Records from 2002 to 2025. Most recent: inspection, 17 November 2025.
Inspection history · 73
17 November 2025
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8269590
15 April 2024
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7896132
16 November 2023
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7824425
6 October 2022
Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7572975
21 October 2021
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7337803
7 June 2019
MTSA/ISPS Verification · DAPI Audit · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6706515
27 March 2019
Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6650828
20 July 2018
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6485450
12 June 2018
MTSA/ISPS Verification · COI Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6435572
22 March 2018
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6377142
21 February 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6358740
18 October 2017
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6298745
4 October 2017
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6298738
17 August 2017
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6243573
30 May 2017
DAPI Audit · COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6160107
29 March 2017
Hull Examination · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6112209
13 July 2016
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5939574
9 June 2016
MTSA/ISPS Verification · DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5902125
3 June 2016
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5896513
28 March 2016
Internal Structural Exam · Drydock Exam · Examination of Repairs · Welding Related Inspections Qualification Testing
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5842280
27 October 2015
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5751846
23 October 2015
Deficiency Check · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5749873
14 August 2015
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5219115
14 August 2015
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5222457
16 July 2015
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5186255
12 June 2014
DAPI Audit · ISPS II Exam · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4886695
6 May 2014
Deficiency Check · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4851472
25 March 2014
Damage Survey
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4822766
25 March 2014
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4823576
20 June 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4350476
19 June 2012
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4350830
15 June 2012
COI Inspection · ISPS II Exam · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4344523
15 June 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4345265
12 June 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4342975
24 January 2012
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4230824
24 January 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4230840
20 January 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4229661
18 January 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4226908
17 January 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4226861
3 January 2012
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4217615
2 January 2012
Damage Survey
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4217262
28 September 2011
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4156123
23 March 2010
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3701014
3 February 2010
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3673173
9 December 2008
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3376646
20 November 2008
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3365277
5 December 2007
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3110573
5 September 2007
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3064729
25 April 2007
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2915437
5 July 2006
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2702713
5 July 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2863362
24 May 2006
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2657460
2 September 2005
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2481872
19 August 2005
Damage Survey · Hull Examination · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2468073
16 August 2005
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2465188
12 August 2005
Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2466133
11 August 2005
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2458966
10 August 2005
Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2458612
12 July 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2424232
1 July 2005
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2410585
12 May 2005
Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2356138
3 May 2005
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2385798
29 April 2005
In-Service Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2345925
29 September 2004
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2208407
13 July 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2131561
9 July 2004
MTSA Verification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2127306
23 December 2003
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1968740
7 November 2003
Hull Examination · Deficiency Check · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1925472
29 April 2003
Administrative Inspection
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1782659
6 November 2002
Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1710548
24 October 2002
In-Service Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1693663
15 October 2002
Initial Certification · Hull Examination · Construction Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1667946
29 May 2002
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1698916
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 March 2019
Resolved
Make permanent repairs to crack/hole in port side quarter at sheer.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2019
Resolution: Properly repaired.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 March 2019
Resolved
Make permanent repairs to (03) holes found on starboard hull inboard side approximately 15' from stern.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2019
Resolution: Holes properly clad welded.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 March 2019
Resolved
Make permanent repairs to wastage/holes identified by VISR inside of port side hull outboard side sheer below deck.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 May 2019
Resolution: Holes properly clad welded.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 27 March 2019
Resolved
Make permanent draft markings at each end of vessel.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 May 2019
Resolution: Draft marks added.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 March 2019
Resolved
Witnessed several wiring modifications and electrical hazards posing severe risk of fire and or electrical shock in both engine rooms and lazarettes. Provide approved electrical plans as well as electrical survey by a certified marine electrician attesting to compliance to the approved electrical plans.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2019
Resolution: Incorrect wiring removed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 27 March 2019
Resolved
Both engine rooms and lazarettes had excessive oil and oily residues in bilge as well as on electrical equipment and batteries. Remove oily residues and degrease all electrical equipment.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2019
Resolution: Spaces cleaned of excess oil.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 March 2019
Resolved
Portable fire extinguisher found to be discharged. Provide fire service report for all portable and fixed fire extinguishing equipment onboard.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2019
Resolution: All fire equipment servied by Caribe Supply.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 March 2019
Resolved
Make vessel available for in service inspection.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2019
Resolution: Completed.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 12 June 2018
Resolved
Prove proper operation of fire detection system. Main deck accomodation space fire detection showing fault. Vessel is restricted to 150 passengers until corrected.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 1 May 2019
Resolution: At owner's request vessel permanetly dropped to a maximum of 150 passengers and sub chapter T.
