Records from 1987 to 2017. Most recent: inspection, 2 October 2017.
Inspection history · 84
2 October 2017
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6281590
9 February 2017
MTSA Verification · COI Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6081475
28 November 2016
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6048571
21 June 2016
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5914357
9 February 2016
MTSA/ISPS Verification · COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5811856
16 December 2015
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5783109
2 November 2015
Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5757704
27 October 2015
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5751846
28 October 2014
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5008546
14 June 2012
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4343516
13 February 2012
Type not recorded
No type recorded · Boat Forces Unit United States Virgin Islands · USCG Southeast District (CGD-SE) · Activity 4243154
24 January 2012
Damage Survey
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4230558
19 September 2011
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4148843
10 February 2011
In-Service Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3942720
2 February 2011
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3937671
31 January 2011
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3936545
29 November 2010
COI Inspection · MTSA/ISPS Verification · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3900188
9 December 2009
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3647144
26 September 2008
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3333240
4 August 2008
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3288755
1 April 2008
MTSA Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3175144
4 December 2007
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3109054
26 October 2007
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3087356
1 June 2006
Re-Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2667561
19 September 2005
Hull Examination · Internal Structural Exam
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2496355
15 July 2005
MTSA Verification
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2430510
13 July 2005
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2426227
13 July 2005
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2426234
13 July 2005
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2433411
13 July 2005
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2433422
9 July 2005
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2424231
9 July 2005
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2424259
6 April 2005
MTSA Verification · Periodic Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2327527
22 October 2004
Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2229905
26 May 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2078536
14 April 2004
Hull Examination · Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2042295
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1972299
10 June 2003
Annual Inspection · Deficiency Check · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1813341
28 May 2002
COI Inspection · Damage Survey · Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1622601
22 May 2002
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1620433
27 December 2001
Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1482829
1 November 2001
In-Service Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1405278
29 May 2001
Re-Inspection · Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1066758
9 April 2001
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1061558
24 May 2000
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 820825
4 June 1999
Deficiency Check · COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 807515
14 May 1999
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1468070
23 April 1998
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1125901
20 April 1998
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 791268
21 October 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 96772
24 July 1997
Examination of Repairs · Damage Survey
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 780338
17 July 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 139188
19 May 1997
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1096919
10 April 1997
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1105141
20 March 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1430365
24 April 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1084159
11 April 1996
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1079095
2 April 1996
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1079488
21 April 1995
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1174168
4 April 1995
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1154492
26 January 1995
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1136684
26 April 1994
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 858634
14 April 1994
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 857051
11 April 1994
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1396084
5 April 1994
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1166935
20 April 1993
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 833630
3 February 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 222334
30 September 1992
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 935740
21 April 1992
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 946627
23 October 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 933762
26 June 1991
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1244556
29 April 1991
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1223840
14 September 1990
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 918882
14 September 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1227177
8 May 1990
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 911374
1 May 1990
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1237662
9 May 1989
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1032056
15 April 1989
