Records from 2016 to 2025. Most recent: inspection, 27 May 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 May 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: Provide services necessary for safety under normal and emergency conditions. Wiring for engine controls was burnt. Replace wiring to the satisfaction of the attending MI.46 CFR 120.200(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 May 2025
Resolution: Wires were replaced
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 May 2025
Resolved
The following spaces must be equipped with a fire detection and alarm system of an approved type that is installed in accordance with part 76 in subchapter H of this chapter. Vessel's fire alarm panel showed a fault alarm. Once cleared, system was unable to be tested. Demonstrate proper operation of fire detection system to satisfaction of attending MI. 46 CFR 118.400(c)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 May 2025
Resolution: Tested smoke and heat detector. All Sat
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 May 2025
Resolved
If 1 1/2 inch diameter fire hose is used, each length of hose must: (1) Be lined commercial fire hose that
conforms to Underwriters' Laboratories, Inc. Port and starboard hoses were found holed. Replace hoses to satisfaction of attending MI. 46 CFR 181.15-10(d)
OLD T
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 May 2025
Resolution: Replaced with new fire hose
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 27 May 2025
Resolved
All toilets and wash basins provided shall be fitted with adequate plumbing. Pipe for salt water intake to sewage was leaking/spraying over nearby electrical equipment. Repair/replace pipe to the satisfaction of the attending MI. 46 CFR 177.30-5(b)
OLD T
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 May 2025
Resolution: Slat water intake pipe was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2025
Resolved
Receptacle outlets and attachment plugs for the attachment of portable lamps, tools, and similar apparatus supplies as ship's equipment and
operating at 100 volts or more, shall provide a grounding pole and a grounding conductor in the portable cord. Upper deck port side concession area food warmer found with broken ground pole. Remove equipment or repair cable to satisfaction of MI. 46 CFR 183.10-20 (o)
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 29 May 2025
Resolution: Cord was replaced
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2025
Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. The 110V M/D 16 outlet receptacle and hot dog maker cable behind the bar in the main deck accommodation area shows signs of arcing. Remove or repair hot dog maker and associated receptacle outlet to satisfaction of MI.46 CFR 183.10-20(a)
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 29 May 2025
Resolution: Cord and outlet was replaced
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2025
Resolved
Except as provided otherwise in this subpart, all electrical equipment including motors, generators, controllers, distribution panels, etc., shall be
dripproof protected. Electrical panel labeled “Master Distribution and E/R Sub Panel” had multiple openings on top of panel, outlet in crew closet had opening on top, junction box under bridge console was found open, and light switch in DJ booth is missing cover. Install protective coverings to satisfaction of MI. 46 CFR 183.10-10(a)
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 29 May 2025
Resolution: ER Panel openings were sealed, Junction box under bridge was closed, lightswitch in DJ booth was replaced, outlet in crew closet was repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 May 2025
Resolved
A loop of tubing or a short length of flexible hose shall be installed in the fuel supply line at or near the engines. Such flexible hose shall be provided with suitable connection fittings and shall have a high resistance to salt water, petroleum oils, heat and vibration. Fuel hose on port generator was worn. Replace hose to the satisfaction of the MI.46 CFR 182.20-40(b)(4)
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 2 June 2025
Resolution: Fuel hose was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 27 May 2025
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Generators had rotating equipment that did not have machinery guards. Install guards to the satisfaction of the MI. 46 CFR 177.35-15
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 29 May 2025
Resolution: Verified guard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 May 2025
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Hose clamps on flexible hose for lubricating oil on the starboard generator were not secured in place. Properly secure flexible hose to satisfaction of MI. 46 CFR 115.830(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 2 June 2025
Resolution: Hose clamps secured.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 May 2025
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that meet UL 1104, “Marine Navigation Lights,” or other standard specified by the Commandant. Vessel's navigation lights do not have approved bulbs in accordance with manufacturer's instructions. Replace bulbs to satisfaction of MI. 46 CFR 120.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 June 2025
Resolved 29 May 2025
Resolution: Bulbs replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 May 2025
Resolved
Penetrations and openings in watertight bulkheads must— Have means to make them watertight. The watertight bulkhead between the second void space and the third space had an opening. Repair to the satisfaction of the MI. 46 CFR 171.114(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 June 2025
Resolved 29 May 2025
Resolution: Verfified opening closed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 May 2025
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Life jacket container markings forward of the operating station (port and starboard) have come off. Relabel to satisfaction of MI. 46 CFR 122.604 (f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 June 2025
Resolved 29 May 2025
Resolution: Verified markings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 May 2025
Resolved
At each inspection for certification and at every other vessel inspection, quarters, toilet and washing spaces, galleys, serving pantries, lockers, and similar spaces may be examined to determine that they are serviceable and in a sanitary condition. Piping in crew closet had corroded salt water pipe for toilets. Repair pipe to the satisfaction of the MI. 46 CFR 115.818
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 June 2025
