Inspection history · 51
12 January 2026
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8285313
31 October 2024
COI Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8027808
4 September 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7995971
15 November 2023
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7841748
13 December 2022
Periodic Inspection · Drydock Exam · Deficiency Check · Internal Structural Exam · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7607748
13 November 2022
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7651401
14 October 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7581483
8 November 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7347087
9 June 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7220608
14 December 2020
MARPOL Annex II Examination · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7113176
14 November 2019
MTSA Verification · Administrative Inspection · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6855462
23 October 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6840176
19 September 2019
Administrative Inspection · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6815629
7 September 2018
MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6534702
24 October 2017
Examination of Repairs · Periodic Inspection · Internal Structural Exam · MTSA Verification · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6293797
1 September 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6256761
21 September 2016
MTSA Verification · MARPOL Annex VI Survey · MARPOL Annex II Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6005745
31 August 2015
DAPI Audit · COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5230965
1 April 2015
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5094360
5 February 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5064876
20 December 2014
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5048626
10 November 2014
Deficiency Check · DAPI Audit · Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5020818
22 September 2014
Cargo Tank Internal · Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4987286
20 January 2014
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4786525
1 January 2014
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4780213
23 October 2013
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4739791
20 August 2013
MTSA Verification · Internal Structural Exam · Periodic Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4693319
7 November 2012
MTSA/ISPS Verification · Deficiency Check · Annual Inspection · MARPOL Annex II Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4481156
23 November 2011
MARPOL Annex IV Survey · MARPOL Annex I Examination · Annual Inspection · MTSA Verification · MARPOL Annex VI Survey · MARPOL Annex II Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4194358
13 August 2010
Drydock Exam · Internal Structural Exam · COI Inspection · MARPOL Annex VI Survey · Deficiency Check · MTSA Verification · MARPOL Annex II Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3823000
7 June 2010
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3760326
24 May 2010
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3746402
21 January 2010
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3667227
7 January 2010
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3660262
9 June 2009
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3500217
9 June 2009
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3500856
8 October 2008
Construction Oversight
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3340838
8 September 2008
Internal Structural Exam · MARPOL Annex VI Survey · Administrative Inspection · Ballast Water Examination · Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3320379
18 February 2008
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3151094
16 February 2008
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3151054
26 November 2007
MARPOL Annex I Examination · MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3104224
24 July 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3026523
30 November 2006
Re-Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2831224
15 September 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2778993
14 September 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2778357
13 February 2006
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2584468
12 February 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2597892
11 January 2006
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2565252
11 January 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2565548
12 August 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2460484
27 July 2005
Initial Certification · Cargo Tank Internal · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2442071
01 - Certificates & Documentation › 013 - Documents › P&A manual
Issued 10 January 2025
Resolved
A Procedures and Arrangements Manual meeting paragraph (b) of this section and approved by—
(i) The Coast Guard, if the ship is a United States ship or one whose Administration is not signatory to MARPOL 73/78.
Vessel was observed to have an unapproved P&A Manual.
46 CFR 153.490(2)(i)
Condition: Invalid
Action required: 702 - Prior to embarking on international voyage
Resolved 12 January 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 November 2021
Resolved
A ground was identified on the 120 Volt panel located in the generator space.
The high/overfill alarm visual indicator for the #5 starboard cargo tank was sputtering due to electrical issue.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 November 2021
Resolved 6 December 2021
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 14 December 2020
Resolved
EPIRB cover was found to duct taped into place preventing free flow operation. Restore EPIRB installation to OEM approved configuration.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 December 2020
Resolution: Cover repaired and now is secured correctly, without duct tape and is a float free arrangement.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 December 2020
Resolved
High level alarm on 4P and overfill alarm on 2S are inoperative. Provide cause and corrective actions taken.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 December 2020
Resolution: 4P had switch submerged in water and frozen; switch replaced. 2S was found to have failed switch; switch replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 December 2020
Resolved
Battery installations in generator space contained water in bottom of boxes and moderate corrosion on battery terminals. Perform corrective maintenance/housekeeping of these items.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 December 2020
Resolution: Housekeeping performed. Vessel is also replacing batteries.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 14 December 2020
Resolved
Port sidelight and fwd anchor light alternate lamps extinguished. Renew lamps.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 December 2020
Resolution: Lamps replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 December 2020
Resolved
Galley receptacle in way of sink showed reverse polarity/missing ground. Determine fault, correct and provide results.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 December 2020
Resolution: Receptacle was replaced and tested by technician.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 December 2020
Resolved
Cargo containment on starboard side under house is not complete and has a series of openings. Make containment continuous at next drydock.
