LA SALLE

Built
1983
Last inspected
15 May 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 15 May 2026
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDK3024
Flag
UNITED STATES
Maury page id
psix-54766

Documentation record

Registered dimensions (L × B × D)62.3 ft × 22.0 ft × 7.1 ft
Registered tonnagegross 55 / net 37
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF CRAFT · PATTERSON, LA, UNITED STATES · built 1983
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMACKINAC ISLAND, MI
Endorsements, as the file codes themcw_un
DocumentationValid · issued 20 June 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it37 - Regulatory (Subpart C or D), Net Ton
55 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 40 inspections, each with its date, unit and type; 76 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 1 other vessel inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MARQUETTE II Passenger (Inspected) · MISLE 737042 · 17 July 2025 · activity 8199321

Inspection history · 40

15 May 2026 In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8373961
28 January 2026 Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8371119
26 August 2025 In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8219903
13 August 2025 In-Service Inspection · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8210036
12 August 2025 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8208405
6 August 2025 In-Service Inspection · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8203860
17 July 2025 Administrative Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8188389
17 July 2025 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8199321
14 May 2025 COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8172375
22 August 2024 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7986590
3 July 2024 Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7967644
17 April 2023 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7670710
7 September 2022 Annual Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7555050
29 August 2022 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7546373
14 August 2022 Administrative Inspection · Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7532930
23 April 2022 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7437439
21 March 2022 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7416740
23 August 2021 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7296096
12 August 2021 Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7289617
23 July 2021 In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7285848
23 June 2021 Deficiency Check · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7233899
20 May 2021 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7208093
12 May 2021 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7199836
29 January 2021 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7135176
1 June 2020 COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6965089
2 March 2020 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6918729
23 December 2019 Hull Examination · Examination of Repairs
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6883964
19 October 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6837793
21 August 2019 Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6790753
23 April 2019 Examination of Repairs · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6688292
24 September 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6547380
5 September 2018 Annual Inspection · DAPI Audit
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6533404
8 June 2018 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6438158
30 May 2018 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6430620
18 April 2018 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6395380
26 October 2017 Administrative Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6304071
12 September 2017 Deficiency Check · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6267375
1 June 2017 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6167254
5 October 2016 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6017396
8 September 2016 Administrative Inspection · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6000717

Deficiency record · 76

03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 15 May 2026 Resolved
Found approximately four inches of standing water in the lazarette which is believed to be coming from the rudder packing. Identify the cause and affect repairs.
Action required: 60 - Rectify deficiencies prior to movement
Due 15 May 2026
Resolved 20 May 2026
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 May 2026 Resolved
A crack was discovered in the port inboard chine bar, located in the second bay aft of the forward bulkhead. This structural failure permitted a minor ingress of water into the Fuel Void. Authorization was granted for the vessel to conduct a single-voyage transit without passengers to the haul-out facility in St. Ignace for repairs.
Action required: 60 - Rectify deficiencies prior to movement
Due 15 May 2026
Resolved 20 May 2026
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 15 May 2026 Resolved
Found multiple cracked welds within the fuel void space that have been repaired in the past and have cracked again. Submit repair proposal to the CG.
