack between 3rd and 4th bay inboard. LEGACY COMPONENT DESC: #3 port void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
Outboard at stern bulkhead, cutback to good steel. Approx 36"x16". LEGACY COMPONENT DESC: #4 port void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2003
Construction/Loadline › Structures
Issued 23 May 2003
Resolved
Aft port section behind engine room over rudder room cut back to good steel on main deck. LEGACY COMPONENT DESC: Deck Plating
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 16 June 2003
Construction/Loadline › Hull
Issued 23 May 2003
Resolved
Crop and renew as original improperly installed doublers on hull, as marked. LEGACY COMPONENT DESC: Doublers
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 10 June 2003
Documentation › Certificates/Documents
Issued 22 October 2002
Resolved
Provide a valid certificate of documentation. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Action required: 705 - Other - as specified
Due 22 November 2002
Resolved 22 October 2002
Engineering › Bilge Water Management System
Issued 22 October 2002
Resolved
Provide visual bilge alarms at the operating station for all compartments required to have high-level alarms.
Action required: 705 - Other - as specified
Due 22 November 2002
Resolved 10 December 2002
Construction/Loadline
Issued 27 October 1999
Resolved
Found vessel to not have a high water alarm installed IAW 46 CFR 119.530. Requred vessel rep to install prior to 27 NOV 99.
Condition: Unknown
Due 27 November 1999
Resolved 20 November 1999
Engineering
Issued 11 May 1999
Resolved
Conduct seatrials with newly installed port motor.
Condition: Unknown
Due 11 May 1999
Resolved 11 May 1999
Construction/Loadline
Issued 11 May 1999
Resolved
Crop and renew corroded metal caused by leaking fwd-most male sink. Effected area located within portside #1 void approx 24" aft & inboard of fwd bulkhead.
Condition: Unknown
Due 14 May 1999
Resolved 14 May 1999
Construction/Loadline
Issued 11 May 1999
Resolved
Remove corroded weldment and reweld along subdivision bulkhead dividing portside #3 and #4 voids.
Condition: Unknown
Due 11 May 1999
Resolved 11 May 1999
Lifesaving
Issued 20 December 1995
Resolved
VSL RESTRICTED TO CARRYING 158 ADULT PERSON UNTILL ADDITIONAL PFDs ARE ON BOARD.
Condition: Unknown
Due 27 December 1995
Resolved 5 January 1996
Engineering
Issued 20 December 1995
Resolved
REPAIR AS PER ORIGINAL AUTOMATIC OVERSPEED SHUT-OFFS ON BOTH GENERATORS, REPLACE WITH MANUAL SHUT-OFFS, OR REMOVE ENTIRELY; OVERSPEED SHUT-OFFS ADDED ON BY OWNER, NOT REQUIRED BY MANUFACTURER, LESS THAN 135 HP EACH.
Condition: Unknown
Due 20 December 1995
Resolved 20 December 1995
Electrical
Issued 20 December 1995
Resolved
CHANGE OUT TWIST TYPE ELECTRICAL CONNECTORS WITH CRIMP TYPE IN STBD ENGINE ROOM; RUDDER ANGLE INDICATOR WIRES AND 110 VOLT OVERHEAD LIGHT._x001C_
Condition: Unknown
Due 27 December 1995
Resolved 5 January 1996
Navigation
Issued 20 December 1995
Resolved
MAKE OPERABLE ANCHOR LIGHT.
Condition: Unknown
Due 27 December 1995
Resolved 5 January 1996
Electrical
Issued 28 September 1995
Resolved
PROVIDE PROPER LIGHTING FOR PORT ENGINE ROOM.
Condition: Unknown
Due 28 September 1995
Resolved 28 September 1995
Engineering
Issued 28 September 1995
Resolved
PROVIDE PROPER DRIP PAN UNDER INBOARD RACOR FILTER IN THE PORT ENGINE ROOM.
Condition: Unknown
Due 28 September 1995
Resolved 28 September 1995
Construction/Loadline
Issued 28 September 1995
Resolved
PROVIDE PERMANENT DRAFT MARKS AT EACH END OF THE VESSEL OR PERMANENT LOAD MARKS ON EACH SIDE OF THE VESSEL IAW 46 CFR 185.30.
