MAURY USCG vessel records
← All vessels

MASSACHUSETTS

MASSACHUSETTS is a 1988 passenger vessel (inspected). The Coast Guard has recorded 45 inspections since 2016, most recently in December 2025, along with 34 deficiencies — 3 with no resolution recorded — and 12 casualty investigations between 2003 and 2018.

Records from 2003 to 2025. Most recent: inspection, 30 December 2025.

Built
1988
Last inspected
30 December 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 30 December 2025
…with no type recorded17
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDH5399
299334
Flag
UNITED STATES
Maury page id
psix-299334

Documentation record

Registered dimensions (L × B × D)87.6 ft × 25.1 ft × 7.1 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF CRAFT, INC. · PATTERSON, LA, UNITED STATES · built 1988
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBOSTON, MA
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 12 September 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 45

30 December 2025 Examination of Repairs · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8288566
28 October 2025 In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8249531
22 May 2025 Plan Review (Other than "T")
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8162036
19 December 2024 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8037617
23 October 2024 Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8022957
4 October 2024 Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8014392
23 July 2024 In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7966451
17 November 2023 Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7809075
25 April 2023 In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7673081
14 October 2022 Hull Examination · Deficiency Check · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7574963
29 September 2022 Internal Structural Exam · COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7542259
6 May 2022 In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7443996
15 October 2021 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7316154
9 November 2020 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7092435
13 October 2020 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7075882
11 October 2019 Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6831139
10 December 2018 Administrative Inspection · Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6594976
10 December 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6596322
3 December 2018 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6591226
19 November 2018 Drydock Extension · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6588031
1 November 2018 Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6572835
16 October 2018 MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6559880
24 September 2018 In-Service Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6547060
12 September 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6539363
11 September 2018 Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6537725
15 August 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6513557
21 May 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6419517
10 April 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6388815
19 December 2017 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6326444
28 November 2017 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6314845
11 October 2017 COI Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6285584
20 September 2017 Deficiency Check · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6271730
19 September 2017 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6271057
25 August 2017 Damage Survey · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6251491
25 August 2017 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6261275
10 November 2016 Drydock Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6038993
28 October 2016 Annual Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6031406
12 September 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5999344
12 September 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5999346
31 May 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5893467
31 May 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5893476
24 February 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5821075
24 February 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5821088
15 February 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5815483
15 February 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5815492

