Inspection history · 72
14 May 2026
Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8332133
6 February 2026
Appeal
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8317283
9 January 2026
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8294049
28 April 2025
Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8116606
19 August 2024
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7982124
9 August 2024
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7977920
18 June 2024
Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7942472
14 August 2023
Administrative Inspection · Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7689894
9 August 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7529248
9 November 2021
Cargo Tank Internal · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7348218
17 May 2021
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7201540
16 April 2020
COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6940124
10 May 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6696684
6 May 2019
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6684184
17 May 2018
Annual Inspection · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6414601
1 March 2018
Administrative Inspection · Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6383583
20 April 2017
Annual Inspection · Administrative Inspection · Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6129989
30 September 2016
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6016118
16 May 2016
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5849226
3 January 2015
MTSA Verification · Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5064180
5 December 2014
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5035133
23 June 2014
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4908811
25 June 2012
Drydock Exam · Internal Structural Exam · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4390567
21 April 2010
COI Inspection · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3718242
28 April 2009
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3460040
25 July 2008
Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3356389
12 April 2007
Cargo Tank Internal · MTSA Verification · Hull Examination · Annual Inspection · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2916497
1 August 2006
MARPOL Annex V Examination · MTSA Verification · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2734054
15 February 2006
Administrative Inspection
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2585950
26 January 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2573638
25 January 2006
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2573106
4 October 2005
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2507937
26 April 2005
COI Inspection · MTSA Verification
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2328866
7 May 2004
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2073461
15 January 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1985825
17 June 2003
Periodic Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1820279
19 July 2002
Hull Examination · Annual Inspection · Internal Structural Exam
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1649104
26 May 2002
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1657643
6 April 2001
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1428008
2 May 2000
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1399406
2 July 1999
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 664068
3 June 1999
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 156246
29 April 1999
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1441553
1 June 1998
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 797135
1 May 1998
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1390782
14 July 1997
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 779404
3 June 1997
Re-Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1368254
22 November 1996
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 870052
22 April 1996
COI Inspection · Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1082002
2 May 1995
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1188281
4 November 1994
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 655736
8 September 1994
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 147398
2 May 1994
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1169422
28 April 1993
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 841294
10 July 1992
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 83439
28 May 1992
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1269050
28 May 1992
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1269051
12 May 1992
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 878454
12 May 1992
Re-Inspection · MARPOL Annex II Examination · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 957951
3 June 1991
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 914333
3 June 1991
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 951789
3 June 1991
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 951790
14 May 1991
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1240030
9 May 1990
Hull Examination · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1236939
2 June 1989
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1351621
10 May 1989
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 968309
21 March 1989
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 897091
11 April 1988
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1199301
29 April 1987
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1320546
15 April 1987
Hull Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1309428
2 June 1986
Credit Drydock
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1298458
15 May 1985
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1289235
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 May 2026
Resolved
provide approved lithium battery for the life ring buoy light.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 May 2026
Resolved 27 May 2026
Resolution: Alkaline batteries replaced with Lith-ion batteries
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 May 2026
Resolved
Conduct cargo hose pressure testing prior to conducting cargo transfers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 May 2026
Resolved 27 May 2026
Resolution: Cargo hose testing completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 May 2026
Resolved
reinstall missing plug on fuel filter water drain.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2026
Resolved 27 May 2026
Resolution: Plug replaced
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 January 2026
No resolution recorded
In hazardous areas machinery and electrical equipment must be approved for the installation by MSC. The
portable diesel engine driven cargo pump must be
approved for operation within the hazardous zone or modified to place the engine and electrical components outside the hazardous zone (10 ft). *Complete prior to operating in 2026.
Condition: Invalid
Action required: 705 - Other - as specified
Due 10 January 2026 — due date passed with no resolution recorded
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 January 2026
No resolution recorded
On all tank vessels, the construction or conversion of which is started on or after July 1, 1951, the cargo piping shall be: A fixed cargo piping system shall be installed on a tank vessel carrying Grade A, B, or C cargo. A portable diesel engine-driven cargo pump is being utilized within a hazardous location, and portable cargo hoses are being used for cargo transfer operations. This arrangement does not comply with the regulatory requirements for hazardous area installations and fixed cargo piping systems on tank barges carrying Grade A, B, or C cargo. *Complete prior to operating in 2026.
