Records from 2016 to 2021. Most recent: operational control imposed, 7 May 2021.
Inspection history · 22
7 May 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7191483
1 May 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7186999
29 April 2021
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7185304
28 April 2021
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7184967
23 December 2020
Explosive Handling Operation-Commercial
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7116909
25 November 2020
Explosive Handling Operation-Commercial
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7098537
23 November 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7100527
9 August 2020
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7027697
20 July 2020
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7011634
15 July 2020
PSC B
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7006816
14 July 2020
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7003711
4 April 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6935472
31 March 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6933476
24 March 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6930835
10 December 2019
ISPS II Exam · NPV Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6870848
20 November 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6859138
16 November 2019
PSC B · Ballast Water Examination · ISPS Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6855065
6 September 2018
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6534301
3 August 2018
PII Safety Exam · Ballast Water Examination · Deficiency Check · ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6494104
29 March 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6113692
17 October 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6023652
14 October 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6022582
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 August 2020
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for twhich they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts,hot surfaces,and other hazards. PSCO conducted damage survey following propulsion irregularity and isse of COTP 0350-20 dated 09AUG2020. Class society shall determine root cause of propulsion irregularity and conduct satisfactory operational test of engine and propulsion equipment.
74SOLAS(2004) II-I/26.1, action 60ac.
Action required: 10 - Deficiency Rectified
Due 9 August 2020
Resolved 9 August 2020
Resolution: Received satisfactory classification report. Cleared COTP 0350-20 and rectified deficiency.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 15 July 2020
Resolved
The original test of the OWS for PSCO was not conducted in accordance with manufacturers instructions. MARPOL 73 Annex I/ 11.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 15 July 2020
Resolution: Deficiency was corrected on the spot through education/discussion with engineering crew of testing OWS IAW manufacturer's instructions.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 August 2018
Resolved
0725 - Machinery spaces of category A containing oil-fired boilers or oil fuel units shall be provided with a gas fixed fire extinguishing system complying with the provisions of regulation 5. PSCO witnessed low O2 and high CO alarms on personal 4 gas meter upon intial entry into the vessel's CO2 space. Unable to verify condition of the CO2 system. Unable to verify current servicing of the Co2 system in adequate. 74 SOLAS (2001) II-2/7.1.1.1 - 17 a/c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 August 2018
Resolution: Received class report attesting to the service report for the CO2 system, all sat.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 3 August 2018
Resolved
0750 - The arrangments for the storage, distribution and utilization of oil used in pressure lubrication systems shall be such as to ensure the safety of the ship and persons onboard. PSCO observed 02 open metallic bins used for the storage of spare engine parts, which were filled with approximately 1m3 each of lube oil and stored openly in engine room. 74 SOLAS (2001) II-2/15.3 - 17 a/c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 August 2018
Resolution: Vessel drained metallic bins of all lube oil to sludge tank.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 August 2018
Resolved
1410 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons onboard. PSCO observed leak on #6 cylinder lube oil injection, through the jacketwater in the cylinder. PSCO additionally observed a crew-made apparatus to contain the leak. SOLAS 74 (2014) I/11(a) - 17 a/c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 August 2018
Resolution: Received class report attesting to the repair work on the #6 cylinder by vessels crew, all
sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 August 2018
Resolved
1430 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. #1 generator is inoperable and unable to take load. Additionally, #1 generator lube oil supply pump is mounted with wood as original mounts are wasted. 74 SOLAS (2014) I/11(a) - 17 a/c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 August 2018
Resolution: Received class report attesting to the repair work on the #1 generator by vessels crew, all
sat.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 3 August 2018
Resolved
2035 - After any survey of the ship has been completed, no change shall be made in the structural arrangements without the sanction of the Administration. Structural fire protection insulation in the paint locker and bosun locker are in inconsistent with the fire control plan and portions are wasted. 74 SOLAS (2014) I/11(b) - 17 a/c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 September 2018
Resolution: Vessel installed insulation on paint store`s inner shell. See documents
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 3 August 2018
Resolved
1330 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Aft starboard mooring winch inoperable due to faulty control unit. 74 SOLAS (2014) I/11(a) - 17 a/c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 September 2018
Resolution: Vessel installed new control units for the aft starboard mooring winch
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 3 August 2018
Resolved
0899 - The steering gear compartments shall be provided with suitable arrangements to ensure working access to steering gear. Arrangements shall include handrails in the event of hydraulic fluid leakage. Steering gear room not fitted with railing. 74 SOLAS (2001) II-1/29.13 - 40 a/c
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 September 2018
Resolution: Handrail arrangements in the steering gear room have been permanently installed.