Inspection history · 21
10 March 2026
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8282170
7 May 2025
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7923312
14 January 2025
COI Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7927712
2 April 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7864443
24 May 2023
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7675535
26 April 2023
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7671062
21 April 2023
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7668068
22 June 2022
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7484348
14 March 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7402315
8 July 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7227548
2 June 2021
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7213171
23 April 2021
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7181681
1 October 2020
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7068468
22 January 2020
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6891729
16 April 2019
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6610025
19 September 2018
Hull Examination · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6436228
10 April 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6371195
19 May 2017
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6148001
21 September 2016
Plan Review "T" Boat
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6017476
7 September 2016
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5982936
25 April 2016
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5858050
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 March 2026
Resolved
On a vessel of more than 19.8 meters (65 feet) in length, a power driven fire pump required by § 181.300 of this subchapter may serve as one of the two fixed power bilge pumps required by this subpart, provided: (3) Stop valves and check valves are installed in the piping to isolate the systems during simultaneous operation and prevent possible flooding through the bilge system. Submit installation of stop valve and check valve plans for review and approval by the [name withheld] stop valve and check valve as per OCMI approved plans.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2026
Resolved 1 April 2026
Resolution: Vessel added a pipe and valve to fire/bilge system prior to plan review approval. Tested fire pump acting as bilge pump from lazarette and engine room, test sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 10 March 2026
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Multiple rubber hoses penetrating fwd E/R bulkhead, remove and make watertight. 46CFR171.114(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2026
Resolved 1 April 2026
Resolution: Penetrations removed and plugged
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 March 2026
Resolved
General design, installation, and maintenance requirements. Electrical equipment on a vessel must be installed and maintained to: (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Exposed wire bundles coming from port and stbd MDE; exposed wiring on high water alarm fwd engine room. Remove/replace or properly secure exposed wiring. 46CFR183.200(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2026
Resolved 1 April 2026
Resolution: wire bundles removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 10 March 2026
Resolved
(a) A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Portlights below the weather deck do not close as designed. Repair to design standards. 46CFR176.800(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2026
Resolved 1 April 2026
Resolution: port lights are able to close.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 May 2025
Resolved
Vessel is to rectify above worklist items to the satisfaction of the attending MI and complete satisfactory sea trial to receive credit dry dock.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2025
Resolution: Vessel rectified above worklist items to the satisfaction of the attending MI and completed satisfactory sea trial; receive credit dry dock.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 January 2025
Resolved
Except as otherwise provided in this section, all fixed fire extinguishing systems shall be of an approved carbon dioxide type and installed to the satisfaction
of the Officer in Charge, Marine Inspection. Upon testing of the CO2 system pressure switches to simulate the discharge of CO2 into the protected space, both mains engines, generators, and blowers did not shutdown upon activation of pressure switches. Demonstrate proper operation of system in the presence of attending marine inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 January 2025
Resolution: System was serviced 22 Jan. Marine Inspector then witnessed satisfactory operation of the fixed extinguishing system's shut downs.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 January 2025
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. During testing of high level alarms the space indicated as "Forward Stateroom" illuminates upon activation of any high level alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2025
Resolved 22 January 2025
Resolution: Marine Inspector then witnessed satisfactory operation bilge alarm system.
