Records from 2005 to 2025. Most recent: inspection, 30 December 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · MADISONVILLE, LA, UNITED STATES · built 2005
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 29
30 December 2025
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8288260
25 June 2025
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8149766
14 April 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8111943
5 March 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8088763
18 July 2023
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7747409
27 June 2022
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7488958
7 September 2021
Deficiency Check · Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7306337
11 June 2020
COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6973883
18 June 2018
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6448050
1 March 2017
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6097027
22 March 2016
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5838487
8 April 2015
Internal Structural Exam · Cargo Tank Internal · COI Inspection · Drydock Exam · MTSA Verification · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5099131
7 April 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4831266
5 February 2014
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4794934
6 March 2012
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4257566
26 January 2011
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3932451
9 February 2010
COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3677449
12 June 2009
Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3489860
26 June 2008
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3249658
13 May 2008
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3197170
1 September 2007
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3044577
29 August 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3048171
8 June 2007
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2955261
28 November 2006
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 2830215
15 August 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2748587
31 May 2006
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2666091
24 August 2005
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 2834588
24 March 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2318531
22 March 2005
Cargo Tank Internal · MTSA Verification · Internal Structural Exam · Initial Certification · Initial Construction-Excluding Oversight · Hull Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2304968
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 September 2021
Resolved
When major alterations or major repairs of tank vessels become necessary the work shall be done under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect for new construction insofar as possible. When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built, or in accordance with the regulations in effect for new construction insofar as possible.
Vsl was reported with damage received from Hurricane Ida
Vsl shall provide damage survey and salvage plan report to the satisfaction of the CG prior to movements.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 September 2021
Resolution: Received, reviewed and accepted satisfactory damage survey and salvage plan report.
Deck/Cargo › Vapor Control Systems › Manual Isolation Valve
Issued 27 June 2008
Resolved
ISOLATION VALVE IS SUSPECT OF BEING INOP. REPLACE VALVE IN-KIND PRIOR TO CARGO OPERATIONS.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2008
Resolution: Properly replace isolation valve, provided picture.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 31 May 2006
Resolved
Provide satisfactory documentation to [name withheld]/Galveston that this vessel has operated in fresh water service at least 6 of the last 12 months. If the vessel has not been operated in fresh water service at least 6 of the last 12 months or satisfactory documentation cannot be provided, the vessel will be required to be inspected IAW the salt water intervals prescribed in 46 CFR 31.10-21(a)(1)
Action required: 705 - Other - as specified
Due 1 July 2006
Resolved 15 August 2006
Resolution: Fresh Water service verified for 6 of the last 12 months of service.