Condition: Invalid
Action required: 705 - Other - as specified
Due 10 January 2026 — due date passed with no resolution recorded
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 20 August 2024
Resolved
The following locations in the weather are Class I, Division 1 (Zone 1) locations (except the open deck area on an inorganic acid carrier which is considered a non-hazardous location) and may have only approved intrinsically safe, explosion-proof, or purged and pressurized electrical equipment. The electrical cable fitting to the explosion proof rated "emergency stop switch" is not rated a being explosion proof or intrinsically safe, install fitting rated for class I, division I hazardous locations.
46 CFR 111.105-31(m)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2024
Resolved 11 September 2024
Resolution: Explosion proof fitting utilized for cable penetration into emergency shut-off switch.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 20 August 2024
Resolved
The following locations in the weather are Class I, Division 1 (Zone 1) locations (except the open deck area on an inorganic acid carrier which is considered a non-hazardous location) and may have only approved intrinsically safe, explosion-proof, or purged and pressurized electrical equipment. The amber light installed within the hazardous location near the pipeline manifold is not rated for hazardous locations, remove the amber light and electrical connections from hazardous location.
46 CFR 111.105-31(m)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2024
Resolved 11 September 2024
Resolution: Amber light removed from hazardous location.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 20 August 2024
Resolved
Cargo tanks in which Grade A, B, or C liquids are to be fitted with either individual pressure-vacuum relief valves which shall extend to a reasonable height above the weather deck. The #4 port cargo tank pressure-vacuum relief valve flame screen was broken, replace flame screen.
46 CFR 32.55-25(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2024
Resolved 11 September 2024
Resolution: Pressure-vacuum relief valve flame screen replaced.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 20 August 2024
Resolved
Except as provided in paragraph (b) of this section, each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. This letter sets forth conditions of operation. As per stability letter all voids are to be kept dry, approximately 1' of standing water was found in the aft void. Remove standing water from aft void.
46 CFR 170.120(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2024
Resolved 22 August 2024
Resolution: Void was empited of all standing was and photographs were provided of void remaing dry.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 20 August 2024
Resolved
The certificate of inspection shall be framed under glass and posted in a conspicuous part of the vessel, except that where it is not practicable to so expose the certificate of inspection it shall be carried in the vessel in such manner as authorized by the Officer in Charge, Marine Inspection. The current COI is not on board the barge with the reduced route to lakes, bays, and sounds.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2024
Resolved 21 September 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 20 August 2024
Resolved
Load line markings are still marked on the hull, remove load line markings by painting over same color as hull.
46 CFR 31.25-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2024
Resolved 22 August 2024
Resolution: Load Line markings were painted over.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 August 2024
Resolved
The owner, operator or master shall provide the Officer in Charge, Marine Inspection with all current valid certificates and registers of cargo gear issued by competent persons or a recognized organization or nonprofit association approved by the Commandant to certify the suitability of the cargo gear. The cargo crane certificate on board was expired in 2016, have cargo crane certified by a competent person or recognized organization as per 46 CFR 31.10-16(e).
46 CFR 31.10-16
Action required: 705 - Other - as specified
Due 19 September 2024
Resolved 15 June 2026
Resolution: Crane certified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 August 2024
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302. The exhaust mount is wasted away and not supporting the exhaust pipe, crop and renew exhaust mount.
46 CFR 58.10-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2024
Resolved 21 September 2024
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 August 2024
Resolved
Each cable installation must meet IEEE 45.8-2016 if not constructed to IEC 60092-353. Such installations should provide support by means of metallic banding to prevent
undue sag, but in no case should exceed the distance between frames or 610 mm (24 in.), whichever is less. The electrical cable supports for the "emergency shut-off switch" are zip-ties, replace zip-ties with metallic
banding.
46 CFR 111.60-5(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2024
Resolved 22 August 2024
Resolution: Plastic zip ties were replaced with metal clamps.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 June 2024
Resolved
Crop/Renew 8" longitudinal crack in 1S center bottom and
associated damage throughout cargo tanks 1S, 2S, and 3S
from impact damage.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 June 2024
Resolved 3 July 2024
Resolution: Repaired necessary damage. Additional insets to be repaired at next drydock.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 June 2024
No resolution recorded
Crop/Renew inset damage between 1S and 3S tanks. Repair at next drydock before 30JUN2027. 46 CFR 31.10-25
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 June 2027
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 August 2023
Resolved
Each internal combustion engine located on the weather deck shall be provided with a ventilated metal hood or where space permits with a well ventilated metal housing of sufficient size to allow for proper operation and maintenance. Exhaust leak found in "pump shack", compromising ventilation and operation of engine. Repair or replace exhaust system to ensure there is no leak.