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1037115
16 December 1988
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1210743
22 November 1988
Drydock Extension
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1204270
25 May 1988
Deficiency Check · COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 898798
28 July 1987
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1308547
19 June 1987
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1000423
1 June 1987
Initial Certification · Hull Examination · Plan Review "T" Boat
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1030626
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 9 February 2017
Resolved
STBD aft vent closure needs to be adjusted to close completely
Action required: 705 - Other - as specified
Due 16 February 2017
Resolved 10 February 2017
Resolution: adjustment made to close properly
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 9 February 2017
Resolved
exhaust pipes in steering room need lagging insulation
Action required: 705 - Other - as specified
Due 16 February 2017
Resolved 10 February 2017
Resolution: Insulation applied to cover the exhaust pipes
Construction/Loadline › Penetrations › Pipe Flange
Issued 9 February 2017
Resolved
unused pipes penetrating bulkhead from MDEs space to steering gear space need to be capped off using simular material as pipes
Action required: 705 - Other - as specified
Due 16 February 2017
Resolved 10 February 2017
Resolution: installed metal plug
Electrical › Electrical Distribution System (service) › Panelboard
Issued 9 February 2017
Resolved
install blanks wear breakers are missing
Action required: 705 - Other - as specified
Due 16 February 2017
Resolved 10 February 2017
Resolution: blanks installed
Electrical › Electrical Distribution System (service) › Panelboard
Issued 9 February 2017
Resolved
correct directory in eletrical panel
Action required: 705 - Other - as specified
Due 16 February 2017
Resolved 10 February 2017
Resolution: directory updated
Construction/Loadline › Structures › Door
Issued 9 February 2017
Resolved
repair handles on port sliding cabin door
Action required: 705 - Other - as specified
Due 16 February 2017
Resolved 6 March 2017
Resolution: Door handles repaired
Navigation › Piloting/Steering › US Coast Pilot
Issued 9 February 2017
Resolved
provide current navigational publictions
Action required: 705 - Other - as specified
Due 16 February 2017
Resolved 10 February 2017
Resolution: current navigational publications on board
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 28 November 2016
Resolved
found temporary repair to bilge pipe for the fwd peak
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 November 2016
Resolution: installed threaded coupling
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 28 November 2016
Resolved
fasteners missing on the through hull on stbd side bulkhead in rudder room
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 November 2016
Resolution: installed fasteners
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 12 February 2016
Resolved
Provide double hose clamps on all exhaust piping in lazarette.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Clamps installed.
Engineering › Steering Gear System › Rudder Stock
Issued 12 February 2016
Resolved
Repair or replace rudder stock gland packing clamp bolts.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Clamp bolts replaced.
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 12 February 2016
Resolved
Make permanent repairs to oil leak on aft section of port side inboard main diesel engine.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Oil leak sealed.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 12 February 2016
Resolved
Prove proper operation of vessel heads.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: ALl vessel heads operate satisfactorily.
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 12 February 2016
Resolved
Provide a rescue boat or meet the requirements of 46 CFR 117.210 (a)(1) & (2)
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 March 2016
Resolved 25 February 2016
Resolution: Vessel installed aft controll station meeting CFR requirements in lieu of a rescue boat.
Engineering › Diesel Engine (propulsion-reduction gear) › Injector (fuel injection)
Issued 10 February 2016
Resolved
Repair fuel leak on port side inboard engine.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 February 2016
Resolved 25 February 2016
Resolution: New fuel pump installed.
Engineering › Engine Controls (Electric/Electronic) › Linkage
Issued 10 February 2016
Resolved
Make proper connections of trottle cables for all (04) main engines.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 February 2016
Resolved 25 February 2016
Resolution: Proper linkage installed.
Construction/Loadline › Structures › Door
Issued 10 February 2016
Resolved
Prove proper operation of weather tight doors on main cabin.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Dogs properly installed on doors.
Electrical › Electric Generation Source (service) › Panelboard
Issued 10 February 2016
Resolved
Provide working ammeters for both generators.
Action required: 705 - Other - as specified
Due 1 April 2016
Resolved 27 June 2016
Resolution: New ammeters installed in panel.
Engineering › Sea-water System (primary cooling) › Piping
Issued 10 February 2016
Resolved
Repair broken hangars on port side outboard engine raw water cooling piping.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Hangars replaced on piping.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 February 2016
Resolved
Prove proper operation of cabin lighting.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Cabin lighting repaired.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 10 February 2016
Resolved
Replace missing lagging on port side main engine.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: New lagging installed.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 10 February 2016
Resolved
Prove proper operation of all required engine gauges.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: All engine gauges operating satisfactorily.
Fire Fighting › Structural - B Class Divisions › Windows
Issued 10 February 2016
Resolved
Replace (06) broken windows in main cabin.