09 - Working and Living Conditions › 092 - Working Conditions › Heating
Issued 14 January 2025
Resolved
All electric cooking equipment,attachments, and devices, shall be of rugged construction and so designed as to permit complete cleaning, maintenance, and repair. Doors shall be provided with heavy duty hinges and locking devices to prevent accidental opening in heavy seas. Oven had no locking device.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2025
Resolved 22 January 2025
Resolution: Marine Inspector then witnessed locking device installed on oven.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 January 2025
Resolved
Conductors shall be protected from over-current in accordance with their current-carrying capacities
as given in Table 183.05-45(a). Conductor connected to house battery at operating station did not have any over-current protection and conductor was not UL or Boat Cable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2025
Resolved 22 January 2025
Resolution: Marine Inspector then witnessed over current protection and proper cable installed at the house battery.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 January 2025
Resolved
A propulsion engine control system, including pilothouse control, must be designed so that a loss of power to the control system does not result in an increase in shaft speed or propeller pitch. Conduct periodic verification of proper operation of processor-controlled propulsion system at all points of operation (03) in the event of a loss of power in the presence of attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2025
Resolved 12 February 2025
Resolution: conducted satisfactory test of propulsion control system power failure. no abnormalities observed.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 April 2024
Resolved
Galleys must be surrounded by B-15 Class fire boundaries. MI identified the absence of B-15 rated fire protection in the galley space. Vessel is restricted from using galley until deficiency is rectified.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 April 2024
Resolution: B-15 protection added to galley area.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 2 April 2024
Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides of the door and indicator lights at the operating station showing whether the door is open or closed. Solenoid indicator found to be missing from watertight door.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 April 2024
Resolution: Solenoid indicator added to watertight door. All sat.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 April 2024
Resolved
Boundaries that separate machinery spaces from accommodation spaces, service spaces, and control spaces must be lined with noncombustible panels or insulation approved in accordance with § 164.009 in subchapter Q of this chapter, or other standard specified by the Commandant. MI identified lack of required structural fire protection in overhead, stbd side E/R above MDE.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 April 2024
Resolution: SFP was added to identified areas.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 April 2024
Resolved
The generator circuit breakers must be interlocked to prevent the generators from being simultaneously connected to the switchboard. MI identified safety interlock disengaged, vsl unable to demonstrate that generators ability to operate in parallel.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 April 2024
Resolution: Deficiency rectified. Vessel will perform test with tech rep prior to renewal of COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 April 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. The two generators were fount to be inoperable.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 21 April 2023
Resolution: After approximately 30 minutes, the vessel's generators were functioning properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 March 2022
Resolved
A vessel of more than 65 feet in length must carry a minimum of three life buoys of not less than 24 inches in diameter. Two of the vessel's ring life buoys have deteriorated grab lines.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2022
Resolution: Photos provided of replaced (two) ring life buoys.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 April 2021
Resolved
Your vessel must undergo an annual inspection within 3 months before or after each anniversary date. The vessel has not completed a satisfactory annual inspection. Vessel cannot carry passengers until a satisfactory annual inspection is completed.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2021
Resolved 8 July 2021
Resolution: Vessel completed satisfactory annual exam.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 October 2020
Resolved
A VESSEL THAT IS EXPOSED TO SALT WATER MORE THAN THREE MONTHS IN ANY 12 MONTH PERIOD SINCE THE LAST DRYDOCK EXAMINATION MUST UNDERGO A DRYDOCK EXAMINATION AT LEAST ONCE EVERY TWO YEARS. VESSEL IS OVERDUE FOR DRYDOCK. COMPLETE SATISFACTORY DRYDOCK PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 October 2020
Resolved 8 July 2021
Resolution: Vessel conducted satisfactory drydock and post drydock sea trial.
Construction/Loadline › Hull › Bottom Plating
Issued 7 September 2016
Resolved
Replace wood around STBD rudder post as indicated
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 29 September 2016
Resolution: Wood tested and proved to be of good quality to the satisfaction of attending MI.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 7 September 2016
Resolved
Make collision bulkhead watertight.
Action required: 705 - Other - as specified
Resolved 29 September 2016
Resolution: Bulkhead made watertight. All sat.
Construction/Loadline › Hull › Sheerstrake
Issued 7 September 2016
Resolved
Crop and Renew clamp FWD cabin STBD closet as indicated.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 29 September 2016
Resolution: Wood properly cropped and renewed. All sat.
Construction/Loadline › Hull › Transverse Frame
Issued 7 September 2016
Resolved
Crop and Renew FWD cabin port aft cabinet deck frame as indicated.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 29 September 2016
Resolution: Wood properly cropped and renewed. All sat.
Engineering › Shafting/Propeller Arrangements › Stern Tube Bearing
Issued 7 September 2016
Resolved
Provide gauging report for shaft bearings (Port + STBD).
Action required: 705 - Other - as specified
Resolved 29 September 2016
Resolution: Gauging report received. All Sat.