Action required: 60 - Rectify deficiencies prior to movement
Due 15 May 2026
Resolved 20 May 2026
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 26 August 2025 Resolved
During an in-service inspection, approximately 18 inches of water was discovered in the forepeak, and I instructed the mechanic to prove the system was operating correctly to de-water the space. Upon lining up the manifold, the overboard discharge was observed to be pumping about an index finger width stream which I found to be inadequate. Mechanic believed the problem to be related to the pump's cover being sealed on with RTV (which was leaking). He was going to take the cover off and reattach with the correct JABSCO O-rings provided in the kit and re-attempt. Upon inspection, the splines from an old impeller were found lodged in the nozzle of the fire hose and in the one-way check valve for the overboard discharge preventing water from moving freely. Spline debris was removed, and the system functioned as designed.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 26 August 2025
Resolved 26 August 2025
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 12 August 2025 Resolved
Stbd quarter mooring bit doubler weld fractured making bit unsafe for use. Stbd quarter mooring bit may not be used until permanently repaired. Effect permanent repairs to the stbd quarter mooring bit.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2025
Resolved 9 April 2026
Resolution: Both quarter mooring bits were upgraded/replaced, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 August 2025 Resolved
OCMI has granted interim approval of Throttle Control Loss of Power DVTP until final approval is received from MSC. Vessel may carry passengers until final approval has been granted or if the DVTP is returned for revision. Any problems or change in operation of the throttle controls must be reported to the CG.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2025
Resolved 2 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 July 2025 Resolved
New vessel controls have not been design verified with MSC approved DVTP and PSTP. Company notified CG today that they have had problems with the controls not functioning properly in 'sync' and engaging in clutch astern without a significant delay. Vessel shall not carry passengers until approved DVTP and PSTP can be witnessed by a CG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 July 2025
Resolved 6 August 2025
Resolution: Witnessed by CG MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 July 2025 Resolved
Both reduction gears fluid fill ports leak. Company attempted to correct but they continue to leak. Gear manufacturer has been contacted and will attend next week to facilitate permanent repairs. Monitor leaks and if degradation occurs it must be immediately reported to the OCMI.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 23 July 2025
Resolution: fill port plugs properly gasketed, leaks corrected, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 July 2025 Resolved
Effect repairs to MDE's and demonstrate proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 July 2025
Resolved 18 July 2025
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 July 2024 Resolved
Both MDE's were over-filled with lube oil with caused over-pressurization, resulting in catastrophic internal damage. Make repairs and demonstrate proper operation prior to the carriage of passengers.
Action required: 60 - Rectify deficiencies prior to movement
Due 3 July 2024
Resolved 7 July 2025
Resolution: MDE's replaced (in-kind), all sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 17 April 2023 Resolved
Found six cracks in the bow bulwarks. Found four cracks in the forepeak structure welds. Found four cracks in the #2 void structure welds. Submit repair proposal and effect repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 1 July 2025
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 17 April 2023 Resolved
Found temp repairs in the forepeak on the hull plate and in the lazarette on the stbd quarter hullplate that company failed to make permenant over the off-season.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 1 July 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2023 Resolved
Vessel has no means of accurately determining the amount of fuel in each tank.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 1 July 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 April 2023 Resolved
Battery box in the engine room needs to be properly secured to the deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 20 April 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 April 2023 Resolved
Circuit breaker box in engine room has hole from old wire.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 20 April 2023
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 17 April 2023 Resolved
Missing exhaust lagging on Hydro-Jet engine needs to be replaced.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 April 2023
Resolved 20 April 2023
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 17 April 2023 Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 11 September 2023
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 17 April 2023 Resolved
Compressor used for producing sound signals has a cracked valve that leaks and constantly runs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 20 April 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 17 April 2023 Resolved
Latch for stbd forwardmost window has no latch to keep it closed which makes it not weathertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 20 April 2023
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 17 April 2023 Resolved
PA system inside the passenger cabin is too low to hear while the vessel is underway.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2023
Resolved 11 September 2023
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 7 September 2022 Resolved
Steering hydraulic actuator is loose, must be corrected.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 September 2022
Resolved 7 September 2022
Resolution: corrected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 September 2022 Resolved
main deck fire leaks excessively, must be replaced.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 September 2022
Resolved 7 September 2022
Resolution: corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 7 September 2022 Resolved
Missing equipment noticed during MOB recovery drill - pins for laddrer retention missing making it unsafe for crew and/or rescued victims.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 September 2022
Resolved 7 September 2022
Resolution: corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 September 2022 Resolved
Hydro-jet engine tach is inop making it unsafe to operate, must be locked out/tagged out until properly repaired or replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2022
Resolved 28 September 2022
Resolution: corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 7 September 2022 Resolved
Hydro-jet exhaust lagging needs repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2022
Resolved 26 October 2022
Resolution: corrected.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 7 September 2022 Resolved
Various weld repairs required in forepeak, #2 void, engineroom fwd bulkhead and overhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2022
Resolved 1 July 2025
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 September 2022 Resolved
Aft cabin PFE is mounted with incorrect bracket, install with appropriate and approved bracket.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2022
Resolved 26 October 2022
Resolution: corrected.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 7 September 2022 Resolved
Fantail middle window cracked, must be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2022
Resolved 19 April 2023
Resolution: replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 7 September 2022 Resolved
MDE shafts are unprotected from personnel falls/injury. install guards as agreed upon.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2022
Resolved 17 April 2023
Resolution: corrected.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 7 September 2022 Resolved
public address system is not loud enough or understandable in the main deck passenger accommodation space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2022
Resolved 19 April 2023
Resolution: cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 August 2022 Resolved
Replace damaged props. Re-build damaged port marine gear actuator box. Prove shaft is undamaged.