46 CFR 32.35-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2023
Resolved 19 September 2023
Resolution: Exhaust leak repaired.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 August 2023
No resolution recorded
Electrical equipment must not be installed in a gas dangerous space or zone except intrinsically safe electrical equipment and wiring. The navigation lights and wiring, which are located near tank vents, are not intrinsically safe. Replace all navigation lights inside gas dangerous space or zone to meet the intrinsically safe standards of IEC.
46 CFR 111.105-32(d)(1)
Received applicaiton for COAC to move navigational lights outside of the hazardous location. Extended deficiency cue date pending approval of COAC.
Action required: 705 - Other - as specified
Due 14 September 2023 — due date passed with no resolution recorded
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 May 2021
Resolved
Replace valve stem/handles on #4 port and starboard cargo tanks.
Action required: 10 - Deficiency Rectified
Due 20 May 2021
Resolved 20 May 2021
Resolution: Replaced valve handles.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 May 2021
Resolved
Remove and/or correctly secure wiring in cargo pump machinery space.
Action required: 10 - Deficiency Rectified
Due 20 May 2021
Resolved 20 May 2021
Resolution: Provided pictures of repair.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 17 May 2021
Resolved
Install machinery guard around cargo pump fan and fix loose radiator mounts.
Action required: 10 - Deficiency Rectified
Due 14 June 2021
Resolved 8 August 2022
Resolution: Machinery Guards installed
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 7 May 2019
Resolved
Update vessel deck plans to show removal of emergency shutdown aft of the engine house.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 May 2019
Resolution: Received plans and uploaded same as permanent documents.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 17 May 2016
Resolved
Provide proof that cargo hoses and piping has been hydro tested, prior to cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 June 2016
Resolved 18 May 2016
Resolution: Proof was provided via email that all cargo hoses and piping was hydro tested.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 3 January 2015
Resolved
Prove satisfactory loadline survey was conducted and provide valid loadline certificate.
Prior to operating beyond the boundary line.
46CFR42.09-1
Due 30 April 2015
Resolved 10 June 2015
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 25 June 2012
Resolved
Provide proof of compliance with pollution prevention regulations to include: PIC designation letter, transfer procedures, transfer hose requirements, and Vessel response Plan.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 July 2012
Resolved 25 July 2012
Resolution: Transfer procedures provided, pic list provided, hoses marked, and VRP updated.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 25 June 2012
Resolved
Provide proof of a COFR.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 July 2012
Resolved 25 July 2012
Resolution: valid COFR.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 25 June 2012
Resolved
Provide proof of valid COD with new registered owner.
Action required: 705 - Other - as specified
Due 25 July 2012
Resolved 25 July 2012
Resolution: New COD issued with correct owner.
Engineering › Fuel Oil Service System › Hose
Issued 25 June 2012
Resolved
Provide proper flexible fuel hose that meets SAE J1942 standards for pump engine.
Action required: 705 - Other - as specified
Due 25 July 2012
Resolved 18 July 2012
Resolution: New approved hose installed.
Deck/Cargo › Cargo Stowage › General
Issued 25 June 2012
Resolved
Provide dunnage between steel shipping container and tank top.
Action required: 705 - Other - as specified
Resolved 25 July 2012
Resolution: new dunnage placed.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 26 April 2005
Resolved
Provide documentation of current hydrostatic tests for all cargo hoses prior to carrying cargo.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2005
Resolved 15 May 2005
Resolution: Documentaton was provided to MSO proving hydro test.
Deck/Cargo
Issued 6 April 2001
Resolved
Provide documentation of crane certification upon completion of repairs. Crane is not to be used for cargo service and must be prominently marked out of service.
Condition: Unknown
Due 30 May 2001
Resolved 25 July 2001
Electrical
Issued 2 May 2000
Resolved
REPLACE BROKEN COVER PLATE ON ELECTRICAL OUTLET IN BARGE SHACK.
Condition: Unknown
Due 4 June 2000
Resolved 26 June 2000
Construction/Loadline
Issued 2 May 2000
Resolved
CROP AND RENEW AS MARKED DAMAGED SHELL PLATE I.W.O. TURN OF BILGE IN #1S AND #2S CARGO TANKS.
Condition: Unknown
Due 4 June 2000
Resolved 26 June 2000
Deck/Cargo
Issued 2 May 2000
Resolved
BLANK OFF UNUSED CARGO LINE TANK 2P.
