13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 October 2024
Resolved
Vessel has an electronic engine control system, a qualitative failure analysis (QFA) and Design Verification Tests (DVT) shall be provided and approved by Marine Safety Center (MSC). A test of vessel's loss of power to propulsion was tested but control system shall be reviewed by MSC. Vessel will have until 27DEC2024 for deficiency to be cleared.
Action required: 705 - Other - as specified
Due 31 March 2025
Resolved 3 March 2025
Resolution: Tests were completed, as per approved DVTP and observed approved electrical schematics, all SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 October 2024
Resolved
Vessel is to place electrical configuration to it's original approved plan and provide single line drawing. If no plans are available, provide plans to MSC for review.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 October 2024
Resolution: Observed battery configuration to one battery bank and tested propulsion. All SAT
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 2 October 2024
Resolved
At each initial and subsequent inspection for certification, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment, including the following: Inspection of piping, controls, and valves, and the inspection and testing of alarms and ventilation shutdowns, for each fixed gas fire extinguishing system and detecting system to determine that the system is in operating condition. Marine inspector found the starboard side fire damper was not fully closing. Fix damper to ensure proper function and notify local OCMI once repairs are complete.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 3 October 2024
Resolution: Vent closure operational.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 October 2024
Resolved
Found a bulkhead penetration in the A/C closet in the main passenger space that was not sealed and would allow the fixed firefighting to escape into another compartment. Seal bulkheaded penetration with approved material and notify local OCMI when repairs are completed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 3 October 2024
Resolution: Penetrations sealed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 October 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the vessel must be equipped with an adult size lifejacket for each person authorized. Marin inspector found one lifejacket with a hole in it. Replace life jacket to required number as per COI. Vessel passenger count is restricted to number of life jackets onboard. Notify local OCMI once life jacket is replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 5 November 2024
Resolution: Received pictures of 03 life buoys, marked with reflective tape and name of vessel. All SAT.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 2 October 2024
Resolved
The regulations in this part provide a means to minimize the use of intoxicants by merchant marine personnel and to promote a drug free and safe work environment. Provide local OCMI of current enrollment in a DAPI program.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 3 October 2024
Resolution: Received enrollment paperwork from company.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 2 October 2024
Resolved
At each initial and subsequent inspection for certification, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment. Vessel was unable to provide fire servicing paperwork. Provide fire servicing to local OCMI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 3 October 2024
Resolution: Received servicing paperwork from company.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 October 2024
Resolved
Electrical equipment on a vessel must be installed to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Starter wires located in engine room bilge. Remove wires from engine room bilge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 3 October 2024
Resolution: Wires remvoed from bilge.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 October 2024
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Piping in forward storage overhead not connected to fitting/hanging free. Make repairs to piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 3 October 2024
Resolution: Piping capped.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 October 2024
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Ventilation for forward storage space damaged. Remove damaged section of ventilation and ensure space is being ventilated as designed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 3 October 2024
Resolution: Damaged ventilation removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 March 2024
Resolved
Vessel rep has contract to replace upper deck roofing. If replacing in-kind, provide specifications of old and new steel being used. If increasing the metal thickness, submit new stability calculations to MSC.
Action required: 705 - Other - as specified
Resolved 14 August 2024
Resolution: Company nav arch submitted weight changes to MSC.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 22 November 2023
Resolved
Each inlet/discharge pipe that penetrates the hull below the waterline must have a means to prevent water from entering the vessel if the pipe fails. Raw water feed valve supplying vessel HVAC system was stuck in the open position. Must repair to satisfaction of the USCG Marine Inspector.
Action required: 10 - Deficiency Rectified
Resolved 22 November 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 22 November 2023
Resolved
Each watertight bulkhead must be of sufficient strength and to remain watertight. Discovered pinholes IVO fuel line penetrations in watertight bulkhead separating engine space and fuel tank space. Must make temp repair to the satisfaction of the USCG Marine Inspector until permanent repairs can be affected at next dry-dock.
