Records from 1997 to 2025. Most recent: inspection, 24 June 2025.
Documentation record
Registered dimensions (L × B × D)65.8 ft × 20.1 ft × 7.1 ft
Registered tonnagegross 110 / net 74
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDRAVO CORPORATION · PITTSBURGH, PA, UNITED STATES · built 1954
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCOVINGTON, KY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 December 2025 · expires 31 December 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it74 - Regulatory (Subpart C or D), Net Ton
110 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
24 June 2025
Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8147018
8 July 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7925952
27 June 2023
Deficiency Check · Annual Survey
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7724817
17 September 2022
Damage Survey
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7561754
28 June 2022
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7489549
21 May 2021
Administrative Inspection · Initial Certification
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7202542
20 November 2017
Industry Initiated Exam · Administration
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6310988
7 November 2017
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6383710
21 November 2014
Industry Initiated Exam
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 5025704
17 August 2011
Industry Initiated Exam
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4138548
11 August 2009
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3562074
14 July 2009
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3543648
17 March 2009
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3436446
15 December 2005
MTSA Verification
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 2553657
3 February 2005
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 2351102
29 July 1997
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 406591
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 July 2024
Resolved
STBD main engine exhaust manifold was leaking exhaust due to a crack in one of the bellows.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2024
Resolved 19 July 2024
Resolution: expansion pipe installed on the starboard main engine.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 June 2023
Resolved
Port main engine had an oil leak on the forward outboard inspection port. All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquids. Make repairs to the satisfaction of the attenuating Coast Guard marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2023
Resolved 18 July 2023
Resolution: Mechanic repalced seal. Inspected port main at operating temperature with neg leaks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 September 2022
Resolved
Starboard main engine starter failed and could not start main engine. Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Repair/replace to the satisfaction of the attending Coast Guard Marnine Inspector.
Action required: 10 - Deficiency Rectified
Resolved 17 September 2022
Resolution: C&B maintenance division installed new starter and tested by ships crew
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 June 2022
Resolved
Starboard main engine has a fuel leak at the fuel pressure gauge. All seals and gaskets must be properly maintained to prevent leaks of flammable liquid. Conduct repairs to the satisfaction of the attending Coast Guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 June 2022
Resolution: Fuel leak repaired
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 28 June 2022
Resolved
Port and starboard watertight doors did not have a dog or handle to secure doors so they would not close properly. The master must ensure that all hatches, doors, and other openings designed to be watertight or weathertight function properly. Make repairs to the satisfaction of the attending Coast Guard marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2022
Resolved 8 July 2022
Resolution: Received objective evidence doors are repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2021
Resolved
Start air receiver data plate MAWP is 150 psi and the two relief valves were set at 200 and 250 psi. Pressure vessels over 5 cubic feet in volume must be equipped with a pressure gauge and a spring loaded relief valve. Install relief valve with a MAWP of no more than 150 psi to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 25 May 2021
Resolved 25 May 2021
Resolution: Received objective evidence that the gauge and relief valves were installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 May 2021
Resolved
Starboard engine had an significant oil leak on the inspection port. All seals and gaskets must be properly maintained to prevent leaks. Repair oil leak to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 10 - Deficiency Rectified
Due 25 May 2021
Resolved 25 May 2021
Resolution: New gasket installed, leak stopped and repaired.