Records from 2002 to 2022. Most recent: inspection, 9 November 2022.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · MADISONVILLE, LA, UNITED STATES · built 2002
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 6 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 31
9 November 2022
Cargo Tank Internal · Drydock Exam · Administrative Inspection · Internal Structural Exam · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7592121
26 October 2021
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7343832
25 January 2021
Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7117786
8 February 2020
Bulk Liquid Transfer Monitor
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6905339
28 January 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6890829
21 September 2018
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6542653
22 August 2018
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6520070
3 November 2017
COI Inspection · MTSA Verification · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6300090
9 September 2016
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5996380
20 August 2015
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5220193
15 October 2014
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5006081
17 July 2013
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4656031
13 November 2012
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4483441
13 July 2012
Drydock Exam · Examination of Repairs · MTSA Verification · COI Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4369965
27 June 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4358229
8 July 2011
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4077789
20 May 2010
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3748145
10 July 2009
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3530583
14 May 2009
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3474897
25 April 2009
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3462213
15 August 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3298167
28 June 2007
Internal Structural Exam · Hull Examination · COI Inspection · Cargo Tank Internal · Administrative Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2970138
16 November 2006
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2835356
6 October 2006
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2795047
7 August 2006
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2738786
19 September 2005
MTSA Verification · Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2496052
19 April 2005
MTSA Verification
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2338108
11 August 2004
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2163227
29 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1979064
8 July 2003
Periodic Inspection
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 1839901
25 June 2002
Initial Construction-Excluding Oversight · Initial Certification · Hull Examination · Internal Structural Exam · Cargo Tank Internal
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1636273
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo Securing Manual
Issued 25 January 2021
Resolved
Prove proper operation of the remote manual shutdown prior to offloading cargo to the satisfaction of an attending USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2021
Resolved 29 January 2021
Resolution: The deficiency was cleared to the satisfaction of a CG Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 22 August 2018
Resolved
During this inspection, the bulkhead between the port #1 and #2 wing void had suffered damage near the top and bottom of the bulkhead. This damage was vertical crushing caused by an unknown event. No fratures were identified in the bulkhead or welds, however the space was not entered; it was not certified for entry.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 September 2018
Resolved 21 September 2018
Resolution: Affected bulkhead sections were cropped and renewed with inserts in conjunction with adjacent gunwhale insert.
Construction/Loadline › Hull › Weld
Issued 3 November 2017
Resolved
Repair broken weld in #3 starboard void, 5th space aft, top of outer shell chord.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 7 November 2017
Resolution: Corrected to satisfaction of attending CG marine inspector
Documentation › Markings/Placards › Warning Signs
Issued 20 August 2015
Resolved
Label required by 46 CFR 39.2009(a)(2)(ix)(B) for barge overfilled device connection located on port side close to the stern must be replaced because the label was found to be worn and not readable.
Action required: 705 - Other - as specified
Due 20 September 2015
Resolved 8 March 2016
Resolution: Placard installed.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 27 June 2012
Resolved
COI expires on 28 June 2012, barge is granted a one time transfer to offload product as per COI extension request letter. Upon completion of offloading of cargo barge is to be gas free and to transit directly to FMT shipyard in Harvey, LA to complete all inspections required for a new COI to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 17 July 2013