MAURY USCG vessel records
← All vessels

PENSILVANIA

PENSILVANIA is a 2005 public freight. The Coast Guard has recorded 48 inspections since 2016, most recently in June 2026, along with 35 deficiencies and 12 operational controls.

Records from 2016 to 2026. Most recent: inspection, 26 June 2026.

Built
2005
Last inspected
26 June 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 26 June 2026
…with no type recorded14
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9287443
740644
Flag
PANAMA
Maury page id
psix-740644

Documentation record

Tonnage as PSIX records it7837 - Dead Weight, Metric Ton
10187 - Displacement, Metric Ton
4819 - Convention (Subpart B), Gross Ton
2548 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

48 inspections, each with its date, unit and type; 35 deficiencies with the resolution recorded against each; 12 operational controls with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 48

26 June 2026 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8412443
22 June 2026 COE-Administrative
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8410625
23 December 2025 COE-Administrative
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8286801
23 December 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8286832
29 August 2025 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8220623
29 August 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8220674
29 August 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8220884
27 August 2025 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8216162
25 June 2025 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8165030
22 May 2025 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8136461
2 May 2025 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8120764
26 December 2024 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8050881
13 November 2024 Administrative Inspection · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8034038
22 October 2024 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8023199
7 October 2024 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8012276
2 October 2024 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8013225
10 November 2023 Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7823046
29 August 2023 Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7780471
20 July 2023 PSC B
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7747330
28 April 2023 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7672080
1 March 2023 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7646150
25 November 2022 Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7599540
25 October 2022 Ballast Water Examination · PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7579625
20 October 2022 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7580798
2 April 2022 Ballast Water Examination · PSC A
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7418383
27 November 2021 Administrative Inspection · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7357888
8 November 2021 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7343805
28 April 2021 PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7184105
27 February 2021 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7143981
9 February 2021 PSC A · PSC B · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7133601
9 February 2021 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7138224
9 February 2021 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7138375
29 February 2020 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6914236
29 February 2020 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6918109
6 March 2019 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6637024
15 January 2019 Deficiency Check · Ballast Water Examination · In-Service Inspection · ISPS III Exam · NPV Safety Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6605907
3 January 2019 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6606715
30 May 2018 ISPS III Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6421860
8 September 2017 PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6257918
7 August 2017 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6232891
19 June 2017 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6180863
14 February 2017 ISPS III Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6086321
25 January 2017 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6076628
25 January 2017 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6077303
8 January 2017 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6063917
22 August 2016 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5980890
15 March 2016 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5833247
5 March 2016 Deficiency Check · Administrative Inspection · ISPS II Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5823413