Action required: 705 - Other - as specified
Due 1 April 2016
Resolved 14 June 2016
Resolution: All broken windows replaced.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 10 February 2016
Resolved
Provide logs for lifesaving maintenance and EPIRB.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Logs installed.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 10 February 2016
Resolved
Provide watch station bill.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: Watch bill installed and posted.
Documentation › Certificates/Documents › Passenger Ship Safety Certificate
Issued 10 February 2016
Resolved
Vessel passenger count reduced to 12 when operating on international route until PSSC and associated documents issued.
Action required: 705 - Other - as specified
Due 1 April 2016
Resolved 21 June 2016
Resolution: International documents issued.
Lifesaving › Inflatable Buoyant Apparatus › Stowage
Issued 10 February 2016
Resolved
Make IBAs deployable without needing to be lifted more than 1 foot or provide lifting mechanism.
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 25 February 2016
Resolution: IBA storages corrected.
Operations/Management › Mandatory Ship Reporting Systems › Entry Report
Issued 29 November 2010
Resolved
Provide logbook for making entries as required by 46 CFR 185.280.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 29 November 2010
Resolved
Provide a curret first aid kit, noted items to be missing or expired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Navigation › Piloting/Steering › Marine Charts
Issued 29 November 2010
Resolved
Update charts, noted only 2002 editions on board.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Communications › Visual Communication › Warning Sign (gangway)
Issued 29 November 2010
Resolved
Placard or mark "Restricted Areas" provide means of securing these areas.
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Navigation › Electronic Positioning › GPS/DGPS Receiver
Issued 29 November 2010
Resolved
Demonstrate newly installed GPS and AIS.
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Communications › Radio Communications › VHF Radiotelephone
Issued 29 November 2010
Resolved
Repair wires on VHF radio installation missing insulation covering.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Navigation › Collision/Grounding Avoidance › Searchlight
Issued 29 November 2010
Resolved
Repair port side search light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 29 November 2010
Resolved
Replace or repair lanyards and painter line on life ring buoy upper deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (electric)
Issued 29 November 2010
Resolved
Repair Main Diesel Engine #4 as well as gauges.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 February 2011
Resolved 5 April 2011
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 29 November 2010
Resolved
Repair 3 cracked windows, pilot house and upper passenger deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 February 2011
Resolved 5 April 2011
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 November 2010
Resolved
Seal forward engine room bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Construction/Loadline › Structures › Manhole
Issued 29 November 2010
Resolved
Provide a securing chain or cable for chain locker hatch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 31 January 2011
Construction/Loadline › Penetrations › Weld
Issued 29 November 2010
Resolved
Repair fractured welds in chain locker.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 February 2011
Resolved 5 April 2011
Documentation › Certificates/Documents › Certificate of Inspection
Issued 29 November 2010
Resolved
Failure to make vessel available for annual inspection within 3 months after anniversary date of issuance of the COI.
Action required: 705 - Other - as specified
Due 29 November 2010
Resolved 29 November 2010
Resolution: Inspection completed. COI Returned to vessel.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 4 December 2007
Resolved
SECURE OR REMOVE CHEST FREEZER IN LOWER PASSENGER AREA.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Fire Fighting › Ventilation Systems › Ducts
Issued 4 December 2007
Resolved
PRIOR TO CARRYING PASSENGERS, PROVE PROPER OPERATION OF PORT AFT FORWARD AIR DUCT CLOSURE DEVICE (BENT).
