Records from 2004 to 2023. Most recent: inspection, 7 December 2023.
Inspection history · 72
7 December 2023
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7836226
6 December 2023
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7847128
30 October 2023
Administrative Inspection · PSC B · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7815376
23 June 2023
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7721879
21 May 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7693083
15 December 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7609597
4 November 2022
PSC B · COC-TVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7588133
21 September 2022
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7563653
1 November 2021
COC-TVE Renew · PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7338489
1 June 2021
PSC B
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7211081
12 January 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7123040
3 November 2020
COC-CHEM & TVE Annual · MARPOL Annex VI Survey · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7088707
1 June 2020
Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6965587
27 October 2019
ISPS II Exam · COC-TVE Renew · Deficiency Check · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6840288
15 June 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6714535
9 November 2018
ISPS II Exam · Ballast Water Examination · COC-TVE Annual · COE-Dockside
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6577202
5 November 2018
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6574693
16 December 2017
COE-Dockside
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6325048
15 October 2017
ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6282683
16 May 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6154407
14 July 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5940671
11 June 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5907505
30 May 2016
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5885490
16 July 2015
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5185911
16 July 2015
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5185975
24 June 2012
COE-Dockside
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4353860
20 June 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4350324
14 February 2012
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4244407
13 February 2012
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4243879
3 September 2011
COE-Offshore
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4126737
3 September 2011
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4134919
1 September 2011
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4133496
25 February 2011
Ballast Water Examination · ISPS II Exam · COE-Dockside · COC-TVE Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3952733
5 December 2010
COE-Dockside
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3904477
31 March 2010
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3710380
5 February 2010
ISPS II Exam · Ballast Water Examination · Deficiency Check · COC-TVE Renew
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3676047
3 January 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3657956
2 January 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3657748
8 July 2009
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3528454
20 February 2009
MARPOL Annex V Examination · Ballast Water Examination · MARPOL Annex I Examination · COC-TVE Annual · ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3417749
16 October 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3350637
7 March 2008
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3160278
12 February 2008
ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3146176
21 September 2007
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3065194
19 September 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3061001
19 September 2007
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3061346
15 September 2007
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3058249
8 September 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3050067
6 April 2007
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2898940
21 March 2007
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2892071
18 February 2007
ISPS II Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · COC-TVE Annual · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2873418
9 February 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2869983
30 August 2006
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2788027
31 July 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2732171
20 March 2006
Random ISPS/MTSA/PSC
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2606017
6 February 2006
COC-TVE Renew · ISPS III Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2579784
6 February 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2580282
19 January 2006
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2569333
12 December 2005
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2549920
30 November 2005
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2543485
17 October 2005
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2516214
13 October 2005
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2514164
6 August 2005
ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2450869
22 April 2005
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2383560
15 April 2005
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2334404
2 April 2005
COC-TVE Annual
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2324733
2 April 2005
Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2326027
11 March 2005
NPV Safety Exam
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2308059
10 February 2005
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2289989
2 January 2005
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2268120
14 June 2004
MTSA/ISPS Verification
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2098388
5 March 2004
Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2018868
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 December 2023
No resolution recorded
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
PSCO observed pinhole leak on port side bunker piping near superstructure that resulted in approximately 1 gallon spilled into ship channel. Port side bunker pipe shall be isolated and not used until repairs are complete.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 December 2023 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 October 2023
Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect i.e. assigned principally to accumulate batteries, in paint lockers, acetylene stores, or similar spaces unless Administration is satisfied that the equipment is (.4) appropriately certifified for safe usage in the dust, vapors, or gases likely to be encountered.
PSCO observed 03 light fixtures inside cargo pump room having cracked lenses and missing electrical bonding straps.
Action required: 15 - Rectify deficiencies by next port
Resolved 7 November 2023
Resolution: Received satisfactory rectification statement from L/R: Statement no: 2220850/01.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 30 October 2023
Resolved
The venting system shall be provided with devices to prevent the pasage of flames into cargo tanks.
PSCO found 02 flame screens on #2 and #5 Port cargo tank p/v valves to have quarter-sized holes in screen.
Action required: 15 - Rectify deficiencies by next port
Resolved 7 November 2023
Resolution: Received satisfactory rectification statement from L/R: Statement no: 2220850/01.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 30 October 2023
Resolved
Doors required to be self-closing shall not be fitted with holdback hooks.
PSCO ovserved manual holdback on self-closing door for CCR.
Action required: 10 - Deficiency Rectified
Resolved 30 October 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 November 2022
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed hydraulic leak at each side of steering gear ram leaking at a rate of one drop per second during operational testing.
