Records from 2019 to 2025. Most recent: inspection, 9 September 2025.
Inspection history · 19
9 September 2025
Ballast Water Examination · PSC B · COC-CVE Quarterly
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8230274
14 April 2025
PSC B · COC-CVE Annual
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8109217
28 August 2024
PSC A · COC-CVE Annual
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7991429
18 May 2024
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7955223
15 May 2024
In-Service Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7913188
11 April 2024
COC-CVE Quarterly · PSC B
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7891354
6 April 2024
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7890787
5 April 2024
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7906176
22 September 2023
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7796653
9 September 2023
COC-CVE Annual · PSC A
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7787126
9 July 2023
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7833440
18 June 2023
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7763664
4 June 2023
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7762623
13 May 2023
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7739061
4 May 2023
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7730142
1 May 2023
COC-CVE Quarterly · Ballast Water Examination
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7679180
22 September 2022
PSC B · COC-CVE Annual
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7541082
28 September 2019
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6832833
25 September 2019
Ballast Water Examination · ISPS II Exam · Deficiency Check · COC-CVE Initial · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6820402
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 9 September 2025
Resolved
Every crew member with assigned emergency duties shall be familiar with theses duties before the voyage begins. PSCO observed a crew member assigned to life boat #10, the second in command of life boat #6, MES, and member of muster station C were not familiar with their emergency duties. 74SOLAS20, III/19.2.1, 17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 September 2025
Resolution: Crew members were re-trained. Documentation of training completion provided.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 September 2025
Resolved
Stairways and ladders shall be arranged to provide ready means of escape to the lifeboat and life raft embarkation deck from all passengers and crew spaces and from spaces in which the crew is normally employed, other than machinery spaces. PSCO observed security equipment including x-ray machines and metal detectors stored in the stairway outside of muster station D port deck side 7 blocking access evacuation routes from muster station D to the embarkation deck. 74SOLAS01, II-2/28.1, 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 September 2025
Resolution: Equipment was removed.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 9 September 2025
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed a portable fire extinguisher at 14.v.ii tied to bulkhead and missing bracket. 74SOLAS20, II-2/14.2.1.2, 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 September 2025
Resolution: Securing mechanism was removed.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 September 2024
Resolved
The construction of all doors and door frames in A class divisions, with the means of securing them when closed, shall provide resistance to fire as well as to the passage of smoke and flame, as far as practicable, equivalent to that of the bulkheads in which the doors are situated. Such doors and oor frames shall be constructed of steel or other equivalent material. PSCO observed fire door FSD01-6.3 not maintaining its A-60 boundary and FSD 04.4.27 not fully latching.
74 SOLAS 01 II-2/30.2 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 3 September 2024
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 September 2024
Resolved
Fire hoses shall be of non-perishable material approved by the Admiistration and be sufficient in length to protect a jet of water to any of the spaces in which they may be required to be used. Each hose shall be provided with a nozzle and the necessary couplings. In interior locations in passenger ships carrying more than 36 passengers, fire hoses shall be connected to the hydrants at all times. PSCO observed fire stations 10.ii.3, 11.iv.4, 11.iii.4 and 12.v.1 with hose not connected to hydrant.
74 SOLAS 01 II-2/4.7.1 10c
Action required: 10 - Deficiency Rectified
Resolved 3 September 2024
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 September 2024
Resolved
For deterring the appropriate fire integrity standards to be applied to boundaries between adjacent spaces, such spaces are classified according to their fire risk as shown in the categories (1) to (14) below. PSCO observed combustible materials incorrectly stowed in technical spaces: 1) Under stairwell near FSD 15.3.7 and 2) technical space near cabin A320.
74 SOLAS 20 II-2/9.2.2.3.2.2 10c
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 3 September 2024
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 September 2024
Resolved
All waste receptacles shall be constructed of non-combustible materials with no openings in the sides or bottom. PSCO observed a plastic trash can labeled scrap metal with combustible materials in the Bosun store, deck 6, fire zone 1
SOLAS 01 II-2/18.5 10c
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 3 September 2024
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 11 April 2024
Resolved
Before a ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Port rescue boat failed to start when initially tested.