Engineering › Bilge Water Management System › Pump
Issued 12 June 2018
Resolved
Prove proper operation of bilge pumping system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 June 2018
Resolved 14 June 2018
Resolution: Vessel demonstrated proper operations.
Navigation › Piloting/Steering › US Coast Pilot
Issued 12 June 2018
Resolved
Provide updated Coast Pilot [name withheld] and Tide Tables.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 14 June 2018
Resolution: Vessel provided current publications.
Communications › Alarms/Indicators › Bilge Alarm
Issued 12 June 2018
Resolved
Prove proper operation of port side engine room high bilge alarm indicator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 14 June 2018
Resolution: Vessel replaced bulb and showed operation.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 12 June 2018
Resolved
Attach ring buoy light with 3-6' line and clip.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 14 June 2018
Resolution: Vessel provided line and clip.
Fire Fighting › Fire Hoses › Connections
Issued 12 June 2018
Resolved
Provide spanner wrench at each fire hydrant.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 July 2018
Resolution: Vessel provided spanner wrenches.
Construction/Loadline › Hull › Side Shell
Issued 22 March 2018
Resolved
Make permanent repairs to crack found on starboard quarter.
Action required: 705 - Other - as specified
Resolved 23 March 2018
Resolution: Crack ground out and welded.
Fire Fighting › Structural Fire Protection - General › Hull Construction
Issued 22 March 2018
Resolved
Replace missing SFP on port side exhaust piping in lazarette.
Action required: 705 - Other - as specified
Resolved 12 June 2018
Resolution: SPF replaced.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 22 March 2018
Resolved
Make permanent repairs to damaged deck railing on bow.
Action required: 705 - Other - as specified
Resolved 12 June 2018
Resolution: Rails properly welded.
Construction/Loadline › Structures › Superstructure
Issued 22 March 2018
Resolved
Make permanent repairs to hole found in superstructure just above sheer on port side amidship. Minimum 18"x18" insert.
Action required: 705 - Other - as specified
Resolved 23 March 2018
Resolution: 18x18 insert welded in place.
Communications › Radio Communications › EPIRB
Issued 4 October 2017
Resolved
Provide operable EPIRB ina proper float free arrangement.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 October 2017
Resolved 18 October 2017
Resolution: EPIRB installed.
Communications › Radio Communications › VHF Radiotelephone
Issued 4 October 2017
Resolved
Provide new antennas for VHF radios.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 October 2017
Resolved 18 October 2017
Resolution: VHF radios repaired.
Electrical › Electric Supply System (service) › Battery Charger
Issued 4 April 2017
Resolved
Replace temporary non-marine grade battery chargers for house batteries with a permanant marine grade battery charger.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 April 2017
Resolved 13 April 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 31 March 2017
Resolved
Provide a permanent repair or renewal of the wasted areas on Stbd MDE exhaust piping.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2017
Resolved 13 April 2017
Engineering › Steering Gear System › Hydraulic Hose
Issued 29 March 2017
Resolved
Conduct Optest in presence of Coast Guard Marine Inspector to verify the new shaft seals, hydraulic steering, fuel system leaks, and exhaust repairs.
Action required: 705 - Other - as specified
Due 4 July 2017
Resolved 13 April 2017
Communications › Alarms/Indicators › Fire Alarm
Issued 10 June 2016
Resolved
Properly mount broken heat detector in port side engine room.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 July 2016
Resolution: Heat detector properly mounted.
Electrical › Electric Supply System (service) › Battery Charger
Issued 10 June 2016
Resolved
Properly mount broken battery chargers in both port and starboard side lazarettes.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Battery chargers mounted.
Engineering › Fuel Oil Service System › Piping
Issued 10 June 2016
Resolved
Provide flame screens for fuel tank vent piping in way of center fuel tank on the port side.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 July 2016
Resolution: Flame screens installed on fuel vent pipe.
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 10 June 2016
Resolved
Provide service reports for all (03) Inflatable Buoyant apparatus.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 July 2016
Resolution: Witnessed service reports for IBAs.
Lifesaving › Lifefloat › Markings
Issued 10 June 2016
Resolved
Properly mark life floats and lifefloat paddles.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Lifefloats properly marked.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 10 June 2016
Resolved
Repair or replace electrical outlet in main cabin on the starboard side, aft.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Outlet repaired.