Condition: Unknown
Due 28 September 1995
Resolved 28 September 1995
Documentation
Issued 28 September 1995
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 28 September 1995
Resolved 28 September 1995
Construction/Loadline
Issued 17 February 1995
Resolved
Repair or replace in kind, the forward hatch cover on the port bow.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Electrical
Issued 17 February 1995
Resolved
Remove or dead end all loose wires in starboard engine room.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Electrical
Issued 17 February 1995
Resolved
Properly close electric conductor box in the starboard engine room.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Electrical
Issued 17 February 1995
Resolved
Provide proper light cover for the light assembly over the forward stairs.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Engineering
Issued 17 March 1994
Resolved
Modify the ventilation intakes to each engine space as required by 46 CFR 182.20-45 to prevent flooding of engine compartments in high seas.
Condition: Unknown
Due 17 March 1994
Resolved 17 March 1994
Electrical
Issued 17 March 1994
Resolved
Replace all wiring harnesses, where wasted, on each main engine.
Condition: Unknown
Due 17 March 1994
Resolved 17 March 1994
Engineering
Issued 17 March 1994
Resolved
Prove prope operation of the engine gauges in each engine compartment and on the bridge.
Condition: Unknown
Due 17 March 1994
Resolved 17 March 1994
Construction/Loadline
Issued 13 April 1993
Resolved
PROVIDE CAPTIVE CHAINS FOR ALL WATERTIGHT HATCHES.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Electrical
Issued 13 April 1993
Resolved
REPAIR ELECTRICAL FAULT WITH ALL TWELVE VOLT BRIDGE EQUIPMENT.
Condition: Unknown
Due 21 June 1993
Resolved 21 June 1993
Electrical
Issued 13 April 1993
Resolved
REPAIR ELECTRICAL FAULT WITH F/W SERVICE PUMP LOCATED IN PILOTHOUSE AND REMOVE JURY RIGGED VENTILATION FAN LOCATED IN SAME AREA.
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Construction/Loadline
Issued 13 April 1993
Resolved
REPAIR FRACTURE IN FORWARD BULKHEAD OF THE FORWARD HOLD, INBOARD SIDE OF THE PORT HULL.
Condition: Unknown
Due 21 June 1993
Resolved 21 June 1993
Lifesaving
Issued 13 April 1993
Resolved
RENEW LIFELINES ON BOTH 24" RING LIFE BUOYS.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Fire Fighting
Issued 13 April 1993
Resolved
PROVIDE PORTABLE HAND FIRE/BILGE PUMP WITH 5 GPM CAPACITY.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Electrical
Issued 13 April 1993
Resolved
PROVIDE A MINIMUM OF FOUR HAND LANTERNS FOR EMERGENCY LIGHTING.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Engineering
Issued 13 April 1993
Resolved
REINSTALL MECHANICAL VENTILATION FAN, PORT ENGINE ROOM.
Condition: Unknown
Due 21 June 1993
Resolved 21 June 1993
Engineering
Issued 13 April 1993
Resolved
INSTALL 30x30 CORROSION RESISTANT WIRE MESH FLAME SCREENS FOR EACH FUEL TANK.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Fire Fighting
Issued 13 April 1993
Resolved
REPAIR BOTH ELECTRIC DRIVEN FIRE PUMPS TO MEET REGULATION SPECIFICATIONS; 50 GPM AT 60 PSI.
Condition: Unknown
Due 21 June 1993
Resolved 21 June 1993
Electrical
Issued 13 April 1993
Resolved
REPAIR RUPTURED EXHAUST LINE ON STBD SHIP SERVICE GENERATOR. MAKE FULLY OPERATIONAL AND PROVIDE ONE ADDITIONAL B-II FIRE EXTINGUISHER PRIOR TO CARRYING MORE THAN 49 PASSENGERS.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Engineering
Issued 13 April 1993
Resolved
DEMONSTRATE, TO THE ATTENDING MARINE INSPECTOR, PROPER OPERATION OF OVERSPEED TRIPS ON BOTH MAIN DIESEL ENGINES AND THE PORT SIDE SHIP SERVICE GENERATOR.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Lifesaving
Issued 13 April 1993
Resolved
PROVIDE ONE ADDITIONAL RED FLARE FOR A TOTAL OF SIX.
Condition: Unknown
Due 29 April 1993
Resolved 29 April 1993
Navigation
Issued 13 April 1993
Resolved
PROVIDE CURRENT EDITION OF THE FOLLOWING PUBLICATIONS: COAST PILOT, CG LIGHT LIST, NAVIGATION RULES (COMDTINST M16672.2B) AND LOCAL NOTICE TO MARINERS.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Unknown
Issued 13 April 1993
Resolved
COMPLETE THE TWENTY WORKLIST ITEMS ISSUED DURING INSPECTION OF 13APR93.
