Inspection history · 39
21 May 2026
Annual Inspection · MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8378351
14 March 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8094891
23 May 2024
MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7917634
1 February 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7630253
3 May 2022
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7442955
14 February 2022
COI Inspection · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7396202
4 December 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7362335
11 March 2021
MTSA Verification · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7154994
5 March 2020
Annual Inspection · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6930078
7 June 2019
MTSA Verification · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6718959
29 May 2018
Annual Inspection · MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6427382
24 May 2017
Bulk Liquid Transfer Monitor
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6160309
4 May 2017
Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6188383
3 April 2017
Drydock Extension
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6116808
9 March 2017
MTSA Verification · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6099605
6 July 2016
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5931329
2 May 2016
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5867393
22 February 2016
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5819732
23 April 2015
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5109408
25 March 2015
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5090211
17 June 2014
Annual Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4883893
11 March 2014
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4816182
10 March 2014
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4814617
12 September 2013
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4713377
4 June 2013
Annual Inspection · MTSA Verification · VRP Review
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4610550
7 June 2012
Hull Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4342859
6 April 2012
Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4272244
15 June 2011
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4045293
14 June 2011
MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4040380
25 May 2010
Examination of Repairs
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3748311
11 May 2010
Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3735629
2 April 2010
Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3707081
17 June 2009
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3506505
15 January 2009
Deficiency Check · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3398347
27 March 2008
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3172197
11 May 2007
Administrative Inspection · Load Line/Change of Employment
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2927668
22 March 2007
Initial Certification · MTSA Verification · Hull Examination · Initial Construction-Excluding Oversight · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2937053
21 November 2006
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2826044
16 October 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2801605
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 23 May 2024
Resolved
oil or hazardous material from each container or enclosed deck area without discharging the oil or hazardous material into the water; and
(3) A mechanical means of closing each drain and scupper in the container or enclosed deck area required by this section. MI found the forward containment full with inoperable valves. Replace valves and empty conatianment. Replace valves and clean containment area.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2024
Resolved 21 June 2024
Resolution: Attended vessel and observed def rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 May 2024
Resolved
The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations. MI found unapproved Inverter and High Out put alternator installed on the #1 cargo pump prime mover. MI witnessed the removal of the inverter from the ship.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 23 May 2024
Resolved 23 May 2024
Resolution: MI witnessed the removal of the inverter from the ship.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 May 2024
Resolved
Each moderate battery installation must be in a boxsuch as an engineroom, storeroom, or similar space. MI found batteries sitiing on deck and not in a battery box.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2024
Resolved 21 June 2024
Resolution: Attended vessel and observed rectified defs.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 17 June 2014
Resolved
Provide double clamps on hoses of vital systems throughout vessel engines. Replace chaffed hydraulic hose on bow thrusters.
Condition: Improper/Lack of Maintenance
Due 1 July 2014
Resolved 19 June 2014
Engineering › Diesel Engine (auxiliary) › Bedplate
Issued 17 June 2014
Resolved
Repair/Renew port cargo pump engine guard bracket.
Condition: Improper/Lack of Maintenance
Due 1 July 2014
Resolved 19 June 2014
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 17 June 2014
Resolved
Prove proper operation of port navigation light.
Condition: Improper Installation
Due 1 July 2014
Resolved 17 June 2014
Deck/Cargo › Cargo Stowage › General
Issued 17 June 2014
Resolved
Renew damaged gasket along #3 cargo tank ullage opening.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2014
Construction/Loadline › Hull › Double Hull
Issued 11 March 2014
Resolved
Make proper repairs IWO #6 starboard void side shell, transverse frame, and lonitudinals.
Action required: 703 - Prior to bunkering operations
Resolved 14 March 2014
Resolution: Examined repairs and conducted NDT of side shell welds, all sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 6 April 2012
Resolved
ALL PV VALVES MUST BE BENCH TESTED.
