Records from 2009 to 2026. Most recent: inspection, 3 February 2026.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 February 2026
Resolved
Install suitable insulation around the port engine exhaust riser (hot piping section).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 February 2026
Resolved 19 February 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 February 2025
Resolved
Vessel's port fuel tank contains water preventing the port engine from operating.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 February 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 February 2025
Resolved
Address the dead end wiring identified near the main distribution panel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2025
Resolved 25 February 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 February 2025
Resolved
Cover the positive terminal of the batteries in the port engine compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2025
Resolved 25 February 2025
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 6 February 2024
Resolved
The bilge high level alarm in the port crash compartment (not a required space) is not signaling an audible or visual alarm when tested. Provide an audible and visual alarm or clearly mark alarm panel to indicate there is no bilge high level sensor for that space.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 February 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 February 2024
Resolved
Place a non-conductive cover over the positive terminal of each battery in the port engine compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 February 2024
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 24 February 2023
Resolved
Install guards around the rotating machinery (engine and generator) in the port and starboard engine rooms.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2023
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 24 February 2023
Resolved
Properly insulate the hot portion of the exposed exhaust pipe on the port engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2023
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 February 2023
Resolved
Plug the draining valves on 03 fuel filters to prevent fuel leakage.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 February 2023
Resolved
Cover the electrical junction box in the port storage space (#2 compartment).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 February 2023
Resolved
Remove the dead-end wiring in the port lazarette or place the exposed end in a junction box.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2023
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 25 February 2022
Resolved
Vessel's crew did not show proficiency with CPR and First Aid during the man overboard drill or the location of vent closures and fuel shutoff valves during the fire drill. Provide training and conduct drills with all crewmembers.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 March 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 February 2022
Resolved
Vessel had a total of 143 of the 159 required adult life jackets on board. The vessel is limited to a maximum of 143 persons until 16 additional adult life jackets are provided.
Action required: 705 - Other - as specified
Resolved 14 March 2022
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 25 February 2022
Resolved
The upper deck fire hydrant does not have a fire hose attached to it. The fire hose is located in a box approximately 10' from the hydrant. The hydrant is situated in a manner that having a fire hose attached would encumber passenger access on the stairway. Configure fire hydrant in a manner that the fire hose can be attached and not encumber passenger movement.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 March 2022
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 23 February 2021
Resolved
Install guards on the rotating machinery of the port and starboard engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 March 2021
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 23 February 2021
Resolved
Install suitable insulation on the exposed exhaust of the port and starboard engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 March 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 23 February 2021
Resolved
The vessel's Stability Letter dated March 21, 2007 states a maximum of 85 passengers may be carried on the upper deck. Mark the number of passengers permitted in at least 1" letters at the entrance to the deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 March 2021
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 December 2020
Resolved
Grind and renew damaged fiberglass around the port generator exhaust.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 December 2020
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 December 2020
Resolved
Grind and renew damaged fiberglass on the port swim platform ladder mount
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 December 2020
Resolved
Prove proper operation of the port engine room bilge piping crossover valve.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2020
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 December 2020
Resolved
Address leaking fitting in the diesel fuel line located next to the port engine room fuel filters.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2020
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 3 December 2020
Resolved
Prove proper operation of port and starboard engine room ventilation closures.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2020
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 February 2020
Resolved
Repair fixed fire extinguishing system for Port engine room, when system was tested the generator did not shutdown upon activation. Vessel may secure generators starting ability to continue to operate with passengers until system can shutdown all engines that draw intake from space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2020
Resolution: System tested, all sat
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 February 2020
Resolved
Repair replace stern navigation light, vessel restricted to operation during daylight hours.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2020
Resolution: New lights installed
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 February 2020
Resolved
Provide masthead light (225*), vessel over 12 meters cannot use white all around light in lieu of masthead. Vessel is restricted to operation during daylight hours only.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2020
Resolution: New lights installed
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 19 February 2020
Resolved
Provide 06 red hand held flares, orange hand held smoke flames may not substitute red flares. Vessel restricted to daylight operations.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2020
Resolution: Flares onboard
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 19 February 2020
Resolved
Provide original COI (03 pages) and post under glass.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: COI delivered
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 February 2020
Resolved
Provide state registration for vessel
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: Document onboard
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 February 2020
Resolved
Label all ring buoys with vessels full name "SUNSET PARTY CAT"
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: All buoys labeled
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 19 February 2020
Resolved
Clean and remove grease from grease extraction hood in galley and from vent hood on second deck. Excessive grease creates an unnecessary fire hazard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: Hood and fan cleaned
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 19 February 2020
Resolved
Provide manufacture test procedures for installed gas detection system in galley, and test system per instructions in the presence of attending MI.
