HARRIETT

HARRIETT is a 2002 freight ship. The Coast Guard has recorded 36 inspections since 2002, most recently in April 2019, along with 15 deficiencies and 9 operational controls.

Records from 2002 to 2019. Most recent: inspection, 4 April 2019.

Built
2002
Last inspected
4 April 2019
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9239458 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
578747
Flag
LIBERIA
—
Maury page id
psix-578747

Inspections, by type

…with no type recorded14
Years with a record 15 calendar years (2002–2019)
The 36 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it17665 - Convention (Subpart B), Gross Ton
8162 - Convention (Subpart B), Net Ton
33844 - Displacement, Metric Ton
25565 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

ZHEN HUA 23 Freight Ship · MISLE 277663 · 8 July 2003 · activity 1845943BARBAROS KIRAN Freight Ship · MISLE 359882 · 8 July 2003 · activity 1845943

Inspection history · 36

4 April 2019 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6655892
24 August 2018 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6516416
23 August 2018 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6520904
19 September 2017 Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 6271475
11 September 2017 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6264530
2 July 2016 NPV Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5923023
2 July 2016 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5926253
19 January 2016 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5799600
3 December 2015 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5774674
16 October 2015 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5744471
14 October 2015 In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5742246
27 July 2015 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5193640
20 October 2014 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 5008824
13 June 2014 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4879995
6 January 2012 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4214901
26 July 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3546289
23 July 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3543135
20 July 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3540491
28 November 2008 MARPOL Annex V Examination · MARPOL Annex I Examination · ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3367291
25 September 2007 Ballast Water Examination · Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3065762
24 July 2007 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3006309
16 January 2007 Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2856589
26 January 2006 Ballast Water Examination · Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2574000
20 July 2005 ISPS II Exam · MARPOL Annex V Examination · PII Safety Exam · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2432154
17 May 2005 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2360961
18 January 2005 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2276936
24 August 2004 Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2175326
7 July 2004 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2125362
25 June 2004 Ballast Water Examination · NPV Safety Exam · Random ISPS/MTSA/PSC
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2110829
10 May 2004 MTSA/ISPS Verification
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2064163
27 March 2004 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2032255
18 January 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1989097
8 July 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1840353
8 July 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1845943
30 October 2002 Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1698494
9 July 2002 Passenger/Freight Vessel Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 1641590