Action required: 60 - Rectify deficiencies prior to movement
Due 15 August 2022
Resolved 7 September 2022
Resolution: completed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 August 2022 Resolved
Complete repairs to forepeak puncture and stbd quarter bit as agreed upon.
Action required: 60 - Rectify deficiencies prior to movement
Due 15 August 2022
Resolved 7 September 2022
Resolution: completed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 15 August 2022 Resolved
Complete assessment and permanent repairs to forepeak damage and stbd quarter bit/maindeck/bulwarks.
Action required: 705 - Other - as specified
Due 15 October 2022
Resolved 1 July 2025
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 15 August 2022 Resolved
Determine cause of steering system malfunction; effect repairs, demonstrate proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 August 2022
Resolved 7 September 2022
Resolution: completed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 August 2022 Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. Vessel experienced a grounding while transiting to St. Ignace pier. Vessel may not carry passengers or cargo until the hull has been inspected to the satisfaction of attending Coast Guard marine inspectors.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 August 2022
Resolution: Attended vessel hauled out, completed damage survey.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 23 August 2021 Resolved
All fuel tank saddles have fracturing, require repairs prior to next operating season.
Action required: 705 - Other - as specified
Due 15 April 2022
Resolved 7 September 2022
Resolution: Sighted repairs/mods completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 August 2021 Resolved
Hydro-jet engine fuel return line kinked at bulkhead, requires replacement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 September 2021
Resolved 21 March 2022
Resolution: corrected.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 12 August 2021 Resolved
Sighted & marked cracks: 4 in forepeak, 5 in #1 void, 6-8 in fuel tank void and all fuel tank saddles. Repairs required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2021
Resolved 23 August 2021
Resolution: All repaired except fuel tank saddles. will re-issue requiring repairs after operating season.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 12 August 2021 Resolved
Fuel leak at stbd MDE fuel tank main feed line valve. Correct prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Due 12 August 2021
Resolved 12 August 2021
Resolution: corrected. Monitor for the next week. Any further leaks must be reported to the OCMI immediately.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 August 2021 Resolved
Both upper deck RLBs deteriorated, need replacement or removal (vsl only required 1).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 September 2021
Resolved 21 March 2022
Resolution: corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 August 2021 Resolved
Hydro-jet engine fuel return line damaged & requires replacement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2021
Resolved 23 August 2021
Resolution: repaired majority of fuel line. sighted 1 additional length of fuel line needing replacement, re-issued.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 23 July 2021 Resolved
Sighted stbd quarter sustained damage from repeated hard docking or piviting. Effect temp repairs as agreed upon.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2021
Resolved 27 July 2021
Resolution: temp repairs completed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 23 July 2021 Resolved
Sighted stbd quarter sustained damage from repeated hard docking or piviting. Effect permanent repairs as agreed upon.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 August 2021
Resolved 23 August 2021
Resolution: repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 June 2021 Resolved
Vessels Port Main engine was shut down due to a non functioning transmission. Make repairs and test to the satisfaction of U.S. Coast Guard Officer In Charge, Marine Inspection prior to movement.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 July 2021
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 May 2021 Resolved
Vessel’s shaft packing on hydro jet engine is leaking excessively into the lazarette. Effect permanent repairs to the satisfaction of the attending CG MI. Vessel is authorized a one time transit from home berth directly to haul out facility with no passengers on board.