SOLAS 74(a), 2011 cons., II-1/26.1
60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 4 November 2022
Resolved 5 November 2022
Resolution: Recieved, reviewed, and accepted class report from [name withheld] stating forward port/stbd ram hydraulic seals were replaced. Operational test sat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Cow operations and equipment manual
Issued 4 November 2022
Resolved
For oil cargo residue control, at least 25 percent of the cargo tanks are crude oil washed before each ballast voyage and that each cargo tank is crude oil washed at least once every fourth time crude oil is discharged from the tank, but no tank need be crude oil washed more than once during each 120 day period. PSCO observed vessel has not conducted crude oil washing despite carrying crude oil onboard as recorded in vessel oil record book part II. Request clarification from class.
33CFR157.160(a)(2)
50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2022
Resolved 15 December 2022
Resolution: Sector Miami received clearification letter from class resolving the code 50 def.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 October 2019
Resolved
In tankers, electrical equipment, cables and wiring shall not be installed in hazardous locations unless it conforms with the standards not inferior to those acceptable to the organization. 74 SOLAS (04) II-1/45.11
Multiple explosion proof electrical fittings in the cargo pump room and on deck missing cable glands allowing cable to move freely. This compromises the maximum expirimental safe gap requirements of the fitting.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 October 2019
Resolved 29 October 2019
Resolution: Recieved classification report attesting to the rectification of all faulty electrical instalations in the pump room and on deck.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 27 October 2019
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company[10.1]. In meeting these requirements, the company should ensure that, inspections are held at appropriate intervals[10.2.1], any non-conformities are reported, with possible cause if known[10.2.2], and appropriate corrective action taken[10.2.3]. 74 SOLAS (14) IX/3.1 / ISM Code 10.1, 10.2
In accordance with fleet manual four electrical testing form E1-03, installations are to be inspected monthly. In accordance with fleet manual UMS checklist form 3.17, UMS engineering rounds are to be conducted daily.
As delineated in deficiencies #1, #3, & #4, the company failed to ensure that the crew carried out all requirements of a proper engineering round, testing of smoke detectors, and inspection of electrical equipment on deck.
*An internal verification of the company procedures pertaining to maintenance of the ship is required within three months.
Action required: 705 - Other - as specified
Due 27 January 2020
Resolved 19 December 2019
Resolution: Vessel provided documentation attesting to the internal verification of the company's maintenance procedures
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 27 October 2019
Resolved
A fixed fire-extinguishing system required by paragraph 5 below may be any of the following systems: a fixed pressure water-spraying fire extinguishing system complying with the provisions of the Fire Safety Systems Code. 74 SOLAS (04) II-2/ 10.4.1.1.3
Any required automatic sprinkler, fire detection and fire alarm system shall be capable of immediate operation at all times and no action by the crew shall be necessary to set it in to operation. F.S.S. Code 8/2.5.1.1
PCCO observed inlet valve providing water to fixed automatic sprinkler system closed. When this valve is closed water will not be supplied automatically in case of emergency use required. The vessel's engine room is UMS.
Action required: 10 - Deficiency Rectified
Due 27 October 2019
Resolved 27 October 2019
Resolution: Chief Engineer stated the valve had been closed prior to test of smoke detectors, and opened valve in presence of PSCO.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 October 2019
Resolved
The means prescribed in paragraph 2.2.3.5.2 which are acceptable to the Administration shall be maintained in the proper condition to ensure their continued accurate functioning in service. 74 SOLAS (14) II-2/4.2.2.3.5.3
PSCO observed aft day service tank sight glass self-closing valve tied in open position, thus presenting large spill and fire hazard.
Action required: 10 - Deficiency Rectified
Due 27 October 2019
Resolved 27 October 2019
Resolution: Chief Engineer cut rope tying valve open in presence of PSCO.
Fire Fighting › Structural - A Class Divisions › Aux Spaces (moderate fire risk)
Issued 30 May 2016
Resolved
74SOLAS(2014 CONS ED)II-1/14.2.1.1.1 The following fire protection systems shall be kept in good order so as to ensure their required perforance if a fire occurs: structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these divisions. Cable trunk room on B Deck has a class "A" penetration leading through to the cable trunk room on C Deck.40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2016
Resolution: RECTIFIED BY CLASS REPORT # LAN 1600143
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 30 May 2016
Resolved
ICLL(88 PROT)REG 8 REG 25.5 Protection for the crew in the form of guard rails or lifelines shall be provided above the deck...Port Side guard rail in the middle just forward of the manifold railing has wasted/worn welding.40ac
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2016
Resolution: RECTIFIED BY CLASS REPORT # LAN 1600143
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 30 May 2016
Resolved
74SOLAS(2014 CONS ED)I/11(a) The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Incinerator would not stay lit.40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2016
Resolution: RECTIFIED BY CLASS REPORT # LAN 1600143
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 30 May 2016
Resolved
74SOLAS(2014 CONS ED)I/11(a) The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. #2 main salt water cooling lines and main engine raw water cooling lines had soft patches.40ac
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2016
Resolution: RECTIFIED BY CLASS REPORT # LAN 1600143
Deck/Cargo › Cargo Stowage › General
Issued 14 February 2012
Resolved
1850 The pressure vacuum breaker shall prevent cargo tanks from effects of overpressure on vacuum. A film of ethylene glycol was observed below the lower fitting of the IGS system's Pv breaker sight tube potentially affecting the required amount of fluid necessary for the PV breaker to function properly. Solas74 II-2/Reg 11.6.3.4 A-Correct prior to cargo operations
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 February 2012
Resolution: Received class report (LR) attesting to the repairs and proper opertation of the PV Breaker.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 2 January 2010
Resolved
The port side anchor was reported as inoperable.