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Fire Fighting › Ventilation Systems › Ducts
Issued 4 December 2007
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT REPAIRS TO STARBOARD AFT VENT CLOSURE DEVICE STOP.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 4 December 2007
Resolved
INSTALL SPEAKER FOR PUBLIC ADDRESS SYSTEM IN LOWER PASSENGER SEATING AREA
Due 4 December 2007
Resolved 10 December 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 4 December 2007
Resolved
COMPLETE INSTALLATION OF AIRSEP OIL VAPOR SEPARATORS ON ALL ENGINES.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 4 December 2007
Resolved
CLEAN GALLEY AND ALL REFRIGERATOS AND FOOD STORAGE AREAS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 4 December 2007
Resolved
MAKE OPERATIONAL ALL INTERIOR CABIN LIGHTING FIXTURES.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 4 December 2007
Resolved
RENEW #1 PROPULSION ENGINE TURBO CHARGER OIL DRAIN LINE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 4 December 2007
Resolved
REPAIR OIL LEAKS ON #4 PROPULSION ENGINE AFT ACCESSORY DRIVE COVERS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 4 December 2007
Resolved
INSTALL DECK RAIL ON PORT SIDE BOARDING ACCESS AMIDSHIPS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Fire Fighting › Ventilation Systems › Ducts
Issued 4 December 2007
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE NECESSARY ADJUSTMENTS TO ACHIEVE FULL CLOSURE OF PORT AFT FORWARD VENTILATION DAMPNER.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2007
Resolved 10 December 2007
Engineering › Bilge Water Management System › Not Operational
Issued 1 November 2007
Resolved
PROVE PROPER OPERATION OF BILGE HIGH WATER ALARMS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2007
Resolved 4 December 2007
Stability › Unintentional Flooding › General
Issued 1 November 2007
Resolved
DOUBLE UP ALL SEA WATER HOSES THROUGHOUT VESSEL WITH STEEL CLAMPS, AS REQUIRED.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2007
Resolved 4 December 2007
Construction/Loadline › Structures › Transverse Bulkhead
Issued 1 November 2007
Resolved
MAKE PERMANENT REPAIRS BY WELDING TO GRINDING WHEEL IMPRINT FOUND ON COLLISION BULKHEAD, FOREPEAK SIDE, AT BILGE LEVEL, AS MARKED.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2007
Resolved 4 December 2007
Engineering › Steering Gear System › Rudder
Issued 26 October 2007
Resolved
REPACK PORT AND STARBOARD RUDDERS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 October 2007
Resolved 1 November 2007
Construction/Loadline › Hull › Weld
Issued 26 October 2007
Resolved
MAKE PERMANENT REPAIRS TO ALL FRACTURED WELDS FOUND IN FOREPEAK.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 October 2007
Resolved 1 November 2007
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 26 October 2007
Resolved
CROP AND RENEW STARBOARD STRUT SHAFT CUTLASS BEARING.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 October 2007
Resolved 1 November 2007
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 6 April 2005
Resolved
Provide Marine Radio Operating License for all vessel Captain's.
Action required: 705 - Other - as specified
Due 19 June 2005
Resolved 17 June 2005
Resolution: Received fax confirming Marine Radio Operator Card for vessel''s master.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 6 April 2005
Resolved
Hydro both MDE air start receivers Hydro due NLT 18 June 2005. No passengers permitted after 18 June 2005
Action required: 705 - Other - as specified
Due 18 June 2005
Resolved 7 June 2005
Resolution: Observed 200 psi MAWP on relief valves on both pressure vessel''s. Test sat.
Construction/Loadline › Hull › Side Shell
Issued 22 October 2004
Resolved
Make permanent repair, as original, to punture hole in stbd sideshell approximately 10 ft aft of stem just below main deck rub rail.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 22 October 2004
Resolved 22 October 2004
Resolution: Examined satisfactory 28 in. x 25 in. insert and witnessed satisfactory hose test of welds.
Operations/Management › Passenger Operations › Safety Orientation
Issued 14 April 2004
Resolved
Make repairs to P.A. system.