Action required: 10 - Deficiency Rectified
Resolved 22 November 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 November 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons and the vessel from electrical hazards including fire and electrical shock. Discovered the following electrical hazards that need to be addressed to the satisfaction of the USCG Marine Inspector: 1)dead end wires under throttle in wheel house,2)daisy chained extension chord for speakers in upper accom space,3)loose battery under wheel in wheel house.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 December 2023
Resolved 20 December 2023
Resolution: Pics sent rectifying deficiency.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 22 November 2023
Resolved
Each window and its means of attachment to the hull must be capable of withstanding the maximum load from wave and wind conditions. Discovered cracked window in forward section on first deck adjacent to the bar. Must make repair by next dry-dock.
Action required: 705 - Other - as specified
Resolved 27 March 2024
Resolution: Window was replaced in-kind.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 22 November 2023
Resolved
Discovered soft patches on upper accom deck located in the lower and upper aft section. Must make permanent repairs by next dry-dock.
Action required: 705 - Other - as specified
Resolved 18 March 2026
Resolution: Area cropped and renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 May 2023
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire
hazards, and other hazardous situations must be corrected and all required guards and protective devices
must be in satisfactory condition. At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes.Identified several fuel leaks in the E/R resulting in accumulated fuel in the bilge. Leaks were identified on the closest valve to the generator and a fitting located above the engine.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 May 2023
Resolution: Conducted operational test and witnessed no further fuel leaks.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 30 May 2023
Resolved
All escape hatches and other emergency exits used as a means of escape must be marked on both sides in clear legible letters at least 2" high "EMERGENCY EXIT, KEEP CLEAR". Exit from the engine room and A/C room do not have signs posted on the exits.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2023
Resolution: Installed new markings on emergency exits.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 May 2023
Resolved
Electrical equipment on a vessel must be installed an maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. There are multiple dead end wires under the main console and engine room, outboard of the main engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2023
Resolution: Properly terminated dead end wires.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 December 2022
Resolved
Solenoid lead for engine cut-off & alarm for the pre-engineered fixed fire extinguishing system is missing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 December 2022
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 5 December 2022
Resolved
Starboard side engine room fire damper failed to close properly due to two broken springs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 December 2022
Resolved 17 January 2023
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 December 2022
Resolved
Fire main discharge pressure gauge indicated 34 PSI with a single fire hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 December 2022
Resolved 17 January 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 December 2022
Resolved
Fuel supply line to stbd main is leaking slightly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 17 January 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 December 2022
Resolved
Type II reto reflective tape must be replaced on the fwd lifebuoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 6 January 2023
Resolution: Pics sent to office
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 5 December 2022
Resolved
Only fire drill logged on Oct 24th and last MOB drill logged was April 3rd. Vessel operator counseled and documented.
Action required: 10 - Deficiency Rectified
Resolved 5 December 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 December 2022
Resolved
The life line on the fwd life buoy suffeted sun damage and was breaking away when touched.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 6 January 2023
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 5 December 2022
Resolved
Sewage cap on the aft sewage tank was broken exposing the vent to the atmosphere.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 17 January 2023
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 5 December 2022
Resolved
Flame bowl was found to be missing on generator racor filter.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 17 January 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 December 2022
Resolved
Stbd junction box in steering gear room leading to steering pump needs to be permanantly mounted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 17 January 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 December 2022
Resolved
Exposed wires wre found underneath wheelhouse steering consul. Wires must be removed or properly terminated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 17 January 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 28 November 2022
Resolved
A vessel to which this sub chapter applies may not be operated without having on board a valid U.S. Coast Guard Certificate of Inspection. Since its issued COI date of 08/25/2021; subject vessel operator has missed its Annual inspection date of 11/25/2022 and in doing so
the vessel’s COI will no longer be valid and is suspended under the authority of 46 U.S.C. 3313(b)(4) until the required annual inspection is completed on the 28th of November 2022.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 December 2022
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 21 July 2022
Resolved
Vessel experienced water ingress through two (02) 1"x 1" holes in the bottom centerline hull in the number two compartment. Vessel operator must conduct the following: 1) Haul vessel out of water at dry-dock facility and conduct complete spot gauging of all sections below the waterline and provide report to USCG 2) Provide repair proposal based on gauging report and must be approved by USCG 3) Conduct crop/renew repairs based on approved repair proposal and non destructive testing to the satisfaction of the USCG. All three (03) items must be completed prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 August 2022
Resolution: Final repair and NDT inspected on this date. Vessel meets all repair proposal requirements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 August 2021
Resolved
Filling and sounding pipes shall be so arranged that overflow of liquid or vapor cannot escape to the inside of the vessel. An active fuel leak was discovered in the union elbow flange of the fuel pipe connecting the bunkering station to the fuel tank while the vessel was bunkering. Vessel operator must make necessary repairs to stop leaking and conduct leak test to ensure no further leaks to the satisfaction of the Coast Guard prior to operating.