Deficiency record · 35

03 - Water/Weathertight Conditions › N/A - No Subsystem › Overloading
Issued 29 August 2025 Resolved
The appropriate load lines on the sides of the ship corresponding to the season of the year and the zone or area within the ship may be, shall not be submerged at any time when the ship puts to sea, during the voyage or on arrival. Vessel's loadline is submerged and did not meet expectations. Vessel did not provide evidence that they were going to consume the proper weight of the fuel and other materials below the point of departure and sea. ICLL 1966 Article 12
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 August 2025
Resolution: Vessel offloaded cargo and provided to Sector Charleston loading calculations showing that mid ships draft would not exceed allowable drafts as established in the vessels load line certificate.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 June 2025 Resolved
Every ship shall be provided with fire mains complying as applicable with the requirements of this regulation. PSCO observed fire main piping to be actively leaking in #1 cargo hold port side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 June 2025
Resolution: Received a report of survey and flag acknowledgement regarding the deficiency. Included in documents.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 25 June 2025 Resolved
The administration shall satisfy itself that the general structural strength of the hull is sufficient for the draught corresponding to the freeboard assigned. PSCO observed 01 inset at the starboard bow and 02 insets on the starboard quarter.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 June 2025
Resolution: Received a Report of Survey, Interim Survey Statement and Flag Acknowledgement regarding the deficiency. Included in documents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 25 June 2025 Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the administration. PSCO observed inadequate seals on hatch covers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 June 2025
Resolution: Received a report of survey and flag acknowledgement regarding the deficiency. Included in documents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 25 June 2025 Resolved
The number of openings in watertight bulkheads is to be kept to a minimum where penetrations are necessary for access, arrangements shall be made to maintain the watertight integrity. PSCO observed a hole from that cargo hold into the bosuns store.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 June 2025
Resolution: Received a report of survey and flag acknowledgement regarding the deficiency. Included in documents.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 June 2025 Resolved
Lockers or housings must be vented to the open air near the top and bottom for positive circulation of vapors. PSC observed oxygen and acetylene bottles stored in a enclosed space with no ventilation. 46CFR147.60(b)(3)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 June 2025
Resolution: Corrected on spot.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 22 May 2025 Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS... MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. [name withheld] LEAKING FROM FUEL PUMP #1. (74 SOLAS (04) II-2/4.1.1)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 May 2025
Resolved 23 May 2025
Resolution: Recieved class report attesting to satisfactory operation. Deficiency cleared, class report attached in deficiency documents.
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 2 May 2025 Resolved
Adequate arrangements are in place to ensure that the performance of the equipment (VDR) required by this chapter is maintained. PSC found the VDR inoperable. 74SOLAS(20)V/16.1 (17ac)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 May 2025
Resolution: Recieved class report from BV. The VDR was visually examined and function tested satisfactory by surveyor. Master stated that the power supply protection fuse was replaced by the ships ETO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 May 2025 Resolved
The associated piping system and fittings shall be of a design and construction adequate for the service for which they are intended. PSC observed active raw water leak from the check valve of the service line, a soft patch on the main engine preheating water system, and a flexible hose was observed on the portable water piping system. 74SOLAS(04)II-1/26.1 (40ac)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 22 May 2025
Resolution: Recieved class report giving vessel condition of class with an expiration of 24 June
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 2 May 2025 Resolved
The opening below the lowest course of the guard rails shall not exceed 230mm (9inches), PSC observed 03 missing handrails on the starboard side and 03 severely damaged on the port side. ILLC Reg 25.3 (40ac)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 22 May 2025
Resolution: Recieved class report giving vessel condition of class with an expiration of 24 June. See attached class report.
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 2 May 2025 Resolved
Tanks for oil residues shall be of adequate capacity to receive the oil residues. PSCO observed 15-20 drums of oil on deck with the inability to transfer to service tank. MARPOL I/12.3.1 (40ac)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 22 May 2025
Resolution: Coast Guard verified all drums were removed from the vessel.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 2 May 2025 Resolved
Means shall be provided to control leaks of flammable liquids. Multiple catch basins were observed below the main engine. 74SOLAS(04)II-2/4.1.1 (40ac)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 May 2025
Resolution: Main Engine was function tested to verify oil leaks satisfactory. Chief Engineer stated that leakages below main engine were corrected by tight gaskets and the replacement of o-rings. Repair and action report was provided onboard.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 2 May 2025 Resolved
Steering gear control shall be provided for the main steering gear, both on the navigation bridge and in the steering gear compartment. Received notification from pilots that the vessel lost remote steering from bridge while inbound to Charleston. PSCO upon examination observed proper repair and operation of remote steering. 74SOLAS(01)II-1/29.7.1 (10c)
Action required: 10 - Deficiency Rectified
Resolved 2 May 2025
Resolution: Steering gear was function tested satisfactory, both main and the emergency steering system local and remote.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 8 October 2024 Resolved