Stability › Severe Wind/Roll › General
Issued 10 June 2016
Resolved
Secure vending machines to prevent movement.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Vending machines secured with cargo straps.
Lifesaving › Inflatable Buoyant Apparatus › Weak Link
Issued 10 June 2016
Resolved
Provide shackles for IBA weaklinks.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Shackles installed.
Engineering › Fuel Oil Service System › Valve
Issued 10 June 2016
Resolved
Properly placard emergency fuel shut-off valves.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Valves properly labeled.
Communications › Alarms/Indicators › High Water Alarm
Issued 10 June 2016
Resolved
Properly mount all high-water alarm switches.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Switches secured.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 10 June 2016
Resolved
Repair or replace junction box in way of bow air conditioning unit cabling.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 June 2016
Resolution: Junction box replaced.
Engineering › Steering Gear System › Hydraulic Hose
Issued 10 June 2016
Resolved
investigate, diagnose and correct steering system hydraulic "hammering."
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 13 July 2016
Resolution: Steering hydraulics found to be working satisfactorily.
Communications › Alarms/Indicators › Fire Alarm
Issued 6 June 2016
Resolved
Prove proper operation of fire detection system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 June 2016
Resolved 10 June 2016
Resolution: System properly operating.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 6 June 2016
Resolved
Provide service report for fixed CO2 system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 June 2016
Resolved 10 June 2016
Resolution: System properly insptected.
Documentation › Certificates/Documents › Safety Management Certificate (ISM)
Issued 5 April 2016
Resolved
Provide valid Safety Management Certificate onboard vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 April 2016
Communications › Radio Communications › EPIRB
Issued 5 April 2016
Resolved
Provide valid EPIRB registration and place decal on EPIRB.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2016
Fire Fighting › Remote Fuel Shutoff › General
Issued 5 April 2016
Resolved
Prove operation of port side fuel shut-off valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2016
Construction/Loadline › Hull › Bottom Plating
Issued 28 March 2016
Resolved
Make bottom plating in port side #2 compartment where pitted in way of transducer.
Action required: 705 - Other - as specified
Resolved 30 March 2016
Resolution: Operator cropped out the pitted area and inserted new bottom plating.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 28 March 2016
Resolved
Prove proper operation of through hull valves servicing the main engines on port and starboard sides, generator valve and bilge valve in starboard steering compartment.
Action required: 705 - Other - as specified
Resolved 30 March 2016
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 28 March 2016
Resolved
Prove operation of sewage ball valve starboard side.
Action required: 705 - Other - as specified
Resolved 29 March 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 23 October 2015
Resolved
Provide damage survey and make vessel available for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 April 2016
Resolution: All machiney damaged by fire has been repaired; witnessed satisfactory operation of vessel while underway for sea trials.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 14 August 2015
Resolved
Prove proper operation of main diesel engine following report that shaft sheared off.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 August 2015
Resolved 21 August 2015
Construction/Loadline › Structures › Deck Plating
Issued 6 May 2014
Resolved
Crop & renew main deck plate, port aft corner, as marked, due to fracturing.
Action required: 705 - Other - as specified
Due 6 May 2014
Resolved 8 May 2014
Construction/Loadline › Structures › Scuttle
Issued 6 May 2014
Resolved
Make permanent repairs to stbd engine room flush hatch coaming or replace hatch in kind.
Action required: 705 - Other - as specified
Due 6 May 2014
Resolved 8 May 2014
Resolution: Repaired.
Engineering › Shafting/Propeller Arrangements › Strut
Issued 6 May 2014
Resolved
Arrest erosion on top of port & stbd strut by preparing surface by sandblasting, then applying Epoxy to affected areas.
Action required: 705 - Other - as specified
Due 6 May 2014
Resolved 8 May 2014
Engineering › Sea-water System (primary cooling) › Valve
Issued 6 May 2014
Resolved
Renew port, outbd sea valve in engine room.
Action required: 705 - Other - as specified
Due 6 May 2014
Resolved 8 May 2014
Engineering › Bilge Water Management System › Piping
Issued 6 May 2014
Resolved
Hard pipe, as original, oily water discharge pipe between valve and check valve in stbd fuel tank room.