Action required: 30 - Ship detained
Due 25 August 2021
Resolved 22 September 2021
Resolution: Fuel-fill piping repaired and verified by Marine Inspector; witnessed fill test of fuel piping, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 August 2021
Resolved
Vessel must maintain electrical safety standards to prevent fires and other safety issues. Dead end wire splices and broken junction boxes were discovered in the galley space, the lazerette space, the engine space and the fuel tank space. Must repair/replace junction box covers and remove dead end wiring or place in junction boxes to satisfaction of the Coast Guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 22 September 2021
Resolution: Conducted walkthrough of electrical wiring; all sat.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 25 August 2021
Resolved
Vessel crew must conduct fire and man overboard drills to demonstrate their familiarity with emergency procedures onboard the vessel to complete COI exam in the presence of Coast Guard Marine Inspectors prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Due 25 August 2021
Resolved 22 September 2021
Resolution: Witnessed crew conduct satisfactory drills; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 25 August 2021
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. It was discovered that the port Main Diesel Engine was missing a guard over the serpentine belt. Must install guard to satisfaction of the Coast Guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 22 September 2021
Resolution: Guards installed satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 August 2021
Resolved
Batteries shall be located as high above the bilge as practicable and secured against shifting with motion of boat. It was discovered that all the battery boxes in the engine space were not properly secured. Must secure boxes to the satisfaction of the Coast Guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 22 September 2021
Resolution: Batteries and wiring raised to satisfactory level and secured appropriately.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 25 August 2021
Resolved
All hazmat in engine space must be properly secured for sea. It was discovered that buckets of hazmat were not secured in engine space. Must rectify to the satisfaction of the Coast Guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 22 September 2021
Resolution: Hazmat secured with straps.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 August 2021
Resolved
Vessels must have appropriate documentation for their routes. It was discovered that the vessel's Certificate of Documentation has been expired since 30JUN2021. Vessel is required to produce current Certificate of Documentation to the Coast Guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 22 September 2021
Resolution: Vessel had appropriate COD on board.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 August 2021
Resolved
Vessel operator must produce current list of employees enrolled in the DAPI program.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 29 September 2021
Resolution: Received list of enrolled employees and enrollment letter for drug consortium "Hire Right."
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 25 August 2021
Resolved
All vessel crew members must demonstrate basic familiarity in operating all systems in regards to emergency response. Crew members misaligned bilge pumping system while testing suction in lazerrette space. Master must conduct re-familiarization training with crew members in regards to operating bilge pump system.
Action required: 10 - Deficiency Rectified
Due 25 August 2021
Resolved 25 August 2021
Resolution: Master conducted familiarization training with crew members in regards to operating bilge pump system; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 November 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Identified active water leak at PORT main engine gear driven bilge pump.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2020
Resolved 25 August 2021
Resolution: Def verified at COI renewal...[name withheld]
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 November 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury.
Electrical outlet box near coffee station missing securing hardware.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2020
Resolved 8 January 2021
Resolution: Def check completed on this date: [name withheld]
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 30 November 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury.
Flex hose on Fire pump discharge piping in engine room missing double hose clamps.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2020
Resolved 8 January 2021
Resolution: Def check completed on this date: [name withheld]
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 November 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury.
Electrical conduit to electrical disconnect switch not properly secured on HVAC unit in forward storeroom.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2020
Resolved 8 January 2021
Resolution: Def check completed on this date: [name withheld]
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 November 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury.
Electrical cabling going through overhead framing in forward storeroom missing chaffing protection.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2020
Resolved 8 January 2021
Resolution: Def check completed on this date: [name withheld]
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 30 November 2020
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel.