74 SOLAS 20 III/20.2
Action required: 10 - Deficiency Rectified
Due 11 April 2024
Resolved 11 April 2024
Resolution: Fuel shut-off valve was pulled and rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2024
Resolved
THE STBD PROPULSION ELECTRICAL MOTOR EXCITOR CABLE LUG CONNECTION WAS DAMAGED DUE TO OVERHEATING AND CAN ONLY BE OPERATED AT 40% OF RATED TORQUE CAPACITY DURING NAVIGATION.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2024
Resolved 18 May 2024
Resolution: Fixed. Class report attached.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 September 2023
Resolved
Crewmembers shall be trained to be familiar with the arrangements with the ship as well as the location and operation of any firefighting systems and appliances that they may be called upon to use. During the abandon ship drill observed deck 6 midship stairway guide who was unfamiliar with IMO signage for firefighting equipment. During the abandon ship drill deck 9 midship stairway guide, deck 9 forward stairway guides and deck 14 forward stairway guide were unfamiliar with the use of basic firefighting appliances including fire doors and fire extinguishers. 74 SOLAS 20 II-2/14.2.2.1; 07199; 17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 September 2023
Resolution: Training completed prior to departure.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 9 September 2023
Resolved
On-board training in the use of the ship's life-saving appliances, including survival craft equipment, and in the use of the ship's fire-extinguishing appliances shall be given as soon as possible but not later than two weeks after a crew member joins the ship. Lifeboat commander for lifeboat #11 was unfamiliar with basic lifeboat operation. Second in command for lifeboat #17 was unfamiliar with basic lifeboat starting procedures. 74 SOLAS 20 III/19.4.1; 11131; 17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 September 2023
Resolution: Training provided prior to departure.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 September 2023
Resolved
Safe escape routes shall be provided. In the main laundry, a storage room was converted to a normally employed tailor shop. Caging surrounding the workshop was being blocked by plastic film and textiles impeding visibility. No audible alarm was provided for the space. 74 SOLAS 20 II-2/13.1.1; 07199; 16ac
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2023
Resolved 22 September 2023
Resolution: Plastic film and textiles removed.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 September 2023
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. In the ship's medical center, LLL was being blocked by seating. On other side, LLL was missing surrounding the reception desk. 74 SOLAS 01 II-2/28.1.5.10; 07120; 16ac
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2023
Resolved 22 September 2023
Resolution: Photoluminescent strip provided.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 9 September 2023
Resolved
Fire doors in main vertical zone bulkheads and stairway enclosures shall satisfy the following requirements: Remote-controlled sliding or power-ooperated doors shall be equipped with an alarm that sounds as least 5s but no more than 10s before the door begins to move and continues sounding until the door is completely closed. Sliding FSD 11.6.16 did not alarm upon activation. 74 SOLAS 01 II-2/30.4.10; 07105; 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 22 September 2023
Resolved 9 September 2023
Resolution: Alarm restored.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 9 September 2023
Resolved
The activation of any detector or manually operated call point shall initiate a visual and audible fire signal at the control panel and indicating units. Manual call points 71.092, 71.091, 71.043, 59.054 did not activate when testing. Smoke detector 47.064 did not activate when testing. 74 SOLAS 01 II-2/13.1.4; 07106; 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 22 September 2023
Resolved 9 September 2023
Resolution: MCPs and Smoke Detector retested after repair. Test sat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 9 September 2023
Resolved
The construction of all doors and door frames in "A" class divisions, with the means of securing them when closed, shall provide resistance to fire as well as to the passage of smoke and flame, as far as practicable, equivalent to that of the bulkheads in which the doors are situated. The following doors did not close upon activation: FSD 15.7.1, FSD 12.6.5 and FSD 04.1.4. Sliding screen door 14.7.1 and 10.4.13 did not latch upon closing. 74 SOLAS 01 II-2/30.2; 07105; 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 22 September 2023
Resolved 22 September 2023
Resolution: FSDs identified were adjusted and functioned, as required.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 September 2023
Resolved
All waste receptacles shall be constrcted of non-combustible materials with no openings in the sides or bottom. PSCO observed 03 plastic trash cans in the main laundry space. 01 plastic garbage can observed IVO iron spaces, 01 plastic garbage can observed in the alteration desk space and 01 plastic garbage can observed under a desk IVO FSD 2.4.3 74 SOLAS 01 II-2/18.5; 07199; 40ac
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 22 September 2023
Resolved 23 September 2023
Resolution: Combustible waste receptacles replaced with non-combustible ones.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 September 2023
Resolved
For determining the appropriate fire integrity standards to be applied to boundaries between adjacent spaces, such spaces are classified according to their fire risk as shown in the categories (1) to (14) below. NFPA Code 30 Flammable Liquid Locker was used to stow flammable products for the spa in a category (13) space called "Scuba Storage". The above-mentioned locker should only be stowed in a category (11), (12) or (14) space unless approved to EN14470-1, Type 60 or Type 90. 74 SOLAS 20 II-2/9.2.2.3.2.2; 07199; 16ac
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2023
Resolved 23 September 2023
Resolution: Items removed from "scube storage" flam locker and placed in proper Cat 14 chemical locker.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 September 2023
Resolved
Within the perimeter of such stairway enclosures, only public toilets, lockers of non-combustible material providing storage for safety equipment and open information counters are permitted. PSCO observed stowage of non-fixed seating, carts, carpets, signage, engineering spare parts, and combustible materials being stowed in Category (2) stairways. Location of stored items included IVO FSD 04.3.25, aft stairwell (deck 5) near mooring station, port stairwell near casins, amidships stairs and crew stairwell on deck 7, zone 1 near FSD 07.1.8. 74 SOLAS 01 II-2/29.2; 07199; 40ac