Resolved 29 May 2025
Resolution: Pipe repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 May 2024
Resolved
Fuel filters fitted with bowls of other than steel construction must be approved by the Commandant and be protected from mechanical damage; Fuel filters/ caps not marine grade; 03 caps and 01 bowl to be fitted with metal/ marine grade material on generators and engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 June 2024
Resolution: Visually verified installed marine grade bowls for required engines/ generators.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 May 2024
Resolved
Battery chargers must have an ammeter connected in the charging circuit; Battery charger needs ammeter, add to circuit.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2024
Resolved 27 June 2024
Resolution: vessel installed a new battery charger with amp meter.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 May 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Battery bank could not supply enough power for engine start. Replace dead batteries.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2023
Resolved 12 May 2023
Resolution: O/O provided pictures of battery purchase
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 May 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Observed dead end wires in the following places: storage closet on main deck near snack stand and running to 50A power Port/Starboard junction box. Also observed junction box was not properly closed. 1. removed dead end wires from above places and properly seal 50A junction box.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2023
Resolved 12 May 2023
Resolution: O/O provided picture of removed dead end wires and junction box
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 May 2023
Resolved
Except as provided otherwise in this subpart, all electrical equipment including motors, generators, controllers, distribution panels, etc., shall be dripproof protected. Dripproof protected means that equipment and machinery is so constructed or protected that its successful operation is not interfered with when subjected to falling moisture or dirt, and rotating or uninsulated parts cannot be inadvertently touched or approached nearer than a safe distance by any person. Belt on center engine near bilge manifold does not have a guard. Place guard over exposed belt.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2023
Resolved 12 May 2023
Resolution: O/O installed guard on center engine where bilge manifold is located.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 1 May 2023
Resolved
At each initial and subsequent for certification... the marine inspector shall require that all unsafe practices and hazardous situations be corrected. Fridges down below were not strapped down which could cause injury or damage while at sea. Strap fridges down below to prevent shifting.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2023
Resolved 12 May 2023
Resolution: O/O installed brackets to prevent shifting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2022
Resolved
The discharge ends of vent pipes shall be fitted with removable flame screens or flame arresters. The flame screens shall consist of a single screen or corrosion resistant wire of at least 30 X 30 mesh. The flame screen on the port side fuel tank vent piping was damaged and needs to be replaced. The starboard side fuel tank vent piping was missing a flame screen. Install flame screens on both port and starboard sides that consist of at least 30 x 30 mesh of corrosion resistant wire.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2022
Resolved 22 June 2022
Resolution: O/O submitted photos of newly installed flame screens.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 June 2022
Resolved
Each life float paddle must be lashed to the life float to which they belong. Several life float paddles were not secured to their life floats. Secure appropriately.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 29 June 2022
Resolution: O/O sent photo of lashed life float paddles.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 June 2022
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Child life jackets were being stowed in a box on the top deck without appropriate labeling. Label stowage box to indicate that the box contains child life jackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 13 June 2022
Resolution: O/O submitted photo of relabeled child life jacket stowage box.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 10 June 2022
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated on the vessel's stability letter, the maximum number of passengers allowed on the upper deck must be indicated by a durable marking of at least 1 inch numbers and letters at the entranceway to that deck. Was was missing sign indicating max. passengers allowed on upper deck. Install sign indicating max. allowable passengers for both protected (218 max) and partially protected (152 max) routes.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 12 December 2022
Resolution: Sign showing max upper deck pax has been installed. Confirmed during 2022 drydock inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 10 June 2022
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Vessel was missing portable lights. Place operable battery-powered lights on board in the vicinity of each of these locations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 29 June 2022
Resolution: O/O sent picture of operable flashlights
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 June 2022
Resolved
All wiring should be run as high as practicable above bilges. The wiring for the high bilge level indicator in the #2 space was not sufficiently supported above the bilge area. Secure electrical wiring so as not to be hanging in water accumulation area in bilge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 13 June 2022
Resolution: O/O submitted photo of bilge high level indicator wire being supported with a support bracket.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 June 2022
Resolved
Each life ring buoy on a vessel must: be approved in accordance with 160.050 in subchapter Q of this chapter or other standard specified by the Commandant... the life ring buoy located on the aft main deck had a cracked plug. Replace life buoy or make suitable repair to the satisfaction of attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2022
Resolved 29 June 2022
Resolution: O/O sent photo of replacement life ring buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 July 2021
Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the waterlight around the body of the ring life buoy.