Condition: Unknown
Due 21 June 1993
Resolved 21 June 1993
Navigation
Issued 13 April 1993
Resolved
PROPERLY SECURE CLEVIS PINS IN PORT AND STBD STEERING RAMS.
Condition: Unknown
Due 14 May 1993
Resolved 29 April 1993
Electrical
Issued 1 May 1992
Resolved
LABEL THE GENERATOR BREAKER SWITCHES LOCATED IN THE PORT AND STARBOARD ENGINE ROOMS.
Condition: Unknown
Due 1 May 1992
Resolved 1 May 1992
Fire Fighting
Issued 1 May 1992
Resolved
LABEL ALL FIRE MAIN AND BILGE MAIN VALVES LOCATED IN THE PORT AND STARBOARDENGINE ROOMS.
Condition: Unknown
Due 1 May 1992
Resolved 1 May 1992
Electrical
Issued 1 May 1992
Resolved
LABEL THE OVEN BRAEKER SWITCHES LOCATED ON PANEL "B AFT" LOCATED IN THE STARBOARD ENGINE ROOM ENTRANCE.
Condition: Unknown
Due 1 May 1992
Resolved 1 May 1992
Fire Fighting
Issued 1 May 1992
Resolved
LABEL THE FIRE PUMP SWITCHES LOCATED IN THE PORT AND STARBOARD ENGINE ROOMS.
Condition: Unknown
Due 1 May 1992
Resolved 1 May 1992
Construction/Loadline
Issued 10 April 1992
Resolved
MAKE PERMANENT REPAIRS TO DAMAGED STARBOARD BOW FORWARD OF COLLISION BULKHEAD.
Condition: Unknown
Due 10 April 1992
Resolved 10 April 1992
Navigation
Issued 27 November 1991
Resolved
RELOCATE OBSTRUCTED STERN LIGHT.
Condition: Unknown
Due 2 January 1992
Resolved 2 January 1992
Construction/Loadline
Issued 30 August 1991
Resolved
CROP AND RENEW AS ORIGIONAL THE SET UP PLATE UNDER THE STARBOARD MAIN ENGINE AT THE NEXT DRYDOCK.
Condition: Unknown
Due 30 August 1991
Resolved 30 August 1991
Lifesaving
Issued 8 May 1991
Resolved
RENEW THE RETROREFLECTIVE TAPE ON ALL LIFE PRESERVERS AS NEEDED.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Lifesaving
Issued 8 May 1991
Resolved
PROPERLY LABEL THE LIFE PRESERVER LOCKERS ON THE UPPER DECK.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Electrical
Issued 8 May 1991
Resolved
MAKE OPERATIONAL THE PORT GENERATOR DRIVE OVERSPEED TRIPPING DEVICE.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Construction/Loadline
Issued 8 May 1991
Resolved
PROPERLY INSULATE THE AFTER ALUMINUM BOARDING LADDER FROM THE STEEL HULL.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Electrical
Issued 8 May 1991
Resolved
MAKE OPERATIONAL THE STARBOARD GENERATOR DRIVE OVERSPEED TRIPPING DEVICE.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Engineering
Issued 8 May 1991
Resolved
REPAIR THE EMERGENCY FUEL SHUTDOWN FOR THE PORT FUEL TANK.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Construction/Loadline
Issued 8 May 1991
Resolved
MAKE WATERTIGHT NUMBER 4 PORT GLASS BOTTOM. KEEP THIS COMPARTMENT PUMPED TO A MINIMUM UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Documentation
Issued 8 May 1991
Resolved
POST A MARPOL V GARBAGE DUMPING PLACARD.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Construction/Loadline
Issued 8 May 1991
Resolved
CLEAN THE TWO FORWARD DECK HATCH SEALS AND INSURE THAT THEY ARE WATERTIGHT.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Construction/Loadline
Issued 8 May 1991
Resolved
MAKE THE FIRE PUMP SEA SUCTION VALVES READILY ACCESSIBLE IN THE ENGINE ROOMS OR MAKE THEM OPERABLE FROM THE MAIN DECK.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Electrical
Issued 8 May 1991
Resolved
REPAIR OR REPLACE THE TACHOMETER FOR THE PORT GENERATOR DRIVE.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Electrical
Issued 8 May 1991
Resolved
REPAIR OR REPLACE THE TACHOMETER ON THE STARBOARD GENERATOR DRIVE.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Fire Fighting
Issued 8 May 1991
Resolved
PROVIDE A PRESSURE GUAGE FOR THE PORT FIRE PUMP.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Navigation
Issued 8 May 1990
Resolved
PROPERLY WIRE THE RUDDER ANGLE INDICATOR FOLLOW-UP BOXES LOCATED IN THE RUDDER COMPARTMENTS.