In addition to complying with the specific provisions for fire integrity of bulkheads and decks mentioned elsewhere in this part, the minimum fire integrity of bulkheads and decks shall be as prescribed in tables 44.1 and 44.2. PSCO observed lack of fire penetration protection on wires between battery room and wheelhouse. 74 SOLAS (01) II-2/44.1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2024
Resolved 13 November 2024
Resolution: Received satisfactory classs report attesting to repair.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 8 October 2024 Resolved
Oil filtering equipment shall be of a design approved by the administration and shall be such as will ensure that any oily mixture discharged into the sea after passing through the system has an oil content not exceeding 15ppm. PSCO observed OWS was inoperable. MARPOL Annex I/14.6
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 8 October 2024
Resolved 8 October 2024
Resolution: PSCO witnessed successful operation of OWS.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 7 October 2024 Resolved
Rescue boat shall be stowed in a state of continuous readiness for launching in not more than 5 min. PSCO observed rescue boat take 21 minutes to start. 74 SOLAS 20 III/14.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 8 October 2024
Resolution: Rescue boat was fixed on the spot, PSCO witnessed start within time requirement.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 7 October 2024 Resolved
The ring, lines, and letters shall be painted in white or yellow on a dark background or in black on a light ground. PSCO observed deck line and tropical fresh line was painted blue on a light background. ILLC REG 8
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 8 October 2024
Resolution: Correct color was painted on hull.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 20 July 2023 Resolved
99102 - Other (SOLAS operational) The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Bow thruster reported inoperable upon vessel arrival. PSCO confirmed bow thruster not operational. 74 SOLAS (2020 Cons.) I/11(a)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 August 2023
Resolution: received Class survey attesting to repairs/ satisfactory operation of bow thruster
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 20 July 2023 Resolved
11101 - Lifeboats Means of identifying the ship to which the lifeboat belongs and the number of the lifeboat shall be marked in such a way that they are visible from above. PSCO observed free fall lifeboat did not have a means of identifying the lifeboat or number to be identified from above. 74 SOLAS (2020 Cons.) III/34 LSA Code 4.4.9.3
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 31 July 2023
Resolution: received documentation/ images attesting to proper identification of lifeboat
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 July 2023 Resolved
11117 - Lifebuoys incl. provision and disposition Self-igniting lights shall be provided with a source of energy for a period of at least 2 hours. STBD side ring buoy light was inoperable. 74 SOLAS (2020 Cons.) III/34 LSA Code 2.2.13
Action required: 10 - Deficiency Rectified
Resolved 20 July 2023
14 - Pollution Prevention › 147 - Anti-Fouling › Other (AFS)
Issued 28 April 2023 Resolved
REMOVE FOULING ORGANISMS FROM THE VESSEL'S HULL, PIPING, AND TANKS ON A REGULAR BASIS AND DISPOSE OF ANY REMOVED SUBSTANCES IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS. PSCO OBSERVED MARINE ORGANISMS ATTACHED TO THE VESSEL. 33CFR151.2050(f) 40c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2023
Resolution: Received email with pictures and report from vessels owner. Marine growth was removed and Anti-fouling coating reapplied during dry dock. Attached email to documents.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 28 April 2023 Resolved
AN EMBARKATION LADDER COMPLYING WITH THE REQUIREMENTS OF PARAGRAPH 6.1.6 OF THE CODE EXTENDING, IN A SINGLE LENGTH, FROM THE DECK TO THE WATERLINE IN THE LIGHTEST SEAGOING CONDITION UNDER ALL CONDITIONS OF TRIM UP TO 10 DEGREES AND A LIST OF UP TO 20 DEGREES EITHER WAY SHALL BE PROVIDED AT EACH EMBARKATION STATION OR AT EVERY TWO ADJACENT EMBARKATION STATIONS FOR SURVIVAL CRAFT LAUNCHED DOWN THE SIDE OF THE SHIP. PSCO OBSERVED MISSING EMBARKATION LADDER FOR PORT SIDE LIFERAFT. CREW PROVIDED ONE.
Action required: 10 - Deficiency Rectified
Resolved 28 April 2023
Resolution: CREW PROVIDED AN EMBARKATION LADDER AND PLACED IT BY THE PORT SIDE LIFE RAFT.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 October 2022 Resolved
When "A" class divisions are penetrated for the passage of electric cables, arrangements shall be made to ensure the fire resistance is not impaired. PSCO observed rags and non approved foam in cable ducts in machinery space class "A", and emergency gen. space. 74SOLAS (CONS 2001) 11-2/18.1.1 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 November 2022
Resolution: Received Class report attesting to the repair using proper sealant
14 - Pollution Prevention › 148 - Ballast Water › Extraordinary Condition Claims
Issued 27 November 2021 Resolved
The master, owner, operator, agent, or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the following ballast water management methods listed in 33CFR 151.2025(a). Vessel's ballast water management system is inoperable. Vessel has been granted an extraordinary circumstance to employ the ballast water management method listed in 33 CFR 151.2025(a)3) to conduct cargo operations while in Sector New Orleans COTP Zone. In accordance with 33 CFR 151.2040(b)(3), the vessel must discharge only that amount of ballast water operationally necessary to ensure the safety and stability of the vessel for cargo operations. (33 CFR 151.2025(a) (40c))
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 December 2021
Resolution: Correction of defs. See documents.
14 - Pollution Prevention › 148 - Ballast Water › Extraordinary Condition Claims
Issued 8 November 2021 Resolved
The master, owner, operator, agent, or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the following ballast water management methods listed in 33CFR 151.2025(a). Vessel's ballast water management system is inoperable. Vessel has been granted an extraordinary circumstance to employ the ballast water management method listed in 33 CFR 151.2025(a)3) to conduct cargo operations while in Sector New Orleans COTP Zone. In accordance with 33 CFR 151.2040(b)(3), the vessel must discharge only that amount of ballast water operationally necessary to ensure the safety and stability of the vessel for cargo operations. (33 CFR 151.2025(a) (40c))
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 8 November 2021
Resolved 27 November 2021
Resolution: Sector Charleston issued Form B to extend deficiency until next US port after sailing foreign Act # 7357888