MI observed that the Port side bridge wing waterlight clip/clasp was corroded and did not spring back to the closed position, correctly securing the waterlight to the ring buoy.
VSL is require to replace the corroded clip in 14 days.
46CFR117.70(d)(1)
16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 29 July 2021
Resolution: Received photo for a new water light clip installed.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 28 July 2021
Resolved
An exposed hazard, such as gears or rotating machinery, must be protected by a cover, guard, or rail.
MI observed MDE belt drive and the overhead supply fan in the engine room did not have protective guard.
VSL is required to install protective guard for those rotating pieces of equipment.
46CFR116.960
16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 21 August 2021
Resolution: Received photos of installed guards.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 June 2020
Resolved
Stern light electrical supply cabling is wasted in vicinity of the light and 220v cabling insulation is separating in laz space. Renew cabling and connections. Covering with electrical tape is not a satisfactory corrective action.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2020
Resolved 23 September 2020
Resolution: Observed cable that was stripped back and connection renewed; inspected by attending inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 25 June 2020
Resolved
Make penetration in laz forward watertight bulkhead starboard side watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2020
Resolved 23 September 2020
Resolution: Penetrations were made watertight; inspected by attending inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 25 June 2020
Resolved
Life floats are not marked with passenger capacity. Mark life floats with passenger capacity.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2020
Resolved 23 September 2020
Resolution: Life floats marked with passenger capacity; inspected by attending inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 25 June 2020
Resolved
Life float paddles are not lashed. Lash paddles to life floats.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2020
Resolved 23 September 2020
Resolution: Life float paddles lashed ; inspected by attending inspector.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 25 June 2020
Resolved
Spanner wrenches not present at each fire hydrant. Provide spanner at each hydrant. 46 CFR 118.310 (e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2020
Resolved 23 September 2020
Resolution: Spanners present at fire stations ; inspected by attending inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 January 2020
Resolved
Make propellers and rudders available for inspection prior to credit drydock.
Action required: 60 - Rectify deficiencies prior to movement
Due 14 January 2020
Resolved 2 March 2020
Resolution: Verified rudders and propellers were installed properly and in good condition.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 May 2019
Resolved
Install positive closure valve on discharge line of engine room sub pump.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2019
Resolved 26 June 2019
Resolution: Received email showing vessel installed a positive closure valve on discharge line of engine room sub pump.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 May 2019
Resolved
Remove dead-end wiring from #3 compartment.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2019
Resolved 30 May 2019
Resolution: Crew removed dead-end wiring.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 9 May 2019
Resolved
Make watertight cable penetration in stbd side from lazarette to #3 compartment.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2019
Resolved 30 May 2019
Resolution: Crew filled the cable penetration with spray foam.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 May 2019
Resolved
Repair improper grounding in 2 identified outlets in the galley.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2019
Resolved 30 May 2019
Resolution: Checked outlet again with different grounding tester and the outlets were good.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 9 May 2019
Resolved
Ensure life float arrangements are made for ready deployment.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2019
Resolved 30 May 2019
Resolution: Crew fixed life float arrangements.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 9 May 2019
Resolved
Bolt down ship's horn compressor located in the #3 compartment.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2019
Resolved 30 May 2019
Resolution: Crew bolted down the ship's horn air compressor.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: No dimension information (AIS Antenna Position ABCD values equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 14 January 2020
Engineering › Bilge Water Management System › Valve
Issued 2 May 2018
Resolved
Install check valves on each bilge suction line as needed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2018
Resolved 27 June 2018
Resolution: Vessel owner installed stainless steel check valves in each space in line with the bilge strainer. Witnessed operation of the bilge system from every space; all sat.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 9 February 2018
Resolved
PWG01 Make overhauled propellors available for inspection.
Action required: 705 - Other - as specified
Due 9 March 2018
Resolved 14 February 2018
Documentation › Certificates/Documents › Letter of Substantial Compliance (DAPI)
Issued 10 May 2017
Resolved
Conduct crew and supervisory training.
Due 24 May 2017
Resolved 23 May 2017
Resolution: Training complete
Navigation › Piloting/Steering › Marine Charts
Issued 10 May 2017
Resolved
Provide up to date charts for area of operation
Due 24 May 2017
Resolved 23 May 2017
Resolution: New chart onboard
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 29 April 2016
Resolved
Replace port navigation light. Restricted to daylight operations only. Cessel shall not operate in visibility less than 1NM.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2016
Resolved 4 May 2016