Action required: 60 - Rectify deficiencies prior to movement
Due 12 May 2021
Resolved 17 May 2021
Resolution: Cleared.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 10 June 2020 Resolved
E/R escape hatch must be properly marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2020
Resolved 30 June 2020
Resolution: Corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 June 2020 Resolved
replace broken steering compartment junction box cover behind ladder.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2020
Resolved 30 June 2020
Resolution: replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 June 2020 Resolved
hydro-jet engine exhaust lagging loose, needs tightening. raw water pump housing leaking, part on order and will be replaced. starter selenoid over-current protection mismatched for this application, must be replaced with proper fuse unit to fit housing and protective cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2020
Resolved 30 June 2020
Resolution: Lagging tightened. new gasket in raw water pump, in-line fuse added to stater solenoid.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 October 2019 Resolved
Determine the cause of failure of the starboard engine and effect repairs to the satisfaction of U.S. Coast Guard Officer In Charge, Marine Inspection prior to carrying passengers. Vessel is authorized to transit from Mackinac Island to St. Ignace to troubleshoot and effect repairs. Proper operation must be demonstrated in the presence of the attending Marine Inspector. 46 CFR 176.700
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 October 2019
Resolved 24 October 2019
Resolution: corrected.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 August 2019 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 September 2019
Resolved 13 September 2019
Resolution: Vessel has onboard valid FCC Station License
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 August 2019 Resolved
Operator is required to have on board a valid FCC Marine Radio Operator Permit as per 47 CFR 80.159. Operator does not have FCC Marine Radio Operator Permit. Obtain FCC Marine Radio Operator Permit for operator.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 September 2019
Resolved 13 September 2019
Resolution: Vessel operator proved possession of FCC Marine Radio Operator Permit
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 August 2019 Resolved
Vessel is required to have on board a Great Lakes Agreement certificate, as per 47 CFR 80.953. Vessel does not have a Great Lakes Agreement certificate. Obtain a Great Lakes Agreement certificate.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 September 2019
Resolved 13 September 2019
Resolution: Vessel obtained valid FCC Great Lakes Agreement certificate.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 21 August 2019 Resolved
The painter of each life float must have a breaking strength of at least 1,500 lbs. The stbd painter is worn and frayed. Replace with a serviceable painter that meets the specifications of 46 CGR 180.175 (f)(3).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2019
Resolved 13 September 2019
Resolution: Replaced with new painter line.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 August 2019 Resolved
On a vessel of at least 26 ft in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in certain spaces. The visual alarm for the bilge high level indicator in the engine room is not operating. Make visual alarm operable for this space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2019
Resolved 13 September 2019
Resolution: Repaired visual bilge alarm. OPTEST sat.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 21 August 2019 Resolved
The name of the vessel must be marked or painted in clearly legible letters on each life float paddle. The name of the vessel was not clearly written on the life float paddle of the top port side life float. Ensure the name of the vessel is marked on the aforementioned paddle.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2019
Resolved 13 September 2019
Resolution: Life float paddles were remarked and the vessel's name is now printed legibly.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 21 August 2019 Resolved
Portable extinguishers must be inspected and maintained in accordance with NFPA 10. The horn of the portable extinguisher on the forward port side of the lower deck is cracked. Replace with serviceable horn in accordance with NFPA 10.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2019
Resolved 13 September 2019
Resolution: Portable fire extinguisher horn replaced in kind.
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 21 August 2019 Resolved
A vessel must be fitted with mooring lines necessary for the vessel to be safely moored. The forward mooring line is worn beyond safe use and must be replaced. Replace to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2019
Resolved 13 September 2019
Resolution: Mooring line replaced appropriately.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 21 August 2019 Resolved
A vessel must comply with the structural design requirements of one of the standards listed in 46 CFR 177.300. In the forepeak, the weld between the aft bulkhead and the 4th longitudinal frame from the keel, on the port side, is cracked. In the forepeak, the weld between the aft bulkhead and the 5th longitudinal frame from the keel, on the stbd side, is cracked. In the forepeak, the weld between the deck and the last port side transverse frame forward of the bulkhead, is cracked. In the space directly aft of the forepeak, the weld between the forward bulkhead and the 4th longitudinal frame, from the keel, on the port side, is cracked. In the fuel tank compartment, the welds between the deck girders and the 1st and 2nd transverse frames forward of the aft bulkhead are cracked. The aft stbd and port mooring line bitt structures are beginning to crack at the base. Repair all cracked welds and mooring line bitts to the satisfaction of the attending marine inspector, prior to next hull exam.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2020
Resolved 8 April 2020
Resolution: All repairs completed.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 24 September 2018 Resolved
The vessel is currently broadcasting (1) Improper MMSI, (2) Improper Call Sign.
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 October 2018
Resolved 29 January 2021
Resolution: corrected.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 5 September 2018 Resolved
Internal structures fractured within first and second voids in way of multiple transverse frame connections to keel and port chine. This pattern of fractures appears to be a structural failure and must be corrected prior to carrying passengers. Provide causal analysis report and a detailed repair proposal to the Marine Safety Center and OCMI for review and approval. Complete permanent repairs to same in accordance with an approved repair proposal, to the satisfaction of the attending marine inspector.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: All repairs completed IAW approved plans.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 5 September 2018 Resolved
Vessel failed to carry required distress signals. Provide distress signals before operating in 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 September 2018 Resolved
The required hand bilge pump leaks excessively. Provide suitable hand bilge pump before carrying passengers and before operating in 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: replaced with operative pump (new).