Action required: 705 - Other - as specified
Due 6 May 2014
Resolved 8 May 2014
Electrical › Electric Generation Source (service) › Generator
Issued 26 March 2014
Resolved
Submit 3rd party electrical report (work proposal) for port generator. Generator was submerged in bilge water.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2014
Resolved 1 April 2014
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 26 March 2014
Resolved
Submit 3rd party electrical report (repair proposal) for port generator starter motor, fire pump/controller, and outboard aft wire run.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2014
Resolved 1 April 2014
Construction/Loadline › Penetrations › Gasket
Issued 25 March 2014
Resolved
Vessel to go to dry dock and make ready for a Coast Guard damage survey inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 March 2014
Engineering › Shafting/Propeller Arrangements › Coupling
Issued 25 March 2014
Resolved
Submit documentation that shaft coupling assembly (key, keyways) meets manufacture specs. for both main diesel engines.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2014
Resolved 1 April 2014
Construction/Loadline › Structures › Transverse Bulkhead
Issued 19 June 2012
Resolved
Make permanent repairs to fractured watertight bulkhead at piping penetration between port engine room aft bulkhead and steering gear room, as shown.
Action required: 705 - Other - as specified
Due 19 June 2012
Resolved 19 June 2012
Communications › Radio Communications › VHF Radiotelephone
Issued 15 June 2012
Resolved
Remove all unused antenna cables, organize and secure same located on top of wheelhouse.
Action required: 705 - Other - as specified
Due 22 June 2012
Resolved 22 June 2012
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 June 2012
Resolved
Renew anchor light fixture in kind.
Due 22 June 2012
Resolved 22 June 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 June 2012
Resolved
Remove dead-ended wiring located at bow, portside, main deck.
Due 22 June 2012
Resolved 22 June 2012
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 15 June 2012
Resolved
Prior to carrying passengers, provide serviceable portable fire extinguisher for main deck passenger salon bar found discharged.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2012
Resolved 22 June 2012
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 15 June 2012
Resolved
Prior to carrying passengers, provide serviceable portable fire extinguisher for main deck passenger salon, portside, aft found discharged.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2012
Resolved 22 June 2012
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 15 June 2012
Resolved
Provide and install air filter assembly for port propulsion engine found missing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2012
Resolved 22 June 2012
Accommodation/Occupational Safety › Potable Water System › General
Issued 15 June 2012
Resolved
Provide and install wire mesh screening for port and stbd potable water storage tank vent and label same.
Action required: 705 - Other - as specified
Due 22 June 2012
Resolved 22 June 2012
Accommodation/Occupational Safety › Potable Water System › General
Issued 15 June 2012
Resolved
Provide and install cap for potable water storage tank fill pipe, stbd side.
Action required: 705 - Other - as specified
Due 22 June 2012
Resolved 22 June 2012
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 15 June 2012
Resolved
Provide and install guard for diesel generator fan blades in port engine room
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 15 June 2012
Resolved
Provide and install silencer/filter for port propulsion engine turbocharger found missing.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 15 June 2012
Resolved
Provide and install signage at each engine room CO2 siren stating, "When Alarm Sounds, Vacate at Once".
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 15 June 2012
Resolved
Provide proof of annual servicing of all Fixed CO2 System Remote Pull Stations.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 15 June 2012
Resolved
Provide new or refurbish existing signs on each engoine room access door stating, When Alarm Sounds, Vacate At Once".
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Engineering › Bilge Water Management System › Strainer
Issued 15 June 2012
Resolved
Disassemble, remove, clean and re-install port engine room bilge suction strainer. While unit is out, clean surrounding area of bilges in way of strainer.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 15 June 2012
Resolved
Make permanent repairs to fire pump electric motor fan housing found fractured.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Fire Fighting › Fire Main › Condition
Issued 15 June 2012
Resolved
Prior to carrying passengers, make permanent repairs to leaking firemain pipe at first dicharge valve after fire pump in port engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2012
Resolved 22 June 2012
Operations/Management › Drills/Instruction › Safety Orientation
Issued 15 June 2012
Resolved
Prove proper operation of stbd, aft main deck loudspeaker.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Engineering › Bilge Water Management System › Not Operational
Issued 15 June 2012
Resolved
Prove proper operation of Void #3 Bilge High Water Level Alarm.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 15 June 2012
Resolved
Permanently mount sewage motor/pump unit located in port rudder room.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 June 2012
Resolved
Prior to carrying passengers, make permanent repairs to port, forward bulkhead of ruddr room. Fractures shall be drill stopped, ground out and re-welded.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2012
Resolved 22 June 2012
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 15 June 2012
Resolved
Permanently seal drilled hole found in port, aft main deck fixed containment.