Due 6 May 2012
Resolved 4 June 2012
Resolution: Received Test Cert
Construction/Loadline › Structures › Rake
Issued 6 April 2012
Resolved
INSTALL A ACCESS LADDER IN THE FWD RAKE FOR ACCESS TO CONDUCT ISE OF THE HEADLOG AND FRAME 1. THE LADDER IS REQUIRED TO BE COMPLETED BY 15 JUN 2014 OR AT NEXT DRYDOCK FOR CAUSE.
Due 15 June 2014
Resolved 8 August 2012
Documentation › Markings/Placards › Warning Signs
Issued 6 April 2012
Resolved
WARNING SIGN MUST BE RENEWED OR REPLACED.
Due 6 May 2012
Resolved 8 August 2012
Resolution: Conversation with vessel rep.
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2010
Resolved
Crop and renew to original scantling from 6 inches forward of FR. 25 aft 14 ft. 6 in., the shear strake, by 92-1/2 inches high in way of STBD Void #5.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 July 2010
Resolved 4 June 2010
Resolution: Renewal as directed.
Construction/Loadline › Hull › Stiffener
Issued 11 May 2010
Resolved
In STBD Void #5, crop and renew the horizontal flat plate stiffeners, 34 in. x 6 in. x 3/8 in., in way of FR. 25.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 July 2010
Resolved 4 June 2010
Resolution: Renewed as required.
Construction/Loadline › Hull › Stiffener
Issued 11 May 2010
Resolved
In STBD Void #5, crop and renew the horizontal side shell stiffeners #3, 4, 5 and 6 from FR. 25 aft 14 feet to FR. 27. The stiffeners are to be 4 in. x 3 in. x 5/16 in. minimum.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 July 2010
Resolved 4 June 2010
Resolution: Renewed as required.
Construction/Loadline › Hull › Bracket
Issued 11 May 2010
Resolved
In STBD Void #5, crop and renew FR. 26 truss to original scantling.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 July 2010
Resolved 4 June 2010
Resolution: Renewed as required.
Construction/Loadline › Hull › Transverse Frame
Issued 11 May 2010
Resolved
In STBD Void #5, in way of FR. 26, crop and renew the outboard 40 in. x 28 in. x 3/8 in. section of the transverse frame.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 July 2010
Resolved 4 June 2010
Resolution: Renewed as required.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 June 2009
Resolved
Install a personnel guard in way of the bow thruster drive shaft, or, provide signage outside the Bow Thruster Void that reads NO ENTRY PERMITTED WHEN BOW THRUSTER IS IN USE.
Condition: Unknown
Due 18 August 2009
Resolved 17 June 2009
Resolution: Signage applied.
Engineering › Bilge Water Management System › Piping
Issued 17 June 2009
Resolved
Remove the PVC bilge piping and the electric submersible bilge pump from the Bow Thruster Void.
Condition: Improper Installation
Due 30 June 2009
Resolved 17 June 2009
Resolution: PVC piping and pump removed.
Construction/Loadline › Hull › Hull Plating
Issued 15 January 2009
Resolved
Crop and renew the port side slope sheet in way of FR. 2 and the side shell. Insert plate to be 12 inches aft of FR. 2 to 24 inches forward of FR. 2. The plate width to be 18 inches starting at the sideshell / slope sheet butt weld. Plate thickness to be not less than 1/2 inch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2009
Resolution: Insert satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 15 January 2009
Resolved
Crop and renew the port side , FR. 3, vertical stiffeners #3 and #4, from the bottom shell 6 in. x 4 in. x 3/8 in. x 32 in.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2009
Resolution: Insert satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 15 January 2009
Resolved
Crop and renew the port side, FR. 3, bottom longs #3 and #4, from FR. 3 5 in. x 3 in. x 1/4 in. x 36 in. and the associated triangular bracket.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2009
Resolution: Insert satisfactory.