MAURY USCG vessel records
← All vessels

SCOTCH MIST II

SCOTCH MIST II is a 1982 passenger vessel (inspected). The Coast Guard has recorded 21 inspections since 2016, most recently in November 2023, along with 23 deficiencies and 1 casualty investigation in 2023.

Records from 2016 to 2023. Most recent: inspection, 1 November 2023.

Built
1982
Last inspected
1 November 2023
Documentation
Expired · documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 1 November 2023
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2016–2023)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL3556
Flag
UNITED STATES
Maury page id
psix-54428

Documentation record

Registered dimensions (L × B × D)48.5 ft × 12.0 ft × 5.2 ft
Registered tonnagegross 16 / net 15
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBILL LEE YACHTS, INC. · SOQUEL, CA, UNITED STATES · built 1982
Hull materialFRP (Fiberglass)
PropulsionDiesel
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLAHAINA, HI
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it15 - Regulatory (Subpart C or D), Net Ton
16 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

NAPALI EXPLORER III Passenger (Inspected) · MISLE 429374 · 23 December 2020 · activity 7131921MAUI NUI EXPLORER Passenger (Inspected) · MISLE 440244 · 23 December 2020 · activity 7131921

Inspection history · 21

1 November 2023 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7819031
9 August 2023 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7770048
9 August 2023 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7789793
10 July 2023 Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7738711
10 February 2023 DAPI Audit
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7645231
11 January 2023 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7619683
7 January 2022 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7376324
3 December 2021 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7362155
4 November 2021 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7344112
6 January 2021 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7119624
23 December 2020 DAPI Audit · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7115858
23 December 2020 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7131921
17 December 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6875423
4 December 2019 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6867191
29 October 2019 Examination of Repairs · Drydock Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6848818
11 December 2018 Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6596235
7 February 2018 Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6352753
27 November 2017 Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6313641
11 July 2017 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6207341
9 March 2017 Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6102168
3 March 2016 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5826355