Action required: 705 - Other - as specified
Resolved 17 January 2023
Resolution: Openings under stbd deck house were welded to make containment continuous.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 December 2020
Resolved
Nine power strips/circuit expanders were found in use in the tankerman house posing an electrical hazard/fire risk. If additional receptacles are required for the operation of the vessel, submit proposed electrical plan updates to the Marine Safety Center for approval.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 December 2020
Resolution: Vessel removed 2 outlet extenders, 2 power strips and 2 extension cords with multiple plug ends.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 31 August 2015
Resolved
Prove proper operation of #1 generator overspeed alarm and shutdown. Vessel is restricted from using #1 generator until operation proven to satisfaction of USCG MI. 46 CGR 62.35-50
Action required: 705 - Other - as specified
Due 14 September 2015
Resolved 22 September 2015
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 31 August 2015
Resolved
Provide servicable hydrostatic release for port and starboard liferafts. 46CFR199.190
Action required: 705 - Other - as specified
Due 14 September 2015
Resolved 22 September 2015
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 10 November 2014
Resolved
Provide permanently attached 0.5" diameter stud at least 1" long on VCS flange on port and starboard manifolds.
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 19 November 2014
Resolution: Provided permanently attached 0.5" diameter stud at least 1" long on VCS flange on port and starboard manifolds.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 10 November 2014
Resolved
Prove proper operation of power loss alarm for tank level gauging system
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 14 November 2014
Resolution: Proved proper operation of power loss alarm for tank level gauging system
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 10 November 2014
Resolved
Replace batteries on ring buoy water lights
Action required: 705 - Other - as specified
Due 24 November 2014
Resolved 14 November 2014
Resolution: Replaced batteries on ring buoy water lights
Documentation › Certificates/Documents › IOPP Certificate
Issued 7 November 2012
Resolved
Have ABS correct IOPP certificate to include vessel's slop tank. Cite: 33CFR151.19(a)
Due 7 February 2013
Resolved 14 January 2013
Resolution: Received new IOPP Form B stating that Reg 29 of MARPOL Annex I does not need to be complied with due to the vsl being a barge and is considered equivalent to this standard due to not having a washing system onboard.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 7 November 2012
Resolved
Provide half inch diameter, 1 inch long stud on both port & stbd Vapor Control headers and attachments. Cite: 46 CFR 39.20-1(e)
Due 7 January 2013
Resolved 17 December 2012
Resolution: Provided studs on attachments.
Operations/Management › Cargo Transfer/Lightering › Use of Vapor Control System
Issued 8 October 2008
Resolved
PROVIDE A COPY OF MSC APPROVAL LETTER FOR THE HAZARDOUS AREA PLAN ONCE RECEIVED.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Resolution: MSC approval of Hazarodus area plan rcv''d.
Documentation › Manuals/Policy Documentation › Procedures and Arrangements Manual (NLS)
Issued 8 October 2008
Resolved
PRIOR TO THE CARRIAGE OF ANY CATEGORY Z NLS CARGOES LISTED IN CHAPTER 18 OF THE IBC CODE PROVIDE AN APPROVED PROCEDURES AND ARRANGEMENTS MANUAL.
Action required: 705 - Other - as specified
Resolved 7 November 2008
Resolution: Rcvd email copy of MSC approval ltr for P & A manual.
Engineering › Generator (propulsion/auxiliary-electric) › Switch
Issued 15 September 2008
Resolved
Repair overspeed device.
Action required: 705 - Other - as specified
Resolved 22 September 2008
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 15 September 2008
Resolved
Provide approval letter for MSD.
Action required: 705 - Other - as specified
Resolved 22 September 2008
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 8 September 2008
Resolved
Repair audible alarm on cargo overfill monitoring system prior to conducting cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 September 2008
Pollution Prevention/Response › Prevention Equipment › Emergency Control Systems (tank barges)
Issued 8 September 2008
Resolved
Adjust (2) cargo relief valves within operational limitations (10%).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 September 2008
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 8 September 2008
Resolved
Provide placard for MSD.
Action required: 705 - Other - as specified
Resolved 22 September 2008
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 8 September 2008
Resolved
Provide installation approval for sewage holding tank.
Due 15 October 2008
Resolved 22 September 2008
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 8 September 2008
Resolved
COMPLY WITH THE REQUIREMENTS SET FORTH IN USCG LETTER E1-0803181, SUBJECT: MISC. PIPING SYSTEMS, DATED 4 NOVEMBER 2008 WITH THE COGNIZANT OCMI.