Deficiency record · 15

07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 August 2018 Resolved
07126- Oil accumulation in engine room. The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed lube oil leak on lube oil storage tank valve. 74SOLAS(a)2014 cons. I/11.a action taken 17.a
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 24 August 2018
Resolved 24 August 2018
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Teflon package was damaged and replaced immediately. During class survey the valve was visually inspected and quick closing device was tested.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 August 2018 Resolved
02105- Steering gear. Unless expressly provided otherwise every ship shall be provided with a main steering gear and an auxiliary steering gear to the satisfaction of the administration. PSCO observed hunting of the rudder while operating on both steering pumps, under bride control while conducting the swing test. 74SOLAS(a)2004cons II-1/29 action taken 60ac
Action required: 60 - Rectify deficiencies prior to movement
Due 24 August 2018
Resolved 27 August 2018
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. The potentiometers were synchronized IAW maker manual. Steering gear was tested in all modes available to the satisfaction of class.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 August 2018 Resolved
13102- Auxiliary engine. In a ship which oil fuel is used the arrangements for the storage, distribution and utilization of the oil fuel shall be such to ensure the safety of the ship and persons on board and shall at least comply with the specific provisions of the regulation. PSCO observed continuous drips of fuel oil on generator No. 1 from the fuel line. 74SOLAS(a) 2001 cons II-2/15.2 action taken 60.a.c.
Action required: 60 - Rectify deficiencies prior to movement
Due 24 August 2018
Resolved 27 August 2018
Resolution: Received, reviewed and accepted class report LLoyd Register stating the deficiency was rectified. Crew replaced O ring on Cylinder NO.4 Fuel Oil pump connection pipe Aux engine no.1 Port. Fuel pump connections were visually inspected by class, no leaks.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder
Issued 3 December 2015 Resolved
1410- Main and auxiliary machinary essential for the propulsion and safety of the ship shall be provided with effective means for its operation and control. The COTP of Savannah was notified via the agent that the vessel's main propulsion engine has one (1) inoperable cylinder. SOLAS (2014 Con ed) II-I/31.1 40ac
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 January 2016
Resolution: Received class report stating that cylinder was operational.
Engineering › Diesel Engine (propulsion-direct drive) › Camshaft
Issued 14 October 2015 Resolved
Vessel's suffered a loss of propulsion due to a sheared coupling on one of the MDE's lub oil camshaft pump. The crew replaced one coupling on the pump side. The condition of the pump side coupling appears the teeth are worn thin. The ship has two L/O camshaft pumps that are alternated on a monthly basis. Recommend further investigation on the old pump coupling acceptability. SOLAS 74 a I/II 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2015
Resolution: Class attended vessel and provided dispensation letter to have deficiency fully corrected by 15DEC15.
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 14 October 2015 Resolved
PSCO witnessed frayed cabling exposing approximately 1 inch of wiring located on the #2 generator's port side. The wiring was covered in oil presenting a possible fire hazard. SOLAS 74a UU-I/45 17 ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2015
Resolution: Class attended vessel and provided dispensation letter to have deficiency fully corrected by 15DEC15. Crew conducted TEMP Repairs and will properly correct issue by the due date.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder
Issued 14 October 2015 Resolved
PSCO witnessed excessive water leaking from the main engines #1 & 7 cylinders (as Marked). The water was running in a continuous stream onto the aft aux blower for the main engine, presenting a possible electrical hazard. SOLAS 74a I/II 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2015
Resolution: Class attended the vessel and determined that the water leaks were due to MDE not being up to temperature. H20 consumption log showed that 3 ltr. of H20 was consumed daily which is acceptable. Electrical motor on aux blower was found to be sealed.
Engineering › Lubricating Oil Service System › Piping
Issued 14 October 2015 Resolved
PSCO witnessed crew made troughs to direct the flow of oil out of the port side of the # 1&3 generators to the bilge from between the engine and the flywheel. In addition oil soaked rags were observed under the starboard generator under the trough. SOLAS 74a II-2/15.3 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2015
Resolution: Class attended vessel and provided dispensation letter to have deficiency fully corrected by 15DEC15. Crew conducted TEMP Repairs and will properly correct issue by the due date.
Electrical › Electric Generation Source (emergency) › Generator
Issued 6 January 2012 Resolved
1430-The vessel could not provide a source of energy for an additional three starts within 30 minutes. The emergency generator secondary means of start (manual) was inoperable. SOLAS 2009 CONS. II-1/44.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 January 2012
Resolved 7 January 2012
Resolution: Received class report from [name withheld] stating all outstanding deficiencies have been rectified. The class report stated: The vessel''s C/E removed the manual starter from the EDG, serviced it and reinstalled it.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 6 January 2012 Resolved
0936-Steering gear-Every ship shall be provided with a steering gear to the satisfaction of the Administration. When conducting steering test with both pumps running, rudder was hunting approximately 5 degrees between 20 and 30 degrees port. Provide clarification from certificate issuing authority attesting to proper operation of steering gear in all modes of operation. SOLAS 2009 CONS. II-1/29.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 January 2012
Resolved 7 January 2012
Resolution: Received class report from Lloyd''''s Register the deficiency has been rectified. The Master arranged for Mackay Communications to service the main S/G. The attending surveyor reviewed the service report and then witnessed satisfactory test.
Electrical › Electrical Distribution System (service) › Neutral Ground
Issued 6 January 2012 Resolved
0800-Electrical-All electrical apparatus shall be installed as not to cause injury when handled or touched in the normal manner. The No. 1 steering pump grounding strap is sliced in two with electrical tape holding it to the rudder stock. SOLAS 2009 CONS. II-1/45.
Action required: 705 - Other - as specified
Due 6 January 2012
Resolved 7 January 2012
Resolution: Received class report from Lloyd''''s Register the deficiency has been rectified. The grounding wires for both #1 and #2 steering pumps have been repaired and properly attached.
Engineering › Lubricating Oil Service System › Tube
Issued 6 January 2012 Resolved
9900-Other (not clearly hazardous)-After any survey of the ship, no change shall be made without the sanction of the Administration. A tray and catch bucket has been installed to the front of the main diesel engine in order to control a flammable liquid leak. Provide clarification from certificate issuing authority as to acceptability of tray and bucket. SOLAS 09 cons. I/11.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 6 January 2012
Resolved 7 January 2012
Resolution: Received class report from Lloyd''''s Register the deficiency has been rectified. The catch buckets were removed.
Stability › Watertight Integrity › General
Issued 6 January 2012 Resolved
9900-Other (not clearly hazardous)-After any survey of the ship, no change shall be made without the sanction of the Administration. Drain valve was tied open from emergency fire pump space to engine room bilge. Crew removed the tie.
Due 6 January 2012
Resolved 6 January 2012
Resolution: Crew removed the tie.
Navigation › Collision/Grounding Avoidance › Radar
Issued 26 July 2009 Resolved
The radar unit was found to be operating intermittently due to insufficient current.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 July 2009
Resolved 26 July 2009
Resolution: Received proper documentation satisfying the requirement.
Navigation › Collision/Grounding Avoidance › Radar
Issued 7 July 2004 Resolved
2nd radar inoperable, repairs to be made NPOC (Rotterdam)
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 24 August 2004
Resolution: RECEIVED TECH REPORT ATTESTING TO REPAIRS.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.