Action required: 705 - Other - as specified
Resolved 6 March 2020
Resolution: System tested
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 February 2020
Resolved
Port and STBD fuel tank sending units inoperable, repair so that tank levels can be accurately be measured.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 March 2020
Resolution: gauges functioning properly
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 February 2020
Resolved
Arrange cables that supply distribution panel in a manner that protects the crew, wires carrying loads over 50volts shall be in a conduit or position wires in a manner so when they enter the panel the individual wires are not exposed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 March 2020
Resolution: corrected
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 19 February 2020
Resolved
Demonstrate proper closure of all ventilation in galley, vents in aft bulkhead were stuck in the open position.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: all ventaltion properly closes
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 19 February 2020
Resolved
Gas line in galley found disconnected, due to kitchen equipment MI was unable to inspect. Make line available for re-inspection or removed unused gas line.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: Gas line removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 February 2020
Resolved
Properly terminate or permanently remove 120/240 AC supply cable in galley by deep freezer, wire end exposed and unknown if cable is still active.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: cable terminated in junction box
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 February 2020
Resolved
Remove portable cable (extension cord) in galley that supplies deep freezer power. Extend freezer cord or move conduit gang down so that it is usable for freezer.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: circuit extended down 2/3 feet to supply power to receptacle.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 19 February 2020
Resolved
Repair deck rail stanchions on top deck in way of ladder well, stanchions were loose when weight was applied.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: Stanchion bases repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 February 2020
Resolved
Repair electrical receptacle on outside of STBD wheelhouse so that its drip proof
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2020
Resolution: Receptacle secured to bulkhead
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 20 February 2019
Resolved
Post Stability Letter
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 March 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 20 February 2019
Resolved
Post Amended Certificate of Inspection
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 March 2019
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 20 February 2019
Resolved
Provide Waste Management Plan
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 February 2019
Resolved
Ensure port side engine raw water intake valve is grounded
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 February 2019
Resolved
Ensure port and starboard side engine room batteries are covered
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 February 2019
Resolved
Replace non UL listed automatic bilge pumps with UL Listed pumps
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 March 2019
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 20 February 2019
Resolved
Cover machinery for moving parts in starboard engine room
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2019
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 20 February 2019
Resolved
Install case cover for EPIRB
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2019
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 20 February 2019
Resolved
Ensure ship's gear and equipment is seaworthy prior to getting underway. (several items were found to become adrift upon taking light swells and posed a significant safety risk).
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 February 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 February 2019
Resolved
Ensure that fixed bilge system is properly functioning
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 February 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 11 December 2018
Resolved
Replace/repair thru-hull valves on Portside (water slide pickup and generator), valves were seized.
*Prior to Credit Drydock*
Action required: 705 - Other - as specified
Resolved 18 December 2018
Resolution: 02 thru hull valves replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 11 December 2018
Resolved
Grind down to good glass on damaged areas on hull that were indicated by USCG and repair with original glass layup. (04 on STBD transom, 02 STBD aft hull, STBD generator exhaust, 02 Port bow, 02 underside by anchor).
