Records from 2018 to 2025. Most recent: inspection, 17 July 2025.
Inspection history · 37
17 July 2025
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8188175
13 July 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8184337
17 February 2025
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8080387
11 January 2025
PSC A · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8062231
19 October 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8021451
4 September 2024
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7996428
24 June 2024
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7941113
11 March 2024
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7873517
5 March 2024
Deficiency Check · MARPOL Annex I Examination · PSC A
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7874227
16 January 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7381083
10 January 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7378799
29 December 2021
Ballast Water Examination · PSC C
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7371914
20 December 2021
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7370691
8 November 2021
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7346846
30 August 2021
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7300489
1 August 2021
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7273981
31 July 2021
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7273362
20 July 2021
Ballast Water Examination · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7261812
4 June 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7215327
16 April 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7176455
25 February 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7146235
7 January 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7121116
5 January 2021
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7119712
21 November 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7099516
2 October 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7069907
16 August 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7034250
7 August 2020
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7026468
25 June 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6986384
22 June 2020
PSC A
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6983713
19 June 2020
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6981058
8 May 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6950191
4 May 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6948062
23 March 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6930381
2 January 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6881729
30 December 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6880745
25 December 2018
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6602533
14 December 2018
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6597621
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 14 January 2025
Resolved
Machinery spaces of category A shall be adequately ventilated so as to ensure that when machinery or boilers therein are operating at full power in all weather conditions including heavy weather, an adequate supply of air is maintained to the spaces for the safety and comfort of personnel and the operation of the machinery. PSCO observed danger tag on "STBD-Aft Engine Room Supply Ventilating Fan". Vessel confirmed fan is inoperable.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 February 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 June 2024
Resolved
The condition of the ship and it's equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea wihtout danger to the ship or persons on board.
PSCO's obeserved the door to the electrical room on A-Deck, identified as an A-60 fire boundary on the fire control plan, propped open and server racks/distribution panels within the space propped open due to overheating. The crew indicated that some of the equipment was recently installed and the ventilation is no longer adequate for the space. Additionally, PSCO's observed missing bolts to the fresh air intake vent with fire damper on both port and starboard sides of the F-Deck.
SOLAS20/I-11
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 10 August 2024
Resolution: Recieved CLASS report on 08AUG2024. Electrical room on A-deck ventilation was found working properly. Additionally, portable fun has been installed. Rooms door has been found permanently closed and back hook was removed. Bolts found in place.
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management Plan (BWMP)
Issued 24 June 2024
Resolved
The master, owner, operator, agent, or person in charge of any vessel equipped with ballast water tanks that operates in the waters of the United States must follow these practices: (g) Maintain a Ballast Water Management (BWM) Plan that has been developed specifically for the vessel and that will allow those responsible for the plans implementation to understand and follow the vessel's BWM strategy and comply with the requirements of this subpart. The plan must include -(1) Detailed Safety Procedures
PSCO observed vessel stowage sewage in #8 P/STBD WBT. The vessel's ballast water management plan indicates that this tank is used for ballast water and does not address it's use as a sewage holding tank isolation procedures from other WBTs, bypassing of the installed BWTS, or cross contamination of the ballast water piping.
33 CFR 151.2050(g)(1)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 September 2024
Resolution: Vessel submitted documentation of amended BWMP
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 5 March 2024
Resolved
The Company should establish procedures to ensure that they ship is maintained in accordance with the provisions of the relevant rules and regulations established by the company. The operational nature of the deficiencies noted below provide objective evidence of a serious failure of the implementation of the ISM Code. An external audit is required.
74 SOLAS (20) IX/3.1
ISM CODE 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. Received audit from class surveyor and vessel to have an internal auditor come on board at NPOC.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 5 March 2024
Resolved
The arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. Excessive fuel oil leaks were observed on the main engine fuel delivery piping system, HFO service tank, F.O. purifier #1, D.O. purifier #1, aux generators #2 and #4, and G/E F.O. heat exchanger piping. Modified catch basins fitted on the aux. generators and M/E were filled with oil despite being required to be cleaned out per ship’s SMS procedures prior to operating under unmanned machinery space.