Condition: Unknown
Due 8 May 1990
Resolved 8 May 1990
Accommodation/Occupational Safety
Issued 8 May 1990
Resolved
GOUGE AND REWELD THE CRACK IN THE COLLISION BULKHEAD LOCATED ON THE STARBOARD SIDE OF THSE PORT HULL TWELVE INCHES ABOVE THE TURN OF THE BILGE AT THE NEXT DRYDOCK.
Condition: Unknown
Due 8 May 1990
Resolved 8 May 1990
Construction/Loadline
Issued 8 May 1990
Resolved
GOUGE AND REWELD THE CRACK LOCATED AT THE INTERSECTION OF THE DECK AND THE STARBOARD SIDE OF THE PORT HULL TWO FEET AFT OF THE COLLISION BULKHEAD AT THE NEXT DRYDOCK.
Condition: Unknown
Due 8 May 1990
Resolved 8 May 1990
Electrical
Issued 8 May 1990
Resolved
PLACE THE RADIO BATTERIES LOCATED IN THE ENTRANCE TO THE STARBOARD ENGINE ROOM IN A SUITABLE PLASTIC, FRP OR LEAD LINED TRAY.
Condition: Unknown
Due 8 May 1990
Resolved 8 May 1990
Construction/Loadline
Issued 1 June 1989
Resolved
REPLACE BROKEN GLASS PANE IN UNDERWATER VIEWING PORT AT TABLE #4S.
Condition: Unknown
Due 1 June 1989
Resolved 1 June 1989
Construction/Loadline
Issued 1 June 1989
Resolved
MAKE PERMANENT REPAIRS TO FRACTURES IN PORT AND STARBOARD HULLS AS MARKED. IN PORT HULL, FRACTURES NOTED IN BAYS # 1 & 2; IN STBD HULL, FRACTURES NOTED IN BAYS # 1, 2, & 3.
Condition: Unknown
Due 1 June 1989
Resolved 1 June 1989
Documentation
Issued 1 June 1988
Resolved
PROVIDE COPY OF AND PLACE ON BOARD VESSEL, CURRENT FCC FORM 824, SAFETY RADIO TELEPHONY CERTIFICATE. UNTIL THIS REQUIREMENT IS MET, THIS VESSEL ISRESTRICTED TO OPERATION NOT MORE THAN 1,000 FEET FROM SHORE.
Condition: Unknown
Due 1 June 1988
Resolved 1 June 1988
Unknown
Issued 7 June 1986
Resolved
DEMONSTRATE EMERGENCY SHUTDOWN FOR STARBOARD MAIN ENGINE FROM WHEELHOUSE LOCATION.
Condition: Unknown
Due 7 June 1986
Resolved 7 June 1986
Unknown
Issued 7 June 1986
Resolved
DEMONSTRATE OPERATION OF HAND FIRE PUMP.
Condition: Unknown
Due 7 June 1986
Resolved 7 June 1986
Documentation
Issued 6 June 1985
Resolved
POST PERMANENT STABILITY LETTER.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Electrical
Issued 6 June 1985
Resolved
REMOVE OR PROPERLY SECURE FANS IN P.A. SYSTEM SPACE AND WORK SPACE.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Fire Fighting
Issued 6 June 1985
Resolved
PROVIDE TWO B-II TYPE PORTABLE FIRE EXTINGUISHERS FOR MACHINERY SPACES. (TOTAL B-II REQUIRED IS 5).
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Accommodation/Occupational Safety
Issued 6 June 1985
Resolved
PROVE PORT AND STARBOARD PUMPS CAPACITY IS AT LEAST 50 G.P.M.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Construction/Loadline
Issued 6 June 1985
Resolved
INSTALL SECURING DEVICES FOR MAIN DECK HATCH COVERS (CIRCULAR TYPE).
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Fire Fighting
Issued 6 June 1985
Resolved
PROVE PORT ENGINE ROOM FIRE PUMP STATIC PRESSURE IS 60 P.S.I.G.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Lifesaving
Issued 6 June 1985
Resolved
PROVIDE AN ACCEPTABLE RESCUE BOAT/RESCUE PLATFORM. SUBMIT SPECS TO [name withheld].
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985
Unknown
Issued 6 June 1985
Resolved
REMOVE ALL COMBUSTIBLE DECORATIONS ON MAIN DECK OR PROVE TREATED WITH FIRE RETARDANT.
Condition: Unknown
Due 6 June 1985
Resolved 6 June 1985