Condition: Unknown
Due 26 June 2000
Resolved 26 June 2000
Electrical
Issued 2 May 2000
Resolved
REPAIR OR REPLACE BROKEN ELECTRICAL CONDUIT PORT SIDE FORWARD AT DECK LIGHT.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 2 May 2000
Resolved
HYDRO TEST AND LOG ALL CARGO LINES AND HOSES.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 2 May 2000
Resolved
PROVIDE PROPOSAL TO EITHER REMOVE CRANE OR REPAIR AND TEST. IN THE INTERIMPROMINENTLY MARK "NOT TO BE USED TO HANDLE CARGO."
Condition: Unknown
Due 26 June 2000
Resolved 26 June 2000
Documentation
Issued 2 May 2000
Resolved
PROVIDE ORIGINAL VALID CERTIFICATE OF DOCUMENTATION ON BOARD.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 2 May 2000
Resolved
REPAIR HYDRAULIC LEAK ON ANCHOR WINDLASS.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 2 May 2000
Resolved
REPLACE GASKETS ON ALL CARGO TANK HATCHES.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Construction/Loadline
Issued 2 May 2000
Resolved
REPAINT NAME AND DRAFT MARKINGS.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Lifesaving
Issued 2 May 2000
Resolved
RELABEL "KEEP OUT" SIGNS ON CARGO TANKS SO THEY CAN BE BETTER SEEN ON DECK.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Lifesaving
Issued 2 May 2000
Resolved
RE-STENCIL EMERGENCY SHUTDOWN SIGN.
Condition: Unknown
Due 4 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 2 May 2000
Resolved
REPLACE ALL DETERIORATED OR BROKEN CARGO VALVE HAND WHEELS.
Condition: Unknown
Due 26 June 2000
Resolved 26 June 2000
Deck/Cargo
Issued 2 May 2000
Resolved
REPAIR HYDRAULIC LEAK IN BARGE SHACK.
Condition: Unknown
Due 4 June 2000
Resolved 26 June 2000
Deck/Cargo
Issued 3 June 1997
Resolved
TEST OR REMOVE CARGO DECK CRANE.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Documentation
Issued 3 June 1997
Resolved
PROVIDE COPY OF ABS SURVEY TO OCMI WESTERN ALASKA.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Deck/Cargo
Issued 22 April 1996
Resolved
Conduct maximum allowable working pressure test on vessel's cargo piping system in accordance with Marine Safety Manual Volume II, Chapter 31.E.8.c,no later than 15 May 96.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Deck/Cargo
Issued 22 April 1996
Resolved
Install machinery guard on generator IAW 46 CFR 58.01-20 no later than 15 May 1996.
Condition: Unknown
Due 7 May 1996
Resolved 14 May 1996
Deck/Cargo
Issued 22 April 1996
Resolved
Conduct hydrostatic test of cargo hoses to 1.5 times the maximum allowable working pressure in accordance with 33 CFR 156.170 (c)(4), no later than 15May 96.
Condition: Unknown
Due 7 May 1996
Resolved 14 May 1996
Documentation
Issued 22 April 1996
Resolved
Provide evidence of shore based damage stability information in accordance with 33 CFR 155.240 no later than 23 Jun 1996.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Deck/Cargo
Issued 2 May 1995
Resolved
REPLACE ULLAGE OPENING FLAME SCREEN IN #3 STBD CARGO TANK.