Action required: 705 - Other - as specified
Due 19 February 2010
Resolved 19 February 2010
Resolution: All comments are addressed except comment 11. Vsl will be required to weld stripping piping penetrations on interior side of cargo tanks at next drydock.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 8 September 2008
Resolved
PROVIDE TO THE COGNIZANT OCMI THE ENCLOSURES LISTED IN USCG LETTER E1-0803181, SUBJECT: MISC.
PIPING SYSTEMS, DATED 4 NOVEMBER 2008.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 8 September 2008
Resolved
COMPLY WITH THE REQUIREMENTS SET FORTH IN USCG LETTER C2-0803282, SUBJECT: MARPOL ANNEX II
PROCEDURES AND ARRANGEMENTS MANUAL; UPDATED CARGO AND VAPOR AUTHORITY, DATED 7 NOVEMBER 2008 TO THE COGNIZANT OCMI.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Resolution: Approval letter items cleared. See activity 3650152.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 8 September 2008
Resolved
PROVIDE TO THE COGNIZANT OCMI THE ENCLOSURES LISTED IN USCG LETTER C2-0803282, SUBJECT: MARPOL
ANNEX II PROCEDURES AND ARRANGEMENTS MANUAL; UPDATED CARGO AND VAPOR AUTHORITY, DATED 7 NOVEMBER 2008.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Resolution: Approval letter items cleared. See activity 3650152.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 8 September 2008
Resolved
COMPLY WITH THE REQUIREMENTS SET FORTH IN USCG LETTER E2-0803252, SUBJECT: HAZARDOUS AREA PLAN, DATED 12 NOVEMBER 2008 WITH THE COGNIZANT OCMI.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Resolution: Approval letter items cleared. See activity 3650152.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 8 September 2008
Resolved
PROVIDE TO THE COGNIZANT OCMI THE REFERENCES LISTED IN USCG LETTER E2-0803252, SUBJECT:
HAZARDOUS AREA PLAN, DATED 12 NOVEMBER 2008.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Resolution: Approval letter items cleared. See activity 3650152.
Operations/Management › Cargo Transfer/Lightering › Use of Vapor Control System
Issued 8 September 2008
Resolved
PROVIDE TO THE COGNIZANT [name withheld] OF THE ABS CORRESPONDANCE ASSOCIATED WITH ITEMS 1-6.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Resolution: Approval letter items cleared. See activity 3650152.
Operations/Management › Cargo Transfer/Lightering › Use of Vapor Control System
Issued 8 September 2008
Resolved
ITEMS 1-7 MUST BE COMPLETED PRIOR TO PLACING THE VAPOR CONTROL SYSTEM INTO SERVICE.
Action required: 705 - Other - as specified
Resolved 3 February 2010
Resolution: Approval letter items cleared. See activity 3650152.
Construction/Loadline › Hull › Bottom Plating
Issued 16 February 2008
Resolved
Vessel grounded and soundings were conducted. Vessel appears to be taking on water in STBD #1 ballast tank. Vessel is allowed to transit to offload cargo. Vessel is to be gas freed and check for source of leak, and monitored every 30min.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2008
Resolved 18 February 2008
Resolution: Attended vessel at Motiva Port Arthur, TX to Inspect #1 Stbd Ballast tank for damage. No damage noted, all sat. Vessel fit for route and service specified.
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 26 November 2007
Resolved
PROVE PROPER OPERATION OF #1 GENERATOR OVERSPEED
Due 9 December 2007
Resolved 6 December 2007
Resolution: RECIEVED A FAX FROM VESSEL SUP PROVING PURCHASE OF SOLENOID SWITCH AND SIGNED STATEMENT FROM BARGE [name withheld] OVERSPEED WORKS CORRECTLY.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 26 November 2007
Resolved
PROPERLY STENCIL ALL LIFERINGS WITH MINIMUM FOUR INCH LETTERS
Due 9 December 2007
Resolved 6 December 2007
Resolution: VESSEL HAD STENCIL AND SPRAY PAINT ONBOARD DURING INSPECTION. LIFERINGS WERE STENCILED AFTER THE INSPECTION WAS COMPLETED. VESSEL SUP NOTIFIED SEC NY BARGE SECTION THAT IT WAS TAKEN CARE OF.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 31 August 2005
Resolved
Prior to departing Sturgeon Bay WI complete all outstanding ABS Technicals and provide the following valid ABS certificates/documents; Special Service Load Line Certificate, Tonnage Certificate, NLS Certificate, International Oil Pollution Prevention Certificate, International Load Line Certificate and ABS NVIC 10 -82 verification letter.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 September 2005
Resolved 7 September 2005