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 22 September 2023
Resolved 23 September 2023
Resolution: Items removed from cat (2) stairways.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 September 2023
Resolved
Below the bulkhead deck two means of escape, at least one of which shall be independent of watertight doors, shall be provided from each watertight compartment or similarly restricted space or group of spaces. In the sewage treatment room, IVO watertight door 1.03, PSCO observed metal drums blocking the means of escape, leaving only the watertight doors as a means of escape. 74 SOLAS 01 II-2/28.1.1; 07120; 10c
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 9 September 2023
Resolution: Drums were removed.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 9 September 2023
Resolved
Every crew member shall be given instructions which shall include but not necessarily be limited to operation and use of the ship's inflatable rafts, problems of hypothermia, first-aid treatment for hypothermia and other appropriate first-aid procedures, special instructions necessary for use of the ship's life-saving appliances in severe weather and severe sea conditions, operation and use of fire-extinguising appliances, and risks associated with and closed spaces and on-board procedures for safe entry. For lifeboats #3, #5, and #7 PSCO observed crew members erroneously identifying seasickness medication for other loose medication being stored in the same watertight container. 74 SOLAS 20 III/19.4.2; 11131; 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 9 September 2023
Resolution: Seasickness medication separated.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 9 September 2023
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. Table and chairs were blocking a fire station IVO FSD 06.5.8. 74 SOLAS 20 II-2/14.1.1; 07123; 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 9 September 2023
Resolution: Table and chairs were moved.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 May 2023
Resolved
fire protection systems and fire fighting appliances shall be maintained ready for use; boxes were stored in excess in the glass store located on deck 5 forward. Boxes were obstructing ventilation damper controls as well as a fire station lcoated within the space.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 May 2023
Resolution: Observed clear items prior to leaving the vessel, after issuing paperwork.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 4 May 2023
Resolved
For determining the appropriate fire integrity standards to be applied to boundaries between adjacent spaces, such spaces are classified according to their fire risk as dhown in categories (1) to (14) below. Flammable liquid storage locker located in the carpenter storeroom (cat 13) was approved to NFPA 30 and only provides protection for 10 minutes. These lockers should only be sued in a cateogry 11,12, or 14 space unless approved to be EN14470-1, Type 60, or Type 90.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2023
Resolution: Flammable liquid locker moved to Paint Stores.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 May 2023
Resolved
Stairways and aldders shall be arranged to provide ready means of escape to the lifeboat and life raft embarkation deck from al passenger and crew spaces and from space in which the crew is normally emploed, other than machinery spaces. In the main laundry, PSCOs observed a room-in room situation. Specifically, the upholstery shop had wire mesh windows that were completely obstructed by fabric curtains. There is only one means of escape provided from the space.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 May 2023
Resolution: Curtains removed.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 4 May 2023
Resolved
Within the perimeter of such stairway enclosures, only public toilets, lockers of noncombustible materials providing for the storage of safety equipment and open information counters are permitted. The stairway located immediately outside deck 5, glass store and deck 6 carpenter store was filled with various boxes, furniture, oil drums and pallets throughout the space obstructing the escape route.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 May 2023
Resolution: Items were moved that were obstructing the escape route.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 May 2023
Resolved
Any required automatic sprinler, fire detection and fire alarm shall be capable of imediate operation at all times and no action needed by the crew. Combustible materials were stored above the installed fixed fire-fighting sprinklers in the forward carptneters store, deck 6.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 May 2023
Resolution: Combustible materials were relocated.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 September 2022
Resolved
Openings in bulkheads and decks in passenger ships. PSCO discovered multiple fire screen doors in the main vertical zone bulkheads, galley boundaries and stairways enclosures are not closing in the correct time and/or are not latching.
74SOLAS 20 II-2/9.4, 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 October 2022
Resolved 13 October 2022
Resolution: Vessel provided class report attesting to satisfactory proof of repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 22 September 2022
Resolved
Evaluation, testing and approval of life-saving appliances and arrangements. PSCO discovered 02 hydrostatic release units without expiration date marked. 74SOLAS 20 III/4, 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 October 2022
Resolved 13 October 2022
Resolution: Vessel provided class report attesting to satisfactory proof of repairs.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 22 September 2022
Resolved
An International Load Line Certificate (1966) shall be issued to every ship which has been surveyed and marked in accordance with the present convention. PSCO discovered load line marking, indicates "CW". ILLC indicates hull marking should read "C1".
LLC (Article 16), 50ac.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 October 2022
Resolved 13 October 2022
Resolution: Vessel provided class report attesting to satisfactory proof of repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 22 September 2022
Resolved
The machinery and associated piping systems shall be of a construction adequate for services for which intended and shall be so installed as to reduce to a minimum and danger to persons. Potable water pipe was leaking on steam lines.
74SOLAS 20 II-1/26, 50ac.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 October 2022
Resolved 13 October 2022
Resolution: Vessel provided class report attesting to satisfactory proof of repairs.