Records from 2004 to 2025. Most recent: inspection, 15 December 2025.
Inspection history · 36
15 December 2025
Periodic Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8268667
19 August 2025
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8247180
19 December 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8034425
25 September 2024
Hull Examination · Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7996233
11 September 2024
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8000289
14 May 2024
Plan Review (Other than "T")
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7943194
11 December 2023
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7837712
7 October 2022
COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7568787
29 August 2022
Drydock Exam · Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7513828
3 January 2022
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7363857
2 September 2021
Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7303086
25 August 2021
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7297063
25 August 2021
Type not recorded
No type recorded · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7353237
4 January 2021
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7127012
3 March 2020
Administrative Inspection
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6920097
8 January 2020
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6875479
8 August 2019
Cargo Tank Internal · Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6776649
7 August 2019
In-Service Inspection · Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6775891
7 August 2019
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6777888
10 October 2018
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6542471
11 August 2017
Deficiency Check · COI Inspection · Internal Structural Exam · Cargo Tank Internal · MTSA Verification · Hull Examination · Uninspected Other · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6241897
31 January 2017
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6080611
11 July 2016
In-Service Inspection · Deficiency Check · Uninspected Other · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5937048
24 November 2015
Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 5760584
10 October 2014
Administrative Inspection
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 5002987
19 January 2012
DAPI Audit · MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4228296
20 January 2011
Ballast Water Examination · Annual Inspection · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3930077
10 December 2008
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3378278
17 December 2007
Internal Structural Exam · Cargo Tank Internal · Re-Inspection · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3116861
21 February 2007
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2871489
6 April 2006
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2618467
22 March 2006
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2607497
21 March 2006
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2607451
9 March 2006
Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2597913
8 December 2004
Initial Certification · Construction Oversight · Cargo Tank Internal · Hull Examination · MTSA Verification · Deadweight Survey · Plan Review (Other than "T") · Internal Structural Exam
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2237239
6 December 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2254455
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 15 December 2025
Resolved
Operational readiness: The manufacturer's instructions for on board maintenance must be on board the vessel, including checklists for use when carrying out the inspections, maintenance and repair instructions, and a schedule of periodic maintenance. The local OCMI may accept a shipboard planned maintenance program that includes the items listed in that paragraph. During periodic inspection, one immersion suit is dated 2007 and the remainder 2013 with no evidence of testing other than monthly visual inspections.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2026
Resolved 7 January 2026
Resolution: Cleared operator provided certificate for 28 immersion suit servicing (unable to load, written description in narrative).
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 December 2024
Resolved
For each generator rated 50v or more, additional measuring instruments, if needed, must be provided. Distribution panel has two banks of 3 phase fault lights, one light bulb was burned out on each bank.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 January 2025
Resolved 17 January 2025
Resolution: Operator provided photo of switchboard lights operable; and indicated with the Malibu and Pacific Palisades wild fires there was some delay in staff coming from Ventura slighly past due date. Accepted by Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2024
Resolved
The following plans must be submitted: Arrangement of electrical equipment, electrical one-line diagram that includes wire types, sizes, overcurrent-device rating and setting, and type of electrical equipment enclosure. Switchboard wiring diagram and switchboard material and nameplate list. If the vessel is altered, or repaired, the plans, information, and calculations required by this part must be submitted—(a) To the OCMI in the zone where the vessel is to be constructed, altered, or repaired; or (b) By visitors to the Commanding Officer, Marine Safety Center. Vessel installed HPU with electric motor, connected by cabling and breakers to the vessel electrical distribution panel. Please provide these details.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2024
Resolved 16 October 2024
Resolution: Vessel provided updated plans 17 SEP, received MSC plan approval letter 16 OCT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 7 October 2022
Resolved
A Class-1 door may be installed at any place if the vessel's pilothouse contains a visual indicator showing whether the door is open or closed. Visual indicators in the pilot house were not functioning. Until repaired, ensure hourly rounds are conducted and logged to verify door closed condition.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2022
Resolved 18 October 2022