Due 24 June 2004
Resolved 25 May 2004
Navigation › Collision/Grounding Avoidance
Issued 10 June 2003
Resolved
Replace sidelights w/ UL 1104 fixtures. LEGACY COMPONENT DESC: Navigation Lights
Due 17 June 2003
Resolved 24 June 2003
Navigation › Collision/Grounding Avoidance
Issued 10 June 2003
Resolved
Replace lense to masthead light. LEGACY COMPONENT DESC: Navigation Lights
Due 17 June 2003
Resolved 24 June 2003
Lifesaving › Inflatable Liferafts
Issued 10 June 2003
Resolved
Replace liferaft hydrostatic releases (vsl restricted to w/in 3 miles from shore until correcterd). LEGACY COMPONENT DESC: Hydrostatic Release Unit
Due 10 June 2003
Resolved 13 June 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 10 June 2003
Resolved
Provide first aid kit that is Coast Guard approved or with contents found at 46CFR160.041. LEGACY COMPONENT DESC: Medicine Chest
Due 17 June 2003
Resolved 13 June 2003
Fire Fighting › Structural - A Class Divisions
Issued 10 June 2003
Resolved
Install 3/4" throws to main deck fire screen door latches. LEGACY COMPONENT DESC: Openings - Fire Doors
Due 10 July 2003
Resolved 5 August 2003
Electrical › Lighting (service)
Issued 10 June 2003
Resolved
Make proper wire connections to light fixture in port side tank space. LEGACY COMPONENT DESC: Conductor
Due 17 June 2003
Resolved 13 June 2003
Electrical › Lighting (service)
Issued 10 June 2003
Resolved
Install cover to electrical box in port tank space. LEGACY COMPONENT DESC: Lighting Fixture
Due 17 June 2003
Resolved 13 June 2003
Fire Fighting › Structural - A Class Divisions
Issued 10 June 2003
Resolved
Install fire stop to penetrations on port side of E/R door. LEGACY COMPONENT DESC: Bulkheads - Machinery Spaces
Due 17 June 2003
Resolved 24 June 2003
Electrical › Lighting (service)
Issued 10 June 2003
Resolved
Install light cover in women's head. LEGACY COMPONENT DESC: Lighting Fixture
Due 17 June 2003
Resolved 24 June 2003
Documentation › Certificates/Documents
Issued 10 June 2003
Resolved
Provide valid FCC Safety Certificate (vsl restricted to w/in 1000 ft fm shore until corrected).
Due 10 June 2003
Resolved 11 June 2003
Construction/Loadline › Hull
Issued 10 June 2003
Resolved
C/R port/stbd #2 transverse frames fm keel to just below chine (forepeak). LEGACY COMPONENT DESC: Transverse Frame
Due 10 July 2003
Resolved 5 August 2003
Construction/Loadline › Structures
Issued 10 June 2003
Resolved
V/W deck long #8 IWO #1 stbd transverse frame.
Due 10 July 2003
Resolved 5 August 2003
Construction/Loadline › Hull
Issued 10 June 2003
Resolved
V/W #1 transverse frame at keel (stbd)(forepeak). LEGACY COMPONENT DESC: Transverse Frame
Due 10 July 2003
Resolved 5 August 2003
Construction/Loadline › Hull
Issued 10 June 2003
Resolved
V/W #1 transverse frame IWO first SSL up fm chine (forepeak). LEGACY COMPONENT DESC: Transverse Frame
Due 10 July 2003
Resolved 5 August 2003
Construction/Loadline › Structures
Issued 10 June 2003
Resolved
V/W port #7/#8 bulwark stiffeners at deck. LEGACY COMPONENT DESC: Deck Plating
Due 10 July 2003
Resolved 5 August 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 10 June 2003
Resolved
V/W port bulwark cap IWO #7 bulwark stiffener. LEGACY COMPONENT DESC: Deck Rail
Due 10 July 2003
Resolved 5 August 2003
Navigation › Piloting/Steering
Issued 10 June 2003
Resolved
Provide current light list. LEGACY COMPONENT DESC: Coast Guard Light List
Action required: 705 - Other - as specified
Due 17 June 2003
Resolved 17 June 2003
Resolution: Current Reed''s Nautical Almanac onboard.
