Records from 2006 to 2020. Most recent: inspection, 7 October 2020.
Inspection history · 11
7 October 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7073270
1 April 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7019500
6 November 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6850759
6 November 2018
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6575250
23 March 2018
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6386086
20 November 2017
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6310178
27 September 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6279252
26 September 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6275571
20 September 2016
DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6004564
19 August 2016
Attraction Vessel Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5988749
23 July 2016
Damage Survey · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5950303
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 November 2018
Resolved
Electrical equipment on a vessel must be maintained to protect passengers, crew, other persons, and the vessel from electrical hazards and electrical shock. The vessel is carrying a 1.5 amp ground. 46 CFR 183.200(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 December 2018
Resolved 3 December 2018
Resolution: Ground was isolated to lighting system and rectified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 November 2018
Resolved
Electrical equipment on a vessel must be maintained to minimize accidental personnel contact with energized parts. Three slots in the breaker box in the forward storage compartment are open and must be blanked off. 46 CFR 183.200(c)
Action required: 10 - Deficiency Rectified
Resolved 6 November 2018
Resolution: Slots on breaker box were blanked off before end of the inspection.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 6 November 2018
Resolved
Provisions must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. The engine room ventilation louvers on the port side are not able to be closed all the way. 46 CFR 182.465(h)
Action required: 705 - Other - as specified
Due 13 November 2018
Resolved 3 December 2018
Resolution: Cowls were adjusted to close fully.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 6 November 2018
Resolved
Life ring buoys must be approved in accordance with 160.050 in subchapter Q of this chapter. The grab-line on three of the vessels life ring buoys were brittle and breaking under strain. 46 CFR 180.70(b)(1)
Action required: 10 - Deficiency Rectified
Resolved 6 November 2018
Resolution: Life rings were swapped out with new ones.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 20 September 2016
Resolved
Secure all compressed bottles to prevent rolling and misle hazards.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 September 2016
Resolved 9 November 2016
Resolution: Vessel installed permanent bottle holders for soda bottles.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 September 2016
Resolved
Reinstall all machinery guards on exposed rotating machinery.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 27 September 2016
Resolved 5 October 2016
Resolution: Guards replaced and found satisfactory.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 23 July 2016
Resolved
Close the bulkhead penetration between the engineroom and forward tank compartment and between the engine room and lazarette. Penetration carries a sewage pipe and must be sealed with watertight and fire resistant material.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 July 2016
Resolution: Received pictures of sealed bulkhead penetratrations on both sides.