Inspection history · 106
17 August 2026
COE-Administrative
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8467330
8 July 2026
In-Service Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8433214
30 May 2026
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8384163
26 May 2026
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8380832
11 May 2026
Deficiency Check · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8370667
11 May 2026
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8371153
21 April 2026
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8353563
17 December 2025
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8284563
1 December 2025
Administrative Inspection · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8275867
11 October 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8251438
5 August 2025
Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8203464
28 July 2025
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8208087
17 July 2025
Administrative Inspection · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8188330
27 June 2025
ACP Drydock Oversight · Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8168881
15 June 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8159435
11 June 2025
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8157615
11 June 2025
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8166531
7 June 2025
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8182350
15 May 2025
Administrative Inspection · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8137134
15 May 2025
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8139847
6 May 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8129490
3 May 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8127727
3 May 2025
ACP Additional Oversight – Risk Assessment · Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8127860
3 April 2025
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8104789
28 March 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8101599
3 March 2025
In-Service Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8087105
9 February 2025
Examination of Repairs · Deficiency Check · In-Service Inspection · Administrative Inspection · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8077004
25 September 2024
Administrative Inspection · Annual Inspection · ACP Annual Oversight · MTSA/ISPS Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8008964
6 August 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7975520
30 July 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7970763
16 July 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7959606
8 July 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7953185
3 June 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7926316
29 May 2024
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7922785
29 February 2024
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7872597
29 January 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7857110
11 December 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7837535
30 October 2023
Annual Inspection · ACP Annual Oversight · Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7816366
12 September 2023
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7789945
7 September 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7786678
27 August 2023
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7779031
26 July 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7753319
17 May 2023
Damage Survey · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7690825
16 May 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7690414
29 March 2023
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7659183
27 March 2023
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7657760
21 March 2023
Administrative Inspection · ACP Additional Oversight – Risk Assessment
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7654151
7 March 2023
ISM Oversight · Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7646724
4 March 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7680945
16 February 2023
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7637853
14 February 2023
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7636365
9 February 2023
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7636596
11 January 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7619960
9 December 2022
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7614853
21 September 2022
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7830192
15 September 2022
ACP COI Oversight · Administrative Inspection · MTSA/ISPS Verification · Annual Inspection · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7559666
14 July 2022
Drydock Exam · Examination of Repairs · Internal Structural Exam · Deficiency Check · ACP Additional Oversight – Risk Assessment
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7482916
8 June 2022
Administrative Inspection · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7476312
17 December 2021
ACP Additional Oversight – Risk Assessment · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7369810
27 May 2021
In-Service Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7208499
31 March 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7166258
19 March 2021
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7292082
1 February 2021
In-Service Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7134050
1 February 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7134273
1 February 2021
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7136349
4 December 2020
ACP Annual Oversight · Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7106206
4 November 2020
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7089821
25 November 2019
Annual Inspection · Administrative Inspection · MTSA Verification · ACP Annual Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6861973
16 October 2019
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6835496
8 August 2019
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6776988
6 August 2019
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6775681
29 January 2019
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6616967
23 October 2018
ACP Annual Oversight · MARPOL Annex I Examination · Annual Inspection · Administrative Inspection · MTSA/ISPS Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6566613
6 September 2018
Examination of Repairs · Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6534018
25 July 2018
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6490659
23 July 2018
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6615948
18 April 2018
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6393835
4 April 2018
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6385025
29 March 2018
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6381033
9 March 2018
Administrative Inspection · In-Service Inspection · ACP Additional Oversight – Risk Assessment
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6370159
3 March 2018
ISM Oversight
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6363901
28 December 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6331640
17 November 2017
Administrative Inspection · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6313938
22 September 2017
ACP COI Oversight · Administrative Inspection · Annual Inspection · MTSA/ISPS Verification · Ballast Water Examination · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6267199
6 May 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6143991
30 March 2017
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6310059
17 March 2017
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6108601
14 March 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6108691
14 March 2017
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6114289
21 December 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6061034
22 November 2016
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6047626
4 November 2016
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6035654
28 October 2016
Administrative Inspection · MTSA/ISPS Verification · ACP Annual Oversight · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6030502
8 October 2016
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6018714
4 October 2016
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6015567
22 August 2016
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5979543
4 August 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5963052
1 July 2016
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5933239
5 May 2016
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5869351
1 May 2016
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5869958
16 March 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5834325
16 March 2016
Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5835584
7 March 2016
Examination of Repairs · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5830247
17 February 2016
Administrative Inspection · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5816486
8 February 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5811710
27 January 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5804554
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 May 2026
Resolved
Surfaces with temperatures above 220°C which may be impinged as a result of a fuel system failure shall be properly insulated.
