Records from 2005 to 2025. Most recent: inspection, 2 September 2025.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · JEFFERSONVILLE, IN, UNITED STATES · built 2005
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portJEFFERSONVILLE, IN
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 8 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Gross Ton
735 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 27
2 September 2025
Hull Examination · Examination of Repairs · Cargo Tank Internal · Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8219138
29 September 2020
MTSA Verification · COI Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7037971
20 September 2018
Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6544750
14 July 2017
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6235567
13 December 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6073055
8 July 2016
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5973604
11 September 2015
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5718676
28 August 2015
Drydock Exam · COI Inspection · Internal Structural Exam · MTSA/ISPS Verification · Cargo Tank Internal
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5225012
21 August 2014
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4965753
14 February 2014
Examination of Repairs
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 4800019
10 February 2014
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 4797444
27 October 2013
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4742731
9 October 2012
Annual Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4464506
6 September 2012
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4444436
29 September 2011
Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4160666
3 November 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3885110
17 August 2010
MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3826671
21 July 2009
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3541852
22 May 2009
Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3482116
11 September 2008
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3322456
1 August 2008
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3305716
31 December 2007
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3139170
14 September 2007
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3056107
25 August 2006
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2759407
28 August 2005
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 2478575
12 August 2005
Cargo Tank Internal · Initial Certification · Hull Examination · Internal Structural Exam · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2447381
28 July 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2442813
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 2 September 2015
Resolved
The barge is outfitted with a P/V valve that is rated for 2.75 psi pressure, and 0.5 psi vacuum. Per it's CAA it is authorized to carry toxic cargos which require a P/V valve with a minimum of 3 psi pressure and 1 psi vacuum in accordance with 46 CFR 151.50-5(e). Barge is restricted from carrying toxic cargos until proper P/V is installed and re-inspected.
Action required: 705 - Other - as specified
Due 9 September 2015
Resolved 11 September 2015
Resolution: Attended vessel at TT Barge 183 to check correction of improper P/V valve. P/V with 3.0 psi was used to replace P/V valve that had 2.75 psi pressure setting. Cleared CG-835. See Sector New Orleans activity 5225012.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 10 February 2014
Resolved
Demonstrate proper operation of the remote emergency shutdown (replace frayed cable) prior to any further cargo operations to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2014
Resolution: Replaced cable.
Electrical › Electric Supply System (service) › Cable
Issued 1 August 2008
Resolved
Electronically controlled engine not in compliance with 46 CFR 111.105.31( l). Vessel operator given until 01JAN09 to correct IAW D8 policy guidance 01-2008 and their approved company compliance plan. ACL compliance plan and D8 compliance plan approval letter have been scanned into vessel documents. For additional information see CG Central/Communities/Domestic Vessel Inspections (Flag State
Action required: 705 - Other - as specified
Due 1 January 2009
Resolved 21 July 2009
Resolution: John Deere replaced with cummings engine to meet req.