*Prior to Credit Drydock*
Action required: 705 - Other - as specified
Resolved 18 December 2018
Resolution: Hull repaired.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 11 December 2018
Resolved
Hydrostaticly test both Port and STBD Fireboy cylinders or replace in kind (700 cubic feet coverage), both cylinders manufactured in Jun2006.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 December 2018
Resolution: New cylinders installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 11 December 2018
Resolved
Make all watertight bulkheads watertight, penetrations for wire runs are not sealed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2018
Resolution: All penetrations watertight.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 11 December 2018
Resolved
Properly affix EPIRB floatfree housing, missing screws.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 December 2018
Resolution: EPIRB attached properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 December 2018
Resolved
Reconnect/replace bonding wires in STBD engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 December 2018
Resolution: Bonding replaced/reconnected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 December 2018
Resolved
Repair/remove PVC venting in engine rooms, PVC tube is cracked.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 December 2018
Resolution: Venting removed/capped.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 20 September 2018
Resolved
Survival craft must be stowed in a way that any protective covers will not interfere with launching and embarkation. Remove 4ft by 8ft fiberglass cover standing 4 feet tall that is covering Lifefloats on 2nd deck, cover restricts a float-free arrangement and inhibits launching of lifefloats.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 September 2018
Resolution: Cover was removed and COI route amended to 3nm.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 20 September 2018
Resolved
Remove fiberglass cover/table on 2nd deck. Or permanently secure to deck to prevent it from moving and provide deck space calculations for current approved stability letter allowing for carriage of 85 passengers on 2nd deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 November 2018
Resolution: Enclosure secured at base.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 22 February 2018
Resolved
Properly secure fryer to prevent shifting. Vessel restricted from using fryer.
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 23 February 2018
Resolution: Vessel secured fryer to deck.
Electrical › Electrical Distribution System (service) › Shore Connection Box
Issued 22 February 2018
Resolved
Install port shore tie conductors to junction box in conduit.
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 1 March 2018
Resolution: Installed conductors in conduit.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 22 February 2018
Resolved
Provided updated navigation publications.
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 1 March 2018
Resolution: Provided publications for vessel's area of operation.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 22 February 2018
Resolved
Renew broken circuit breakers on switchboard.
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 23 February 2018
Resolution: Renewed all broken circuit breakers.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 27 February 2017
Resolved
Properly install all electrical cables into junction boxes. Following locations: Cook-top, port and starboard shore-power breaker panels, exhaust fan for galley.
Action required: 705 - Other - as specified
Due 14 March 2017
Resolved 13 March 2017
Resolution: Exposed wires covered in conduit.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 27 February 2017
Resolved
Install guards on all lighting fixtures
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 24 March 2017
Resolution: Guards installed
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 27 February 2017
Resolved
Install drip proof cover on receptacle behind galley fryer.
Action required: 705 - Other - as specified
Due 6 March 2017
Resolved 27 February 2017
Resolution: Drip proof cover installed on receptacle.
Accommodation/Occupational Safety › Cooking Systems › Cooking Fuel
Issued 27 February 2017
Resolved
Demonstrate proper operation of propane solenoid valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2017
Resolution: Proper operation observed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 February 2017
Resolved
Remove extension cord for freezer.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 6 March 2017
Resolution: Extension cord removed.
Stability › Watertight Integrity › General
Issued 27 February 2017
Resolved
Renew gaskets on watertight hatches for port and STBD lazerret spaces.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 6 March 2017
Resolution: New gaskets installed.
Fire Fighting › Structural - Horizontal Zones › General
Issued 27 February 2017
Resolved
Install non-combustible insulation on engine room hatches.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 24 March 2017
Resolution: Insulation installed
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 February 2017
Resolved
Remove deadened cables in galley.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 6 March 2017
Resolution: Cables removed/covered.
Lifesaving › Lifefloat › Serviceable
Issued 27 February 2017
Resolved
Make repairs to identified life floats, 22 person and 15 person.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 6 March 2017
Resolution: Life floats repaired and painted.
Lifesaving › Lifefloat › Float Free
Issued 27 February 2017
Resolved
Provide separation between staked life-floats on 2nd deck.
Action required: 705 - Other - as specified
Due 6 March 2017
Resolved 6 March 2017
Resolution: Foam inserts between stacked life floats inserted.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 27 February 2017
Resolved
Secure receptacle to bulkhead on port exterior side of pilot house.