Action required: 705 - Other - as specified
Due 31 January 2010
Resolved 2 January 2010
Engineering › Steering Gear System › Motor
Issued 7 March 2008
Resolved
Vessel experienced steering gear servomotor malfunction affecting the ship's primary steering. A classification society report of repairs to the equipment must be submitted prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 March 2008
Resolution: Received classification society report of repairs.
Engineering › Diesel Engine (propulsion-direct drive) › Distributor (air start)
Issued 19 September 2007
Resolved
Air distribution valve for cylinder No. 4 seized resulting in a power loss while transiting the Lower Mississippi River at Nine Mile Anchorage
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2007
Resolved 19 September 2007
Resolution: Received class report from Lloyd''s Register satisfying requirement.
Communications › Alarms/Indicators › General Alarm
Issued 18 February 2007
Resolved
The vessel was granted a deviation to enter the port with an inoperative INOP BRIDGE REMOTE CONTROL. See Operational Control Activity # 2869983.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2007
Resolved 18 February 2007
Resolution: Received Tech report documentation from LYNGSO MARINE satisfying requirement.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 18 February 2007
Resolved
The viewing windows from the cargo control are clouded over and the PIC is unable to satisfactory view cargo operation.
Action required: 705 - Other - as specified
Due 18 June 2007
Resolved 15 September 2007
Resolution: Received class report attesting to the replacement of the windows in the cargo control room.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom Ventilation
Issued 6 February 2006
Resolved
Ventilation blower coupling sheared bolts. Repairs attempted but alignment of shaft couplings was excessive and would have eventually have failed possibly causing sparks in a hazard zone of the Cargo pump room. Make permanent repair prior to conducting Cargo operation to satisfaction of class.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2006
Resolution: Pump room ventilation shaft coupling renewed and aligned by shore side personnel. Fan testes , and found satisfactory. Repair concidered to be permanent. Pump room ventilation is now concidered satisfactory for cargo operations. As per report.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 6 February 2006
Resolved
One of the smoke detectors in the oil purifier room in not functioning. Attempts to repair the detector the detector head failed to give an alarm. Make repairs to detector system and conduct an operational test of the fire detection system with class observing.
Action required: 705 - Other - as specified
Due 8 March 2006
Resolved 9 February 2006
Resolution: Detector in question was found to activate the sprinkler system in unison with the Flame detector. See class surveyors report MM10640037/1 dated 9 Feb 06.
Engineering › Freshwater Generation System › Piping
Issued 6 February 2006
Resolved
The fresh water generator in the Engineroom has a temporary patch on slat water piping. Make permanent repairs to piping to satisfaction of classification society.
Action required: 705 - Other - as specified
Due 8 March 2006
Resolved 9 February 2006
Resolution: Patched salt water piping removed and new one fabricated. New pipe installed , pressure tested and found satisfactory. Repair concidered permanent. Class surveyors report MM10640037/1. See attached document.
Deck/Cargo › Inert Gas System › IGS Scrubber
Issued 17 October 2005
Resolved
Sea water cooling pipe for IGS system has a two inch crack. Vsl is to have class approve a temp repair.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2005
Resolution: Received class report stating that a temp repair to the Inert Gas System overboard sea water cooling pipe crack was carried out on 10/21/05. Vsl is required to have a permanent repair Prior to next U.S. Port after sailing forward by Condition of Class.
Deck/Cargo › Inert Gas System › IGS Scrubber
Issued 17 October 2005
Resolved
Sea water cooling pipe for IGS system has a two inch crack, with a approved temp repair., . Vsl is to have class approve a permanent repair.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 November 2005
Resolution: SECNY recieved a class report attesting to permanent repairs to the Inert Gas System.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 2 April 2005
Resolved
Provide proper testing material "Formazin" to test the oily water separator according to the vessels operation manual. Vessel must secure the OWS and retain all bilge slopes on Board the vessel until proper testing procedures are in place. Vessel must also test and calibrate the alarm system on the OWS system to the satisfaction of a class surveyor. Prior to departure from next U.S. port.
Action required: 705 - Other - as specified
Resolved 13 April 2005
Resolution: MSO Philadelphia received class report from Lloyd''s Register. OWS now calibrated as per makers instructions using "Formazin" liquid provided by mafufacturer. All found satisfactory with no adjustment required. Deficiency cleared.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 2 April 2005
Resolved
Inspection of pump room must be comleted prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2005
Resolution: Pumproom Inspection completed. Marine Chemist Certificate #M46222