Records from 2006 to 2026. Most recent: inspection, 20 July 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2006
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portJEFFERSONVILLE, IN
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 8 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
20 July 2026
Examination of Repairs · MTSA Verification · Hull Examination · Internal Structural Exam · COI Inspection · Cargo Tank Internal
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8437094
6 March 2025
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8089441
20 February 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8081830
30 July 2021
Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7261248
11 November 2019
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6853287
11 November 2019
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6867380
10 July 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6476574
6 April 2018
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6386736
11 May 2017
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6149386
6 April 2016
Examination of Repairs · MTSA Verification · Cargo Tank Internal · Hull Examination · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5847199
21 March 2015
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5201781
22 July 2014
Administrative Inspection · Construction Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4930272
2 April 2014
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4835753
3 March 2012
MTSA Verification · Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4258609
13 January 2010
Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3669529
20 May 2009
Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3480082
5 January 2009
Deficiency Check · MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3383658
1 August 2008
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3308882
25 April 2008
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3473229
8 February 2008
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3140211
22 March 2007
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2890612
7 July 2006
Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2704365
13 February 2006
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2584051
7 February 2006
Initial Certification · Internal Structural Exam · MTSA Verification · Cargo Tank Internal · Hull Examination
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2580624
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 November 2019
Resolved
MSU Port Arthur personnel received a report the CHEM 3205 was involved in a marine casualty. Towing vessel Anita Eva Sharp allied with a piling and their tow bounced off the piling. Damage survey was requested and CG-835 was issued.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 November 2019
Resolved 12 November 2019
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 24 May 2016
Resolved
Port VCS header was missing the 0.5inX1.0in pin that prevents a cargo line from being attached.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 May 2016
Resolved 24 May 2016
Resolution: Added Pin to vapor header and inspected on the spot
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 24 May 2016
Resolved
Located at the forward most end of the main cargo line a rising stem valve valve was installed on the bage that is not in accordance with the barges cargo piping diagram.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 May 2016
Resolved 24 May 2016
Resolution: removed the valve and replace with blank at end of the cargo line.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 2 April 2014
Resolved
During annual inspection, TBSIP examiner noted that the PV setting were incorrect. New PV installed and vapor tightness test performed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2014
Resolved 2 April 2014
Resolution: Proper PV installed
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 February 2006
Resolved
Vessel owners are to prove that cargo pump engine units are in complete compliance with 46 CFR 111.105-31(l).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 July 2009
Resolved 5 January 2009
Resolution: A new cargo pump engine was installed that met regulations.