Posted Certificate of Documentation onboard was expired as of 30 JUNE 2020.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2020
Resolved 8 January 2021
Resolution: Def check completed on this date: [name withheld]
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 July 2020
Resolved
Provide report stating replacement transmission is "In Kind" replacement.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 August 2020
Resolution: Verified by attending MIs: [name withheld]/[name withheld]
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2020
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its design limitations. The starboard transmission is not operating as intended. Provide a third party technician report attesting to the cause of failure and the condition after repairs. Repairs and sea trials to be made to the satisfaction of attending marine inspector.
46 CFR 182.200
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 August 2020
Resolution: verified by attending MIs: [name withheld]/[name withheld]
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 19 November 2019
Resolved
Engine room fire dampers do not fully close in the event of a engine room fire due to severe corrosion.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2019
Resolution: Repairs made to fire dampeners.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 November 2019
Resolved
Fuel Oil supply cut off valves do not fully close.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2019
Resolution: Repairs made to remote fuel shut-off.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 19 November 2019
Resolved
All vessels shall carry the required amount of pyrotechnic distress signals.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2019
Resolution: Additional 03 distress signals were provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019
Resolved
Steering ram installation bolts are loose. Tighten and torque as needed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Double nuts installed & tightened.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 19 November 2019
Resolved
Vessel does not have a Bridge to Bridge FCC Certificate as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Done.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 November 2019
Resolved
Dead end wires were discovered in AFT lazarette above sewage tank and FWD store room.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 November 2019
Resolved
Properly mount outlet in FWD bar area
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Mounted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 November 2019
Resolved
AFT lazarette bilge suction pipe did not have a strainer installed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019
Resolved
Permanently mount grey water lift pump in AFT lazarette.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Mounted lift pump.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 19 November 2019
Resolved
Ensure deck/overhead penetrations are water/fire tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Made water tight.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 November 2019
Resolved
Wet exhaust pipe from Starboard MDE has several Belzona patches.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 19 November 2019
Resolved
Repair ship service diesel generator belt guard.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 19 November 2019
Resolved
Repair coolant leaks on both MDE's.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Repaired.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 November 2019
Resolved
Main fuel oil tank drain valve needs a plug.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Plug installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019
Resolved
Properly mark and cover engine room fuel oil shut off pull valves.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2019
Resolution: Done.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 19 November 2019
Resolved
Repair broken window in FWD bar area. Extended to 08Jan2020.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 December 2019
Resolved 3 January 2020
Resolution: Window was replaced in-kind.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 16 October 2018
Resolved
Seal all penetrations from laz going forward.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 19 November 2018
Resolution: All penetrations sealed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 October 2018
Resolved
Make bilge dry in engine room and trace leak near water sea strainer. Repair leak.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 19 November 2018
Resolution: Leak secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 October 2018
Resolved
Mount battery switch. Currently in bilge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 19 November 2018
Resolution: Battery swith mounted.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 October 2018
Resolved
Mount automated charger near battery station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 19 November 2018
Resolution: Automated charger mounted.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 16 October 2018
Resolved
Verify hot water tanks and water pumps have been properly wired IAW approved electrical plans.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 28 January 2019
Resolution: Electrical plans submitted. Required revision. Vessel attended and electrical traced. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 October 2018
Resolved
Remove breaker in tank room. Verify removal IAW approved electrical plans.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 16 November 2018
Resolution: Breaker removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 October 2018
Resolved
Seal old AC pipe in tank void heading aft.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 19 November 2018
Resolution: Pipe sealed.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 16 October 2018
Resolved
Provide light for magnetic compass.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 19 November 2018
Resolution: Mag compass light provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 October 2018
Resolved
Provide retro-reflective tape on lifebuoys.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 16 October 2018
Resolution: Tape provided.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 16 October 2018
Resolved
Update station bill to coincide with total crew on COI and remove use of BA.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2018
Resolved 26 November 2018
Resolution: Station bill updated to coincide with total crew on COI and removed use of BA.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 13 September 2018
Resolved
SHIP TYPE MISSING: Vsl is not broadcasting an AIS Ship Type
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 17 October 2018
Resolution: Verified in VIVS
Engineering › Reduction Gearing/Clutches › Clutch Plate
Issued 6 February 2018
Resolved
STBD main engine stalled while engagine reduction gear. Trouble shoot and repair.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 March 2018
Resolved 10 February 2018
Resolution: Renewed reduction gear.