Turbo exhaust piping and bellows on emergency generator was missing, vessel to re-lag piping.
74SOLAS(04) II-2/4.2.2.5.4
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 May 2026
Resolution: ABS accepted the deficiency, provided vessel 90 days to effect permenant repairs to ABS satisfaction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 May 2026
Resolved
Means shall be provided to control leaks of flammable liquids.
MI found several fuel/oil drain lines going to buckets throughout engine room.
74SOLAS(04) II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 May 2026
Resolution: ABS accepted the deficiency, provided vessel 90 days to effect permenant repairs to ABS satisfaction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 May 2026
Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled.
Emergency generator block heater wire was hanging loose and live, SWBD breaker in ECR found to be loose and rendered inoperable without opening the panel.
74SOLAS(04) II-1/45.1.3
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 26 May 2026
Resolution: ABS accepted the deficiency, provided vessel 90 days to effect permenant repairs to ABS satisfaction.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 11 May 2026
Resolved
The main inlets and outlets of all ventilation systems shall be capable of being closed from outside the space being ventilated.
E/R ventilation closing devices outside of exhaust stack found to be broken off hinges and inoperable.
74SOLAS(04) II-2/5.2.2.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 May 2026
Resolution: ABS accepted the deficiency, provided vessel 90 days to effect permenant repairs to ABS satisfaction.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 11 May 2026
Resolved
Where air pipes to ballast and other tanks extend above the free board or superstructure decks, the exposed parts of the pipes shall be of substantial construction.
MI found Bow thruster, port and stbd fwd ballast water vents to be corroded compromising water tight integrity.
ICLL(96) Reg 20(1)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 May 2026
Resolution: ABS accepted the deficiency, provided vessel 90 days to effect permenant repairs to ABS satisfaction.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 11 May 2026
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use.
MI found substantial wastage on remote hand brake wire guide for port lifeboat winch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 May 2026
Resolution: ABS accepted the deficiency, provided vessel 90 days to effect permenant repairs to ABS satisfaction.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 December 2025
Resolved
All life-saving appliances shall be kept in working order and available for immediate use before the ship leaves port and at all times during the voyage.
Port lifeboat was found to have taken on water during operational test, and is incapable of ensuring watertight integrity due to inoperable port sliding door.
74SOLAS III/4(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 December 2025
Resolved
All life-saving appliances shall be kept in working order and available for immediate use before the ship leaves port and at all times during the voyage.
Starboard lifeboat was found to be incapable of ensuring watertight integrity due to inoperable overhead hatch, and has sustained damage to fender system.
74SOLAS III/4(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 2 December 2025
Resolved
The construction of all doors in "A" class divisions shall provide resistance to fire as well as to the passage of smoke and flame.
Found A-15 door on main deck to dry stores with 3"-4"
gap on bottom sill.
74SOLAS II-2/37(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 December 2025
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards shall be ensured.
Conduit below shaft had several cut electrical conductors with bare wire.
74SOLAS(97)II-1/40.3
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 December 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Vessel reported loss of astern propulsion while mooring. Appropriate repairs and corresponding class report to be submitted prior to clearance of this deficiency.
Generator independent jacket water pump was found leaking from pump shaft seals.
74SOLAS(20)I-11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 December 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Vessel reported loss of astern propulsion while mooring. Appropriate repairs and corresponding class report to be submitted prior to clearance of this deficiency.
Observed #1 Generator local lube oil gauge missing.
74SOLAS(20)I-11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 December 2025
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service they are intended…
Safety relief valves for the start air receivers, and service air receiver had no readable tag indicating setting or servicing.
74SOLAS(97)II-1/26.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 2 December 2025
Resolved
The Company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel.
The revision of the PSTP instructions in use on board were a newer revision than what was approved by ABS.
74SOLAS (20)IX/2.1.3
ISM Code 7
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 2 December 2025
Resolved
The Company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel.
Crew’s annual completion logs of PSTPs shows a significant number left unfinished within the one-year time frame.
74SOLAS (20)IX/2.1.3
ISM Code 7
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 2 December 2025
Resolved
The Company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel.