Deficiency record · 34

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 December 2025 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Stbd inner MDE experienced a punctured block due to a failed connecting rod. Vessel is allowed to operate on the three other engines not to exceed 12 knots so as to not overwork the remaining engines. Repair or replace engine in kind or to the satisfaction of the cognizant OCMI.
Action required: 705 - Other - as specified
Resolved 20 January 2026
Resolution: satisfactory installation and sea trial
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 December 2024 No resolution recorded
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space, including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. Attending MI found that the welds on bulkhead stiffeners on transom in lazarette did not have adequate tie in/penetration where previous repair occurred aft of the wet exhaust piping. Permanent repairs to be complete at the credit drydock in 2026. 46 CFR 115.600(d)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 December 2024 Resolved
The number of persons capacity must be marked or painted in clearly legible letters and numbers on each life float and buoyant apparatus. This number must: ( 1) Be the number of persons the device is equipped for; and (2) Not be greater than the number the device is approved for as shown on the data on the nameplate. Persons capacity was not marked on the life floats and the nameplates were no longer legible due to being painted over.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2025
Resolved 27 February 2025
Resolution: Vessel removed life floats and restricted its operational route.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 19 December 2024 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 65 feet in length must also have navigation lights that meet UL 1104 "Marine Navigation Lights," or other standard specified by the Commandant. Vessel has LED navigation lights that are not marked with UL listing. Prove installed lights meet UL 1104 or install navigation lights that meet UL 1104.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2025
Resolved 5 February 2025
Resolution: Operator installed UL 1104 navigation lights
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 December 2024 Resolved
Each battery used in an item of lifesaving equipment, must be replaced during the annual inspection if the expiration date of the battery has passed... Except for storage battery, each battery without an expiration date indicated on it or for which the the owner or managing operator does not have a record of the expiration date, used in an item of lifesaving equipment, must be replaced during the annual inspection. Batteries in the life float and ring buoy lights have expired or are not marked with expiration dates. Renew all batteries with approved batteries as indicated by the light manufacturer.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2025
Resolved 7 January 2025
Resolution: Batteries were renewed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 December 2024 Resolved
Where liquid level indicating gages are installed,they shall be of heat resistant materials, adequately protected from mechanical damage and provided at the tank connections with devices which will automatically close in the event of rupture of the gage or gage lines. Vessel has a gate valve which does not automatically close in the event of rupture of the gage or gage lines. Cite: 46 CFR 182.20-25(1)(5) Old T
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2025
Resolved 7 January 2025
Resolution: Valve installed and tested.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 12 November 2024 No resolution recorded
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space, including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. Pitting found in lazarette hull plating starboard side in way of rudder post and forward corner at the bulkhead. 04 pits to be repaired by clad welding; 02 pits in Bay #4 and 02 pits near rudder post not protected by external doubler. All other pits greater than 0.16" deep to be cleaned to good metal and filled with a suitable marine epoxy for corrosion resistance. Both areas are to be cropped and renewed prior to credit drydock in 2026. Until renewed, high water alarm in lazarette shall be tested and logged daily.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 4 October 2024 No resolution recorded
Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads. Small hole developed in way of the STBD quarter at the transom, approximately 4' above the waterline. Operator is permitted to install a temporary patch to continue operations until permanent repairs are completed as part of the next credit hull inspection. Vessel is to operate on a Lakes Bays and Sounds route only during this period, the Limited Coastwise route is deactivated until permanent repairs are complete. Conduct rounds of the lazarette at each stop on the ferry run.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 November 2023 Resolved
(a) At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: (1) Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather desks. During Annual Exam, a crack in the starboard side shell near the transom. Repair the crack to the satisfaction of the attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2023
Resolved 23 December 2023
Resolution: VSL made satisfactory temporary repairs and will make permanent repairs during vsls next drydock.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 17 November 2023 Resolved
At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. The vessel's starboard outboard main diesel engine was found to have a fuel leak on the piping to the engine's fuel strainer isolation valve. Repair to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2023
Resolved 30 November 2023
Resolution: Deficiency was corrected. All SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 17 November 2023 Resolved
Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway. The lighting fixture cover in the lazarette was found to be incorrectly affixed. Repair to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2023
Resolved 30 November 2023
Resolution: Light cover was installed correctly with new clips. ALL SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 September 2022 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Fuel supply/return lines on generator engine/s were found to be deteriorated. Replace fuel lines on port and starboard generators.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2022
Resolved 8 February 2023
Resolution: Return and supply fuel lines were replaced on port and stbd generators.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 September 2022 Resolved
Each lighting fixture, globe, lens or diffuser must have a guard or be made of high strength material. Florescent light fixture was found to have a broken clip that secures the light cover. Replace clip/cover to meet the requirements in 46CFR120.410.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2022
Resolved 8 February 2023
Resolution: Light fixture cover and clips were replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 October 2021 Resolved
Employers must ensure that they and their crewmembers meet the requirements of this part. Vessel was unable to provide enrollment for the DAPI program.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2021
Resolved 1 November 2021
Resolution: Verified enrollement in DAPI
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 15 October 2021 Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Vessel limited to 3mn operation due to expired Hydrostatic release.
Action required: 705 - Other - as specified
Resolved 1 November 2021
Resolution: Verified EPIRB installation sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 October 2020 Resolved
The minimum capacity of the fire pump shall be not less than 60 pounds per square inch at the pump outlet. The fire pump only makes 30 psi at the pump outlet. 46 CFR 181.10-1(c)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2020
Resolved 15 October 2020
