Records from 2005 to 2024. Most recent: inspection, 19 August 2024.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · MADISONVILLE, LA, UNITED STATES · built 2005
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 August 2026 · expires 30 September 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
19 August 2024
Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7984923
17 June 2019
MTSA Verification · Examination of Repairs · Drydock Exam · COI Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6709611
26 July 2016
MTSA Verification · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5953335
7 August 2015
Periodic Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5206853
29 April 2014
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4847242
21 June 2013
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4626895
5 July 2012
COI Inspection · Drydock Exam · Cargo Tank Internal · Internal Structural Exam · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4364460
1 March 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4254248
24 February 2012
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4250426
31 January 2012
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4234666
9 June 2011
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4039638
8 February 2011
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3941546
1 December 2010
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3902466
17 February 2010
MTSA Verification · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3680993
17 June 2009
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3505483
25 November 2008
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3369798
23 July 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3276867
21 August 2007
Hull Examination · Cargo Tank Internal · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3034408
17 July 2007
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2998213
15 May 2006
Re-Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2650052
15 June 2005
Deficiency Check
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2391501
9 May 2005
Initial Construction-Excluding Oversight · Deadweight Survey · Internal Structural Exam · Hull Examination · Initial Certification · Cargo Tank Internal · MTSA Verification
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2349288
24 March 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2318546
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 26 July 2016
Resolved
Prior to off-loading cargo, repair or replace the remote quick acting manual shutdown on the engine so as to provide a quick and effective means of stopping the engine.
Condition: Invalid
Action required: 705 - Other - as specified
Due 27 July 2016
Resolved 26 July 2016
Resolution: Remote quick acting manual shutdown replaced and tested.
Engineering › Diesel Engine (auxiliary) › Spark Arrestor (exhaust)
Issued 26 July 2016
Resolved
Repair or replace flex-tubing connected to flame arrestor; must be of a type and size suitable for the purpose intended.
Condition: Invalid
Action required: 705 - Other - as specified
Due 27 July 2016
Resolved 26 July 2016
Resolution: Flex-tubing connected to flame arrestor replaced and suitable for intended purpose.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 7 August 2015
Resolved
During annual inspection P/V valve was found to be mounted at a reasonable height. However, the riser at the bottom of the P/V valve showed signs of excessive pitting. Provide attestation that valve and current material condition of riser piping meets regulatory requirements of 46 CFR 32.20-5. (46 CFR 32.20-5) (due 07SEP15)
Due 7 September 2015
Resolved 18 August 2015
Resolution: Vessel rep provided pictures as well as shop order and test report attesting to the condition of the PV. PV was changed out and found satisfactory.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 31 January 2012
Resolved
Cargo pump engines must be fitted with emergency shutdown. Cargo pump shutdown not operating. Repairs to be made to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 February 2012
Resolution: Cleared 04 feb 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 May 2005
Resolved
Make wiring on computer box and battery box intrinsically safe.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2005
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 9 May 2005
Resolved
Provide proof that the vessel has a valid Certificate of Financial Responsibility.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 May 2005
Resolution: COFR desk called to verify that the vessel is in compliance and has a valid COFR.