Engineering › Bilge Water Management System
Issued 18 June 2002
Resolved
Bilge pump is clutch operated off of inboard starboard main. Clutch engage is worn due to age of pump. CG 835 written for replacement of this pump, becuse it also operates as a secondary fire pump. Replacement scheduled for 19JUN02. LEGACY COMPONENT DESC: Pump
Action required: 705 - Other - as specified
Due 20 June 2002
Resolved 20 June 2002
Resolution: New pump installed. Sat operation observed.
Engineering › Bilge Water Management System
Issued 18 June 2002
Resolved
Prove proper operation of machinery space Hi-level alarm (no local alarm, visual or audible in bridge). LEGACY COMPONENT DESC: Interface Detector
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 20 June 2002
Resolution: Witnessed sat operation of high level alarm from E/R.
Electrical › Electric Supply System (service)
Issued 18 June 2002
Resolved
Remove Romex wire beneath operating station/replace with proper wire & connectors.
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 25 June 2002
Resolution: Romex removed and wired w/ proper boat cable.
Accommodation/Occupational Safety › Medical/First Aid
Issued 18 June 2002
Resolved
Replace expired eye wash, with recent eye wash solution. LEGACY COMPONENT DESC: Medicine Chest
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 20 June 2002
Resolution: Observed updated medications.
Accommodation/Occupational Safety › Occupational Safety
Issued 18 June 2002
Resolved
Permanently mount hearing conservation placard at engine room entry hatch.
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 20 June 2002
Resolution: Observed hearing conservation placard.
Communications › Radio Communications
Issued 18 June 2002
Resolved
Mount emergency broadcast placard in bridge. LEGACY COMPONENT DESC: Broadcast Placard
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 20 June 2002
Resolution: Observed emergency broadcast placard in wheelhouse..
Engineering › Diesel Engine (propulsion-direct drive)
Issued 18 June 2002
Resolved
Prove proper operation of bridge remote start of inboard starboard main diesel. At time of inspection this engine could only be started locally.
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 25 June 2002
Resolution: Witnessed control of inboard stbd engine from pilothouse.
Navigation › Piloting/Steering
Issued 18 June 2002
Resolved
Replace charts, light list, coast pilot and 47 CFR in bridge LEGACY COMPONENT DESC: Marine Charts
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 20 June 2002
Resolution: Observed new charts, light list, coast pilot and 47 CFR.
Operations/Management
Issued 18 June 2002
Resolved
Conduct 15 minute rounds, while underway until Hi-level alarm is operational.
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 20 June 2002
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 June 2002
Resolved
Remove dead-ended wires beneath same area (NY07) or properly terminate.
Action required: 705 - Other - as specified
Due 25 June 2002
Resolved 20 June 2002
Resolution: Dead ended wires removed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 June 2002
Resolved
Install metal supports to wiring every 24 inches in engine room (such manner as to avoid chaffing).
Due 25 June 2002
Resolved 25 June 2002
Resolution: Observed new supports in E/R.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 1 November 2001
Resolved
REPAIR EXHAUST LEAK ON PORT ENGINE, INBOARD TURBOCHARGER.
Condition: Unknown
Due 1 December 2001
Resolved 3 December 2001
Resolution: Repaired
Construction/Loadline
Issued 1 November 2001
Resolved
REPAIR SUPPORT STANTION IN ENGINE ROOM. STANTION HAS BROKEN BOLTS ON THE TOP AND IS NOT PROPERLY SUPPORTING THE MAIN DECK. STANTION IS LOCATED IN THE E/R, PORT SIDE FWD.