Action required: 705 - Other - as specified
Due 15 June 2012
Resolved 22 June 2012
Construction/Loadline › Hull › Weld
Issued 2 January 2012
Resolved
Damage from allision caused 5"-6" crack in aluminum weld at stbd corner of aft compartment. There was crushing as well. Crack is currently temporarily patched with concrete. Effect permanent repairs to 5"-6" crack in stbd corner of platform piror to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 January 2012
Personnel › Certificates/Documents/Licenses › STCW Certificate, Master
Issued 23 March 2010
Resolved
Valid certificate could not be produced for Master providing proof of training required by STCW Regulation V/3 (Crowd management and Crisis management and human behavior).
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 March 2010
Resolved 5 April 2010
Lifesaving › Hand Flares › Storage
Issued 23 March 2010
Resolved
Distress signals noted stowed in an improper container. Ensure they are stowed in a brightly colored, watertight container marked "DISTRESS SIGNALS"
Action required: 705 - Other - as specified
Due 23 March 2010
Resolved 5 April 2010
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 23 March 2010
Resolved
Marking for PFDs storage on the upper passenger deck could not be verified as accurate. Storage containers appeared to have the wrong quantity of PFDs sored inside. Prove that storage containers are equipped as marked or re-mark the containers to accurately reflect the contents.
Action required: 705 - Other - as specified
Due 23 March 2010
Resolved 5 April 2010
Lifesaving › Lifefloat › Paddle
Issued 23 March 2010
Resolved
Ensure paddles in lifefloats are lashed to the lifefloats as required.
Action required: 705 - Other - as specified
Due 23 March 2010
Resolved 5 April 2010
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 23 March 2010
Resolved
None of the lifefloats were outfitted with floating waterlights. Ensure each is equppied and attached as required.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 March 2010
Resolved 5 April 2010
Construction/Loadline › Hull › Side Shell
Issued 3 February 2010
Resolved
Make permanent repairs by welding the outboard web frame to shell plating in starboard forepeak, as shown.
Action required: 705 - Other - as specified
Due 3 February 2010
Resolved 4 February 2010
Stability › Unintentional Flooding › General
Issued 3 February 2010
Resolved
Prove proper operation of sea valve located in port engine room, forward, outbd side.
Action required: 705 - Other - as specified
Due 3 February 2010
Resolved 4 February 2010
Stability › Unintentional Flooding › General
Issued 3 February 2010
Resolved
Prove proper operation of sea valve located in port engine room, aft.
Action required: 705 - Other - as specified
Due 3 February 2010
Resolved 4 February 2010
Construction/Loadline › Structures › Deck Plating
Issued 3 February 2010
Resolved
Make permanent repairs by welding holes in way of mooring bit foundation inside port forepeak, as shown.
Action required: 705 - Other - as specified
Due 3 February 2010
Resolved 4 February 2010
Documentation › Certificates/Documents › FCC SSL
Issued 20 November 2008
Resolved
Provide current FCC Bridge to Bridge Radio Telephony Certificate. This may be faxed into our office.
Action required: 705 - Other - as specified
Due 20 December 2008
Resolved 9 December 2008
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 20 November 2008
Resolved
Post signage indicating a maximum of 130 passengers allowed on upper deck in way of aft stairway.
Action required: 705 - Other - as specified
Due 20 December 2008
Resolved 21 November 2008
Personnel › Training › Familiarization Training
Issued 24 May 2006
Resolved
Training log not being kept IAW 46CFR185.420. Initial crew familiarization training is not being logged. Ensure training is being conducted and logged.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 5 July 2006
Communications › Radio Communications › EPIRB
Issued 24 May 2006
Resolved
The EPIRB is not being tested monthly IAW 46CFR185.728. Conduct required tests and make the correct log entries.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 5 July 2006
Engineering › Fuel Oil Service System › Hose
Issued 24 May 2006
Resolved
Stbd racor filter differential pressure switch hoses are of improper material. Add a fire sleeve or replace IAW 46CFR182.720.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 5 July 2006
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 24 May 2006
Resolved
Stbd generator is missing the lagging around the turbocharger. Replace the lagging.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 5 July 2006
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 24 May 2006
Resolved
Stbd engine room vent damper failed to close. Make repairs prior to caring passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2006
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 24 May 2006
Resolved
Provide a framed chart or diagram IAW 46CFR181.400(c). The chart must indicate the location of the various zones and give instructions for the operation, maintenance and testing.