Electrical › Electric Generation Source (service) › Generator
Issued 28 December 2017
Resolved
Diagnose and repair gen-set.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 December 2017
Engineering › Bilge Water Management System › Piping
Issued 16 November 2017
Resolved
Install rigid non-metallic hose at bilge pump on port MDE of sufficient length and strength to prevent kinking. (OLD T 46CFR182.40-5.) Correct prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 November 2017
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 16 November 2017
Resolved
Remove electric pump from bilge in tank void. (46CFR183.200(b)) Correct prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 November 2017
Electrical › Electrical Distribution System (service) › Cable
Issued 16 November 2017
Resolved
Install chafing protection on wires supported by metal hangars in machinery space. (46CFR183.340(b)(4)) Correct by 16Dec17
Due 16 December 2017
Resolved 5 January 2018
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 16 November 2017
Resolved
Masthead light arch of visibility is obscured by STBD spot light. (Col Regs; rule 21.) Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 16 November 2017
Resolved
Install all-around/anchor light is not illuminating. Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Operations/Management › Navigation Safety › Requirements for Vessels at Anchor
Issued 16 November 2017
Resolved
Anchor flukes are seized encumbering the anchor from functioning as designed. Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Electrical › Electrical Distribution System (emergency) › Cable
Issued 16 November 2017
Resolved
Remove dead-end wires. (46CFR183.200(b)) Correct by 16Dec17
Due 16 December 2017
Resolved 5 January 2018
Engineering › Steering Gear System › Motor
Issued 16 November 2017
Resolved
Properly mount electric motor to foundation in tank void. (46CFR183.220(a)) Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Electrical › Electrical Distribution System (service) › Cable
Issued 16 November 2017
Resolved
Properly mount all conductors in aft main salon galley space at distribution panels. (46CFR183.330/340) Correct by 16Dec17
Due 16 December 2017
Resolved 5 January 2018
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 16 November 2017
Resolved
Properly bond fuel vent and fill at non-metallic hose connection. (46CFR182.445/450) Correct by 16Dec17
Due 16 December 2017
Resolved 5 January 2018
Engineering › Fuel Oil Service System › Hose
Issued 16 November 2017
Resolved
Install fire sleeves on diesel fuel return hoses for both MDE. (46CFR182.720) Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Engineering › Fuel Oil Service System › Hose
Issued 16 November 2017
Resolved
Install chafing protection starboard side MDE fuel hose from fuel filter resting on bottom long. (46CFR182.720) Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 16 November 2017
Resolved
Permanently mount ice maker, dish washer, coffee pot in forward salon. (46CFR183.220) Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 16 November 2017
Resolved
Permanently mount outlet to bulkhead located behind the coffee pot. (46CFR183.220) Correct by 16Dec17
Due 16 December 2017
Resolved 15 December 2017
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 16 November 2017
Resolved
Install double hose clamps on generator turbo lube oil lines. (46CFR182.410) Correct by 16Dec17
Due 16 December 2017
Resolved 5 January 2018
Resolution: Single hose clap allowed as connection throat of fitting was not large enogh to facilitate addition of a second hose clamp. - MWS
Engineering › Sea-water System (primary cooling) › Piping
Issued 21 May 2017
Resolved
Discovered sea water leak on STBD side main engine inboard exhaust cooling elbow. Make effective repairs and prove operation of the main engine sea water system (intact)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2017
Resolution: Complted satisfactory check ride
Electrical › Electric Generation Source (service) › Generator
Issued 14 January 2017
Resolved
Make effective repairs to the onboard generator and prove proper operation to the attending Marine Inspector IAW 46 CFR 183.200
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 January 2017
Resolution: Repairs made to wiring issues.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 September 2016
Resolved
Repair 03 lighting fixures in the forward storage compartment
Condition: Placed in Improper Service
Due 2 October 2016
Resolved 3 October 2016
Resolution: Light fixtures installed
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 1 September 2016
Resolved
Make the aft and forward bulkheads in the linen room watertight.
Condition: Improper Installation
Due 2 October 2016
Resolved 3 October 2016
Resolution: Bulkheads made watertight.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 1 September 2016
Resolved
Provide over current protection on portside main engine impellor pump clutch switch.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 2 October 2016
Resolved 3 October 2016
Resolution: Over current device installed.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 1 September 2016
Resolved
Prove proper operation of the starboard side engine room fire dampener.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 September 2016
Resolution: Fixed on the spot.