Resolution: Vessel replaced the watertight door indicating switches and demonstrated operation through pictures and video.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 October 2022
Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors, such as bilge slop tanks and contaminated drain tanks, must be fitted with a single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two screens of at least 20 by 20 mesh spaced not less than one-half inch (13mm) nor more than 11/2 inches (38mm) apart. The clear area through the mesh must not be less than the internal unobstructed area of the required pipe. The retaining rings on a 2 1/2 inch vent on the starboard day tank and a 3 inch vent on a port fuel storage tank were found broken, allowing air flow around the vent screens.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2022
Resolved 20 October 2022
Resolution: Vessel replaced tank vent assemblies.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 January 2022
Resolved
Fire pump self priming and capable of delivering a stream of water. Firemain found aligned to monitor unable to provide any stream.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2022
Resolved 3 January 2022
Resolution: Corrected during inspection.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 3 January 2022
Resolved
Drills: Firefighting training and drills must be held before the vessel leaves port or within 24 hours of departing. Vessel mate has been onboard recently, and not participated in a fire drill.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2022
Resolution: Fire drill held in galley, all crew participated.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 January 2022
Resolved
Tests and inspections of fire fighting equipment. Galley smoke detector found inoperable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2022
Resolved 14 January 2022
Resolution: Vessel bought and installed new detector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 January 2022
Resolved
Operational readiness. Each item of lifesaving equipment must be in good working order. Deck lifering found with detoriorated shell and grab line.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 3 January 2022
Resolution: Lifering replaced with extra onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 January 2022
Resolved
Test procedure and operations. Vessel technician no longer services John Deere and needed to perform safety and shutdowns on both service generators.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 February 2022
Resolved 14 January 2022
Resolution: Vessel provided technicians report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 January 2022
Resolved
Nothing limits the inspector from making tests and inspections as he deems necessary to be assured of the safety and seaworthiness of the vessel. Fuel shut down reach rods not readily operational.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2022
Resolved 3 January 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 January 2022
Resolved
Nothing limits the inspector from making tests and inspections as he deems necessary to be assured of the safety and seaworthiness of the vessel. Forepeak ballast vent missing floating stopper.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2022
Resolved 14 January 2022
Resolution: Vessel replaced ballast vent assembly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 August 2021
Resolved
Vessel reported loss of both ship's service generators. Make necessary repairs and prove satisfactory operation of both generators prior to continued operation/service. Provide the local OCMI office a written report of the repairs/work completed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: All machinery running Sat.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 7 August 2019
Resolved
Demonstrate proper operation of steering gear to include diagnosis and rectification of steering loss sufferred 07AUG2019.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 August 2019
Resolved 7 August 2019
Resolution: Vessel demonstrated proper operation after replacement of DCV.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 August 2019
Resolved
Make tank adjacent to damage starboard midship available for inspection.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 August 2019
Resolved 7 August 2019
Resolution: Vessel made space available.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 10 October 2018
Resolved
Prove proper operation of both SSDG safety shutdowns; low lube oil pressure, hi jacket water temp.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2018
Resolved 15 November 2018
Resolution: Tested all sat.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 10 October 2018
Resolved
Prove proper operation of Bow thruster safety shutdowns; low lube oil pressure, hi jacket water temp.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2018
Resolved 15 November 2018
Resolution: Tested all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 10 October 2018
Resolved
Replace relief valve on #1 air receiver.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2018
Resolved 15 November 2018
Resolution: Tested newly installed valve, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 October 2018
Resolved
Replace wing nuts on E/R batteries with standard nuts.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2018
Resolved 15 November 2018
Resolution: Verified standard nuts on batteries.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 October 2018
Resolved
Replace indicator lights for both steering motors.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2018
Resolved 15 November 2018
Resolution: Verified indicator lights are working.
Construction/Loadline › Hull › Hull Plating
Issued 11 July 2016
Resolved
Vessel installed a large sonar gondola below the bow without plan approval. Title 46 CFR 127.120 requires alteration plans to be submitted to the USCG for review and approval. You must restore the vessel hull to approved design or receive approval from Marine Safety Center for hull modification, prior to the vessel departing the partially protected waters of Puget Sound.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 November 2016
Resolution: Vessel representatives submitted new plans to CG Marine Safety Center (MSC) for review and received approval via C1-1603932. Inspectors verified modifications matched approved plans. All sat.