Resolution: New fire pump installed. Operationally tested with 2 fire hoses, hitting 60 psi at the pump outlet.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 October 2020 Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets. One of the forward, port lifejacket bins is missing the number of lifejackets stored inside. Add a label for the number of lifejackets stored in that container. 46 CFR 122.604(f)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 October 2020
Resolved 9 November 2020
Resolution: Label added
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 October 2020 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Lifejackets are stored on the second deck, but there are no donning instructions posted. 46 CFR 122.516(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 October 2020
Resolved 15 October 2020
Resolution: 02 placards posted on 2nd deck.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 October 2020 Resolved
All escape hatches used as a means of escape must be marked on both sides in clearly legible letters at least 2 inches high "EMERGENCY EXIT, KEEP CLEAR". The emergency escape hatch on the stbd side near the bar on the main deck is not adequately marked. 46 CFR 122.606
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 October 2020
Resolved 15 October 2020
Resolution: New marking was made on top of the escape hatch.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 October 2020 Resolved
Machinery spaces must be separated from accommodation spaces by boundaries that prevent the passage of vapors. The foam gasket under the door leading from the accommodation space on the main deck to the engine room on the stbd side is wasted. 46 CFR 116.405
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 October 2020
Resolved 9 November 2020
Resolution: New gasket installed
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2020 Resolved
All electrical equipment, including distribution panels, shall be dripproof protected. Breaker panel in the engine room on the port side aft does not latch closed. 46 CFR 183.10-10(a)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 October 2020
Resolved 15 October 2020
Resolution: New latch was installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2020 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge of Marine Inspection. The bilge alarm junction box in the aft steering void near the centerline on the transom is not watertight as designed (missing stuffing tube). 46 CFR 183.01-15(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 October 2020
Resolved 15 October 2020
Resolution: New watertight fitting installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 October 2019 Resolved
Port outboard propulsion engine raw water hose dry rotted. Hose is located on the onboard side at the expansion tank outlet. Replace hose in kind.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2019
Resolved 29 October 2019
Resolution: Installed new hose, inspected sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 October 2019 Resolved
Aft emergency escape hatches on port and starboard of engine room not properly marked. Mark emergency escape hatches as required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2019
Resolved 29 October 2019
Resolution: Installed 5 new LED emergency light fixtures in engine room, marked emergency exits.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 October 2019 Resolved
Starboard generator failed to start during operational testing. Starting battery replaced. Generator op test sat.
Action required: 10 - Deficiency Rectified
Resolved 11 October 2019
Resolution: New batt installed, tested sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 October 2019 Resolved
No visible draft marks on vessel. Provide draft marks as required. 46CFR122.602(b)(1) NLT next DD on 2020
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2019
Resolved 9 November 2020
Resolution: Inspected draft marks, sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 October 2019 Resolved
Access control markings on starboard door into pilot house missing restricted access marking. Provide markings as required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2019
Resolved 29 October 2019
Resolution: Provided all required markings.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 February 2019 Resolved
Where subject to moisture, a storage cylinder must be installed to provide a space of at least 2 inches between the deck and the bottom of the storage cylinder. Storage cylinders on the MASSACHUSETTS are currently resting directly on the deck in an area subject to moisture.
Action required: 705 - Other - as specified
Due 31 October 2019
Resolved 9 November 2020
Resolution: Elevated installation of CO2 cylinder, inspected sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 1 November 2018 Resolved
Owner/Operator shall conduct tests to determine that fixed gas fire extinguishing equipment, including controls, are in operating condition. Cylinder control heads linked to engine room rate of rise heat sensors for automatic deployment of fixed CO2 system are inoperable. System is currently capable of manual operation only.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2018
Resolved 15 November 2018
Resolution: 2 new pneumatic control heads were installed on the CO2 pilot bottles. Test conducted and system 100% operational via manual and auto activation.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 11 September 2018 Resolved
Vsl is broadcasting NAME with Vsl type precursor (NAME must not include Vsl type precursors, e.g. F/V, M/V) and no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 16 October 2018
Resolution: While running a query in VIVS, all information had been updated and AIS was broadcasting the proper information.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (electric)
Issued 12 October 2017 Resolved
Provide vessel with approved DVTP's and PSTP's.
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 24 September 2018
Resolution: Veriffied DVTP's approved by MSC. Tested all with stisfactory results.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 21 September 2017 Resolved
Make permenent repairs to STBD M/E. Prove proper operation of main propulsion.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 September 2017
Resolved 5 October 2017
Resolution: Conducted underway sea trial, examined M/E fuel, lube oil, and cooling water syatems, Sat. Examined stuffing box, packing and shaft, sat. There were no vibrations detected. The CG-835 issued 20SEP17 was cleared and the vessel was returned to service.
Electrical › Electric Generation Source (service) › Grounding Conductor
Issued 25 August 2017 Resolved
Multiple wires were damaged due to a fault in the engine control system. Replace in kind all damagaed wires.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 August 2017
Resolution: Wires replaced in kind.
Engineering › Electric Propulsion System › Cable
Issued 25 August 2017 Resolved
Conduct operational test of all propulsion equipment to the satisfaction of attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 August 2017
Resolution: Completed inport and underway operational test. All sat.

Casualty record · 12

11 June 2003Routine · role: Involved in a Marine Casualty · activity 1815234
12 June 2006Major Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 2678071
10 July 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 2990497
6 August 2007Routine · role: Involved in a Marine Casualty · activity 3019808
5 September 2007Routine · role: Involved in a Marine Casualty · activity 3051831
3 July 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3784411
27 July 2011Routine · role: Involved in a Marine Casualty · activity 4096900
12 December 2011Routine · role: Involved in a Marine Casualty · activity 4206808
14 March 2014Routine · role: Involved in a Marine Casualty · activity 4817263
25 August 2017Routine · role: Involved in a Marine Casualty · activity 6261275
19 September 2017Routine · role: Involved in a Marine Casualty · activity 6271057
10 December 2018Routine · role: Involved in a Marine Casualty · activity 6596322
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.