PSTP instruction for the automatic bilge pump is not a feature supported by the installation and did not function.
74SOLAS (20)IX/2.1.3
ISM Code 7
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 2 December 2025
Resolved
Wiring shall be supported in such a manner as to avoid chafing or other injury.
Conduit housing electrical wiring to both port and starboard davit systems found to be wasted and broken.
74SOLAS II-1/27(a)(vi)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 2 December 2025
Resolved
Wiring shall be supported in such a manner as to avoid chafing or other injury.
Electrical box servicing the starboard bow mooring winch found to be broken and temporarily repaired.
74SOLAS II-1/27(a)(vi)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2025
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 11 October 2025
Resolved
Except as specified in paragraph 3 of this regulation, any ship of 10,000 gross tonnage and above shall be fitted with oil filtering equipment complying with paragraph 7 of this regulation.
Received report from Class (ABS) of a failed Oily Water Separator. Vessel shall enact permanent repairs to the satisfaction of class.
MARPOL I/14.2
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 October 2025
Resolution: Received notification from class that surveyor witnessed sat repair to OWS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 August 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Vessel reported loss of astern propulsion while mooring. Appropriate repairs and corresponding class report to be submitted prior to clearance of this deficiency.
74 SOLAS (20) I/11 (a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 July 2025
Resolved
Temporary patch on Galley A/C raw water overboard discharge. Repair as original.
The machinery, boiler and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 18 July 2025
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 17 July 2025
Resolved
Engine room fan space deck repaired with temporary concrete patch which is failing in multiple areas. Determine condition of deck plating condition and repair as original.
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship in all respects will remain fit to sea.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 18 July 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 July 2025
Resolved
Galley electrical space broken door to electrical enclosure with temp repairs. Repair as original.
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards shall be ensured.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 18 July 2025
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 July 2025
Resolved
Incinerator space pooled oil in fuel tank containment, pooled oil beneath motor, oil soaked insulation around peripheral of space. Remove pooled oil, determine source and remove/replace soaked insulation.
Means shall be provided to control leaks of flammable liquids.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 18 July 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 July 2025
Resolved
Terminations and joints in all conductors shall be made so as to retain the original electrical, mechanical, flame-retarding and where necessary, fire resisting properties of the cable.
MI found emergency control air for the main engine to have a exposed electrical wire and severely degraded sheathing. Vessel to enact permanent repairs to the satisfaction of class.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 18 July 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 July 2025
Resolved
External high-pressure fuel delivery lines between high pressure fuel pumps and fuel injectors shall be protected with a jacketed piping system capable of containing fuel from a high pressure line failure.
MI observed all double jacketed fuel lines on all three service generators to be disconnected. Vessel to enact permanent repairs to the satisfaction of class.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 18 July 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 June 2025
Resolved
Ships shall be provided with a main steering gear and an auxiliary steering gear to the satisfaction of the Administration. The vessel reported a failure of both steering pumps during transit from Puerto Rico to Houston, TX.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 June 2025
Resolution: Loose electrical connection in the #2 steering gear control panel. TECH attended found system to be in go working order. Steering tested in all modes, alarms, and shutdowns, which were also found to be in good working order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 May 2025
Resolved
A survey, either general or partial, according to the circumstances shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel.
Vessel master reported the M/E #2 cylinder high pressure fuel line suffered a failure. Ships crew repaired the fuel line with parts on board. A damage survey shall be completed by the RO (ABS) and the results provided to the Coast Guard marine inspector for acceptance. Vessel must contact Sector Houston-Galveston OCMI prior to entry into port.
46 CFR 91.30-1
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 18 July 2025
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 6 May 2025
Resolved
In general, compliance with the standards established by the American Bureau of Shipping (ABS), see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. However, in special cases, a detailed analysis of the entire structure or some integral part may be made by the Coast Guard to determine the structural requirements.
Structural repairs to shell plating shall be completed in accordance with ABS approved repair plan reference DWG 2241-S11-1-2 dated 07APR2025. Vessel shall not operate past 01JUN2025 until repairs are completed to the satisfaction of ABS attending surveyor.
Action required: 705 - Other - as specified
Resolved 20 May 2025
Resolution: Closed deficiency, reissued amended 835 under sep activity.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 3 May 2025
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company.