Due 23 June 2006
Resolved 18 June 2007
Construction/Loadline › Hull › Bottom Plating
Issued 8 September 2005
Resolved
Crop out and renew fracture in hull plating in port hull forward of shaft log. CG Marine Inspector to verify fit-up and successful NDT.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Hull › Hull Plating
Issued 8 September 2005
Resolved
Gouge out, drill stop, and weld port rudder bearing. CG marine inspector to witness fit-up and satisfactory NDT.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Structures › Deck Plating
Issued 8 September 2005
Resolved
Crop out and renew main deck plating in way of portside transom. CG Marine Inspector to witness fit-up and successful NDT.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Penetrations › Pipe Flange
Issued 8 September 2005
Resolved
Remove exhaust piping from hull penetration and present side shell plating for inspection.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Hull › Strut/Cross Tie
Issued 8 September 2005
Resolved
Perform repairs on starboard propulsion shaft strut bearing housing. CG Marine Inspector to verify fit-up.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Personnel › Certificates/Documents/Licenses › License, Operator
Issued 8 September 2005
Resolved
Provide welder's qualifications prior to performing hull repairs.
Action required: 705 - Other - as specified
Due 7 October 2005
Resolved 14 September 2005
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 8 September 2005
Resolved
Provide a copy of the condition report on both propellers.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 8 September 2005
Resolved
Provide a copy of both propulsion shaft condition reports.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 8 September 2005
Resolved
Renew weldment to sea chest valve housing flanges.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 8 September 2005
Resolved
Repair broke exhaust pipe hanger in port lazzerette.
Action required: 705 - Other - as specified
Resolved 28 February 2006
Engineering › Sea-water System (primary cooling) › Valve
Issued 8 September 2005
Resolved
Present all through hull valves located below the waterline for inspection.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 September 2005
Resolved
Remove the epoxy coating in the overhead of the portside fuel oil day tank compartment and present the area for inspection.
Action required: 705 - Other - as specified
Due 7 October 2005
Resolved 14 September 2005
Construction/Loadline › Hull › Side Shell
Issued 8 September 2005
Resolved
Gouge out and repair all cracks in the vessel's rub rail.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Penetrations › Weld
Issued 8 September 2005
Resolved
Repair broken weld on longitudinal frame in portside fore peak tank.
Action required: 705 - Other - as specified
Resolved 28 February 2006
Construction/Loadline › Hull › Weld
Issued 8 September 2005
Resolved
Repair 02 deck longitudinal cracked welds and 01 overhead longitudinal cracked weld in the starboard fore peak tank.
Action required: 705 - Other - as specified
Resolved 28 February 2006
Construction/Loadline › Hull › Transverse Frame
Issued 8 September 2005
Resolved
Repair 04 deep gouges in the plating of the starboard #1 void compartment.
Action required: 705 - Other - as specified
Resolved 28 February 2006
Construction/Loadline › Structures › Transverse Bulkhead
Issued 8 September 2005
Resolved
Make water tight the penetration on the aft bulkhead of the starboard fuel oil day tank compartment. The weld on the penetration is incomplete.
Action required: 705 - Other - as specified
Resolved 28 February 2006
Construction/Loadline › Hull › Weld
Issued 8 September 2005
Resolved
Repair broken weld on overhead stringer in the starboard fuel oil day tank compartment.
Action required: 705 - Other - as specified
Resolved 28 February 2006
Construction/Loadline › Hull › Weld
Issued 8 September 2005
Resolved
Repair identified porosity areas along hull weld seams.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Hull › Keel
Issued 8 September 2005
Resolved
Perform satisfactory Sea Trial with CG Marine Inspector onboard.
Action required: 705 - Other - as specified
Resolved 28 February 2006
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 8 September 2005
Resolved
Provide copy of Naval Architects recommendation to remove forward propulsion shaft cutlass bearing.
Action required: 705 - Other - as specified
Resolved 9 February 2006
Construction/Loadline › Structures › Manhole
Issued 7 September 2005
Resolved
Present the forward centerline void for inspection.