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 April 2021 Resolved
The fire resistance shall as far as practicable.. doors fitted in boundary bulkheads of machinery spaces of category A shall be reasonably gas tight and self closing... doors leading to several machinery spaces are not provided with a self closing mechanisms. 17ac
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2021
Resolution: Vessel provided documentation that a door was fixed to include self-closing and the other doors in question were not part of the A class boundary
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 27 February 2021 Resolved
All ships of 3000 GT abnd upwards in addition to meeting the requirements of paragraph 2.5, have a 3GHZ radar or an alternative approved by class. The vessel's S band radar was found to be inoperable
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 February 2021
Resolution: Technician report was accepted by BV.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 9 February 2021 Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the Administration with a stored energy capability of at least three consecutive starts. A second source of energy shall be provided for an additional three starts within 30 min unless manual starting can be demonstrated to be effective. The vessel’s secondary means of starting the emergency generator found disconnected, discarded and adrift on deck. Spring starter failed to operate after reinstalled. 74 solas (cons. 2001)CH. II-1, REG 44.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 13 February 2021
Resolution: Witnessed operation of E-gen to include secondary means.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 February 2021 Resolved
Fire-extinguishing appliances shall be kept in good order and be available for immediate use at all times. The following engine room equipment was found in disorder and/or unavailable for immediate use: inoperable smoke detection in lower level engine room, engineer’s workshop missing fire hose, missing discharge nozzle on semi-portable fire extinguisher, clogged CO2 discharge nozzle in purifier room, broken CO2 nozzle in engine room, inaccessible EEBD, tampered EEBD, 02 inoperable self-closing A-60 fire doors.74 solas (cons. 2001)CH. II-2, REG 2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 13 February 2021
Resolution: Observed correction of itmes listed above. Portable B5 nozzle was in compliance with mfg manual.
10 - Safety of Navigation › N/A - No Subsystem › Voyage or passage plan
Issued 9 February 2021 Resolved
Nautical charts and nautical publications, such as sailing directions, lists of lights, notices to mariners, tide tables and all other nautical publications necessary for the intended voyage, shall be adequate and up to date. Vessel was without appropriate charts and corrected nautical charts for intended voyage, namely chart containing final leg of inbound voyage, NOAA Chart 11527.74 solas (cons. 2014)CH. V, REG. 27
Condition: Invalid
Action required: 30 - Ship detained
Resolved 13 February 2021
Resolution: Vessel provided chart 11527 with updated corrections.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 9 February 2021 Resolved
All ships of 3,000 gross tonnage and upwards shall, in addition to meeting the requirements of paragraph 2.5, have a 3 GHz radar or, where considered appropriate by the Administration, a second 9 GHz radar, or other means, to determine and display the range and bearing of other surface craft, obstructions, buoys, shorelines and navigational marks to assist in navigation and in collision avoidance, which are functionally independent of those referred to in paragraph 2.3.2. The vessel’s secondary S-Band radar was found inoperable.74 solas (cons. 2014)CH. V, REG. 19.2.7.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 13 February 2021
Resolution: Observed proper operation of radar. Attached tech report in documents.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 9 February 2021 Resolved
The company should establish procedures to ensure the ship is maintained in conformity with the provisions of the relevant rules and regulations. Based on the overall materiel condition of the vessel as substantiated by the objective evidence cited above, an additional external verification is required.74 solas (cons. 2014)CH. IX, REG. 3.1.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 13 February 2021
Resolution: Received external audit from RO. Attached in documents.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 February 2021 Resolved
The electrical power available shall be sufficient to supply all those services that are essential for safety in an emergency, due regard being paid to such services as may have to be operated simultaneously. The emergency sources of electrical power shall be capable, having regard to starting currents and the transitory nature of certain loads, of supplying simultaneously at least the following services for the periods specified hereinafter, if they depend upon an electrical source for their operation for a period of 18 h, emergency lighting in all control stations, machinery control rooms, and at each main and emergency switchboard. The vessel’s CO2 room emergency lighting was inoperable.74 solas (cons. 2001)CH. II-1, REG. 43.2.2.3.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2021
Resolution: Observed operation of E-lighting in CO2 room.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 15 January 2019 Resolved
01-1710-OIL RECORD BOOK-Each operation Described in Paragarph 2 of this regulation shall be fully recorded without delay in the oil record book Part 1. The vessel oil record book has not been updated since the 05 Jan2019. Due to the vessel having a marine Casualty on 03Jan2019. Conducted an expanded MARPOL exam due to the missing entry there was no evidence of any other Pollution violation.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 16 January 2019
Resolved 14 February 2019
Resolution: Received Class Report attesting to the correction of this deficiency.
Stability › Watertight Integrity › General
Issued 30 May 2018 Resolved
0986-Bulkheads-operational damages-The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. PSCO observed damage to the port side bulkhead in No. 1 cargo hold, adjacent to the port anti-heeling ballast tank, which caused the ingress of 1.5 cubic meters of water to be introduced into the cargo hold. Prior to departure, provide class report attesting to satisfactory repairs to damage in No. 1 cargo hold. SOLAS 74(a) 2009 cons. I-11.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 30 May 2018
Resolved 30 May 2018
Resolution: Received class report stating all repairs were completed with satisfactory results.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.