According to ships SMS SMM-ENG-03 5.5 & 5.6, vessel maintenance shall be carried out in accordance with company and manufacturers' instructions; vessel shall maintain spare parts stock levels adequate for safe and effective operation. Vessel found to have a substantial overdue maintenance list(217 items), vessel unable to keep up with maintenance due to lack of spare parts and resources. An external SMS audit focused on maintenance and critical spare parts accessibility is required within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2025
Resolved 19 May 2025
Resolution: ACS conducted external audit to the satisfaction of USCG/TPOC.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 3 May 2025
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use.
Port liferaft painter line improperly configured, secured to vessel instead of weak link.
Action required: 10 - Deficiency Rectified
Resolved 3 May 2025
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 4 March 2025
Resolved
In general, compliance with the standards established by the American Bureau of Shipping (ABS), see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. However, in special cases, a detailed analysis of the entire structure or some integral part may be made by the Coast Guard to determine structural requirements.
Temporary repairs shall be completed in accordance with the ABS approved proposal and engineering analysis, to the satisfaction of the attending ABS Surveyor and USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2025
Resolution: Received ABS report.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 3 March 2025
Resolved
In general, compliance with the standards established by the American Bureau of Shipping (ABS), see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. However, in special cases, a detailed analysis of the entire structure or some integral part may be made by the Coast Guard to determine the structural requirements.
The vessel has significant wastage in the engine room sideshell plating, rendering the plate thickness below the ABS acceptable standards. Submit a detailed permanent repair proposal through ABS to the USCG, to bring the affected areas into compliance with the ABS minimum thickness rules. This shall include material lists, drawings, and engineering analysis.
46CFR92.01-10(a)
16ac
21MAR2025 - extended to 01APR2025 - MHM
31MAR2025 - extended to 15APR2025 - MHM
14APR2025 - extended to 01MAY2025; final repairs due 01JUN2025
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2025
Resolved 6 May 2025
Resolution: Received and reviewed final repair plan.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 February 2025
Resolved
The hull, machinery and equipment of a cargo ship shall be surveyed on completion and thereafter in such a manner and at such intervals as the Administration may consider necessary in order to ensure that their condition in all respects satisfactory.
Temporary repairs to side shell were completed on 17FEB25. Vessel required to notify USCG upon next port of call in Houston, TX to schedule attendance to assess condition of repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 March 2025
Resolution: USCG attendance complete as required.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 February 2025
Resolved
The machinery, boiler, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended.
Evaporator pump inoperable requiring vessel to utilize general service fire pump for evaporator operations which has resulted in increased failures of fire pumps.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 March 2025
Resolved 25 February 2025
Resolution: Accepted by RO (ABS).
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 February 2025
Resolved
The machinery, boiler, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended.
MI observed significant leakage and deterioration of ship service cooling water header circulating pump and possible deterioration of inlet and outlet piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 March 2025
Resolved 25 February 2025
Resolution: Accepted by RO (ABS).
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 25 September 2024
Resolved
General arrangement plans shall be permenantly exhibited for the guidance of the ships officers, showing clearly for each deck the control stations, the various fire sections enclosed by "A" class divisions, the sections enclosed by "B" class divisions together with the particulars of fire detection and fire alarms systems... Plans and booklets shall be kept up to date; any alterations thereto shall be recorded as soon as practicible.
Ships current revision of fire control plan has incorrectly labeled spaces (Gymnasium, Electrical workshop, etc) and doors that have been removed from the vessel. Additionally, fire boundaries on the main deck and "B" deck have been modified and not noted on the fire control plan. Vessel fire control plan does not match current arrangement.
74 SOLAS (20) II-2/ Reg 15.2.4.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 October 2024
Resolution: Recieved Class (ABS) WO#6622814 dated 24SEP24 (see documents tab) accepting deficiencies
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 September 2024
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended.
Multiple soft patches observed on cooling water lines in engine room.
74 SOLAS (97) II-1/ Reg 26.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 October 2024
Resolution: Recieved Class (ABS) WO#6622814 dated 24SEP24 (see documents tab) accepting deficiencies
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 25 September 2024
Resolved
Except where otherwise stated, the normal equipment of every lifeboat shall consist of:
(.12) a food ration totaling not less than 10,000kj for each person the lifeboat is permitted to accommodate.
05 food rations in the port lifeboat and 03 rations in the starboard boat were found unsealed.
74 SOLAS (97)III/ Reg 41.8.12
Action required: 10 - Deficiency Rectified
Resolved 25 September 2024
Resolution: Crew replaced with on board spares
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 25 September 2024
Resolved
Fire extinguishing appliances shall be kept in good order and available for use at all times.