Action required: 705 - Other - as specified
Due 7 October 2005
Resolved 14 September 2005
Construction/Loadline › Hull › Bottom Plating
Issued 11 August 2005
Resolved
PRIOR TO CARRYING PASSENGERS VESSEL TO TRANSIT TO FT. LAUDERDALE, FL FOR PERMANENT REPAIRS TO PORT HULL BOTTOM PLATING. AN ADDITIONAL CREWMEMBER IS REQUIRED TO CHECKS COMPARTMENT. PROVIDE PORTABLE DEWATERING PUMP. AVOID VIBRATION OF PORT HULL AND POUNDING FROM SEA CONDITIONS. PORT MAIN ENGINE TO ONLY BE USED TO MANEUVER AS DETERMINED BY MASTER DURING TRANSIT.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2006
Construction/Loadline › Hull › Bottom Plating
Issued 11 August 2005
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE MAKE PERMANENT REPAIRS TO BOTTOM PLATE FAILURE IN PORT HULL LAZZERETTE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR PER THE COGNIZANT OCMI'S ACCEPTED REPAIR PROPOSAL.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2006
Construction/Loadline › Hull › Bottom Plating
Issued 11 August 2005
Resolved
PRIOR TO MAKING REPAIRS PROVIDE REPAIR PROPOSAL FOR FAILURE OF PORT LAZZERETTE HULL PLATING TO COGNIZANT [name withheld] TO BE CONDUCTED. PROPOSAL TO INCLUDE WRITTEN DETERMINATION OF CAUSE OF PLATE FAILURE AND POSSIBLE ANALYSIS BY NAVAL ARCHITECT AND CONCURRENCE FROM CG MARINE SAFETY CENTER. NOTIFY COGNIZANT [name withheld] AT REPAIR FACILITY. (SECTOR MIAMI VESSEL INSP: [phone withheld].
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2006
Documentation › Manuals/Policy Documentation › Maneuvering Information
Issued 29 April 2005
Resolved
Provide an updated passenger transfer plan for vsl and OB-150.
Condition: Improper/Lack of Maintenance
Due 2 May 2005
Resolved 12 August 2005
Resolution: COMPLETED IN PREVIOUS INSPECTION, BUT NEVER CLEARED.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 29 April 2005
Resolved
Provide a video of passenger transfer to our office for viewing.
Condition: Improper/Lack of Maintenance
Due 2 May 2005
Resolved 12 August 2005
Resolution: COMPLETED, BUT NEVER CLEARED.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 29 April 2005
Resolved
Update emergency instructions to fit the lay-out of vessel.
Condition: Improper/Lack of Maintenance
Due 6 May 2005
Resolved 12 August 2005
Resolution: COMPLETED IN PREVIOUS INSPECTION, BUT NEVER CLEARED.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 29 September 2004
Resolved
Found 3 bad Emergency lights on the aft weatherdeck.
Condition: Improper/Lack of Maintenance
Due 4 October 2004
Resolved 7 October 2004
Engineering › Fuel Oil Service System
Issued 23 December 2003
Resolved
Make fuel tank vent flame screens available for inspection. LEGACY COMPONENT DESC: Vent Pipe
Due 10 January 2004
Resolved 21 January 2004
Resolution: Inspected fuel oil vent flame screens, sat.
Navigation › Collision/Grounding Avoidance
Issued 23 December 2003
Resolved
Upper Port side navigation light inop. LEGACY COMPONENT DESC: Navigation Lights
Due 10 January 2004
Resolved 21 January 2004
Resolution: Replaced socket on upper port side nav light, tested sat.
Navigation › Collision/Grounding Avoidance
Issued 23 December 2003
Resolved
Install properly sized bell (300 mm) for vessel's greater than 20 meters IAW Navrules. LEGACY COMPONENT DESC: Bell
Due 10 January 2004
Resolved 21 January 2004
Resolution: New 300 mm bell installed.
Operations/Management › Passenger Operations › Safety Orientation
Issued 23 December 2003
Resolved
Vsl is missing Operations Manual LEGACY COMPONENT DESC: Operations Manual
Due 31 March 2004
Resolved 12 August 2005
Resolution: N/A
Operations/Management › Drills/Instruction
Issued 10 November 2003
Resolved
Conduct fire, man overboard, and abandon ship drill with permanently assigned crew. 46 CFR 122.520 & 524.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 January 2004
Resolved 21 January 2004
Resolution: Sat fire and MOB drills conducted.
Electrical › Lighting (emergency)
Issued 7 November 2003
Resolved
Conduct satisfactory operational test of emergency lighting for the embarkation decks.