Condition: Unknown
Due 2 May 1995
Resolved 2 May 1995
Deck/Cargo
Issued 2 May 1994
Resolved
REMOVE THE IMPROPERLY LOCATED REMOTE "EMERGENCY" SHUTDOWN SIGN FROM THE VESSEL'S STERN. THIS ITEM IS TO BE COMPLETED PRIOR TO PRIOR TO LOADING NEXT VESSEL CARGO.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Construction/Loadline
Issued 2 May 1994
Resolved
REPLACE THE TORN GASKET ON THE ACCESS OPENING TO NO. 1 STBD CARGO TANK. THIS ITEM IS TO BE COMPLETED PRIOR TO PLACING THE VESSEL IN SERVICE.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Fire Fighting
Issued 2 May 1994
Resolved
PROVIDE AN APPROVED BRACKET FOR EACH FIRE EXTINGUISHER ON BOARD THE VESSEL.THIS ITEM IS TO BE COMPLETED PRIOR TO PLACING THE VESSEL IN SERVICE.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Unknown
Issued 2 May 1994
Resolved
REPLACE THE VESSEL'S BROVO FLAG. THIS ITEM IS TO BE COMPLETED PRIOR TO LOADING NEXT VESSEL CARGO.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Deck/Cargo
Issued 2 May 1994
Resolved
HYDROSTATICALLY TEST CARGO HOSE AT 1.5 TIMES THE MAXIMUM ALLOWABLE WORKING PRESSURE (THE MINIMUM MAWP FOR HOSE IS 150PSI). THIS ITEM IS TO BE COMPLETED PRIOR TO NEXT VESSEL TRANSFER.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Lifesaving
Issued 2 May 1994
Resolved
PROVIDE RESTRICTED GAUGING FOR CARGO TANKS IDENTIFIED TO CARRY GASOLINE PRODUCTS. THIS ITEM IS TO BE COMPLETED PRIOR TO CARRIAGE OF A CARGO WITH GREATER THAN .5% BENZENE CONTENT.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Lifesaving
Issued 2 May 1994
Resolved
IMPLEMENT OPERATING COMPANY'S BENZENE PROGRAM; INCLUDING EMPLOYEE TRAINING,MEDICAL MONITORING, VESSEL SURVEY AND MARKING IN ADDITION TO OTHER REQUIREMENTS OF PROGRAM. THIS ITEM IS TO BE COMPLETED PRIOR TO CARRIAGE OFA PRODUCT WITH GREATER THAN .5% BENZENE CONTENT.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Deck/Cargo
Issued 2 May 1994
Resolved
PROVIDE FLAME SCREEN FOR ULLAGE OPENING TO NO.3 STBD CARGO TANK. THIS ITEMIS TO BE COMPLETED PRIOR TO PLACING THE VESSEL INTO SERVICE.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Navigation
Issued 2 May 1994
Resolved
PROVIDE A PROPER BULB FOR THE VESSEL'S STERN LIGHT. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AT NIGHT.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Deck/Cargo
Issued 2 May 1994
Resolved
PROPERLY MARK CARGO HOSE AND PIPING WHEN TESTED,(COMPLETING ITEMS 10 & 11).THIS ITEM IS TO BE COMPLETED PRIOR TO NEXT CARGO TRANSFER.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Deck/Cargo
Issued 2 May 1994
Resolved
HYDROSTATICALLY TEST CARGO PIPING AT 1.5 TIMES THE MAXIMUM ALLOWABLE WORKING PRESSURE. THIS ITEM IS TO BE COMPLETED PRIOR TO LOADING NEXT VESSEL CARGO.
Condition: Unknown
Due 2 May 1994
Resolved 2 May 1994
Documentation
Issued 28 April 1993
Resolved
PROVIDE EVIDENCE THAT THE VESSEL RESPNSE PLAN HAQS BEEN SUBMITTRED TO CG HEADQUARTERS.
Condition: Unknown
Due 28 April 1993
Resolved 28 April 1993
Engineering
Issued 28 April 1993
Resolved
RE;OCATE REMOTE EMERGENCY SHUTDOWN TO MIDPOINT ON BARGE AND PROPERLY MARK SIGN.
Condition: Unknown
Due 28 April 1993
Resolved 28 April 1993
Deck/Cargo
Issued 28 April 1993
Resolved
PROVIDE EVIDENCE THAT THE CARGO DISCHARGE HOSE MEETS THE REQUIREMENTS OF 33CFR154.500.
Condition: Unknown
Due 28 April 1993
Resolved 28 April 1993
Lifesaving
Issued 28 April 1993
Resolved
MAKE OPERABLE THE AMBER FLASHING LIGHT.
Condition: Unknown
Due 28 April 1993
Resolved 28 April 1993
Documentation
Issued 14 May 1991
Resolved
HAVE LOADLINE CERTIFICATE RENEWED.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Documentation
Issued 14 May 1991
Resolved
PROVIDE ANNUAL STICKER FOR CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Deck/Cargo
Issued 14 May 1991
Resolved
PROVIDE PROOF THAT THE CRANE HAS BEEN TESTED IN THE LAST 12 MONTHS.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Deck/Cargo
Issued 14 May 1991
Resolved
TEST ALL TRANSFER HOSES AND MARK ACCORDINGLY. THIS IREM TO BE COMPLETED BEFORE HOSES ARE USED.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Documentation
Issued 15 April 1987
Resolved
PROVIDE OCMI WESTERN ALASKA WITH A COPY OF THE PERMANENT LOAD LINE CERT. UPON RECEIPT FROM A.B.S. AND NO LATER THAN 25 AUGUST 1987.
Condition: Unknown
Due 15 April 1987
Resolved 15 April 1987