Multiple fire extinguishers on the main deck and one on the bridge were observed with dry rotted and cracked hoses.
74 SOLAS (97) II-2/ Reg 21
Action required: 10 - Deficiency Rectified
Resolved 25 September 2024
Resolution: Crew replaced with onboard spares. Vessel has sufficient spares to meet both minimum carriage requirements and statutory spares.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 June 2024
Resolved
The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must be sufficient for the ship's service loads.
Vessel reported casualty to #1 SSDG resulting in loss of ability to utilize vessel's bow thruster without risk of excessive load fluctuations.
Vessel shall provide an additional assist tug in maneuvering/docking situations in which the bow thruster would normally be utilized.
46 CFR 111.40-4
Action required: 705 - Other - as specified
Resolved 26 August 2024
Resolution: Received ABS damage repair report. Repairs are satisfactory to the attending ABS surveyor.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 2 November 2023
Resolved
Except as specified in paragraph 3 of this regulation,
any ship of 10,000 gross tonnage and above shall be
fitted with oil filtering equipment complying with
paragraph 7 of this regulation.
Vessels OWS found to be leaking water from 3 different
temporary repairs. Repair to satisfaction of class.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 November 2023
Resolution: Accepted by RO
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 October 2023
Resolved
The condition of the ship and its equipment shall be
maintained to conform with the provisions of the present
regulations to ensure that the ship in all respects will
remain fit to proceed to sea without danger to the ship
or persons on board.
Vessels salt water cooling line for the ECR air
conditioning system found to be ruptured.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 November 2023
Resolution: Accepted by RO
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 30 October 2023
Resolved
Termination and joints in all conductors shall be made
as to retain the original electrical, mechanical, flamretarding
and, where necessary, fire-resisting
properties of the cable.
During the inspection of the electrical equipment room
on the poop deck, MI found two electrical NEMA
enclosures fed by an extension cord as well as several
loose connections.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 November 2023
Resolution: Accepted by RO
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 March 2023
Resolved
Electrical installations shall be such that the safety of crew and the ship from from electrical hazards will be ensured. Inspectors identified unauthorized modifications had been made to the reefer receptacles distribution box to accommodate the installation of welding machine power supplies.
Action required: 705 - Other - as specified
Resolved 23 March 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 20 September 2022
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use.
During lifeboat drill, lifeboats were unable to be recovered due to limit switch and fast/slow switch failures. Deficiency corrected and proper operation demonstrated.
74 SOLAS(20) III/20.1
10 C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2022
Resolved 20 September 2022
Resolution: Electrician repaired control box and all three limit switches. All sat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 20 September 2022
Resolved
Fire doors shall be self closing.
Fire doors found not non-latching and/or not self closing. Repair and demonstrate proper operation.
74 SOLAS(97)II-2/30.4.1
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 20 September 2022
Resolved
The machinery shall be adequate for the service intended
Excessive water ingress in the following engine room pump assemblies due to shaft seal failures. Repair or replace and prove proper operation.
1. Ballast pump.
2. Main fire pump.
3. Main salt water cooling pump
74 SOLAS(97) II-1/26.1
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 20 September 2022
Resolved
The means of escape, including stairways and exits, shall be marked by lighting.
Inoperable emergency light in engine room emergency escape. Repair and demonstrate proper operation.
74 SOLAS(97)II-2/28.1.10
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 September 2022
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards shall be ensured.
Exposed electrical components in following locations, install protective colors.
1. Emergency generator control assembly
2. Lower engine room heat detector overhead MSD.
3. Intermediate engine room level starboard side pneumatic manifold.
74 SOLAS(97) II-1/40.3
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 September 2022
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards shall be ensured.
Overhead light starboard bunker station not mounted. Repair and demonstrate proper operation.
74 SOLAS(97) II-1/40.3
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 September 2022
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards shall be ensured.
Multiple broken overhead fluorescent light covers in steering gear room and lower engine room. Repair or replace as needed.
74 SOLAS(97) II-1/40.3
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 20 September 2022
Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed,
constructed and installed as to withstand the maximum
stresses to which it may be subjected to.
Steam leak on auxiliary boiler safety relief valve
flange. Repair as required.
74 SOLAS (97)II-1/33.1
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 20 September 2022
Resolved
Plans and booklets shall be kept up to update; any alterations thereto shall be recorded as soon as practicable.