Condition: Unknown
Due 1 December 2001
Resolved 3 December 2001
Resolution: Repaired
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 1 November 2001
Resolved
PROVIDE PROPER SUPPORTS FOR MDE CONTROL CABLES. CABLES ARE CURRENTLY SUPPORTED FROM THE ENGINE ROOM OVERHEAD USING RUBBER TIE DOWN STRAPS LEGACY COMPONENT DESC: Controls
Condition: Unknown
Due 1 December 2001
Resolved 3 December 2001
Resolution: Repaired
Construction/Loadline › Hull
Issued 1 November 2001
Resolved
MAKE PROPER REPAIRS TO CRACKED BULKHEAD IN AFT ENGINE ROOM. CRACK IS LOCATED ON THE AFT E/R BULKHEAD IWO PORT ENGINE SEAWATER DISCHARGE PIPING PENETRATION. CRACK EXTENDS FROM S/W PIPING PENETRATION TO DRY EXHAUST FLANGE FOR THE PORT MDE. LEGACY COMPONENT DESC: Watertight bulkhead
Condition: Unknown
Due 1 December 2001
Resolved 18 June 2002
Resolution: Repaired IAW approved proposal from Derecktor S/Y.
Fire Fighting › Structural - A Class Divisions
Issued 1 November 2001
Resolved
REMOVE MECHANICAL HOLD BACKS ON ALL FIRE DOORS. LEGACY COMPONENT DESC: Fire Doors
Condition: Unknown
Due 1 December 2001
Resolved 3 December 2001
Resolution: Removed
Fire Fighting › Structural Fire Protection - General
Issued 1 November 2001
Resolved
REMOVE CARPET UNDER FIRE DOORS. CARPET NEEDS TO BE REMOVED FROM THE THRESHOLD AREA UNDER THE DOOR WHEN CLOSED. LEGACY COMPONENT DESC: Fire Boundary
Condition: Unknown
Due 1 December 2001
Resolved 3 December 2001
Resolution: Removed
Electrical › Electric Supply System (service)
Issued 1 November 2001
Resolved
REPAIR AUXILLARY SHORE POWER RECEPTICLE. RECEPTICLE IS LOCATED PORT SIDE MIDSHIP ON THE BACK SIDE OF THE BULWARK LEGACY COMPONENT DESC: Shore Tie Connector
Condition: Improper/Lack of Maintenance
Due 1 December 2001
Resolved 3 December 2001
Resolution: Repaired
Construction/Loadline
Issued 9 April 2001
Resolved
Welds in the forepeak are broken. Starboard side on the first frame and at the stem where the longs tie in. These need fix prior to carrying passengers.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Lifesaving
Issued 4 June 1999
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 11 June 1999
Resolved 11 June 1999
Engineering
Issued 10 April 1997
Resolved
REPLACE LAGGING ON MAIN ENGINE TURBOCHARGERS: (1) ON PORT INBOARD, (2) ON PORT OUTBOARD, (2) ON STBD OUTBOARD.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Engineering
Issued 10 April 1997
Resolved
REPLACE LAGGING ON STBD GENERATOR EXHAUST MANIFOLD ELBOW.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Electrical
Issued 10 April 1997
Resolved
REPLACE (2) GLOBES, (1) GUARD, AND (1) BULB IN LAZARRETTE LIGHT FIXTURES.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Lifesaving
Issued 10 April 1997
Resolved
RENEW PAINTER ON AFT BUOYANT APPARATUS.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Accommodation/Occupational Safety
Issued 2 April 1996
Resolved
MAKE PERMANENT REPAIR TO THE BENT RAILING ON THE BOW AND MINOR (LESS THAN 2") FRACTURES UNDER THE BENT RAILING.
Condition: Unknown
Due 2 April 1996
Resolved 2 April 1996
Accommodation/Occupational Safety
Issued 2 April 1996
Resolved
PORT LOADING DOOR WOULD NOT CLOSE PROPERLY (WATERTIGHT).
Condition: Unknown
Due 12 April 1996
Resolved 12 April 1996
Lifesaving
Issued 2 April 1996
Resolved
MAKE PERMANENT REPAIR TO SIX BUOYANT APPARATUS WHERE TORN.
Condition: Unknown
Due 2 April 1996
Resolved 2 April 1996
Accommodation/Occupational Safety
Issued 2 April 1996
Resolved
WATER TIGHT DOOR TO THE ENGINE ROOM WAS NOT PROPERLY ADJUSTED (DOGS NOT TOUCHING).
