MAURY USCG vessel records
← All vessels

RENOWN

Built
1940
Last inspected
22 April 2020
Documentation
Expired · NVDC file of 10 August 2026
Controls
1 with no removal date recorded

This record may be incomplete: the most recent inspection recorded for this vessel was 6 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 22 April 2020
…past their stated due date1
Operational controls 1 with no removal date recorded
Years with a record 5 calendar years (2016–2020)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WAJ2248
Flag
UNITED STATES
Maury page id
psix-60930

Documentation record

Registered dimensions (L × B × D)65.4 ft × 16.0 ft × 8.1 ft
Registered tonnagegross 73 / net 57
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMATHIS YACHT BUILDING COMPANY · CAMDEN, NJ, UNITED STATES · built 1940
Hull materialWood
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSAN DIEGO, CA
Endorsements, as the file codes themcw_un, reg
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it73 - Regulatory (Subpart C or D), Gross Ton
57 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 10 inspections, each with its date, unit and type; 40 deficiencies with the resolution recorded against each, 17 without one; 1 operational control with no removal date recorded; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 10

22 April 2020 Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6942359
29 January 2020 Administrative Inspection · Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6898630
22 January 2020 Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6893856
6 February 2019 Annual Inspection · Construction Oversight
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6621184
21 February 2018 Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6359167
12 February 2018 Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6356469
18 January 2018 Internal Structural Exam · Administrative Inspection · Deficiency Check · Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6339367
22 November 2017 COI Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6306534
15 February 2017 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6088780
12 January 2016 Hull Examination · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5796256