Due 10 November 2003
Resolved 10 November 2003
Resolution: The batteries for the emergency lights were replaced and a satisfactory test was performed
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
Provide copy of corrosion/gauging report. LEGACY COMPONENT DESC: Hull Plating
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 November 2003
Resolution: Vessel representative provided a copy of the corrosion report.
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
Ensure metal to metal contact when installing zincs. Contact inspector prior to installing zincs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 October 2003
Resolution: Verified bare metal exposed for contact to zincs.
Operations/Management › Passenger Operations
Issued 30 October 2002
Resolved
Provide operations manual.
Due 10 December 2003
Resolved 21 January 2004
Resolution: Operations Manual onboard.
Operations/Management › Equipment Service/Testing
Issued 30 October 2002
Resolved
Submit Design Verification Procedures, and perform satisfactory Failure Mode and Effects Analysis examination
Due 18 March 2003
Resolved 28 April 2003
Resolution: DVT procedures approved by USCG (MSC) under letter E2-0304816.
Fire Fighting › Fixed Gas Fire Extinguishing System › Piping
Issued 28 October 2002
Resolved
Improper installation of FF piping, remove all A53F piping and replace. Retest system.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 November 2002
Resolution: Received fax from [name withheld] confirming the replacement of approved piping and system was retested. Visual examined new piping installation.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 October 2002
Resolved
Insulate exhaust piping brackets in both enginerooms
Action required: 705 - Other - as specified
Due 4 November 2002
Resolved 14 November 2002
Resolution: Insulation provided over exposed brackets.
Electrical › Electrical Distribution System (service)
Issued 28 October 2002
Resolved
Reinforce plastic wire ties with appropriate ties where needed in both enginerooms. LEGACY COMPONENT DESC: Wiring
Action required: 705 - Other - as specified
Due 4 November 2002
Resolved 14 November 2002
Resolution: Wiring reinforced with the appropriate ties.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 October 2002
Resolved
Provide protective cover for Macerator switch.
Due 4 November 2002
Resolved 14 November 2002
Resolution: Switch is a pull switch that will be isolated from use while passengers on board. No protective cover needed.
Fire Fighting › Miscellaneous Items
Issued 25 October 2002
Resolved
Provide approved Fire and Safety plan.
Due 25 November 2002
Resolved 22 November 2002
Resolution: Received confirmation that MSO Mobile received new plans, and vessel has installed them on board.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 October 2002
Resolved
Resolve MSC comment #1 in letter dated 28 APR2003, serial E2- 0304816. LEGACY COMPONENT DESC: Control System Failure
Due 31 August 2003
Resolved 5 November 2003
Resolution: Witnessed control system failure alarms at the operating station for each power failure simulation. Test satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 October 2002
Resolved
Resolve MSC comment #2 in letter dated 28APR2003, serial E2-0304816. LEGACY COMPONENT DESC: Emergency Backup Mode
Due 31 August 2003
Resolved 5 November 2003
Resolution: Conducted operational test of emergency back up mode after each power failure simulations per approved test procedures. Test satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 October 2002
Resolved
Resolve MSC comment #3 from letter dated 28Apr2003, serial E2-0304816. LEGACY COMPONENT DESC: Remote Shutdowns
Due 31 August 2003
Resolved 5 November 2003
Resolution: Conducted emergency shutdown of each propulsion engine from the operating station. Test satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 October 2002
Resolved
Verify design verification test procedures as per approved propulsion Control Design Verification test procedures (DVTP), rev A, dated 2/2003. See MSC letter dated 28 Apr2003, serial E2-0304816. LEGACY COMPONENT DESC: Design Verification Procedures
Due 31 August 2003
Resolved 5 November 2003
Resolution: Conducted DVT per procedures approved by USCG (MSC) on 04/28/03. Test satisfactory.
Fire Fighting › Structural Fire Protection - General
Issued 28 August 2002
Resolved
Install appropriate structural fire protection between port/ stbd engineroom and main deck port/ stbd engine room access IAW 46 CFR 116.415. Passengers limited to 150 until structural fire protection requirements are resolved. Requirements to be satisfied no later than 22 November 2002.
Action required: 705 - Other - as specified
Due 22 November 2002
Resolved 14 November 2002
Resolution: Vessel installed removable ventillation covers (same material as bulkhead) that can be place over the ducts in case of emergency.