Required forward/focsle life-jackets not found on fire control/safety plan. Verify accuracy of fire control plan, revise fire control plan as needed, and submit to class for review and approval.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
14 - Pollution Prevention › N/A - No Subsystem › VGP: General
Issued 20 September 2022
Resolved
A ship of 300 gross tons or more constructed after June 30, 1974 must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe
Holed/wasted pollution containment for ventilation openings on aft deck below Incinerator room door. Repair as original.
46 CFR 155.320
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 September 2022
Resolved
Means shall be provided to control leaks of flammable liquids
Fuel oil pooled on fwd deck of engineering storeroom from prior casualty. Remove fuel oil as needed.
74 SOLAS(97) II-1/40.3
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 20 September 2022
Resolved
The main inlets and outlets of all ventilation systems shall be capable of being closed from outside the spaces being ventilated.
EDG intake vent closure inoperable. Repair and demonstrate proper operation.
74 SOLAS(97) II-2/16.9
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 September 2022
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards shall be ensured.
Multiple bonding wires for reefer plugs missing. Replace as needed.
74 SOLAS(20) II-1/4.1.1
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 20 September 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship in all respects will remain fit to sea.
Port side gangway frame wasted below boat deck. Conduct assessment of extent of wastage and possible structural impacts, develop repair plan as needed.
74 SOLAS(20) I/11a
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 20 September 2022
Resolved
The machinery shall be adequate for the service intended which is recognized by the Administration.
Emergency diesel generator canvas exhaust fan enclosure damaged. Repair and demonstrate proper operation.
74 SOLAS (97) II-1/26.1
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 20 September 2022
Resolved
Draft limit control. The draft loss interlock switch must be tested to ensure proper operation. The draft limit control must cause burner shutdown and prevent startup when an inadequate air volume is supplied to the burner(s).
Auxiliary boiler does not have required loss of combustion air alarm or means of testing. Provide alarm and demonstrate proper operation.
46 CFR 61.35-3 (a)(7)
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 15 September 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship in all respects will remain fit to sea.
Escape hatch from engine control room does not properly
close or seal. Repair and demonstrated proper operation.
74 SOLAS(20) I/11(a)
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 15 September 2022
Resolved
On all ships, within machinery spaces, emergency escape breathing devices shall be situated ready for use at easily visible places, which can be reached quickly and easily at any time in the event of fire.
EEBD missing in AFT corner of CO2 room. Replace as required by fire control plan.
74 SOLAS(20) II-2/13.4.3.1
16 A
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 26 September 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 20 July 2022
Resolved
All hatchways in position 1 and 2 shall be fitted with hatch covers of steel or other equivalent material. Such hatch covers shall be weather tight and fitted with gaskets and clamping devices. The arrangements shall ensure that the tightness can be maintained in any sea conditions.
MI observed forward hatch main deck going into the Bos'n Locker with severely corroded/wasted knife edge not sealing.
ICLL(88)16.1
Action required: 705 - Other - as specified
Resolved 17 September 2022
Resolution: ABS accepted deficiency and provided finding # 1438.0. Work Order 5348731: The top ten inches of the forward hatch on main deck leading into the Bos'n Locker was part cropped to fair metal and sound material and inserted as original. NDT conducted.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 20 July 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
MI observed wastage on bulkheads between scullery and crews mess and bulkhead between crews mess and officers mess. Wastage is located at the deck level up approximately 10" next to sideshell.
74 SOLAS (04)I/11(a)
Action required: 705 - Other - as specified
Resolved 17 September 2022
Resolution: ABS accepted deficiency and provided finding # 1441.0. Work Order 5348731 ABS witnessed completion of steel replacement and NDT. The repairs were carried out using approved procedures, qualified personnel, certified materials/ consumables. NDT conducted.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 July 2022
Resolved
Ventilator openings shall be provided with weather tight closing appliances of steel or other
equivalent material.
MI observed the natural ventilation mushroom head sealing surfaces for the Bosun Store, Paint Locker, Bow Thruster & Electrical Room were severely corroded and wasted.
ICLL(88)19.4
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 September 2022
Resolution: ABS accepted the deficiency and provided finding # 1437.0. Work Order 5348731: The natural ventilation mushroom head sealing surfaces for the Bosun Store, Paint Locker, Bow Thruster & Electrical Room were replaced. Ventilator closure tested satisfactory
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 1 February 2021
Resolved
Ships shall be provided with a main steering gear to the satisfaction of the Administration...