74 SOLAS (97) II-2/15.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 9 March 2024
Resolution: Team conducted def check and confirmed corrective action is in place. Vessel plans on finishing engine room cleaning and maintenance within the next month by having cleaners come on board at NPOC.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 5 March 2024
Resolved
...Oil fuel pipe lines shall be screened or otherwise suitably protected to avoid as far as practicable oil spray or oil leakages on to hot surfaces... Leakages from high-pressure oil fuel pipes shall be collected. Multiple high pressure fuel line jacketing on the main engine cylinders were found deteriorated which caused the fuel lines to be exposed and leak at the connection points on to the M/E casing. The oil delivery piping between fuel injectors #5 and #6 was actively leaking and sealed with welding epoxy.
74 SOLAS (97) II-2/15.5.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. Double jacketing was replaced.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 March 2024
Resolved
Oil fuel pipes and their valves and fittings shall be of steel or other approved material... Flexible hoses were found to be used throughout the engine room being used to collect and transport oil. A modified connection on the HFO settling tank piping was observed connecting a flexible hose to another oil storage tank. One flexible hose ran from the auxiliary generator to underneath the deck plates where a modified catch basin was placed. Additionally, a manufactured catch basin was found under a main engine cylinder that contained approx. 1 liter of oil and was fitted with a flex hose to drain oil to another collection point. Lastly, approx. 10-foot metal pipe labeled “TRANSFER PIPE FWD SETT TO 7 STBD” was found with a rag stuffed in it with dried oil.
74 SOLAS (97) II-2/15.2.8
Condition: Invalid
Action required: 30 - Ship detained
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. All flexible hoses and catch basins were removed.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage
Issued 5 March 2024
Resolved
Every ship... shall carry a garbage management plan which the crew shall follow. While in the Engine Room, an excess of 50 oil/chemical containers and catch basins were found stored in a single void space near the HFO tank. Additionally, oily rags, garbage, and discarded engineering equipment were scattered throughout the Engine Room. Bags of oily rags were being stored in a clean rag receptacle and one oily rag receptacle contained mixed plastics, oil-soaked rags, and metals.
MARPOL V/10.2
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. Vessel got rid of excess garbage scattered throughout engine room.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 5 March 2024
Resolved
… Boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. Steam piping from boiler leading to accommodation spaces was leaking on the deck near the boiler at a rate of 3-5 drops per second.
74 SOLAS (04) II-I/26.1
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. Leak was fixed along with lining around the valve.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 March 2024
Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. PSCO observed multiple disconnected grounding wires on pieces of machinery as well as missing stuffing tubes exposing wiring insulation on 440V equipment throughout the engine room creating an electrical hazard to the crew.
74 SOLAS (04) II-I/54.2.8
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action with appropriate material installed and in place.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 March 2024
Resolved
Bulkheads forming boundaries between cargo spaces and machinery spaces of category A shall be insulated to ‘A-60’ standard. Insulation on the main engine machinery space bulkhead was missing.
74 SOLAS (97) II-2/54.2.8
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. Insulation was fixed.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 5 March 2024
Resolved
After any survey of the ship… no changes shall be made in the structural arrangements, machinery, equipment, and other items covered by the survey, without the sanction of the Administration. Lube oil purifier #1 was partially disassembled and taken out of operation by the crew without utilizing proper lock out/tag out procedures or approval.
74 SOLAS (20) I/11b
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. Crew implemented LO/TO procesdures according to their SMS for the LO Purifier and put a cap on the exposeded pipes.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 5 March 2024
Resolved
Machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Hydraulic piping for mooring line auto-tension system was sheared off.
Cite: 74 SOLAS (04) II-1/26.1
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 March 2024
Resolution: Team conducted def check and verified corrective action. Crew put a cap on the hydraulic piping as it is currently not in use by the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 July 2021
Resolved
MAIN AND AUXILLARY MACHINERY ESSENTIAL FOR THE PROPULSION AND SAFETY OF THE SHIP SHALL BE PROVIDED WITH EFFECTIVE MEANS FOR ITS OPERATION AND CONTROL.
DURING DEPATURE VESSEL LOSS PROPULSION DUE TO AN ISSUE WITH THE BACKUP ENGINE CONTROL ROOM SYSTEM.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2021
Resolved 30 August 2021
Resolution: NABCO M-800S, rails for Electronic Board Card E were replaced and Engine Remote Control System was tested by the Chief Engineer and the Service Technician. No alarm has occured since.