Deficiency record · 40

02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 February 2020 No resolution recorded
Vessels exposed to salt water more than 3 months in any 12 month period must undergo a drydock and internal structural examination at least once every 2 years. The vessel failed to complete the required drydock and internal structural examination in accordance with 46CFR176.600(b)(1). The vessel is not permitted to carry passengers for hire until satisfactory completion of the required drydock and internal structural examination.
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 January 2020 No resolution recorded
Install emergency lighting in all spaces below the main deck accessible to passengers/crew; emergency lighting shall automatically activate upon failure of the main lighting system. Due prior to credit hull. Old-T 46CFR184.30-5.
Condition: Improper Installation
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 22 January 2020 No resolution recorded
Renew rotten sheer clamp, port side galley. Due prior to credit hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 22 January 2020 No resolution recorded
Renew rotten frames and hull at galley starboard side window (remove coverings for further inspection). Due prior to credit hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 22 January 2020 No resolution recorded
Renew rotten hatch at forward escape. Due prior to credit hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 22 January 2020 No resolution recorded
Replace broken window in forward escape trunk, port side. Due prior to credit hull.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 22 January 2020 No resolution recorded
Renew rotten deck, port side main deck at galley/sheer clamp. Due prior to credit hull.
Condition: Improper Installation
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 January 2020 No resolution recorded
Install non combustible waste receptacles in passenger lounge areas. Due 22Feb2020.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 February 2020 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 January 2020 No resolution recorded
Provide repair plan for fixed bilge system - system shall contain manifold with individual stop valves, check valves, and strainers for each suction line. System is to be operationally tested after repairs, due prior to carriage of passengers.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 January 2020 No resolution recorded
Provide repair plan for fuel piping arrangements meeting the requirements in 46CFR182.455. System is to be operationally tested following repairs, prior to carriage of passengers.
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 January 2020 No resolution recorded
Install permanent fuel vent flame screen at vent terminus; minimum 30x30 mesh. Due prior to credit hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 January 2020 No resolution recorded
Install outlet cover on galley hot plate outlet. Due 22Feb2020.
Condition: Improper Installation
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 January 2020 No resolution recorded
Make three (03) electrical j-boxes on cabin top above wheel house water tight. Due prior to credit hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 22 January 2020 No resolution recorded
Remove obstruction (light strip) from port side galley window. Due prior to credit hull.
Condition: Improper Installation
Action required: 705 - Other - as specified
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 22 January 2020 No resolution recorded
Renew rotten overhead in wheel house under port side running light. Due prior to credit hull.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 22 January 2020 No resolution recorded
Crop and renew aft water tight bulkhead where wasted; make bulkhead water tight. Due prior to credit hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 6 February 2019 Resolved
Provide vessel with 03 additional flares
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 February 2019 Resolved
Terminate open wires in junction box on vessel's stern
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2019
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 6 February 2019 Resolved
Remove all oily water from eninge room and galley bilges
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 February 2019 Resolved
Label life jacket stowage on vessel's bow
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2019
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 6 February 2019 Resolved
Complete underway drills with full crew onboard
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2019
Resolved 12 April 2019
Resolution: Drills conducted.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 6 February 2019 Resolved
Properly mount steering pump accumulator
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2019
Resolved 12 April 2019
Resolution: Pump mounted.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 6 February 2019 Resolved
Renew 02 kinked steering control pipes
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2019
Resolved 12 April 2019
Resolution: REplaced w/ hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 February 2019 Resolved
Renew 02 generator fuel hoses
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2019
Resolved 12 April 2019
Resolution: Hoses replaced.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 6 February 2019 Resolved
Properly mount fire pump
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2019
Resolved 12 April 2019
Resolution: Pump mounted.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 6 February 2019 Resolved
Provide one-line diagram of new battery charger power
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2019
Resolved 18 June 2019
Resolution: Vessel rep provided drawing, loaded drawing into activity documents.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 6 February 2019 Resolved
Provide one-line diagram of new throttle control power
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2019
Resolved 18 June 2019
Resolution: Vessel rep provided drawing, loaded drawing into activity documents.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 6 February 2019 Resolved
Provide MSC approved PSTP's and DVTP's for propulsion throttle controls
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 April 2019
Resolved 22 April 2020
Resolution: Received approval letter from MSC.
Electrical › Electrical Distribution System (service) › Neutral Ground
Issued 21 February 2018 Resolved
Demonstrate proper operation of propulsion system due to repeated loss of propulsion.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 February 2018
Resolved 23 February 2018
Resolution: Electrical ground found. All new wiring from engine to helm controls installed.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 21 February 2018 Resolved
Provie proper operation of both MDE temp guages.
Action required: 705 - Other - as specified
Due 21 February 2018
Resolved 23 February 2018
Resolution: Gauges rewired.
Engineering › Shafting/Propeller Arrangements › Coupling
Issued 12 February 2018 Resolved
Demonstrate proper operation of vessel shaft. Make available for inspection prior to operations.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2018
Resolution: Seatrails conducted. Did not see vessel in dry dock due to operator leaving before CG arrived.
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 15 February 2017 Resolved
Provide master with valid marine radio operators permit.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 February 2017
Resolved 15 February 2017
Resolution: GMDSS Radio operators license provided.
Engineering › Steering Gear System › Piping
Issued 15 February 2017 Resolved
Remove bucket of hydraulic oil under helm.
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 9 March 2017
Resolution: Bucket removed.
Engineering › Steering Gear System › Piping
Issued 15 February 2017 Resolved
Cap hydraulic lines under helm.
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 9 March 2017
Resolution: Lines capped.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 15 February 2017 Resolved
Replace battery in lifebuoy light with approved type.
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 9 March 2017
Resolution: Battery replaced.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 15 February 2017 Resolved
Update placard for child lifejackets.
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 9 March 2017
Resolution: Placard updated.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 15 February 2017 Resolved
Provide blank in engineroom swithcboard.
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 9 March 2017
Resolution: Blank provided.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 15 February 2017 Resolved
Ensure sewage valve is locked while not pumping sewage.
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 24 February 2017
Resolution: Locked valve.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 February 2017 Resolved
Cap exposed wires on port engine.
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 9 March 2017
Resolution: Wiring capped.
Stability › Incline Test › General
Issued 15 February 2017 No resolution recorded
Vessel is not permitted to carry passengers with the canopy structure installed over the aft cockpit. Prove vessel is in compliance with current stability letter. Vessel made unauthorized alteration to stern portion of vessel by adding awning.
Action required: 701 - Prior to carriage of passengers/cargo

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.