Lifesaving › Line-Throwing Appliances › Lines
Issued 24 November 2015
Resolved
Provide 500' of synthetic auxiliary line for line throwing appliance.
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 December 2015
Resolved 18 December 2015
Resolution: Item purchased and shipped to vessel.
Fire Fighting › Fire Main › Pressure
Issued 24 November 2015
Resolved
Fire pump gauge on bridge is not required but installed and is inop. Replace or repair fire pump gauge on bridge.
Action required: 705 - Other - as specified
Due 24 December 2015
Resolved 26 November 2015
Resolution: Fire pump pressure gauge was installed on bridge and is operational.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 19 January 2012
Resolved
LIFEBUOY LOCATED ON 02 DECK PORT SIDE IS MISSING 100FT OF LIFELINE. APPROPRIATELY ATTACH LIFELINE.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 October 2012
Resolution: Verified 02 Deck Port side lifebuoy has 100ft of lifeline.
Lifesaving › Lifebuoys › Serviceable
Issued 19 January 2012
Resolved
LIFEBUOY GRAB LINE FOR LIFEBUOY LOCATED ON 02 DECK STBD SIDE IS DETERIORATED. REPLACE GRAB LINE WITH APPROPRIATE LINE.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 October 2012
Resolution: Verified 02 Deck Stbd side lifebuoy grab line is satisfactory.
Fire Fighting › Ventilation Systems › Ducts
Issued 19 January 2012
Resolved
DRYER VENT DUCT HAS EXCESSIVE LINT BUILD UP. CLEAN DRYER VENT PRIOR TO NEXT USAGE BUT NLT 19JAN12.
Action required: 705 - Other - as specified
Due 19 January 2012
Resolved 4 October 2012
Resolution: Verified dryer vent duct has been cleaned.
Operations/Management › EPA Vessel General Permit (VGP) › 1.5.1-VGP Notice of Intent (NOI)
Issued 19 January 2012
Resolved
INSP: CHAD D. DAVISON; [phone withheld]; [email withheld]; LAKE CHARLES, LA; QUESTIONED VESSEL MASTER, MATE AND PORT CAPTAIN ON VGP NOI. ALL PARTIES CLAIMED TO HAVE NO KNOWLEDGE OF VGP. INSPECTOR WILL FORWARD INFORMATION TO VESSEL PORT CAPTAIN.
Action required: 705 - Other - as specified
Due 19 January 2012
Resolved 4 October 2012
Resolution: Verified VGP NOI onboard.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 20 January 2011
Resolved
Methanol system not operable and crew had never used or tested any of the equipment. Vsl not to use this system until it has been inspected/tested.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 November 2014
Resolution: Methanol system piping removed. Vessel does not plan to ever carry methanol again.
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 20 January 2011
Resolved
SSB emergency power. Battery and charger install not proper. Battery not in a box and charger is the portable type with clips.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Proper charger installed, battery secured.
Construction/Loadline › Structures › Superstructure
Issued 20 January 2011
Resolved
All port light gaskets leaking and not weather tight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Gaskets replaced and inspected.
Construction/Loadline › Markings › Load Line Mark
Issued 20 January 2011
Resolved
Paint deck line in a contrasting color.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Painted
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 20 January 2011
Resolved
Paint draft marks and homeport in a contrasting color.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Painted
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 20 January 2011
Resolved
Provide means to secure freezer doors.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Completed
Electrical › Electrical Distribution System (service) › Switch
Issued 20 January 2011
Resolved
Provide GFI protection for galley outlets around sink area.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Installed and tested.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 20 January 2011
Resolved
Provide ball day shape. Vsl needs 3 total. (aground)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: provided
Engineering › Compressed Air System (start air) › Valve
Issued 20 January 2011
Resolved
Provide documentation of bench test or replace PV relief valves and provide documentation. Valves are not to exceed 195psi.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Replaced
Electrical › Electric Supply System (service) › Battery Charger
Issued 20 January 2011
Resolved
Provide drip shields on 2 battery chargers on centerline of e/r.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: installed and inspected
Construction/Loadline › Structures › Ventilators
Issued 20 January 2011
Resolved
Provide proper vent closures for laundry space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Installed and inspected
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 20 January 2011
Resolved
MDE alarm boxes in e/r. port is only supported by wire. stbd has bent cover and circuits are exposed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 March 2011
Resolved 2 March 2011
Resolution: Completed and inspected.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 17 December 2007
Resolved
Fuel transfer procedures not posted within the engine room.