Action required: 705 - Other - as specified
Due 6 March 2017
Resolved 6 March 2017
Resolution: Receptacle secured with watertight enclosure.
Electrical › Electric Supply System (service) › Battery Charger
Issued 27 February 2017
Resolved
Remove temporary battery charger from under console.
Action required: 705 - Other - as specified
Due 13 March 2017
Resolved 13 March 2017
Resolution: Battery charger secured and mounted.
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 27 February 2017
Resolved
Renew auto fuses with cartridge type fuses. Will provide plans in originally approved make not needed to renew when failed.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 14 March 2017
Resolution: Electrical fuses panel replaced with cartridge type fuses.
Fire Fighting › Remote Fuel Shutoff › General
Issued 27 February 2017
Resolved
Repair fuel shutoff valve on starboard side.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2017
Resolution: Fuel shutoff valve repaired.
Communications › Radio Communications › VHF Radiotelephone
Issued 27 February 2017
Resolved
Provide GPS input in VHF radio.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 5 April 2017
Resolution: GPS input provide for VHF.
Navigation › Collision/Grounding Avoidance › Radar
Issued 27 February 2017
Resolved
Demonstrate proper operation of radar.
Action required: 705 - Other - as specified
Due 27 March 2017
Resolved 15 May 2017
Resolution: Received picture of operational radar.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 27 February 2017
Resolved
Properly secure galley fryer.
Action required: 705 - Other - as specified
Due 6 March 2017
Resolved 6 March 2017
Resolution: Galley fryer secured to deck.
Construction/Loadline › Hull › Bottom Plating
Issued 30 November 2016
Resolved
Repair hull in way of CG marked areas
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Gel coat renewed in way of all marked areas.
Engineering › Fuel Oil Service System › Tank
Issued 30 November 2016
Resolved
Make repairs to port fuel tank and pressure test
Action required: 705 - Other - as specified
Resolved 20 December 2016
Stability › Watertight Integrity › General
Issued 30 November 2016
Resolved
Install metallic through bulkhead fitting and metallic valves on nonmetallic piping that penetrates watertight bulkheads
Action required: 705 - Other - as specified
Resolved 16 December 2016
Resolution: Renewed nonmetallic piping with metallic
Engineering › Bilge Water Management System › Strainer
Issued 30 November 2016
Resolved
Install missing strainers on all bilge suctions
Action required: 705 - Other - as specified
Resolved 20 December 2016
Resolution: Installed strainers
Electrical › Electric Supply System (service) › Cable
Issued 30 November 2016
Resolved
Properly install cables into potable water pump and hot water heater
Action required: 705 - Other - as specified
Resolved 20 December 2016
Resolution: Installed cables into junction boxes.
Communications › Radio Communications › VHF Radiotelephone
Issued 19 February 2016
Resolved
Provide a marine radio operators permit. 47 CFR 80.905
Due 19 March 2016
Resolved 3 March 2016
Resolution: Vessel's Captain provided a valid marine radio operator's permit.
Lifesaving › Lifefloat › Float-free Link
Issued 19 February 2016
Resolved
Install a proper capacity float-free link to connect lifefloats to vessel prior to operating beyond 3 miles from land.
Due 19 March 2016
Resolved 3 March 2016
Resolution: Vessel installed a 22+ capacity float-free link. Total lifefloat capacity tied to the painter is 22+.
Communications › Radio Communications › VHF Radiotelephone
Issued 19 February 2016
Resolved
Program digital select calling VHF radio with MMSI # on FCC SSL.
Due 19 March 2016
Resolved 3 March 2016
Resolution: Vessel programmed MMSI # 367161110 into VHF radio.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 19 February 2016
Resolved
Provide 159 total Typ I adult lifejackets (two additional) prior to carrying more tha 157 total persons.
Action required: 705 - Other - as specified
Resolved 3 March 2016
Resolution: Vessel provided 159 total Type I adult lifejackets.