Deficiency record · 23

99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 January 2023 Resolved
Sail Rigging Preventative Maintenance Plan (PMP) must be updated and onboard vessel at all times. PMP not currently updated. Provide full rigging inventory of all old and new rigging components, inspections, and rigging details. Ensure all to log all inspections in accordance with vessel PMP. Keep copy of PMP on board vessel at all times and submit revised version of PMP to [name withheld]. 46 CFR 176.802
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 February 2023
Resolved 21 January 2023
Resolution: PMP provided. See documents.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 January 2023 Resolved
Connections must be made to battery terminals with permanent type connectors. Existing battery connection uses temporary wing-nut connectors. Properly install permanent type connectors on all battery installations. 46 CFR 183.350
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 February 2023
Resolved 1 February 2023
Resolution: Permanent connector provided.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 11 January 2023 Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked "First-Aid Kit". A first-aid kit must be easily visible and readily available to the crew. First aid kit is incomplete. Provide USCG-approved kit or a kit that complies with the list in 46 CFR 160.041. 46 CFR 184.710
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 February 2023
Resolved 17 January 2023
Resolution: First aid kit provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 January 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Dead end wires found on port side of engine hatch. 46 CFR 183.200 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 February 2023
Resolved 1 February 2023
Resolution: Dead end wires removed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 January 2023 Resolved
Sail rigging and components are to be maintained in accordance with good marine practice. Observed missing mousing on furler and missing cotter pins on turnbuckles bellow deck. Provide mousing for furler and cotter pin per vessel's Preventative Maintenance Plan. 46 CFR 176.800
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 February 2023
Resolved 17 January 2023
Resolution: Mousing and cotter pin provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 January 2022 Resolved
Vessel does not currently meet the requirements of Work Instruction 31. Mandated crew posted on COI may not enter the water or act as lifeguard until policy and procedure provided. Provide written procedure. Work Instruction 31
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 February 2022
Resolved 25 February 2022
Resolution: Procedures provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 January 2022 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 February 2022
Resolved 25 February 2022
Resolution: PMP provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 January 2022 Resolved
All portable fire extinguishers must be serviced annually. Portable and pre-engineered fixed fire fighting bottles have not been serviced in the past year. Provide service report for each portable and pre-engineered fixed fire fighting bottle. NFPA 10
Action required: 10 - Deficiency Rectified
Resolved 7 January 2022
Resolution: Bottles serviced.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 7 January 2022 Resolved
A vessel over 26 feet must have an audible alarm at the operating station. Audible bilge alarm not operational. Provide operational bilge alarm. 46 CFR 182.530
Action required: 10 - Deficiency Rectified
Resolved 7 January 2022
Resolution: Bilge alaram operational.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 January 2022 Resolved
A pre-engineered fixed gas fire extinguishing system must have a light and audible alarm to indicate discharge. Light and audible not operational. Provide operational visual and audible alarms. 46 CFR 181.420
Action required: 10 - Deficiency Rectified
Resolved 7 January 2022
Resolution: New alaram installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 January 2021 Resolved
Life ring buoy showing damage. Provide new life ring buoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2021
Resolved 5 February 2021
Resolution: New ring buoy provided.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 6 January 2021 Resolved
Life Float weak link tag was missing. Provide new weak link with proper tag.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2021
Resolved 5 February 2021
Resolution: Weak link provided.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 6 January 2021 Resolved
Fuel shut of marking damaged. Provide new fuel shut of marking.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2021
Resolved 5 February 2021
Resolution: Fuel shut off marking provided.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 6 January 2021 Resolved
Sewage valve not locked. Provide locking mechanism for sewage holding tank when within 3nm from shore.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2021
Resolved 24 February 2021
Resolution: New valve installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 January 2021 Resolved
Automatic bilge light at helm could not be seen. Provide visual indicator when automatic bilge pump starts.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2021
Resolved 5 February 2021
Resolution: New bilge light installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 January 2021 Resolved
Pre-engineered fire fighting system does not have instructions at pull handle. Provide instruction for fire boy pull handle at pull handle.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2021
Resolved 5 February 2021
Resolution: Instructions provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 January 2021 Resolved
Provide electronic copy of Vessels Sail Rig Preventative Maintenance Plan IAW with NVIC 02-16 Chapter III part a. iv.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2021
Resolved 5 February 2021
Resolution: PMP provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 December 2020 Resolved
Currently, employees are verbally notified to take a random drug test. Provide written notification to employees template for DOT Random Drug Test.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 January 2021
Resolved 20 January 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 December 2020 Resolved
Identify SAP for DAPI Program; Update EAP Information/Policy Statement with SAP Information.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 January 2021
Resolved 20 January 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 December 2019 Resolved
Fireboy audible alarm was inoperative. Prove correct operation in accordance with 46 CFR 176.810.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 December 2019
Resolved 4 December 2019
Resolution: Audible alarm operation satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2019 Resolved
Fuel shut-off pull cable failed. Prove correct operation of fuel shut-off in accordance with 46 CFR 176.804.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 December 2019
Resolved 17 December 2019
Resolution: Cable renewed, valve closes.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2019 Resolved
Cracks were found in boom gooseneck. Repair/renew gooseneck in accordance with 46 CFR 176.840. Monitor daily and notify [name withheld] immediately if any crack spreads or deformation of gooseneck occurs. Replace fitting at next dry dock. 30 Nov 2021.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2020
Resolved 4 November 2021
Resolution: The boom gooseneck was inspected and found to be in good condition. The mast was un-stepped for credit to the satisfaction of the attending marine inspector.
Operations/Management › Drills/Instruction › Not Conducted
Issued 3 March 2016 Resolved
Masters and Crew have not been conducting quarterly drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 March 2016
Resolution: Vessel conducted drills with inspector and proved proficiency with all.

Casualty record · 1

9 August 2023Significant Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 7789793
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.