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 September 2018 Resolved
Within forepeak, hull bottom plating has been gouged by contact with bilge suction strainer next to keel. Repair prior to operation in 2019, no later than May 31, 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: repaired.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 5 September 2018 Resolved
The required weathertight door at cabin forward exit is not weathertight. Adjust and prove weathertightness prior to operation in 2019, no later than May 31, 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: adjusted, door now weathertight.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 5 September 2018 Resolved
Certificate of inspection (COI) was not posted. COI must be posted in a conspicuous place on the vessel where observation by passengers is likely. COI must be posted under glass or other suitable material prior to operation, no later than May 31, 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 3 May 2019
Resolution: posted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 September 2018 Resolved
The required second independent means of controlling each propulsion engine failed to operate properly, when engaged, main engines went to full speed and could not be controlled. Determine and report cause of failure, complete proper repairs and demonstrate proper operation of same in all modes and from all stations, prior to carrying passengers, no later than May 31, 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: System disconnected temporarily until vendor can troubleshoot/repair. In the meantime, vessel is required to carry portable radios and ensure crew is properly trained for local operation of MDE's.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 September 2018 Resolved
Child sized life jackets, recently replaced, were not marked with vessel name. Ensure all life jackets are properly marked with vessel name prior to carrying passengers, no later than May 31, 2019.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 September 2018 Resolved
Rudder stops are ineffective to starboard. Modify and prove proper function of rudder stops prior to carrying passengers, no later than May 31, 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 September 2018 Resolved
Main rudder hydraulic actuator mountings are worn at connection to foundation. This allows excessive end-play and is likely to fail. Repair and demonstrate proper operation of rudders prior to carrying passengers, no later than May 31, 2019.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2019
Resolved 1 May 2019
Resolution: repaired & demo'ed, all sat.
Engineering › Steering Gear System › Rudder
Issued 8 June 2018 Resolved
Discovered fractures to both rudders. Make permanent repairs to rudders PTO.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 June 2018
Resolved 8 June 2018
Resolution: Received photos of repaired rudders, all sat.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 26 October 2017 Resolved
Remove all accessories and after market software/monitoring equipment that has been installed without approval from the Marine Safety Center/[name withheld] proper operation of the propulsion system controls and both main diesel engines.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 November 2017
Resolved 31 October 2017
Resolution: Confirmed GPLink was disconnected from electronic control units, it was also disconnected from the power supply so it couldn’t easily be reconnected.
Construction/Loadline › Hull › Weld
Issued 12 September 2017 Resolved
Repair cracked welds as marked in forepeak, #2 & #3 voids. 3 cracked welds found in forepeak, 4 in #2 void & 5 (4 port side & 1 stbd side) found in #3 void.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 15 November 2017
Resolved 8 June 2018
Resolution: Owner attempted repairs but due to extremely cold the new welds re-cracked. I extended the due date to allow repairs to take place in warmer weather. Attended vessel to clear cracked welds def, found several not corrected. Owner rep requested 2 week ext.
Lifesaving › Lifefloat › Paddle
Issued 12 September 2017 Resolved
Replace and properly mark 1 missing lifefloat paddle.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 September 2017
Resolved 28 September 2017
Resolution: replaced & marked
Engineering › Engine Controls (Electric/Electronic) › Actuator
Issued 12 September 2017 Resolved
Demonstrate proper operation of MDE's emergency manual controls. Controls function but improperly raise MDE's RPM's beyond normal shift range.
Condition: Invalid
Action required: 705 - Other - as specified
Due 12 October 2017
Resolved 28 September 2017
Resolution: repaired and demonstrated proepr operation
Construction/Loadline › Hull › Weld
Issued 8 September 2016 Resolved
Discovered multiple cracked welds in forepeak, #1 and #2 compartments. Marked all and required repairs.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 8 October 2016
Resolved 5 October 2016
Resolution: All fractured welds were repaired.
Communications › Alarms/Indicators › Bilge Alarm
Issued 8 September 2016 Resolved
Install audible and visual bilge alarm lanel at the operating station.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 1 June 2017
Resolution: Operationally tested newly installed high water level bilge alarm panel, all sat.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.