Action required: 703 - Prior to bunkering operations
Resolved 17 December 2007
Stability › Watertight Integrity › General
Issued 17 December 2007
Resolved
All watertight doors improperly adjusted.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 December 2007
Construction/Loadline › Markings › Load Line Mark
Issued 17 December 2007
Resolved
Painted over.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 December 2007
Navigation › Piloting/Steering › Marine Charts
Issued 17 December 2007
Resolved
Charts and NTM's out dated. All dated 2005.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 December 2007
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 17 December 2007
Resolved
Test kit not onboard as required.
Due 17 January 2008
Resolved 10 December 2008
Resolution: Vessel had valid alcohol test strips on board.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 17 December 2007
Resolved
Sporadic log entries and not IAW requirements as set forth in 46 CFR 131.620. Vessel's master and company representative were shown the requirements within the regulation. Deficiency should be cleared at the next annual exam.
Action required: 705 - Other - as specified
Resolved 10 December 2008
Resolution: Vessel''s personnel was making good entries for training, drills, and general shipboard operations.
Lifesaving › Lifefloat › Serviceable
Issued 17 December 2007
Resolved
One needing replacement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 December 2007
Communications › Radio Communications › EPIRB
Issued 21 February 2007
Resolved
Replace hydrostatic release to EPIRB as per 46 CFR 133.60
Action required: 705 - Other - as specified
Due 22 March 2007
Resolved 13 March 2007
Resolution: corrected
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 21 February 2007
Resolved
Prove operation of overspeed to service generators as per 46 CFR 129.380.
Action required: 705 - Other - as specified
Due 7 April 2007
Resolved 21 February 2007
Resolution: corrected.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 21 February 2007
Resolved
Removed two worn oil transfer hoses on the spot.
Due 7 March 2007
Resolved 7 March 2007
Electrical › Electric Generation Source (service) › Generator
Issued 9 March 2006
Resolved
Repair coolant leak on the port generator.
Action required: 705 - Other - as specified
Due 9 April 2006
Resolved 6 April 2006
Resolution: Master [name withheld] attended the vessel and replaced defective parts.
Communications › Radio Communications › EPIRB
Issued 9 March 2006
Resolved
EPIRB registration expires 29NOV06.
Action required: 705 - Other - as specified
Due 29 November 2006
Resolved 17 December 2007
Electrical › Electric Supply System (service) › Cable
Issued 8 December 2004
Resolved
Properly secure all dead end spare cabling under the pilothouse forward and aft consoles
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 December 2004
Resolved 13 December 2004
Resolution: Secured.
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 8 December 2004
Resolved
Repair or replace the leaking pressure relief device for the fuel oil transfer pump.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 13 December 2004
Resolved 13 December 2004
Resolution: Pressure relief plugged. Not required.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 8 December 2004
Resolved
Properly mark or label the life ring stowage points.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 December 2004
Resolved 13 December 2004
Resolution: Marked.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 8 December 2004
Resolved
Provide all required nautical publications and charts
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 13 December 2004
Resolved 13 December 2004
Resolution: All Navigation publications provided.
Construction/Loadline › Markings › Load Line Mark
Issued 8 December 2004
Resolved
Paint loadline mark.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 December 2004
Resolved 14 December 2004
Resolution: Applied.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 8 December 2004
Resolved
Provide all required logs
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 December 2004
Resolved 13 December 2004
Resolution: Provided, training held
Operations/Management › Drills/Instruction › Fire
Issued 8 December 2004
Resolved
Demonstrate crew proficiency in Fire, Man Overboard, Abandon Ship, and Security drills.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 13 December 2004
Resolved 14 December 2004
Resolution: Completed drills.