The vessel reported a failure of one steering pump while in transit to Houston.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2021
Resolution: Recevied class report attesting to satisfactory repair to steering pump system.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 8 December 2020
Resolved
"A" class divisions shall comply with the following: they shall be so constructed as to be capable of preventing the passage of smoke and flame. Found 02 cable transits cut in "A" class boundary forming the exterior of the AC space on the A deck. Space is considered to have "A" class boundaries as per Class approved fire control plan.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 December 2020
Resolution: Recieved class report attesting to repair of the SFP boundary.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 8 December 2020
Resolved
All Bulkheads required to be "B" class divisions shall extend from deck to deck and to the shell or other boundaries. Found gym space(voids on FCP) bulkhead to be wasted and holed in numerous places to include 3 doors leading to the space from the accommodation hallway. Space is considered to have "B" class boundaries per class approved fire control plan.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 January 2021
Resolved 8 December 2020
Resolution: Recieved class report accepting as a condition of class.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 25 November 2019
Resolved
The forward ballast had a small pin hole, which leaked into the bow thruster room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 January 2020
Resolved 29 December 2019
Resolution: Repaired and surveyed by ABS.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 25 November 2019
Resolved
Vessel's oil water separator was inoperable. Chief Engineer was not able to prove proper operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 January 2020
Resolved 31 January 2020
Resolution: Class conducted training on proper operation of OWS.
Lifesaving › Lifeboat › Embarkation/Disembarkation Capabilities
Issued 22 September 2017
Resolved
Remote lowing cables for vessel's lifeboats do not operate as designed.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 29 September 2017
Resolved 22 September 2017
Resolution: Class (ABS) claered deficiencies see attached ABS survey report.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 22 September 2017
Resolved
Several class A fire doors were found to inoperable and /or prevented quick escape.
Action required: 705 - Other - as specified
Due 29 September 2017
Resolved 22 September 2017
Resolution: Class (ABS) claered deficiencies see attached ABS survey report.
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder
Issued 6 May 2017
Resolved
Vessel experienced a loss of propulsion during outbound transit. Vessel to provide Class report attesting to proper repairs and operation prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 May 2017
Resolved 6 May 2017
Resolution: Class report received.
Lifesaving › Launching Appliances › Release Mechanism
Issued 26 November 2016
Resolved
Remote lowwering cables for vssel's lifeboats do not operate as designed or specified in the manufacturer's instructions. The remote release cable pays out at a faster rate than the falls, preventing the continual smooth lowering of the lifeboat and requiring the lifeboat operator to repeatedly remove slack from the line into the lifeboat. Make appropriate repairs.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 24 March 2017
Resolution: Received report from ABS surveyor attesting to the proper operation of the remote launching pull on the port lifeboat. Also received OEM report detailing how issue was resolved.
Documentation › Safety Management System › Master's Authority/Responsibility Documentation
Issued 26 November 2016
Resolved
Due to the lifeboat release mechanism deficiency, an internal ISM audit of the vessel's Safety Management System is required. The audit shall be equivalent in scope to the annual internal ISM audit required by the ISM code. Upon completion of the audit, provide a copy of the audit report to this office.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 26 December 2016
Resolved 21 December 2016
Resolution: Received evidence internal ISM Audit was conducted.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 17 February 2016
Resolved
The current fire boundary doors in the engine room are not closing tightly and are deteriorating, specifically noted were the lower level escape and control room doors. Provide and demonstrate the proper operation of fire boundary doors throughout the engine room.
Action required: 705 - Other - as specified
Due 18 August 2016
Resolved 22 August 2016
Resolution: Received full term Safety Construction Certificate from ABS.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 17 February 2016
Resolved
Electrical junction boxes on the stern winches are corroded. Provide watertight connections.
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 16 March 2016
Resolution: Junction boxes renewed and made watertight.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 17 February 2016
Resolved
Both port and starboard gangways have areas of the kick plate that are fractured or wasted. Renew kick plates to good metal.
Due 18 March 2016
Resolved 16 March 2016
Resolution: Kick Plates were cropped and renewed as necessary.
Deck/Cargo › Cargo Stowage › General
Issued 17 February 2016
Resolved
Portable stanchion mounting sockets between Bays 2 and 3, were found corroded and fractured. Renew socket mounts on the port side.
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 16 March 2016
Resolution: Stanchion was cropped and renewed.