Condition: Unknown
Due 12 April 1996
Resolved 12 April 1996
Accommodation/Occupational Safety
Issued 2 April 1996
Resolved
MAKE PERMANENT REPAIR TO STARBOARD VENT PIPE WHERE FRACTURED IN COMPARTMENTNUMBER TWO (STORE ROOM).
Condition: Unknown
Due 2 April 1996
Resolved 2 April 1996
Electrical
Issued 2 April 1996
Resolved
MAKE PERMANENT REPAIR TO THE TWO WATER TIGHT DOOR INDICATOR LIGHTS LOCATED ON THE BRIDGE.
Condition: Unknown
Due 2 April 1996
Resolved 2 April 1996
Engineering
Issued 2 April 1996
Resolved
MAKE PERMANENT REPAIRS TO THE MAIN ENGINE EXHAUST SYSTEM WHERE LEAKING WATER IN THE STEERING SPACE.
Condition: Unknown
Due 2 April 1996
Resolved 2 April 1996
Engineering
Issued 2 April 1996
Resolved
BRING EXHAUST SYSTEM INTO COMPLIANCE WITH 46 CFR 182.20-20 OR 46 CFR 119.425 (EXHAUST LAGGING MISSING).
Condition: Unknown
Due 2 April 1996
Resolved 2 April 1996
Electrical
Issued 2 April 1996
Resolved
PLACE DEAD ENDED HEATER CABLE IN OUTLET BOX OR REMOVE FROM SPACE.
Condition: Unknown
Due 2 April 1996
Resolved 2 April 1996
Construction/Loadline
Issued 4 April 1995
Resolved
VEE-OUT AND AND REWELD FRACTURES IDENTIFIED IN BOW COMPARTMENT.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Construction/Loadline
Issued 4 April 1995
Resolved
VEE-OUT AND REWELD FRACTURES IN DECK PILLARS IN LOWER LOUNGE.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Construction/Loadline
Issued 4 April 1995
Resolved
RENEW DISTORTED NO. 1 STARBOARD TRANSVERSE FRAME IN BOW COMPARTMENT.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Construction/Loadline
Issued 4 April 1995
Resolved
VEE-OUT AND REWELD FRACTURES IN LAZARETTE IN WAY OF BOTH PORT AND STARBOARDGENERATOR EXHAUST PIPING AT STERN HULL PLATING.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Engineering
Issued 11 April 1994
Resolved
PIPE NIPPLE IS CORRODED IN WAY OF BULKHEAD CUTOUT VALVE FOR EXHAUST COOLINGWATER LINE TO STBD INBD MDE EXHAUST IN LAZZARETTE. RENEW AS REQUIRED.
Condition: Unknown
Due 11 April 1994
Resolved 11 April 1994
Engineering
Issued 11 April 1994
Resolved
RAW WATER COOLING HOSE FROM SEA STRAINER TO THE PUMP ON THE STBD INBOARD MDE WAS CRACKING AND DETERIORATED. RENEW SAME.
Condition: Unknown
Due 11 April 1994
Resolved 11 April 1994
Navigation
Issued 25 May 1988
Resolved
RESECURE ALL CLAMPS ON HYDRAULIC LINES FOR STEERING SYSTEM.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Fire Fighting
Issued 25 May 1988
Resolved
INSTALL A LATCHING MECHANISM ON TWO FIREDOORS; MAIN DECK.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Fire Fighting
Issued 25 May 1988
Resolved
PROCURE ONE 1 1/2" FIREHOSE
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Accommodation/Occupational Safety
Issued 1 June 1987
Resolved
INSTALL AUTOMATIC DOOR CLOSINGS ON INCLINED DOORS.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Documentation
Issued 1 June 1987
Resolved
CONTACT MSO BOSTON UPON ARRIVAL IN THEIR ZONE.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987